LOCKOUT/TAGOUT PROGRAM

Similar documents
ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN

LOCKOUT/TAGOUT PROGRAM. Table of Contents

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

L O C K O U T / TA G O U T A D M I N I S T R AT I V E G U I D E

Lockout / Tagout Program

University of Nevada, Reno

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

CONTROL OF HAZARDOUS ENERGY (Lockout Tagout)

Lockout/Tagout Compliance Guide and Checklist

Lockout/Tagout (LOTO) Compliance Guide

BWC Division of Safety and Hygiene

Page85. Lock-out Tag-out Plan

LOCK-OUT/TAG-OUT PROGRAM I. Purpose

Control of Hazardous Energy (Lockout / Tagout)

Energy Control Lockout/Tagout

Lock-out/Tag-out.

Lockout / Tagout Awareness

LOCK-OUT / TAG-OUT SAFETY TRAINING

Lockout/Tagout Training Program

Lockout Tagout Program. Table of Contents

WEEKLY SAFETY MEETING All Euramax Subsidiaries LOCKOUT / TAGOUT. Safety Meeting Contents. Meeting Notice. Leaders Guide.

File Name: LO/TO Orig. Date: November 2005 Revision Date:November 2006 Reviewed Date: November Standard: OSHA: 29CFR

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

3088 Lockout-Tagout Training Program Course Outline

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

Lockout - Tagout Program

Lockout-Tagout Training for Albany Employees Control of Hazardous Energy OSHA standard

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

Safe Operating Procedure

HealthStream Regulatory Script

Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010

HERSHEY ENTERTAINMENT & RESORTS COMPANY LOCKOUT / TAGOUT PROCEDURE

Control of Hazardous Energy

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

ISSUE: LOCK OUT BLOCK OUT

OSHA Training Guidelines (An Unofficial Summary)

Business Unit/Area: N/A. Protocol No.: COR-3S3-PR

CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM

Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

Company Safety & Health Policy Statement

Lockout/Tagout. Training: 29 CFR Lockout Tagout Standard States employer must provide training on lockout tagout.

ELECTRICAL SAFETY. The standard unit for measuring electrical current.

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

Planned, Limited Notice and Emergency Outage Guidelines

Hampshire College. Lockout/Tagout and Electrical Safety Program and Procedures

section 5 machine guarding and lockout

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Planned and Emergency Utility Outage Guidelines

Preventative Maintenance Policy

OPTIONAL INFORMATION ELECTRICAL SAFETY WORK PRACTICES SELF INSPECTION CHECKLIST

Confined Space Training. Developed and Presented by: Scott Cole, CSP (440)

Sample Checklist for Permit Required Confined Spaces Program

Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety

Lockout Tagout Presentation For GOSH Group Aberdeen UK

STANDARD PRACTICE INSTRUCTION

OSHA Regulations 29 CFR (I) Powered Industrial Trucks. Mushroom Generic (I) (Sample) Program

Machine Guarding and Operator Safety. Leader Guide and Quiz

MORE HIGH-IMPACT LOCKOUT/TAGOUT SAFETY TRAINING

Oil and Coolant Circulating Heating System. Model - OCSM

Millersville University - Office Of Environmental Health & Safety Scope & Application

Preventing Overheated Boiler Incidents

OSHA SAFETY TRAINING TABLE for more information see

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

PC1131 Electric Air Compressor

810. Health and Safety Policy

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?

On-Site Risk Management Audit Checklist for Program Level 3 Process

WHITE PAPERS. Process Safety Management

SAFETY AND HEALTH PROGRAM

Confined Spaces. Notes

Confined Space Entry Policy

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?

MD 52 WASTE MANAGEMENT AUTHORITY CORPORATE HEALTH AND SAFETY PROGRAM

Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON

PC1130 Electric Air Compressor

WORKING IN CONFINED SPACES GUIDELINES

CONFINED SPACE ENTRY NON-MARINE FACILITES

Sample Written Program. For. Confined Space OSHCON

!!! SAFETY!MANUAL/PROGRAM!! FOR!!! MERIT!ELECTRIC!COMPANY,!LTD.!!!!!!!!!

KELLER S 5-MINUTE WORKPLACE SAFETY TALKS

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents

Confined Space Training

Elements Elements describe the essential outcomes.

Powered Industrial Truck Safety Program

Employee Safety and Health Training Plan

UC Berkeley Energy Isolation Lockout Tagout (EI-LOTO) Program

OVERVIEW SCOPE DEFINITIONS

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

Electrical Safety in the Workplace

Confined Space Entry Safety Program

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

CONFINED SPACES MANAGEMENT PROGRAM (REGIONAL CAMPUSES AND RESEARCH STATIONS)

Facilities Maintenance Standards rev

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

Transcription:

LOCKOUT/TAGOUT PROGRAM SOP #18

I. PURPOSE To ensure that machinery or equipment is isolated from all potentially hazardous energy, and locked out or tagged out before employees perform any servicing or maintenance activities where the unexpected energization, start-up, or release of stored energy could cause injury. II. SCOPE This program covers the servicing and maintenance of machines and equipment in which the unexpected energization or start up of the machines or equipment, or release of stored energy could cause injury to employees. Machines and equipment that must be "locked-out" and/or "tagged-out" during maintenance or servicing include, but are not limited to, the following: Ord Memorial Steam Plant (chains, locks, and/or tags) 1. Boilers 2. D. A. Tank 3. Condensate Tank 4. Inoperable equipment (ie. pumps, and motors) Campus Equipment (locks and/or tags) 1. Elevators 2. Air Handling Units (AHU) 3. Cooling Towers 4. Pumps (heat, condensate, sewage) 5. Electrical Boxes 6. Motors (belt changes) 7. Heating Ventilating Air Conditioning Units (HVAC) III. REFERENCED DOCUMENTS Occupational Safety and Health Administration (OSHA), 29 CFR 1910.147, The Control of Hazardous Energy (Lockout/Tagout). IV. DEFINITIONS 1. Affected Employee: An employee whose job requires him or her to operate or use a machine or equipment on which service or maintenance is being performed under lockout/tagout or whose job requires him or her to work in an area in which such service or maintenance is being performed. Affected employees must be informed when lockout/tagout is being performed. 2. Authorized Employee: A person who locks and tags machines or equipment in order to perform service or maintenance on it. 3. Energy-Isolating Device: A mechanical device that physically prevents the transmission or release of energy, including a manually operated electrical circuit breaker, a disconnect switch, a line valve, a block and any similar device used to block or isolate energy. 4. Lockout: The process used to identify, cut off and secure all energy sources before beginning repair, adjustment or maintenance. A lockout device is used to secure equipment or machinery in the off position, ensuring that it cannot be operated. 5. Lockout Device: A lock (either key or combination type) that holds an energy-isolating device in a safe position and prevents the machine or equipment from energizing. 1

6. Servicing And/Or Maintenance: Workplace activities that require lockout/tagout on the equipment before beginning the activity because employees may be exposed to the unexpected energization or startup of the equipment or the release of hazardous energy. Servicing and/or maintenance includes constructing, installing, setting up, adjusting, inspecting, modifying, lubricating, cleaning or unjamming and making tool changes. 7. Tagout: Attaching a tag to the lock on the power source that has been shut off, indicating the time and reason for the lockout and the name of the person doing the work. The tag acts as a warning not to restore energy to the equipment or machinery. 8. Zero-Energy State: All energy has been controlled in the machinery or equipment. V. RESPONSIBILITIES 1. Department Heads will: a. Ensure that appropriate supervisors and employees (new hires and transfers) are trained and knowledgeable in the safe application, usage, and removal of energy controls. b. Be familiar with this SOP and the Lockout/Tagout regulation (OSHA 29 CFR 1910.147). c. Hold Supervisors accountable for following this SOP. 2. Supervisors will: a. Ensure that all employees who are authorized to service equipment within the facility have received training on appropriate lockout/tagout procedures and energy control plans. b. Complete an energy control procedure for each specific piece of equipment or process within the facility. c. Assure that appropriate energy-isolating devices are available for all equipment and processes within the facility. d. Assign locks to authorized employees e. Coordinate activities of contractors that may affect lockout/tagout and energy control procedures within the College. 3. Public Safety will: a. Administer this program and making sure that it satisfies the requirements of all applicable federal, state and local lockout/tagout requirements. b. Provide initial and annual training of employees on lockout/tagout procedures. c. Maintain the training records of all employees included in the training sessions. d. Verify through periodic audit that the lockout/tagout program effectively protects employees who are servicing powered equipment 4. Authorized employees will: a. Attend training as required. b. Comply with the company s lockout/tagout program. c. Follow all safe shutdown and startup procedures. d. Communicate activities to all affected employees and other authorized employees. e. Ensure the security of their own locks and keys. 5. Affected Employees will: a. Advise the maintenance department when equipment needs servicing. b. Follow the direction of the authorized employee as it affects the operation of their equipment 2

6. Department Heads and Supervisors Whose Departments Contain Energized Equipment will: Ensure that only authorized employees service the equipment and machinery in their department. The following employees are authorized to utilize our lockout/tagout system: Mechanical Trades Adams Beltz Blackton Brinker Jr. Coveleskie Diorio Emrick Holley Kerchner Koerber Lobb Jr. Peterson Vonelli Wisniewski Michael Leonard Matthew Donald Michael John Daniel George Christopher John Ronald John Rocco Richard Steam Plant Kosa McFadden Oswald Oswald Pursel Hartzell Smith Wayne Edward Gregory Nathan Thomas Alan David 3

VI. TRAINING REQUIREMENTS Training shall be provided to ensure that the purpose and function of the energy control program is understood by employees and that knowledge and skills required for the safe application, usage, and removal of energy controls are utilized. The training shall include the following: 1. Each authorized employee shall receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation and control. 2. Each affected employee shall be instructed in the purpose and use of the energy control procedure. 3. All other employees whose work operations are or may be in an area where energy control procedures may be utilized, shall be instructed about the procedure, and about the prohibition relating to attempts to restart or reenergize machines or equipment which are locked out or tagged out. When tagout systems are used, employees shall also be trained in the following limitations of tags: 1. Tags are essentially warning devices affixed to energy isolating devices, and do not provide the physical restraint on those devices that is provided by a lock. 2. When a tag is attached to an energy isolating means, it is not to be removed without authorization of the authorized person responsible for it, and it is never to be bypassed, ignored, or otherwise defeated. 3. Tags and their means of attachment must be made of materials that will withstand the environmental conditions encountered in the workplace. 4. Tags may evoke a false sense of security, and their meaning needs to be understood as part of the overall energy control program. 5. Tags must be securely attached to energy isolating devices so that they cannot be inadvertently or accidentally detached during use. Use a self-locking plastic "tie-wrap" to fasten the tag. Retraining shall be: 1. Provided for all authorized and affected employees whenever there is a change in their job assignments, a change in machines, equipment or processes that present a new hazard, or when there is a change in the energy control procedures. 2. Conducted whenever a periodic inspection reveals, or whenever we have reason to believe that there are deviations from or inadequacies in the employee's knowledge or use of the energy control procedures. The retraining shall reestablish employee proficiency and introduce new or revised control methods and procedures, as necessary. 4

VII. Program Activities General 1. All equipment that contains energy of any form will be locked out prior to being serviced or maintained. 2. All employees who are authorized to work on equipment or machinery in the company will follow appropriate company lockout/tagout procedures. 3. Contractors who perform work on company equipment will comply with company lockout/tagout procedures. 4. An energy control procedure will be completed for each piece of equipment requiring lockout. It will identify all energy-isolation points to be locked and tagged as well as any special information required to safely achieve a zero-energy state. 5. A Lockout Checklist and a Safe Startup Checklist will be used during all service and maintenance activities to ensure the safety of both authorized and affected employees. Work Requiring More Than One Person 1. If more than one person is required to lock or tag out equipment, each person will place his or her own lock and tag on the energy-isolating device. 2. When an energy-isolating device cannot accept multiple locks and tags, a multiple lockout device or hasp will be used. 5

VIII. EMERGENCY REMOVAL OF A LOCKOUT/TAGOUT DEVICE Each lockout or tagout device shall be removed from each energy-isolating device by the employee who applied the device. When the authorized employee who applied the lockout or tagout device is not available to remove it, that device may be removed as follows: 1. Notify your Supervisor that the device must be removed. 2. The Supervisor will verify that the authorized employee who applied the device is not at the facility. 3. The Supervisor will notify the Assistant Director or Director of Plant Operations that the lockout/tagout must be removed. 4. The Assistant Director or Director of Plant Operations will verbally authorize the Access Control s Office to remove the lock and or tag. 5. Access control will notify the appropriate Supervisor that the lock and or tag was removed. 6. The Supervisor will then make all reasonable efforts to contact the authorized employee to inform them that his/her lockout or tagout device has been removed. 7. The Supervisor will ensure that the authorized employee has this knowledge before he/she resumes work at that facility. NOTE: The above procedure has been approved by the Occupational Safety and Health Administration, Allentown Office, Technical Representative, Mike Buck (2/12/93). http://www.osha-slc.gov/oshstd_data/1910_0147.html Attachments The forms are located in a separate file. A Lockout Checklist B Safe Startup Checklist C Energy Control Diagram D Lockout/Tagout Evaluation Form E Lockout/Tagout Training Record 6

Lockout Checklist Building: Date: Equipment: Step 1: Prepare and Notify Comment/Problem: A. Have the type and amount of energy source on the equipment been identified? B. Have the possible dangers related to the energy source being controlled been identified? C. Are the steps necessary to control the energy source understood? D. Have all affected employees been notified of when the equipment will be shut off for service? Yes No NA Step 2: Shut Down the Equipment Yes No NA A. Have Lafayette College s safety procedures been followed? Step 3: Isolate the Equipment Yes No NA A. Has the main breaker or control switch been shut off? B. Have valves been closed? C. Have process lines been disconnected? Step 4: Attach the Lock and Tag Yes No NA A. Have the lock and tag been attached? Step 5: Release Any Stored Energy Yes No NA A. Has the electrical capacitance been bled? B. Have pressures or hydraulic lines from the work area been vented or isolated? C. Have tanks been drained? D. Have switches or levers that could be moved into the start position been blocked, clamped or chained? E. Have lines containing process materials that are toxic, hot, cold, and corrosive or asphyxiating been cleared? Step 6: Verify That All Energy Has Been Released/Controlled Yes No NA A. Have the start switches on the equipment been tested? B. Have pressure gauges been checked to ensure that lines are depressurized? C. Are blocks or cribs secured? D. Have electrical circuits been checked to verify that voltage is at zero energy? E. Are blanks used to block feed chemicals secure and not leaking? Step 7: If you have answered Yes to all of the above questions, begin working. Otherwise, go back to each No question and resolve the problem. Attachment A

Safe Startup Checklist Step 1: Prepare A. Are all machine components operational? B. Are all safety guards in place? C. Have all tools been removed from the machine? D. Have all braces, pins, blocks and chains been removed? E. Are all pressure tubing, pipes and hoses connected with valves closed? F. Is the work area clear for mechanical operation? Step 2: Remove Lockout Devices and Tags Step 3: Notify Affected Employees A. Has the work area been cleared? B. Has the servicing been completed and the locks and tags removed? Yes No NA Yes No NA Yes No NA Step 4: If you answered Yes to all the above questions, start up the equipment. Otherwise, go back to each No question and resolve the problem. Step 5: Attach your completed Lockout Checklist and Safe Startup Checklist to your work order and return it to your supervisor. Attachment B

Special Lockout/Tagout Instructions Equipment # Page of Approved By Date List any special instructions for this machine here: Attachment C 1

Lockout/Tagout Evaluation Form Located in the Public Safety Office Attachment D 2

Facility Lafayette College Lockout/Tagout Training Record Department Mechanical Trades/Steam Plant Date Employee Name Please print Job Title Please print Employee Signature Signature Of Trainer Attachment E 3