Schemes for Grid Interacted Rooftop and Small SPV Power Plants in Uttarakhand

Similar documents
G.O.MS.No. 8 Dated Read the following:-

Pilot Scheme of MNRE for Large Scale Grid Connected Roof Top Solar Power Generation

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

TELANGANA SOLAR POWER POLICY 2015

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO , SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

Policy. For. Development of Micro & Mini Hydro Power Projects upto 2 MW Government of Uttarakhand. Page 1

File No. 5/22/ /RT Ministry of New and Renewable Energy Grid Connected Rooftop Solar Power Division *****

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

PICO HYDROPOWER PROMOTION PROJECT

all that you want to know About Rajasthan Solar Energy

Financial Analysis of Solar Photovoltaic Power plant in India

SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems

DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014

Government of Jharkhand Department of Energy. Notification

Draft Jharkhand State Solar Power Policy 2015

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

Solar PV For Surrey Schools - Information Pack

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

Solar Power Plants FAQs

Delhi Solar Energy Policy, 2015

Through NABARD. System- street lights, home lights, LED Up to 40 Wp Rs.120 Rs.160 Rs.132 Rs.396 Rs.120 Rs.360 NA

Form DVAT 04 Cover Page [See Rule 12]

POLICY FOR IMPLEMENTATION OF SOLAR POWER BASED PROJECTS IN MADHYA PRADESH, 2012

Rooftop Solar PV Power : Potential,Growth and Issues related to

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

Application for Individual Retail Exemption

For Empanelment of Registered Firms of Chartered Accountants for. conduct of Audit of Accounts and also Physical verification

Analysis of state-wise RPO Regulation across India

Electricity in Egypt

To whom application is to be filed

Photograph. Pleas affix a recent passport size photograph. To PUNJAB & SIND BANK Branch Office.. Date:..

FORM D (See rule 40) THE RUBBER BOARD APPLICATION FOR SPECIAL LICENCE TO PURCHASE OR OTHERWISE ACQUIRE RUBBER

Guidelines for Solar Grid Power Projects

Total 5,926 24,514 66,355 97,042 68, ,

Solar Purchase Obligation

Initiatives by TEDA and

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY

Community Solar Roof Guide

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

Methodology for Solar Power Projects

Renewable Energy. and Renewal Energy Certificates in Indian Context

BEFORE THE HARYANA ELECTRICITY REGULATORY COMMISSION BAYS NO , SECTOR 4, PANCHKULA HARYANA

Existing Wind Power Policies and Incentives

S. No. Year Obligation expressed as percentage of energy consumption (%)

PROCEDURE FOR AVAILING DUTY BENEFITS FOR MINI-GRID OR MICRO GRID SOLR POWER PLANTS

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE

Online Registration of Channel Partner/New Entrepreneur

Grid Connected Storage Various Applications Realised with Proven Technologies. Wilhelm van Butselaar Clean Energy Week 2013, Brisbane July 2013

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

Marketing Methodology of Solar PV Power Packs

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009

Good Energy Feed-in Tariff sign up form

SOFTWARE TECHNOLOGY PARKS OF INDIA

No. 22/9/2009-NSM (ST) भ रत सरक र/ Government of India नव न और नव करण य ऊर म त र ऱय / Ministry of New & Renewable Energy ***** Office Memorandum

e-factsheet Feed-in Tariffs what we have to offer

DELHI ELECTRICITY REGULATORY COMMISSION

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT

( A Category -1 'Mini Ratna' Public Sector Enterprise) दक ष ण त र, च न न - 27 SOUTHERN REGION: CHENNAI 27

2016 Santee Cooper Solar Home & Solar Share Home Program Manual

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India

HARNESS. Utilising solar energy to save money

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION

INFORMATION DOCUMENT

Private School Management Portal

GOVERNMENT OF MANIPUR SECRETARIAT: GENERAL ADMINISTRATION DEPARTMENT ---- N O T I F I C A T I O N Imphal, the 22 nd June, 2016.

National Electricity Policy 03-Feb-2005

COMBINED SUMMARY OF STATE POLICIES FOR SOLAR POWER

APPLICATION FORM FOR GRANT OF PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (FM) (Seven Copies to be submitted)

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

DRAFT APPLICATION FORMAT FOR ELECTRICITY CONNECTION

ASSOCIATION OF MUTUAL FUNDS IN INDIA LEVY OF SERVICE TAX VIS-À-VIS MUTUAL FUNDS A GUIDANCE NOTE

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

Renewable Energy Certificate Mechanism

Smart meters: Removing regulatory barriers and maintaining consumer safety for a market-led roll out of smart meters in New South Wales

HMT (INTERNATIONAL) LIMITED (A Govt. of India Undertaking) Regd. Office: HMT Bhawan, No.59, Bellary Road, Bangalore

Energy Efficiency, Clean Power as Engine for Sustainable Growth

Utility Warehouse. Feed-In Tariff scheme. Application form

Explanation of Net Energy Metering and Annual Net Surplus Electricity Settlement Options

HARYANA STATE PHARMACY COUNCIL, PANCHKULA

PACKAGE OF INCENTIVES The incentives under the 1997 scheme shall be available for eligible units of the following categories:

Solar City Master Plan - Executive Summary

Expression of Interest for Empanelment Of Film Producer/ Film Production Agency

RENEWABLE ENERGY INVESTMENTS

DELHI ELECTRICITY REGULATORY COMMISSION VINIYAMAK BHAWAN, C-BLOCK, SHIVALIK, MALVIYA NAGAR, NEW DELHI

Directorate General of Supplies & Disposals Jeevan Tara Building 5, Parliament Street, New Delhi (Planning and Coordination Directorate)

Renewable Energy Feed-in Tariff Projects Regulations

HOW TO ESTABLISH A BUSINESS IN BOSNIA AND HERZEGOVINA

The Solar Power Specialists. Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House, Unit A19, 20 Heron Road, Belfast, BT3 9LE

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION

Renewable energy mini grids Indian experiences

Subject: Draft Scheme for development of Solar Parks and Ultra Mega Solar power projects circulation for comments reg.

a) No. of Posts: ONE

GOVERNMENT OF ANDHRA PRADESH Notification for Filling up of Backlog Vacancies of STs in Zilla Grandhalaya Samsta in Librarian Gr.

Transcription:

Schemes for Grid Interacted Rooftop and Small SPV Power Plants in Uttarakhand 1.0 Background There is a large potential available for generating solar power using unutilized space on rooftops and wastelands around buildings. Small quantities of power generated by each individual household, industrial building, commercial buildings or any other type of building can be used to partly fulfill the requirement of the building occupants and surplus, if any, can be fed into the grid. In order to utilize the existing roof space of buildings, the roof-top SPV systems on buildings can be installed to replace DG genets installed for minimum load requirement for operation during load shedding. The Ministry of New and Renewable Energy (MNRE), Govt. of India has been implementing a programme on Off-grid and Decentralized Solar Applications for the first phase of the Jawaharlal Nehru National Solar Mission (JNNSM). The programme has been amended time to time and with the recent amendment a provision on this ongoing scheme has been made to connect the small SPV Plants with grid to export excess power. MNRE may provide one time subsidy upto 30% of the benchmark cost of the project as follows (current rate): S.No. Type of system Benchmark cost (Rs./Wp) 1. Solar Power plants/packs (with battery bank with 6 hours autonomy) >300 Wp to 1 kwp >1 kwp to 10 kwp >10 kwp to 100 kwp 2. Solar Power plants/packs(without battery) Upto 100 kwp >100 kwp to 500 kwp 2.0 The Scheme 210 190 170 Uttarakhand state has a good potential of Solar Energy. About 300 sunny days are available in the State which provides an excellent potential for installation of Rooftop and other Small Solar Power Plants in the State. Keeping the above in view, grid interactive rooftop or small SPV system will be supported under this scheme. The generated power from such SPV system/project will be 100 90

utilized fully by powering captive loads during the day time and excess power will be fed into the grid as long as grid is available. In case, where solar power is not sufficient due to cloud cover etc., the captive loads will be served by drawing power from the grid. The connectivity of such projects will be either at 33 kv/11 kv three phase lines or of 440/220 Volt three/single phase line depending on the system installed. The grid-interactive rooftop system can work on net metering basis wherein the beneficiary pays to the utility on net meter reading basis only. Alternatively two meters can also be installed to major the export and import of power separately. Ideally, grid interactive systems do not require battery back-up as grid acts as the back-up for feeding excess solar power and vice-versa. However, to enhance the performance reliability of the overall systems, a minimum battery back-up of one hour of load capacity is recommended. In grid interactive systems, it has, however to be ensured that in case the grid fails, the solar power has to be fully utilized or stopped immediately feeding to the grid (if any in excess) so as to safe-guard any grid person/technician from getting shock (electrocuted) while working on the grid for maintenance etc. The feed in tariff for the power generated from the Solar Power Plant will be decided by Hon ble Uttarakhand Electricity Regulatory Commission (UERC) in such a manner that it provides a safeguard to all stakeholders including DISCOMs. The availability of electricity grid near the solar installation is an essential component which needs to be provided by the concerned agencies i.e. UPCL/PTCUL. 3.0 Eligibility and Targets under Scheme The policy aims to utilize the existing roof space of buildings for the roof-top SPV systems to replace DG gensets installed for minimum load requirement for operation during load shedding. Also harness the available potential for generating solar power using unutilized space and Promoting green and clean power using solar energy to reduce the dependence on conventional source of energy. All the individuals, residential/commercial/institutional/govt. building owners, Industrial units are eligible to set up Solar Power Plant within the prescribed capacity limit. Eligible capacity limit under the scheme will be as under:- a) Project capacity with battery backup 300 Watt to 100 KW. b) Project capacity without battery backup upto 500 KW. The projects of total capacity 5 MW is proposed for 2013-15, this scheme announced by MNRE vide No. 5/23/2009-P&C dated 8 th July, 2010.

4.0 Various Options for Installation of Solar Power Projects:- For the success and smooth operation of rooftop and small solar power plants, various situations and conditions needs to be worked out to make it a workable business model. There can be many possible business models, some of which can be considered are as follows: (a) Solar installations owned by consumer i) Solar Rooftop facility owned, operated and maintained by the consumer(s). ii) Solar Rooftop facility owned by consumer but operated and maintained by the 3 rd party. (b) Solar installations owned, operated and maintained by 3 rd Party The 3 rd party implements the solar facility and provides services to the consumers. The surplus electricity may be injected to the electricity grid. The combinations could be: i) Arrangement as a captive generating plant for the roof owners The 3 rd party implements the facility at the roof or within the premise of the consumers; the consumer may or may not invest as equity in the facility as mutually agreed between them. The 3 rd party may also make arrangement of undertaking operation and of maintenance of the facility. The power is then sold to the roof owner. ii) Solar Lease Model, Sale to Grid The 3 rd party implementing the solar facility shall enter into a lease agreement with the consumer for medium to long term basis on rent. The facility is entirely owned by the 3 rd party and consumer is not required to make any investment in facility. The power generated is fed into the grid and the roof top owner gets a rent. (c) Solar Installations Owned by the Utility Ownership of i) Solar installations owned operated and maintained by the DISCOM The DISCOM may own, operate and maintain the solar facility and also may opt to sub contract the operation and maintenance activity. The DISCOM may recover the cost in the form of suitable tariff. The electricity generation may also be utilized by DISCOM for fulfilling the solar renewable purchase obligation.

ii) Distribution licensee provides appropriate viability gap funds The DISCOM may appoint a 3 rd party to implement the solar facilities on its behalf and provide appropriate funds or viability gap funds for implementing such facility. It may also enter into an agreement with the 3 rd party undertaking the operation and maintenance of the solar facilities. 5.0 Site Requirement:- i. The project site/rooftops at office buildings, commercial buildings, residential complexes etc. can be selected on the basis of total energy requirement of the premise and the area available for installation of roof top Solar PV system. ii. Solar PV system on the roof top of selected buildings can be installed for meeting the requirement of the building as much as possible. iii. Though rooftop systems shall be generally connected on LV supply, large solar PV system may have to be connected to 11kV system. Following criteria has been made by Hon ble UERC for selection of voltage level in the distribution system for ready reference of the solar suppliers: Load upto 4 KW: low voltage single phase supply Load >4 kw and upto 75 kw: low voltage three phase supply Load >75 kw and upto 1.5 MW: at 11 kv Load >1.5 MW and upto 3 MW: at 11/33 kv or as per site condition iv. Export Import meters/two way meters shall be installed with the facility of net metering. Two way meters can also be used as they are cheaper and give better idea about power exported. The meter may also be finalized in consultation with the DISCOM. 6.0 Power Purchase Agreement:- i. A Power Purchase Agreement (PPA) should be signed between the owner of buildings, 3 rd party and the DISCOMs as applicable. ii. An agreement between DISCOM and the owner of building/premise/spv plant needs to be signed for the net metering and billing on the monthly/bi-monthly basis as applicable. Suitable payment security mechanism to be provided by the DISCOM/State Nodal Agency/Utility.

7.0 How to Apply & Register:- a) Application form will be made available on UREDA website (www.ureda.uk.gov.in), with effect from 12/08/2013. b) Photocopies of the application form may be used. When the targets available (total capacity 5 MW) get exhausted, application process will be closed and the matter intimated on UREDA s website. Applicants are advised to verify this status on UREDA s website, before sending the application. c) Applicant has to apply to UREDA in the prescribed format along with an application fee @ Rs. 500/- per KW or part thereof in the form of DD drawn in favor of Director, UREDA, Dehradun. The maximum application fee will be Rs. 30,000/- per project. d) The application form must be accompanied by the required application fee, a selfattested copy of a Photo identity card, copy of recent electricity bill, and a selfaddressed and Rs.25/- stamped envelope. In the case of Government/Govt. Undertaking/Autonomous body buildings, photo ID card are exempted upon making an official request by the head of office concerned is required. e) Complete filled in application form along with registration fee and documents has to be sent to The Director, UREDA, Energy park campus, Industrial area, Dehradun- 245001 by post/courier. f) Applications without application fee, required details and documents will be summarily rejected. g) Selection of beneficiaries will be strictly on first come first served basis (subject to the condition that application is complete in all respects). District wise target allocation may be introduced if found necessary. h) A registration number will be allotted by UREDA in the acknowledgement letter to the applicant. i) The registration is not transferable to another beneficiary or site/building. j) The site will be inspected by UREDA officials for assessing technical feasibility and if found technically feasible, plant will be allotted to the applicant through an Allotment Letter. k) Plants constructed without getting the Allotment Letter from UREDA or without following the instructions/ specifications contained in the Allotment Letter from UREDA will not be considered for subsidy release.

Application Form For Office Use Reg. No. :... UTTARAKHAND RENEWABLE ENERGY DEVELOPMENT AGENCY Urja Park Campus, Industrial Area, Patel Nagar, Dehradun 248001 Ph. 0135-2521553, 2521387, Fax: 0135-2521386, E-mail: spv.uredahq@gmail.com, Website: www.ureda.uk.gov.in Dt. :... Application fee details: DD No.:... Dt. :... Bank :... 1 Name of Applicant 2 Address in Full PIN: 3 Mobile phone No. 4 STD code/land line No. 5 Email ID 6 Category (SC/ST/General) 7 Beneficiary has to submit self attested copy of Voters ID card/passport/pan card/any other photo ID card Type of ID card submitted ID card No. Site Details: 8 Address of the site for Installation 9 Nearest land mark 10 Name of DISTRICT 11 Grama Panchayat /Minicipality/ Corporation 12 Ward No./Building No. 13 Type of Application (Domestic/ Non-domestic) 14 If non-domestec, specify type of building {shop/ industry/ Govt./ educational/ others (specify)} 15 Shade free area available for PIN:

installation of solar panel (Per KW requirements is nearly 15 m 2 ) m 2 16 Proposed Capacity of the Project in KW Electricity Consumption Details: 16 Do you have electricity connection YES/NO (If YES, attach a copy of recent electricity bill) 17 Average monthly consumption of electricity..units 18 Remittance details of application fee of Rs.../- Name of Bank DD. NO. Date Declaration I... Son/Daughter of..., have read and hereby agree with the terms and conditions and specifications stipulated by UREDA for the selection and installation of roof-top solar power plant. If allotted a plant, I agree to complete the installation within the time allowed and submit the details to UREDA for release of subsidy. Place : Date : Signature : Name: CHECK LIST: 1. Copy of photo ID card (YES/NO):. 2. Copy of recent electricity bill (YES/NO):. 3. DD for Application Fee (As applicable) (YES/NO):. 4. Self-addressed Rs.25/- stamped envelope (YES/NO):. 5. Filled in acknowledgment slip (YES/NO):.

ACKNOWLEDGEMENT SLIP Your application for the roof-top solar power plant under the Grid Interacted Rooftop and Small SPV Power Plants has been received along with the registration fee with the following details: Proposed Project Location Proposed Capacity DD No. DD Date Issuing Bank Application Fee Amount Rs... (To be filled in by the applicant) The following Registration Number has been allotted to your application. Please quote this Registration Number in all your future correspondences. Registration Number Date of Registration (To be filled in by UREDA) To Authorized Signatory UREDA PIN (Applicant has to write the full postal address with PIN in BLOCK letters in the box above)