Ready to realise your vision



Similar documents
Conoship News. Periodical Newsletter Thinking towards new opportunities

Periodical Newsletter

OFFSHORE WIND Peter Robert

Emission support system for calculation of energy demand and emissions of ships. Hans Otto Kristensen

SIMON STEVIN. 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2

Trends in the Development of Container Vessels

Azimuth thrusters. propulsors

Dry Bulk Carriers Vessel: Bulk Americas

COMPUTER MODEL TIL BEREGNING AF EEDI OG RØGGASEMISSIONER FOR FORSKELLIGE SKIBSTYPER

Design and Operation of Fuel Efficient Ships. Jan de Kat Director, Energy Efficiency Operational and Environmental Performance Copenhagen

THE NEXT REVOLT 18 BATTERY COASTAL TRAFFIC REVOLT IN BRIEF

New Ferries for Gedser - Rostock. Development of a transport concept GR12. Ferry Conference in Copenhagen 22 nd November 2010

FKAB is and has been an independent marine consultancy since 1961, this makes us an innovative and reliable partner for the Marine and Shipbuilding

GAS FLAWLESS - FORM C

MERIAURA LTD >YOUR EXPERT IN MARINE TRANSPORTATION

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

Fatal fall overboard during loading operations M/V Azoresborg, Bilbao, Spain

Stena S ,200 DWT Product/Chemical Tanker CONQUEST CONQUEROR CONCORD CONCEPT CONSUL CONTEST

Cleaning and painting work. Electrical work. Pipe-fitting work. Mechanical work. Others. Steelwork

How To Optimise A Boat'S Hull

GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011

Safe carriage of oil in extreme environments

ANNEX 10. RESOLUTION MEPC.214(63) Adopted on 2 March GUIDELINES ON SURVEY AND CERTIFICATION OF THE ENERGY EFFICIENCY DESIGN INDEX (EEDI)

Multipurpose Offshore Construction Vessel

Laws and price drive interest in LNG as marine fuel

lng conversion (General)

Part 0 - Classification and Surveys Classification and Surveys I

How To Develop A Waterborne

CH-01.qxd 4~6~04 11:22 AM Page 1. Part 1 Ship Design

Grain Capacity: No Hold name Hold C.B.M. ULUSOY-11

Floating. Diesel power stations

Viking Grace 20 months' experience of Ship to Ship LNG bunkering

Retrofit Opportunities for Existing Fleet

SURVEY and CERTIFICATION RULES on ENERGY EFFICIENCY of SHIPS (MARPOL 73/78 ANNEX VI, CHAPTER 4) SEPTEMBER 2015

M/V TAMARITA/FERMITA/ ROSITA/FAVORITA

Module Title: General Ship Knowledge

> Capital Markets Day 2011

How To Design A Semidisplacement Yacht

The influence of ship operational parameters on fuel consumption

No Limit, no limits. Constant inspiration to m ake plans...

Documentation o 2D Drawings o 3D Structural Model o Instruction books and manuals. Page 1 / 17

How To Reduce Energy Efficiency On Ships

Fot. Kacper Kowalski/aeromedia.pl

U l t i m a t e e f f i c i e n c y D re D ging

il Castorone la più avanzata nave posatubi al mondo: acquisti e logistica Paolo Daleffe Armando Favi

skirt Appendix A Mechanical Containment and Cleanup Technologies Containment Booms

The Effects of Length on the Powering of Large Slender Hull Forms

maersksupplyservice.com S-TYPE ANCHOR HANDLING TUG SUPPLY VESSEL Visit our web site at: maersksupplyservice.com

MAN Diesel & Turbo. Frederik Carstens Head of Offshore Sales Marine Medium Speed. Frederik Carstens & Karsten Borneman

Propulsion Trends in LNG Carriers

DCI Dredge XIX. Fair Winds. Ballast Squeeze COMPLEX INSIDES COMPOSITE CONSUMMATE BEAT THE BOTTLENECK. SBI 2012 volume 6 ISSue 6

Waterjets. propulsors. courtesy of Austal

Advantages of our solution

KNUD E. HANSEN A/S. Design of Wind Turbine Installation Vessel Pacific Orca for Swire Blue Ocean

MV EVITA. VS 485 PSV MK II - Platform Supply Vessel. Ugland Supplier AS OFFICE ADDRESS:

Key Technologies of Mitsubishi LNG Carriers - Present and Future -

Green Ship of the Future

SUMMARY REPORT. December 2014

Technology guidelines for efficient design and operation of ship propulsors by Teus van Beek, Propulsor Technology, Wärtsilä Propulsion Netherlands BV

NavDP4000 Series Dynamic Positioning Systems

products 22 º C Ventilation Air Conditioning Refrigeration Energy & Cost Saving Products Inside PROVIDED BY HEINEN & HOPMAN

Onboard-NAPA News. Jan Schauman, Onboard-Napa Ltd

DEME-QHSES-DOC-031 ENERGY MANAGEMENT ACTION PLAN. Uncontrolled if printed. Most recent version is available on the DEME website.

Container design and types

VESSEL S TECHNICAL SPECIFICATION

SURVEY and CERTIFICATION RULES on ENERGY EFFICIENCY of SHIPS (MARPOL 73/78 ANNEX VI, CHAPTER 4)

Boskalis: at home in the Middle East

GL Generell IACS/Rules/Conventions Neubau Beschichtung/Korrosion

VS 485 CD. Siem Meling Offshore Da Karmsund Maritim Services AS, Karmøy, Norway Built IMO No DNV No

Basic terms deck engine room propeller shaft bow thruster rudder bulbous bow hold

Design methodology and numerical analysis of a cable ferry

Construction of»coral Energy«at Meyer s Neptun facilities in Rostock

Statistical Summary Marine Occurrences 2013

from the DrAwinG BoArD to A finished flagship Hamburg Hapag-Lloyd AG ExprEss

Performance Monitoring and Analysis for Operational Improvements

EEDI. Energy Efficiency Design Index

Meyer Turku Shipyard. Vard Group Aalto Passenger Ship Architecture Creativity in Ship Design. Kai Levander SeaKey Naval Architecture

M/Y NAIA RV PEGASO. (ex. PEGASO) Isle of Man CLASSIFICATION: 14 knots (cruising) 3516C 2350 KW ( Total 4700 KW) GUESTS: 12 in 6 CONSTRUCTION:

NAVAL ARCHITECTURE, OCEAN AND MARINE ENGINEERING

Trends of the Shipbuilding sector in Europe (based on the Polish example)

ARRANGEMENT. Main deck. Below main deck. Below tween deck. Slop. Mud. Fuel oil (FO) Base oil (BO) Fresh water (FW) Drill water (DW) Met BRIZ

Carbon Footprint of Refrigerated Goods Transportation

Personal injury accident on the MV KATRINE KROG on 17 September 2007 at Rüsterbergen pilot station

Energy Efficiency of Ships: what are we talking about?

Contents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8

Ship Structure Committee Case Study. BULK CARRIERS: Design, Operation, and Maintenance Concerns for Structural Safety of Bulk Carriers

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

REPORT Dry cargo ship STEEL QUEEN - PBDM grounding on 20 March 2005

IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request.

Press Release. PIRIOU launches the ALMAK, a Maritime Training Vessel of 44 meters

The Dalian Developer A new approach to oil spill response

The current business context and future role of LNG in Europe. Ulco Vermeulen Executive Director Participations and Business Development

Vessels reporting duties on the NSR

E- LASS results : (EU Martec ULIVES project ) Old Facts became Myths in Arctic Inland Navigation Shipdesign

EMISSIONS FROM MARINE ENGINES VERSUS IMO CERTIFICATION AND REQUIREMENTS OF TIER 3

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

Why a torque measuring system?

Transcription:

Conoship News Periodical Newsletter - 2013 1 Ready to realise your vision Lady Anna: EEDI-champion Comfortable seakeeping Oceanic: M 2 Runner

Best wishes and a prosperous 2013! ConoDuctTail Sea River Liner 3700: Energy Effici The Conoship Design Team is looking forward to 2013 and is ready to realise your visions. In this edition of the Conoship Newsletter you will find a selection of recently delivered innovative ships, each originated from a vision of one of our creative clients, resulting in a challenging set of design requirements. We are happy and proud to support them- and you - to find new opportunities for today s and future markets. READY TO REALISE YOUR VISION Innovative designs that realise the visions of shipowners on new opportunities in their (niche) markets, are the main theme of this Conoship News. The earlier research program for aft ship development led to the new ConoDuctTail, reducing fuel consumption and emissions based on maximum propulsive efficiency, as described in the first article. Application of the ConoDuctTail in the new River- Sea-Vessels for Wijnne Barends results in an EEDI-Champion thanks to surprisingly limited fuel consumption. Another innovative concept is the Hartman M 2 Runner, developed in close cooperation with the Hartman Marine Group, supporting their creative vision on transport logistics of project cargo for the wind farm industry. The first vessel of the series, MV Oceanic is very successful in her niche market. The first Pilot Station Vessel, the Polaris was successfully delivered by Barkmeijer Shipyards, turning the visions of a large number of wellexperienced Pilots into reality. The motional behavior of the Conoship hull design proved to be very good. This experience provides a good basis for all kinds of new designs for offshore support operations. In the field of dredging, the various dredging specialists have their own vision on the optimal design of a Trailing Suction Hopper Dredger (TSHD). Conoship supported amongst others the following parties to realise their vision: - The 2125 m 3 TSHD Contender was delivered to ABEKO last year, a very versatile dredger, being a conversion of a former Conoship general cargo vessel; - After the good performance of the 4500 m 3 TSHD Shoalway, Boskalis ordered three more sister vessels further optimized in close cooperation with D.W. den Herder Maritiem BV; - For Bijlsma Shipyard we developed the SmartDredge3500 in close cooperation with DredgeVision: a modular dredging equipment package, with hull lines for which existing steel hulls can be applied, reducing building time to less than a year. We hope that the presented visions and designs may inspire you to find new opportunities in your existing or new markets, both for new designs or the conversion of existing vessels. We are looking forward to meet you and wish you good luck in the new year. Guus van der Bles ConoDuctTail for maximum propulsive efficiency Optimal wake-field of ConoDuctTail

ent Champion of Short Sea Shipping Design description: 3700 TDW Sea River Liner Vessels names: MV Lady Anna / Lady Anneke / Lady Alexandra / Lady Amalia Wijnne Barends, Delfzijl, The Netherlands Groningen Shipyard BV, Waterhuizen, The Netherlands MV Lady Amalia with ConoDuctTail : EEDIchampion in her DWT-class with an Attained Energy Efficiency Design Index of 11.3, only 62% of the maximum allowable value! In practice a daily fuel consumption of less than 3 ton/24h is reported, carrying 3000 3500 ton cargo at a service speed of abt. 10 kn. Conoship developed the ConoDuctTail to improve the energy efficiency of Short Sea Ships. The propulsive efficiency of the ConoDuctTail is maximized for actual (rather low) speeds of abt. 10 to 12 kn, by optimizing an aft ship shape with a duct, a nozzle and a propeller with a large diameter. Application in the MV Lady Anna of 3700 tdw shows a fuel consumption at 10 kn of abt. 3 ton per day: a reduction of up to 50% on emissions and fuel consumption compared to older existing vessels of same size! Last few years, numerous innovative bow forms emerged which claim to substantially improve the efficiency and reduce the fuel consumption. They show characteristic hull shapes above the waterline that at least function as marketing tools for the designs and have positive effects in heavy seaway. At Conoship however, we were convinced that the largest energy efficiency gains could be found in a vessel s aft ship, so we started an extensive research program in cooperation with MARIN, SasTech and Delft University of Technology. The analysis also included numerous discussions with ship-owners and captain-owners regarding the merits and disadvantages of various aft ship hull shapes. Development of the ConoDuctTail-concept With the use of extensive CFD calculations, performed in close cooperation with specialists SasTech and Van Oossanen, an aft ship hullform was developed which incorporates an integrated nozzle and a ducted-tunnel shape in order to maximize the propeller diameter. Numerous CFD iterations supported an integral optimization of tunnel lines, nozzle design, resulting wakefield and propeller design, leading to the optimal combination of low resistance and best propulsive efficiency: the ConoDuctTail. The optimized ducted-tunnel design reached 17% less resistance compared to a conventional tunnel aft ship hull shape. The tunnel design provides an optimal wakefield and the possibility to incorporate a nozzle and a larger propeller diameter (up to 25% larger). This results in quite an increase in propulsive efficiency and a considerable reduction of fuel consumption and emissions. Practical Application of ConoDuctTail: MV Lady Anna + sister vessels The performance of the first practical application of the ConoDuctTail in a series of 3700 dwt Sea/River vessels is very successful according to the owner Wijnne Barends. While the main dimensions of these vessels (Lpp=84.98 m, B=13.35 m, D=7.05 m) are comparable to those of other Sea/ River liners, the 748 kw installed power is often 20 to 50% lower! On the design draft of 4.30 m, these vessels carry 3000 tdw and reach a trial speed of 10.8 kn at 748 kw MCR. In practice they sail at an average service speed of abt. 10 kn in regular weather, with less than 3,0 ton fuel per day, carrying 3000 to 3500 ton cargo. Consumption figures of around 2.7 ton per day (!) have been reported by Wijnne Barends, by careful consideration of the actual required speed/power at each part of the trip. Also in adverse weather conditions the ConoDuctTail fulfils the expectations of Wijnne Barends: the combination of nozzle and tunnel enables good sustaining propeller thrust in heavy seaway. Four vessels of this successful series were built at Groningen Shipyard and the design was elaborated in collaboration with Groot Ship Design who optimized steelweight and general arrangement while Conoship focussed on optimization of hull lines and speed/ power. Conoship s mission: improving econology The ConoDuctTail enables optimization of both economy and ecology, considered by us as the best way to improve the econology of our designs. Application in the Lady Anna series leads to the EEDI-Champion in this DWT-class! New econologic designs are under development, combining ConoDuctTail design with new ConoSeaBowdevelopments, incorporating an LNG installation for propulsion fuel, enabling Conoships drive for continuous improvement of the energy efficiency of the Short Sea Shipping sector.

PSV Polaris, first of three Pilot Station Vessels, christened by Queen Beatrix Design description: Pilot Station Vessel Vessel name: PSV POLARIS Dutch Pilot Association, Hoek van Holland, The Netherlands Barkmeijer Shipyards, Stroobos, The Netherlands On the 10th of October 2012, the Dutch Queen Beatrix christened the Polaris, the first of a series of three Pilot Station Vessels at the Cruise Terminal in Rotterdam. The vessel was officially handed over by Barkmeijer Shipyards to the Dutch Pilot Association. was launched at Barkmeijer Shipyards location in Stroobos. Currently this vessel is being outfitted in Harlingen. The delivery of the Polaris is one of the highlights of this long running project. Already at the beginning of 2008, Conoship International B.V., together with Barkmeijer Shipyards, started with the design of the Pilot Station Vessel. The Pilot Association started even earlier with in-house working groups to define an elaborate list of design requirements. During a very extensive preliminary design phase, which included thorough tank testing at MARIN prior to the actual building contract, a unique design was developed. Numerous design iterations resulted in a vessel that is capable for extended operations at sea in challenging weather conditions and wave heights up to 3.5 m. After an extensive sea trial and training program, the Polaris chose position at the Rotterdam Pilot Station on the 6th of December. The reactions of the crew and the pilots are very enthusiastic. Especially the sea keeping behavior, which was the main focus point during the design, is judged to be very good. It seems that all effort spent during the design process to optimise the sea keeping characteristics of this vessel turned out to be successful. A true example of the capabilities of Conoship International B.V. and Barkmeijer Shipyards to turn the visions of a shipowner into reality. On the 19th of October the Pollux, the second of the Pilot Station Vessel series Length over all Length between p.p. Breadth moulded Draught (design) Draught (max.) Speed 81.20 m 74.80 m 13.30 m 4.80 m 5.10 m 16.0 kn COMPLEMENT Pilots 18 Crew 17 Others 10 Photo:H. van der Heijden - Maassluis. PROPULSION SYSTEM Electr. prop. engines 2 x 1700 kw Diesel generators 4 x Caterpillar C32 2 x Caterpillar C18

M 2 Runner Oceanic Project Cargo vision turned into reality Design description: 3500 TDW Hartman M 2 Runner Vessel name: MV Oceanic Global Seatrade BV, Urk, The Netherlands Hartman Marine BV, Urk, The Netherlands Flexibility, (fuel) efficiency and a maximization of the deck area were the leading aspects to be taken into account in the design of the Hartman M 2 runners. Recently the MV Oceanic - the first of this series - has been delivered to her owner Global Seatrade. In close cooperation with Hartman Marine BV, Conoship International BV developed the Hartman M 2 Runner, a flexible and spacious project cargo vessel for the short sea project market. With a total hold volume of 219,000 cuft and a free deck area of more than 1300 m 2, the vessel is oversized compared to conventional 3500 tdw vessels. In fact, the hold capacity and deck area of the M 2 Runners are almost comparable to the capacities of a 6000 dwt general cargoes vessel. With the M 2 Runner, Hartman Marine and Global Seatrade meet the changing needs of the project cargo market. More and more offshore plants and offshore windmill parks are constructed in deeper waters, remote areas and harsh environments, requiring larger transport volumes and a need for more flexible vessels, capable of transporting larger parts or components in one-piece. Even more than in the past, shipping of project cargos will be dominated by available deck area and hold volume. Open top After extensive tank testing at MARIN, the M 2 Runner received permission from the Authorities to sail open top. This enables worldwide operations without hatchcovers closing the hold and provides the possibility to transport very large and high parts. Open-top operations are usually not feasible with vessels of this size, but only permitted with vessels much larger than the Hartman M 2 Runner. The Hartman M 2 Runner is also an environmentally friendly vessel. Featuring an integrated nozzle and a relatively large propeller, the Hartman M2 Runner is a very fuel efficient vessel. With an installed power of 1200 kw, a service speed of about 12 knots is reached. Length over all Length between p.p. Breadth moulded Breadth max. Depth Draught (summer) Deadweight Gross tonnage Main engine Speed (service) 92.90 m 84.99 m 14.00 m 15.00 m 10.00 m 5.00 m 3500 ton 2979 GT 1200 kw 12.0 kn CARGO CAPACITIES Hold dimensions: Lower 53.90 x 12.00 x 3.20/3.90 m Upper 69.30 x 12.50 x 4.60/3.90 m Tank top area 635 m 2 Tweendeck area 830 m 2 Deck length x breadth 90 x 15 m Deck area 1300 m 2 Cargo hold capacity 219200 cb.ft. Container cap. 105 hold - 199 deck TEU

TSHD Contender : MV Sirocco converted to 2125 m 2 multi-purpose Trailing Suction Hopper Dredger Design description: 2100 m 3 Trailing Suction Hopper Dredger Vessel name: TSHD Contender ABEKO Marine BV, Beverwijk, The Netherlands Neptune Marine Services BV, Hardinxveld-Giesendam, The Netherlands The successful extreme make-over of the Conoship designed 3200 tdw General Cargo vessel Sirocco to a multi-purpose Trailing Suction Hopper Dredger resulted in the versatile 2125 m 3 TSHD Contender for ABEKO Marine. The dredger was handed over in April when she directly started her first job in Wilhelmshaven and proved to be very efficient. The design challenge for Conoship was to integrate the wide variety of required dredging equipment. One of the key issues for ABEKO is the possibility to fit an excavator on top of the hopper, conveyor belts alongside the hopper and a rotatable shore-conveyor on the forecastle. This system is fully integrated in the design and can be installed for specific jobs in which dry delivery of sand or gravel to quay is required. For maintenance or construction jobs, the cargo can be discharged through the bottom doors or through the rainbowing nozzle or bow-coupling to a floating pipeline. This modular design approach, elaborated together with DredgeVision, leads to a very flexible dredging-tool that can be adapted to any specific job. The design of the hopper and hull modifications enables the installation of this extra dredging equipment. Pumprooms were fitted in the aft- and forward part of the original cargohold, the forecastle was raised and two sponsoons were fitted to enlarge the breadth from 12.50 m to 16 m to increase deadweight and stability. At the foreship the sponsoons were faired into the existing hull lines, resulting in a good speed/power performance. The project management of this conversion was done by DredgeVision. This successful make over shows one of the opportunities to create a new life for good second hand General Cargo vessels that are widely available these days. IMSV Sanaborg : Multipurpose support vessel for extreme ice Design description: 3900 kw Ice Breaking Support Vessel Vessel name: IMSV Sanaborg Wagenborg Offshore, Delfzijl, The Netherlands Royal Niestern Sander, Delfzijl, The Netherlands Recently Royal Niestern Sander in Delfzijl delivered the Sanaborg and the Serkeborg to Wagenborg Offshore. These Ice Breaking Multipurpose Support Vessels (IMSV) have been jointly developed, by the shipyard, Wagenborg and Conoship, for offshore services in shallow water and under arctic conditions. Sanaborg and Serkeborg are more efficient than the existing vessels because of the new hull form, which was developed by Conoship International. Design target was to reach a minimum speed of 4.0 knots in unbroken first year ice of 0.60 m thickness. Model tests were conducted to verify the icebreaking performance in deep and shallow waters, as well as washing and breaking the ice to penetrate grounded ridges travelling stern first. Equipped with two Wärtsilä Icepod thrusters the vessels reach a bollard pull of 36.3 mt and have excellent ice management capabilities. Length between p.p. 63.45 m Breadth moulded 14.00 m Depth 5.10 m Draught (design) 2.50 m Deadweight (design) 444 ton Draught (summer freeboard) 3.15 m Deadweight (summer) 1005 ton Gross tonnage 1520 GT Main propulsion 2 x 1950 kw Tank capacities: Potable water 329 m 3 Gasoil 790 m 3 Treated water 260 m 3 Ballastwater 605 m 3

New Design TSHD SmartDredge 3500 Design description: 3500 m 3 Trailing Suction Hopper Dredger Veka Bijlsma, Lemmer, The Netherlands Profitable dredger shaped out of existing hull modules Length over all 90.50 m Length between p.p. 84.41 m Breadth moulded 15.80 m Depth 6.90 m Draught (summer) 5.23 m Deadweight (summer) 4200 ton Draught (dredging) 6.35 m Deadweight (dredging) 5700 ton Gross tonnage 2999 GT Speed (service) 13 kn Main generators 3 x 1400 kw DREDGING PARTICULARS Diameter of drag arm 800 mm Max. dredge depth 25-38 m Sand pump output 1400 kw Jet pump output 2 x 360 kw Hopper capacity 3500 m 3 Densitiy of hopper load 1.0-2.2 t/m 3 Under Construction TSHD Causeway Boskalis triple repeat order after successful 4500 m 3 TSHD Shoalway Design description: 4500 m 3 Trailing Hopper Suction Dredger Vessel name: TSHD Causeway Royal Boskalis, Papendrecht, The Netherlands D.W. den Herder Maritiem BV, Sliedrecht, The Netherlands Length over all 92.10 m Length between p.p. 84.88 m Breadth moulded 19.00 m Depth 7.25 m Draught (summer) 6.16 m Deadweight (summer) 5950 ton Draught (dredging) 6.82 m Deadweight (dredging) 6980 ton Gross tonnage abt. 4300 GT Speed (service) 11 kn Main engines 2x1500 kw DREDGING PARTICULARS Diameter of drag arm 900 mm Max. dredge depth 30 m Sand pump output 2x1825 kw Jet pump output 2x750 kw Hopper capacity 4520 m 3 Densitiy of hopper load 1.0-2.2 t/m 3 Recent Delivery MV FIORANO Efficient trader for niche market Design description: Bijlsma Confeeder 350 Vessel name: MV FIORANO Fiorano CV, Werkendam, The Netherlands Veka Bijlsma, Lemmer, The Netherlands Length over all 99.97 m Length between p.p. 84.99 m Breadth moulded 15.85 m Depth 8.85 m Draught 5.65 m Deadweight 4533 ton Gross tonnage 3871 GT Speed (service) 15 kn Main engine 3280 kw CAPACITIES Hold dimensions Hold 1 24.20 x 13.20 x 8.85 m Hold 2 27.27 x 13.20 x 8.85 m Cargo hold capacity 212360 cb.ft. Container capacity 354/124 hold - 230 deck TEU HFO 319 m 3 Ballast water 2615 m 3

Conoship International: the innovative designer of Short Sea vessels Design and Engineering Conoship International provides design, engineering and consultancy services for the maritime industry. Since 1952 Conoship designs are renown throughout the world. More than 2.000 Conoship designs are sailing the seven seas. Each design is customized based on the client s demand in order to achieve an optimum technical and economical solution, enabled by the most innovative ship design tools. Our wide range of services for shipowners, brokers and shipyards, includes: Conceptual ship design Basic ship design Class approval design Conversion design Market and marketing studies Ship design and shipbuilding project management Feasibility studies Research and development Please contact us to find out more about our services, to discuss your ideas and to see whether we can be of any assistance to you. Upcoming topics in next issues: EEDI news New concepts LNG for propulsion ConoSeaBow Wind propulsion New Dredgers Check www.conoship.com Energy Efficiency Design Index On the 1st of January 2013 the new IMO-regulations on energy efficiency for ships enters into force, including the mandatory Energy Efficiency Design Index. The regulations aim to reduce the CO2-emissions of shipping, prescribing a maximum allowable EEDI-value for new designs. Conoship performed a study together with MARIN for the Dutch Shipbuilding Association on correction factors in the EEDI calculation for small General Cargo ships. Conoship presented the results in the IMO-meeting in London in October last year and the proposed correction factors are adopted in the Guidelines. For more info see www.conoship.com Member shipyards: Barkmeijer Shipyards, The Netherlands Royal Bodewes Shipyards, The Netherlands Royal Niestern Sander, The Netherlands Recent selection of yards building our designs: Bijlsma Shipyard, The Netherlands Hartman Marine, The Netherlands Groningen Shipyard, The Netherlands Chowgule Shipyards, India Gelibolu Shipyard, Turkey Shipkits Shipbuilders, Poland Daesun Shipbuilding, Korea Wuxue Kaiyangxing, China Business Partners: Dredge Vision Engineering, The Netherlands SasTech, The Netherlands India Futuristic Marine, India SEDS Engineering, India GTRC Algoship, Bahama s Recent selection of shipowners sailing our designs: Dutch Pilot Association, The Netherlands Royal Boskalis, The Netherlands DTM Dredging, France ABEKO Marine, The Netherlands UK Dredging, United Kingdom Wagenborg, The Netherlands Arklow Shipping, Ireland Global Seatrade, The Netherlands Wijnne Barends, The Netherlands Union Transport, United Kingdom Amasus Shipping, The Netherlands Albros Shipping, Russia Navigia Group, The Netherlands Danser van Gent Shipping, The Netherlands Fehn Shipping, Germany LEONARD SPRINGERLAAN 9, GRONINGEN, THE NETHERLANDS P.O. BOX 6029, 9702 HA GRONINGEN, THE NETHERLANDS TELEPHONE + 31 50 526 88 22, TELEFAX + 31 50 525 22 23, E-mail conoship@conoship.com, website www.conoship.com