POPPET BLOCK CONTROL

Similar documents
INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

OPERATING INSTRUCTION MANUAL FOR S-240 HYDRAULIC CUTTERS WITH PARTS LIST

Char-Lynn Hydraulic Motor. Repair Information Series. October, 1997

TYPE E Main Valve Sizes 3 /8 through 12

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

Vickers. Overhaul Manual. Relief Valves. Balanced Piston Relief Valves. CG/CS/CS5-03/06/10 Series CT/CT5/CG5-06/10 Series

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)

Rebuild Instructions for and Transmission

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

Service Manual Rol-Lift

INGROUND, ROPED, AND HOLELESS JACK SEAL REPLACEMENT

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions

Operating Instruction Manual For S-40B Hydraulic Cutters With Parts List

Pallet Jack. OWNER S MANUAL Model MH1230. Important Safety Instructions Assembly Instructions Parts and Hardware Identification

BOWIE PUMPS OPERATION - MAINTENANCE

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual

Mustang Series PRESSURE REDUCING CONTROL VALVE WITH PRESSURE SUSTAINING FEATURE. M115-2 (Globe) M (Angle) Schematic. Standard Components

CYLINDER LEAKAGE CHECK (Compression)

Round Housing with Side Ports

PRESSURE REDUCING CONTROL VALVE

Fisher 377 Trip Valve

Fleck Service Manual INSTALLATION AND START-UP PROCEDURE TABLE OF CONTENTS JOB SPECIFICATION SHEET

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Operating Instructions Parts List Manual Scissor Lift Pallet Truck

Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water

Machine needle shut-off nozzle type HP

*Rated to 207 Bar/3000 PSI with Aluminum Body. Catalog HY /US SERIES CAVITY DESCRIPTION FLOW PRESSURE PAGE NO.

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

BRAKE SYSTEM OVERVIEW AND OPERATION PROCESS 1. BRAKE SYSTEM GENERAL INFORMATION 1) DESCRIPTION AND OPERATION 16-3.

Tri-Homo Style Operation and Maintenance Instructions

2006 HEADSHOK Service Video #1

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions


Bulletin 2537-M4/USA Service Bulletin Series CPOM

BETTIS CONVERSION INSTRUCTIONS TO CONVERT HD SERIES ACTUATORS TO HD-M3, HD-SR-M3 HD-M3HW OR HD-SR-M3HW SERIES PNEUMATIC ACTUATORS

Trash Pumps Models: 56200, , 56201, , 56300, , 56301,

Drive shaft, servicing

Float and Thermostatic Traps Series H, C and X

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

Unit 24: Applications of Pneumatics and Hydraulics

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Product Manual. CVS Type 67AFR Filter Regulator. Introduction. Installation. Description

Fuel Injection Pump, Rotary ( )

STEERING SYSTEM - POWER

Fire Hydrant Troubleshooting

MP8000 Series Pneumatic Valve Actuators

Front brakes (FN- 3), servicing

TECHNICAL DATA. Dry 122a. November 12, 2013

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

PILOT SL & XC SERVICE GUIDE

Chapter 7 Hydraulic System Troubleshooting

S&G Model 2937 Group 1 Combination Lock

For exploded diagram and part number information, refer to the Spare Parts Catalog available on our website at

Telescoping Post Indicator Wall Post KENNEDY VALVE ISO 9000 ISO 14001

HYDRAULIC LIFT TABLE CART 2200-LB.

3", 4", 6" & 8" Model H Series Alarm Check Valve Installation and Maintenance Guide

Stainless Steel Single and Dual Circulation Kits

IMPORTANT DOCUMENTATION DO NOT DISCARD!

INDEX INTRODUCTION. Reference No L-01 R E V I S E D :

MP-4V Heavy Duty Riveter / 39048

Diesel Fuel Systems. Injection Nozzles

Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations

SERIES HYDRAULIC MOTOR DRIVEN CENTRIFUGAL PUMPS

SLP 1.85 Ratio Offset Rocker Arms with Valve Springs, LS3

INSTRUCTION MANUAL. FOR Air Balance Jib Lifter MODELS COVERED:DSL-300 & DSL-300-P

HT-0095 Mini PV Receptacles AWG Crimping Hand Tool. Tool P/N HT-0095

TECHNICAL SERVICE MANUAL

APPLIED PNEUMATICS AND HYDRAULICS H TUTORIAL HYDRAULIC AND PNEUMATIC CYLINDERS. This work covers part of outcome 2 of the standard Edexcel module.

ENGINE FUEL FUEL FILTER... FUEL HEATER... INJECTOR... SUPPLY PUMP... COMMON RAIL... FUEL PRESSURE LIMITTER...

REPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL)

This instruction is valid for all ACD pump models shown on page 2

Direct Operated Regulator for 6.0 MPa (Relieving Type) How to Order. Body size 30 40

Tech. Services: (800) Fax: (800) Order Entry: (800) Fax: (800) Internet Address:

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY

CHIPPING HAMMERS Tabor Place, Santa Fe Springs, California, CA 90670, U.S.A.

INSTALLATION MANUAL MODEL RP-100

2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13)

Hydraulic Air Riveter. Operation Manual RC197 RC198. Recommend for mass production line industrial area. Page 1

This is the civilian transfer case with the cooling loop only found in the driven gear half of the front case.

Fisher CV500 Rotary Globe Control Valve

Buy Karcher Parts Online: Need Technical Help? Call: Requests to:

CPL SYSTEMS / GROENEVELD AUTOMATIC GREASING SYSTEM COMPLETE SYSTEM CHECK PNEUMATIC PUMP

Instructions and precautions. Fork Height. Visit our website at:

FLUSHOMETER - TANK SYSTEM

MODEL T200-F18 MODEL T125-F18 Finish Nailers

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

*Rated to 207 Bar/3000 PSI with Aluminum Body. Denotes New Winner s Circle Product Line. Catalog HY /US

MAINTENANCE MANUAL INDEX DOUBLE CHECK ASSEMBLIES MODELS 850 & 850U 1/2" - 2"

Installation, Operation and Maintenance Manual for Pilot Operated Valves

relief valves 500 Series Adjustable Popoff & Inline Relief Valves 0.5 to 150 psig (10 bar)

Instruction Manual EH /10. Putting You In Control Series. Double Ported Globe Valves

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS

Instruction Manual. Alfa Laval SB Membrane Sample Valve ESE02963-EN

Safety Relief Valve Product Literature & Maintenance Guidelines Revision Jun 2008

Tool And Material Checklist

Transcription:

POPPET BLOCK CONTROL MAINTENANCE AND SERVICE MANUAL USASI SCHEMATIC Normally closed, double three-way poppet valve, with open exhaust, manual and pilot actuated.

POPPET BLOCK GAS OR OIL FLOW INTRODUCTION The poppet block is the heart of most Shafer control systems. A double three-way, manual and pilot actuated, control valve is designed to provide selective directional operation of Shafer actuators. The poppet block control may direct power gas to a set of gas/hydraulic tanks (generating hydraulic pressure for powering valve actuators), or it may direct central hydraulic system pressure directly into a valve actuator. It is engineered to provide reliable and durable operation and toleration of contaminates in the power source. BASIC CONSTRUCTION The poppet block control consists of a double three-way ported valve body containing two sets of inexpensive, easily replaced nylon poppets to provide tight sealing, poppet springs, push pins, power and pilot filters, a manual lever assembly and pilot pistons for remote operation. NOTE: For low pressure applications, 350 psi or less, the power poppets item (2) in Figure 1 are steel backed Neoprene poppets. The exhaust poppets item (3) in Figure 1 are nylon. OPERATION FIGURE 1 - NEUTRAL POSITION Spring compression (1) and power gas force the power poppets (2) on their respective seats and simultaneously hold exhaust poppets (3) in the open position via interconnecting poppet pins. Tank porting is open to exhaust. The exhaust port is equipped with a check valve (4) to prevent atmosphere from entering the poppet block assembly. FIGURE 1 FIGURE 2A - PILOT ACTIVATION Pilot pressure to the pilot piston (5) illustrates force applied to the piston seating the exhaust poppet and simultaneously unseating the power poppet. Power gas is directed through tank port "B". NOTE: Pilot pressure to the opposite pilot piston shown in Figure 2A will activate the opposite set of poppets and direct power gas to tank port "A". FIGURE 2A NOTE: Pilot pistons are equipped with an orifice in order to vent the pilot pressure and allow the control to neutralize after stroking an actuator. 2

POPPET BLOCK GAS OR OIL FLOW High Pressure Exhaust Pilot Pressure Atmospheric Pressure FIGURE 2B - MANUAL ACTIVATION Movement of the lever (7) illustrates force applied by the stem (6), seating the exhaust poppet and simultaneously unseating the power poppet. Power gas is directed through tank port "A". NOTE: Movement of the opposite lever shown in Figure 2B will activate the opposite set of poppets and direct power gas to tank port "B". FIGURE 2B FIGURE 3 - NEUTRALIZATION Release of the lever will allow the compressed poppet spring and power gas to reseat the power poppet and simultaneously unseat the exhaust poppet. Power gas pressure remaining in the gas/hydraulic tank is now vented through port "B" to the exhaust, thus neutralizing tank and actuator pressures. FIGURE 3 3

BASIC CHECK-OUT PROCEDURES The following two checks illustrate proper working functions of the Shafer Poppet Block. Failure of any of these procedures may result in operating problems with the valve actuator. This description is for gas service, but the unit can also be used in hydraulic service. CHECK NO. 1 There should be zero leakage throughout the control system. In the neutralized position there should be zero power gas leakage from the exhaust port. Power gas leakage is usually attributed to debris lodged between the power poppet and seat. CHECK NO. 2 Pull the manual lever to full travel and stroke the actuator partially open or closed. NOTE: The manual lever for open and close is indicated on the attached tag. After stroking the actuator partially open or closed, release the manual lever thus exhausting the gas/hydraulic tank. After the gas/hydraulic tank is completely exhausted, check the exhaust port for any gas leakage. NOTE: The exhaust port should be free of any restrictions or piping size reductions less than 1/2 NPTF unless factory supplied. 4

BILL OF MATERIAL ITEM QTY. DESCRIPTION ITEM QTY. DESCRIPTION 1 1 Valve Body 15 2 Piston O-Ring 2 2 Power Poppet Cap 16 4 Piston Back Up Ring 3 2 Filter Cap 17 4 Piston Wear Ring 4 1 Power Connection Cap 18 8 Cap O-Ring 5 1 Exhaust Connection Cap 19 2 Stem O-Ring 6 2 Stem Cap 20 1 Check Valve O-Ring 7 2 Stem 21 1 Check Valve 8 4 Poppet (Nylon) 22 2 Power Poppet Spring 8* 2 Power Poppet (Neoprene) 23 2 Stem Spring 2 Exhaust Poppet (Nylon) 24 2 "X" Washer 9 2 Poppet Pin 25 2 Stem Boot 10 2 Piston 26 2 Flush Plug 11 1 Strainer (Power) 27 2 Stem Back Up Ring 12 1 Strainer (Pilot) 28 2 Music Wire.018 Dia. x 1" Lg. S.S. 13 4 Strainer Seal 29 1 Manual Actuation Plate 14 1 Flush Plug 30 3 Actuation Plate Mtg. Bolts * For low pressure applications 5

RECONDITIONING AND ASSEMBLY RECONDITIONING Power poppets have a raised boss for poppet spring engagement which may be grasped with pliers for easy removal. Do not pry poppets off pins with a screwdriver as damage to seats in the poppet block may result. Remove exhaust poppets from poppet pins. ASSEMBLY 1) Thoroughly clean all components. Inspect seats in poppet block for nicks, scratches, pitting, etc. NOTE: Seat reconditioning may be accomplished by polishing with an emery cloth. Care must be taken to maintain the radius at the outer edge of the poppet seat. 2) Replace power and exhaust poppets on poppet pins. Poppets may be tapped lightly into position with a drift pin and light hammer. FIGURE A 3) Check travel of poppet assembly with the scale as shown in (Figure B). Make any adjustment for travel by grinding or filing to shorten the poppet pin or replace with a new pin if length is needed. Ref: 1/4" drill rod may be substituted for poppet pins in the 1/4" assembly and 1/2" drill rod for the 1/2" assembly. Adjust poppet travel to maintain 1/16" min. travel and 3/32" max. travel for both 1/4" and 1/2" assemblies (Poppet block size, 1/4" and 1/2", is designated by the diameter of the poppet connecting pin.) 4) Inspect and replace O-rings on pilot pistons. Place a small quantity of valve grease in poppet spring recesses on caps (2) to insure that springs stay in place during reassembly. FIGURE B Replace poppet block caps (2) insuring power poppet bosses are engaged properly in poppet springs, replace caps (2), (6), levers, and bracket (29). 6

DISASSEMBLY OF THE POPPET BLOCK CAUTION: Turn off power gas, bleed off gas volume in power storage tank if so equipped, depress manual poppet - activating stem to vent any entrapped pressures. NOTE: Isolate and disarm control. Assure availability of spare O-rings and poppets. 1) POWER POPPET REMOVAL: Loosen poppet caps (2), remove springs (22) and power poppets (8). (See reconditioning and assembly section for reinstallation.) 2) EXHAUST POPPET REMOVAL: Disassemble the manual lever assembly by removing bolts (30) and bracket (29). Loosen stem caps (6), remove stem assembly (7) and pilot pistons (10). NOTE: Pilot pistons (10) can be removed by threading one of the hex bolts (30) into the back of the piston (10). Remove exhaust poppets and pins (8) and (9). 3) POWER STRAINER REMOVAL: Piston cap (3) (on top of block), remove strainer seal (13) and strainer screen (11). 4) PILOT STRAINER REMOVAL: Removal hex cap (3) on right side of poppet block. Remove strainer seal (13) and strainer screen (12). 7

Emerson Process Managemenmt Valve Automation, Inc. 2500 Park Avenue West Mansfield, OH 44906 Phone (419) 529-4311 FAX (419) 529-3688 www.emersonprocess.com/shafer PBC-01102001