Introducing IEC61850 in Distribution Substations. Substation Automation Systems

Similar documents
Substation Automation based on IEC 61850

Substation Automation Systems. Nicholas Honeth

Industrial IT for Substation Automation & Protection

SICAM PAS - the Key to Success Power Automation compliant with IEC and your existing system

B5-103 DESIGN OF IEC BASED SUBSTATION AUTOMATION SYSTEMS ACCORDING TO CUSTOMER REQUIREMENTS

Protection and Substation Automation. Training Programmes

Managing Relion IEDs Protection and control IED manager PCM600

IEC 61850: Communication Networks and Systems in Substations

Siemens ENEAS solutions for substation automation and protection

Relion. Power system protection and automation reference Extending substation life cycle with IEC 61850


Grid Automation Products. MicroSCADA Pro for substation automation

Secure your electrical network. PACiS The Safety Solution for Healthcare Institutions

1. Introduction Communication in Substation

ISIO 200. Binary Input/Output (I/O) Terminal with IEC Interface

IEC A New Perspective in Substation Automation

Relion. Power system protection and automation reference Fast substation busbar protection with IEC and GOOSE

UNLOCK YOUR IEC TESTING EXCELLENCE

Technical Specification Of Substation Protection & Control System with IEC BHEL s Perspective

ABB PSPS Erich Steinmann; Generator control-2013

GROUP OF SPANISH ELECTRICITY COMPANIES FOR STUDIES ON IEC 61850

IEC in ZX Gas-insulated medium voltage switchgear

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

Electrical Network Management System

Power network telecommunication

Siemens Integrated Substation Condition Monitoring System. Circuit Breaker Monitoring

1. Communication Network Requirements

IEC SCL - MORE THAN INTEROPERABLE DATA EXCHANGE BETWEEN ENGINEERING TOOLS

Square D Model 6 Motor Control Centers

REQUIREMENTS FOR AUTOMATED FAULT AND DISTURBANCE DATA ANALYSIS

Verifying the IEC Configuration and Assessing the Communication Network during Commissioning

Power products and systems. Intelligent solutions for power distribution Zone concept

DMS - Breakthrough Technology for the Smart Grid

Quality of Service in Industrial Ethernet Networks

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V V V (at 50 Hz)

Testing Intelligent Device Communications in a Distributed System

Highly Available Mobile Services Infrastructure Using Oracle Berkeley DB

Disturbance Recoder SPCR 8C27. Product Guide

ABB North America. Substation Automation Systems Innovative solutions for reliable and optimized power delivery

English Training RTU / Substation Automation MicroSCADA Courses 2012 ABB DEPSNM-T ( )

IEC TRAINING PROGRAM

Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards

DIGITAL CONTROL SYSTEM PRODUCT SOLUTIONS

Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System)

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

On the Road to. Duke takes the road less traveled and arrives at a new level of distribution automation.

SGTech Europe 2015 September 22 th Amsterdam. Pedro Gama, Head of SCADA & Telecom Department at EDP Distribuição, SA

Manage Utility IEDs Remotely while Complying with NERC CIP

Substation Automation Products Relion 670/650 series IEC and ANSI Hardware

Outage Management System Implementation. Status Report

Permissible ambient temperature Operation Storage, transport

Basics in Energy Information (& Communication) Systems Summary Substation Automation

Efficient remote access to machines and plants with SIMATIC

Real-time Video Monitoring Increases the Efficiency of SCADA Process Management

Wide Area Monitoring, Control, and Protection

Chapter 1. Network Structures

CYBER SECURITY: SYSTEM SERVICES FOR THE SAFEGUARD OF DIGITAL SUBSTATION AUTOMATION SYSTEMS. Massimo Petrini (*), Emiliano Casale TERNA S.p.A.

Distribution System Automation

WISE-4000 Series. WISE IoT Wireless I/O Modules

Updating to Test Universe 3.0. What s new?

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:

SCADA Questions and Answers

Monitoring & Control of Small-scale Renewable Energy Sources

Remote Maintenance with Security Appliances FL MGuard RS2000 and RS4000. Economic and Reliable Service

How to Prevent Power Surges: The Leading Cause of Serial Device Server Failures

Integrated Application and Data Protection. NEC ExpressCluster White Paper

Plant automation and telecontrol in one system. SIMATIC PCS 7 TeleControl SIMATIC PCS 7. Answers for industry.

LEASED-LINE REPLACEMENT

Symphony Plus Cyber security for the power and water industries

Software INTERACT. MachineLogic. The Shortest Distance Between Man and Machine

A new radio system for the German coast

Basics in Energy Information (& Communication) Systems Substation Automation

FOXBORO. I/A Series SOFTWARE Product Specifications. I/A Series Intelligent SCADA SCADA Platform PSS 21S-2M1 B3 OVERVIEW

Cyber Security of the Smart Grid

CG Automation Solutions USA

What Matters for Successful Integration of Distributed Generation

Voltage Regulator SPAU 341 C. Product Guide

Test & Data Management Software

CONTROL MICROSYSTEMS DNP3. User and Reference Manual

Wide Area Monitoring Current Continental Europe TSOs Applications Overview

How To Use Safety System Software (S3)

Page 1 / 14 Groupe MOBILITECHMIOSBOX Technical Specification MWP-DT1010. Technical specifications

ICS Technology. PADS Viewer Manual. ICS Technology Inc PO Box 4063 Middletown, NJ

1MRK GEN June 2016 Integrated Engineering Tool IET600 Ver. 5.3 FP2 Release Note

Automation Unit TM 1703 ACP Flexible automation and telecontrol

INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN

PROCESS DATA VISUALIZATION AND MONITORING USING INTERNET

TDMS Test & Data Management Software

Sectoral dictionary of competencies. page 1

Document ID. Cyber security for substation automation products and systems

New Technologies for Electric Power Distribution Systems

TRACTION NETWORK MONITORING AND PROTECTION SYSTEM SMTN-3 CITY ELECTRIC TRANSPORT RAILWAYS METRO INDUSTRY

Internet-Accessible Power Monitoring & Control Systems

This webinar brought to you by the Relion product family Advanced protection and control from ABB

R-Win. Smart Wireless Communication Management System

White Paper. Convergence of Information and Operation Technologies (IT & OT) to Build a Successful Smart Grid

Linear Motion and Assembly Technologies Pneumatics Service. Industrial Ethernet: The key advantages of SERCOS III

Arduino Wifi shield And reciever. 5V adapter. Connecting wifi module on shield: Make sure the wifi unit is connected the following way on the shield:

Transcription:

PowerGrid Europe T&D Unifying Europe 26-28 June 2007 Madrid Introducing IEC61850 in Distribution Substations Substation Automation Systems Carlos Caetano, Miguel Pernes ABB S.A. Portugal 1 Introduction In the last decades, utility companies have been increasing the investment in Substation Automation Systems (SAS). The reason behind this is the intention to decrease the number of interruptions and its durations, with fast detections of faulty conditions, selective fault tripping and automatic restorations of power supply, improving the quality of the energy supplied to end users. These SAS systems were until now, vendor proprietary, as there was no standard approach that could be followed. This leaded to closed systems, with narrow functional scope and with its own serial communication, where to integrate a third-party device or application, protocol converters had to be used. From the need to overcome this limitation, a standard named IEC61850 has been studied and developed, over the last 10 years. This standard states a set of rules and definitions, in order to enable interoperability between Intelligent Electronic Devices (IED) from different types or manufacturers. Interoperability means that two or ore IEDs are capable of exchanging data and use it to perform their own functions in a coherent cooperation. The Standard also allows a free allocation of functions, which permit that each vendor uses its own philosophy, for a specific function, but all the data that can be seen in the communication bus, regarding this function, look the same for all IEDs. As a global standard for these processes, it also contains specifications about design, engineering, testing rules and others. But the current version is still open in some areas, like the fully redundant communication or the specifications for complex distributed functions inside a substation, like Breaker Failure Protection or Station Level Authority. These are some of the reasons why it demands a very good understanding of the standard itself, much before the engineering process starts in a new project. 1/13

2 User benefits The first benefit from applying the IEC61850 to SA systems is clearly the installation of interoperability between IEDs of different brands. A global market needs global standards, where each device must have the ability to be integrated in any system with its own global principle of operation. Thinking global means cost reduction by equalizing competitors and their specific functions and by standardizing maintenance and operation procedures. But if the interoperability is one of the most important aspects of the standard, the ability to maintain a certain level of freedom allowing the use of specific vendor functions, is also one of the major advantages, as it allows different philosophies from each supplier and still leaves a certain space for creativity. It is also considered as a future-proof standard, because it takes in consideration the evolution of the technology in the coming years. It is based on the mainstream Ethernet communication and contains definitions for the communication to the process-bus, expecting that in the future the products will start supporting communication in the lowest level of the process. The configuration language, Substation Configuration Language (SCL), is defined in the standard. The use of this language permits that different tools, from different vendors, can understand the information contained inside any IED. Enabling data exchange, it also avoids misunderstandings, and facilitates the integration between vendors. All the engineering is stored in these SCL files, which facilitates its reuse in the next projects. Also the project documentation is produced from these files, which makes it to be more standard between projects and vendors. 2/13

3 The first IEC 61850 project experiences in Portugal a. The Projects The first projects where it had to be implement the new standard were six, all included in the same supply package, namely, Cacém, Aeroporto, Glória, Serpa, Venda do Pinheiro and Parede substations. All these substations belong to the distribution grid, enabling 60/30kV, 60/15kV and 60/10kV conversions. The six substations are of high importance for the grid, due to the fact that are installed in urban regions, but should be highlighted the importance of Aeroporto Substation, since it is the principal supply point to the Lisbon Airport. b. Typical Single Line Diagram The figure 1 shows a typical Single Line Diagram of the installed systems. Figure 1 Single Line Diagram of Cacém Substation 3/13

c. System Arquitecture The system arquitecture designed to all the six substations is conceptually shown in figures 2.1 and 2.2. Figure 2.1 System Arquitecture of Aeroporto Substation Figure 2.2 System Arquitecture of Aeroporto Substation (cont.) d. IED level 4/13

All IEDs installed are IEC 61850 compliant, and include horizontal communication (Goose) feature. Horizontal communication Goose was used for sending several data between IEDs. We can highlight Circuit Breaker Failure Protection (CBFP) trip signal from all outgoings to each corresponding incomer bay, earthling of neutral point to all feeders, Undervoltage and Underfrequency trips from both Incomers to all feeders, Trigger conditions for voltage and frequency restoration after a Load-Shedding, VTs truck positions, Parallel Operation of the Power Transformers, as important examples of information data exchanged with Goose. Roughly, 150 Binary indications are being sent using Goose messages. e. Network level The system uses a ring network topology, with full optical connections between all active elements. All switches are managed type, to enable the reprogramming of the network in case of failure. f. Station level The highest level in the substation consists of a computer without moving parts, running the SCADA application. This application provides all features needed to fully control and monitor the installation like Event and Alarm Lists, Single Line pictures, bay pictures, Commands to primary apparatus, measures from Voltage and Current transformers. It also implements global automatic functions like Voltage and Frequency Restoration and Time-based control function of capacitor banks. The SCADA application is running on top of a Windows XP Embedded operative system (OS). XP embedded is an operative system from Microsoft, that delivers the power of Windows XP in a componentized form. This allows the built of smaller images that can be installed in Compact Flash memories, avoiding the use of Hard Disks. It contains special functions to protect Compact Flash memories against writes from the OS, because these types of memories have a limit to the number of times that can be written in. Time Synchronisation was made using a GPS time server connected to the main switch. g. Communication to Network Control Centre The communication to the Network Control Centre was implemented using the standard protocol IEC 60870-5-101, trough a serial RS232 port of the SCADA computer. Roughly, 2000 indications were selected by customer, to be sent to the Dispatch Centre. All the primary equipment of the installation is controllable from the NCC, as well as Transformers tap changers, activation and deactivation of Automatic Functions and others. 5/13

h. Remote Maintenance Several engineering tools are available for customer, in order to make its own Remote Maintenance operations. The connection from the remote engineering offices can be made by a dial-up modem or using the same Ethernet structure of the company, which is preferable due to the largest bandwidth. For this one, an Ethernet Router was provided, to connect the Local Network to the company s WAN network. Remotely, maintenance teams can access each IED in the substation, checking for example event and error logs, change settings of Protection Functions, access switch s alarm lists or download a historic event list from a predefined day, from SCADA application. Basically, all active elements that are connected to the Local Network are remotely accessible for diagnosis and correction purposes, which is bringing a major advantage since it avoids time and cost consuming trips of maintenance teams to the installations. 4 The Customer a. Introduction The introduction of the standard in Portugal, started to be a demand from the customer, rather than a spontaneous proposal from the certified suppliers. The customer is the main Portuguese utility for electrical energy distribution. There is a history background knowledge of the customer, due to many years of a close cooperation between engineering teams from both sides. This made it possible to standardize the SAS projects, based on previous existing system solutions. A very detailed specification from the bottom engineering up to the Network Control Centre (NCC) communication was developed and discussed along the years, and a very stable engineering process workflow has been reached. b. Customer expectation with the new standard From all the benefits of migrating SA systems to the new standard, customer was focused in one in particular: standardize the system architecture from all suppliers, using same network topology for all, same physical network, same number of IEDs and same type of communication to NCC, among others. One can say that it was not the interoperability vision that leaded them to the migration decision. The introduction of Ethernet for the complete communication structure inside the substation was also an important trigger for the migration. 6/13

c. Customer specification for IEC61850 Along with the decision to acquire systems with the new IEC61850, it was started by the customer, a process to create a standard specification for Substations. These specifications define among others, global automatic functions, particular functions per feeder, system architectures and events description. We can consider customer s attitude as medium involving in the detailed specification, not defining extensively the IE61850 details. This fact in addiction to the trusting attitude from the customer obtained from dozens of previous projects, revealed itself as an advantage, once it allowed engineering teams to fully control and orientate all the engineering workflow with the adequate timings and methods. On the other hand, knowing in anticipation that customer would focus all attentions to the Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT), engineering teams were saved to be involved in dispersing discussions and meetings, regarding deep analysis of the new standard. One of the keys for the success was the advantage taken from the experience of dozen of previous projects, with a different platform certainly, but with very good relation and interface with customer engineering teams. This marked an excellent starting point and was the compensation to the fact that it was not possible to find a pilot project where to first start applying the standard. 5 Impact of Introducing IEC 61850 in SA projects a. Introduction In a first approach, the feeling among the engineering teams about a totally new system brings a certain part of fear and a certain part of reluctance for abandoning a totally proved system, where the workflow was clearly controlled. The most urgent issue regarding engineering teams when a project is gained and has to be delivered consists in training. All the programmers that will be involved have to be trained immediate and efficiently, otherwise a normal delivery time will not be enough for system development and error corrections. At the same time, facilities have to be redesigned and prepared in order to receive the new IEDs. This usually means to make modifications in testing cabinets, arrange a good Ethernet network structure using compliant IEC61850 switches to all IEDs, new software tools to diagnose and repair Ethernet communications, and probably new servers, capable of running the new and more demanding engineering tools. These processes, to physically prepare the facilities where programmers will work, are very important, as it permits that after the training period, everything is ready to begin with the engineering tasks. 7/13

b. The engineering workflow Engineering first started with the specification phase, getting all available documents from customer, and analyzing the latest previous projects. Then it was made a compilation of all functions, signal lists and other elements, from the previous projects that could be migrated and re-used in the new system. The first obstacles come with the need of use new engineering tools, in a new engineering workflow and when people are not yet familiarized with the new interfaces, not expecting the first problems. When new tools are getting more familiar to engineering people, the first results start to appear, the first communicating feeders, the first Alarms and Events make the initial reluctance start to disappear, and starts arising the idea that a final working system is possible to reach. Figure 3 SCL exchange the engineering process But not considering the whole new environment for the engineering period, with modified facilities and new tools that have to be learned from zero, all the rest of the engineering workflow can be considered much the same as in a normal old project. c. Vertical Communication The local control of a substation requires a good Human Machine Interface (HMI) application. The HMI is directly dependant of a good acquisition of data like positions and measures directly from each IED, in order to have a coherent vision of the substation. This type of communication is purely vertical, using a client-server concept to implement the needed services: event and alarm reporting, commands to breakers and other devices in the substation and File Transfer. The commands for primary equipment use the model of select-before-execute, to ensure safe and secure operation of this important equipment. File transfer is used e.g. to upload a recorded file from a disturbance stored in one IED to a computer connected to the station bus, like the station computer. 8/13

The vertical communication is also responsible to bring up to the NCC gateways the data to be converted and sent to the NCC, as long as, in the inverse direction, to receive commands from the NCC and send them, in a secure way, to the correct IED. Network Control Center Station Controller HMI NCC Gateway Figure 4 Vertical communication 9/13

d. Horizontal Communication With the horizontal communication capability, it is possible to exchange data from one IED directly to another. This feature is useful for example for station interlockings between different bays or for complex distributed functions that demands a coordinated action of different IEDs. In the IEC61850, horizontal communication is defined in terms of Generic Object Oriented Substation Event (GOOSE) mechanism. Network Control Center Station Controller HMI NCC Gateway Figure 5 Horizontal communication, Goose messages Goose is based on multicast messages directly mapped to the Ethernet, where a message sent by one IED can be seen by several receivers. Due to the periodic send and to the fast repetition mechanism when a data value changes, these messages are considered truly reliable and this is why they could be used for critical data exchange between bays, like inter-trips, time-critical triggers or interlockings. 10/13

Figure 6 Goose fast repetition mechanism In the implemented systems, Goose messages were used for Circuit Breaker Failure Protection (CBFP), Automatic Voltage Restoration trigger, neutral reactance position to all feeders among several others, in an average of 150 multicast messages per system. e. Time Synchronization Time synchronization is now totally independent from the other services inside the system. It is possible to use different services for different synchronization accuracy classes, but currently is defined SNTP (Simple Network Time Protocol) that assures a 1 ms accuracy class. Each IED connected will stay as a time client, fetching the time from a time server that can be a GPS clock or any other SNTP server running in a computer connected to the network. The 1ms accuracy is implemented via a mechanism of calculation and correction of the transmission delays between clients and server. f. Verification and Testing The Factory Acceptance Tests (FAT) with the customer s presence are of a crucial importance. FAT consists in a simulation, as close as possible, of the real conditions of the installation; to prove that the system fulfils what was contracted between supplier and customer. Usually a set of IEDs of each bay type is mounted in cubicles prepared to simulate the process, and then connected to the Ethernet bus and to station HMI, respecting what is the real system architecture. Typical tests are made for each bay, in order to check the correct operation of the IED, event report and HMI pictures, and in some cases also NCC communication can be simulated. If global complex functions need to be tested, usually this requires that more IEDs of the same bay type have to be mounted in cubicles, to verify the correct behaviour of the system as a whole. The FAT period is where it is still accepted that customer asks for small modifications to the initial specifications. All corrections to the system have to be made during or 11/13

immediately after ending this period, in order to have a system as close as possible to the final version, when leaving the verification room. For the first IEC61850 projects it is also advised to make deep internal verifications, even before the FAT starts, without the presence of customer, in order to identify in advance as more problems as possible and their resolutions. The Site Acceptance Tests (SAT) consists in a repetition of the FAT procedures, but now with the real process. The objective is to deliver a fully tested system to customer. No special differences were found comparing with the previous projects. Only should be taken in account the preparation of the physical conditions, before the commissioning team comes to substation, since there are new communication devices like managed switches that require software programming, a different communication structure and some more aspects that can delay the real start of the commissioning tests. g. Documentation Until now, the common practice shows that the final documentation is manually produced by the system engineers. From now on, the production of the final documentation of the system is much more facilitated by the common use of the Substation Configuration Language (SCL). It can be produced directly from the SCL files used for the engineering process. This brings an enormous advantage for customer, since all documentation received, will have a unique and standard format for all different systems independently of the supplier. 6 Conclusions The introduction of the standard IEC 61850 to the SA systems is a positive measure. The standard does not impose restrictive rules over many aspects there is still a large functional freedom for each vendor to explore. But it normalizes a set of elements from design, engineering and verification, up to the system documentation. It s a future-proof solution because it takes in consideration the progress of technology and is able to follow it. Contains the interoperability advantage because it enables IEDs from different vendors to exchange information and use it to implement correctly their own functions. Supports different philosophies of operation and free allocation of functions. From the customer point of view, it brings independency of single suppliers, capability to mix devices, competitive performance and cost savings in engineering and maintenance. The migration process must be very well designed. Trainings to the engineering teams must be consistently applied. 12/13

A good relation and understanding of the customer and its expectations are major factors to accomplish the migration task. If previous projects for the same client exist, they must be taken in consideration, as it already contains several important parts of the customer specification, which were previously tested and accepted. 7 References [1] Ivan De Mesmaeker*, Peter Rietmann, Klaus-Peter Brand, Petra Reinhardt Practical considerations in applying IEC 61850 for Protection and Substation Automation Systems GCC Power 2005 Conference and Exhibition, Doha, Qatar from 27th 29th November 2005 [2] K.P.Brand, C.Brunner, W.Wimmer, Design of IEC 61850 based Substation Automation Systems according to Customer Requirements, CIGRE Plenary Meeting, Paris, 2004, Session of SC B5, Paper B5-103 [3] M. Hyvärinen, P. Laakso Comparison of the Life Cycle Costs of Conventional and Numerical Secondary Systems, CIGRE Plenary Meeting, Paris, 2002, Session of SC 34, Paper 34-104 [4] K.P.Brand, M.Janssen, The Specification of IEC 61850 based Substation Automation Systems, Paper presented at DistribuTech 2005, January 25-27, San Diego [5] P.Rietmann, B. Reimann, Handling of users' requirements in Substation Automation (SA) Paper presented at CIGRE Study Committee B5 Colloquium 2003, September 30 to October 1,03, Sydney [6] M.Hyvärinen, P.Laakso, Comparison of the Life Cycle Costs of Conventional and Numerical Secondary Systems, CIGRE Plenary Meeting, Paris, 2002, Session of SC 34, Paper 34-104 [7] Peter Rietmann, Petra Reinhardt Applying IEC 61850 to Substation Automation Systems 13/13