Sand Control. Consequences of Sand Production

Similar documents
Drilling Problems. pull

Perforating Basics. How the perforating processes work. George E. King Engineering GEKEngineering.com 3/14/2009 1

The Impact Of Cementing On Proper Well Control

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

An Introduction to Oil and Gas Well Servicing

Plug and Abandonment Forum

UNDER DRAINAGE AND FILTER DESIGN

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

Tax Executives Institute

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS

Remediation Services & Technology

C O M P L E T I O N S E R V I C E S

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Dávid Szabó*, Ján Pinka*, ¼uboš Fedorko** UGS WELLS IN DEPLETED FIELDS

Step Rate Testing: Determining Fracture Pressure for Injection Wells 2016 UNDERGROUND INJECTION CONTROL CONFERENCE DENVER, CO LEWIS WANDKE, PE

Acta Montanistica Slovaca, vol. 11 (2006), special issue 1, pages A selection method of the horizontal wells completion

CHAPTER 4 WELL COMPLETION AND MAINTENANCE

Introduction: Overview of Soil Mechanics

Best Practice for Stand-alone Screens

Selection and Determination of Tubing and Production Casing Sizes

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

Fiberstars Mini Lighted Laminar Flow Fountains

DecisionSpace Well Engineering Software

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

Flow Assurance & Operability

Solving challenges. Drill out solutions Package

Formation Damage Effects and Overview

WELL DEVELOPMENT COMPARING SEVERAL METHODS OF WELL

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

1.72, Groundwater Hydrology Prof. Charles Harvey Lecture Packet #2: Aquifers, Porosity, and Darcy s Law. Lake (Exposed Water Table)

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons.

Graduate Courses in Petroleum Engineering

Drilling, Completion & Well Intervention and its relation to Geology

Introduction of Gravel Pack with Inflow Control Completion in Brazil

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Mud logging, also known as hydrocarbon well logging, is the creation of a detailed record (well

KWANG SING ENGINEERING PTE LTD

Recommended Practices Associated with Hydraulic Fracturing Operations

Diagnostic Fracture Injection Tests (DFIT ) in Ultra Low Permeability Formations

Dr Amjad Aliewi House of Water and Environment Website:

HDD High Definition Data. defining a new standard for Open Hole, Cased Hole & Production Logging

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

SECTION PRECAST CONCRETE STRUCTURES

FLOWBACK & PRODUCTION TESTING SERVICES

BRAZED PLATE INSTALLATION MANUAL

MUDSOLV NG. Integrated filter-cake removal service for optimizing performance of open-hole completions

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

Standard Hydraulic Piping Flushing Procedure

Acidizing Causes of Failures

Drilling Fluids, Inc. Brine Fluids

Understanding Porosity and Permeability using High-Pressure MICP Data: Insights into Hydrocarbon Recovery*

APPLICATIONS OF REAL-TIME WELL MONITORING SYSTEMS

Flow Measurement Options for Pipeline and Open Channel Flow

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well

Innovation and Progress in Water Treatment Technology

Removing Solids with Automatic Self-Cleaning Filters

DIRECT PUSH DRILLING.

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

Lab 1 Concrete Proportioning, Mixing, and Testing

Soil Mechanics. Soil Mechanics

Drainage Solutions and Water Treatment / Single-wall corrugated drainage tubing is ideal for agricultural and. Durable Economical Wide range of sizes

NORSOK Standard D-010 Rev. 4, August 2012

FIBER-OPTIC SENSING TECHNOLOGIES

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions

Understanding Well Construction and Surface Footprint

The University of Toledo Soil Mechanics Laboratory

DIRECTIONAL DRILLING

E-Line and Braided Line. E-Line Open Hole wireline

Introduction: Basic Well Completion Concepts

Sample Career Ladder/Lattice for Energy (Petroleum Sector)

Cooling Tower Sidestream Filtration A Green, Proven Cost Reduction Technology

Energize your mind. April Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones

RMF TANDEM 900 OFF-LINE FILTER SYSTEMS

Understanding Hydraulic Fracturing

Specifications For Rehabilitation Hudson #1A Hudson #2 Foster Island Well #41

RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT

UNIVERSITY OF CHICAGO ELEVATOR PIT LEAK REPAIR

Fracture Technologies 9. Frac Candidate Selection

Directive 059: Well Drilling and Completion Data Filing Requirements

Liquid Applied Internal Flow Coatings for Oil Transmission Lines

Watershed Works Manual

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

STANDARD SPECIFICATIONS SECTION CLEANING AND LINING WATER MAINS

PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

Enhanced Coring Services. Acquisition and preservation

DESIGN, TESTING, AND OPERATING EXPERIENCE OF A SALTWATER DISPOSAL SYSTEM OIL-WATER SEPARATOR

Asbestos in your home

SECTION 10 WATER WELL SUPPLY SCOPE OF WORK

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

Special Linings for unusual service conditions. Please contact ACIPCO.

Chapter 3: Separating Mixtures (pg )

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

FORMATION DAMAGE AND WELL TREATMENT SYSTEM

Transcription:

Sand Control Marine deposited sands, most oil and gas reservoir sands, are often cemented with calcareous or siliceous minerals and may be strongly consolidated. In contrast, Miocene or younger sands are often unconsolidated or only partially consolidated with soft clay or silt and are structurally weak. These weak formations may not restrain grain movement, and produce sand along with the fluids especially at high rates. Fluid movement causes stresses on the sand grains because of the fluid pressure differences, fluid friction and overburden pressures. If these stresses exceed the formation-restraining forces, then the sand will move and be produced. Rapid changes in flow rates and fluid properties cause unstable conditions which can result in increased sand production. It has been shown that particle movement occurs in multiphase flow when the wetting fluid starts to move (Mueckle). Consequences of Sand Production Production interruptions can be caused by sand plugging the casing, tubing, flowlines and separators. Casing collapse can be caused by changes in overburden pressures and stresses in the formation. Downhole and surface equipment can be destroyed, downtime and replacement costs, spills and in extreme cases a blowout. Disposal of produced sands is costly. Methods of Sand Control Restricting the production rate of the well. This reduces the drag forces on the sand grains. This is often an uneconomical solution. Increasing the number and diameter of the perforations also reduces the flow velocity and drawdown pressures. Gravel packing is the oldest and simplest method of sand control. Works in both on and off shore wells. Sand consolidation; resins are injected into the formation binding the grains of sand while leaving pore spaces open.

Resin coated gravel packs; gravel coated with resin is placed in the casing and perforations. The resin binds the grains together which results in a strong but permeable filter. The excess is drilled out of the casing so the well is produced with a full opening wellbore. This can be used with or without a screen, can be placed using coiled tubing. The method of sand control will depend on such parameters as grain-size distribution, clay content, interval length, well deviation, flow rate and of course costs. Procedures in designing gravel packs Type of completion; cased or open hole. Formation sampling, it is very important to know the sand grain size distribution in the formation. The best samples are obtained using a rubber sleeved core barrel. Sidewall cores are the next best technique for getting

samples. Bailed or separator samples should not be used, being small grained biased. Best case a full formation analysis should be run, this would include acid solubility, clay content, fines. Gravel Selection; the gravel should be sized to prevent the invasion of the pack by the finest of the formation sand but not reduce the flow of fluids. Quality control of the gravel is important. The amount of particles that are smaller than the specified range can affect the permeability of the pack. To size the gravel a sieve test is run on the formation sample, the results are plotted on semi log paper, grain diameter vs. cumulative percent by weight. This should form a s shaped curve. The mean diameter size of the gravel is: D = g ( 5or6) D f 50 D g is the mean diameter of the gravel, D f50 is the diameter of the formation grains at the 50% weight. Screen selection; there are many types of wire wrapped screens available. The wrapping wire is usually made of 304 stainless steel, while the pipe core is Pipe Grade S or K. For gravel packing the gauge of the screen should be small enough to prevent the passage of the gravel sand. Installing Gravel Packs Well preparation; The tubing should be as clean as possible to prevent contamination of the pack. The completion fluids also should be as can as possible, no solids floating around, silt or organic. If a cased hole completion the cement bond should be checked, very important to have a good bond to control the placement on the pack. The perforation tunnels must be opened for good placement of the pack. The number and size of perforation is also important. The more the better, and the larger the better, this helps keep the fluid flow laminar, lower pressure drop. Any clay problems should be resolved before the placement of the gravel pack. The gravel is pumped down the well in a viscous fluid similar to frac fluids. A breaker is included just like frac gels, to break down the fluid after the placement to facilitate clean up.

Placement of Gravel Pack One method of placement is the reverse circulation method. The gel and gravel is pumped down the annulus of the well after the screen has been placed on bottom. The carrier fluid then passes into the formation and through the screen and is returned to the surface up the tubing. The major disadvantage with this method is the possibility of pumping debris down with the pack. The crossover method is a much cleaner method with less chance of contamination the pack while placing the gravel. The gel and gravel is pumped down the tubing, crossover to the screen annulus below a packer. The carrier fluid then passes through the screen and is returned to the surface in the tubing casing annulus. Both these methods are used in open and cased holes. Another method in cased holes is the wash down method. In this method the gravel is placed across the interval before the screen. Then the screen is washed down to its final position.