DALY CITY RESIDENTIAL ADDITIONS GUIDELINES

Similar documents
Applications for building permits will not be reviewed until all of the required information has been submitted.

Single Family Residential Basement Finish

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

BUILDING PERMIT SPECIFICATIONS

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

How To Build A Basement House

2. What building projects are exempted? (permit not required)

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

City of St. Charles Basement Finish or Remodel

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Development Services City of Lawrence, KS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Bureau Veritas Contact Information

Single Family Residential Building Permit Questions & Answers

Residential Building Permits

RESIDENTIAL WINDOW REPLACEMENT

Does Wall Township require an inspection by the building department on resale of a home?

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

TOWN OF OHIO BUILDING PERMIT APPLICATION

2010 Residential Water Heater Replacement Check List

SECTION 19 RESIDENTIAL CONSTRUCTION IN FLOODZONES

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

City of Riverside Building & Safety Division Phone: (951)

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

SINGLE-FAMILY EARTHQUAKE (SEISMIC) RETROFITS

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

PERMITS REQUIRED & PERMIT EXEMPTIONS

Botetourt County, Virginia. Frequently Asked Questions

Arapahoe County Residential Water Heater Installation and Inspection Guide

Building Department John Fiedler Construction Official Ext SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev

General Fire Code Requirements Within Commercial Tenant Spaces

( Staple Upper Right Corner ) MINNEAPOLIS TRUTH-IN-SALE OF HOUSING DISCLOSURE REPORT

An Applicant s Guide to Residential Building Permits

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

SECTION 1 - BUILDING CODE

C I T Y O F P E A R S A L L

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Building Permit Application

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

dpd 316 Seattle Permits Tip Subject-to-Field-Inspection (STFI) Permits Projects that Qualify as STFI

Instructions for Obtaining a Certificate of Smoke Detector, Carbon Monoxide Alarm, and Kitchen Fire Extinguisher Compliance

dpd Seattle Permits CAM Establishing an Accessory Dwelling Unit (ADU) What is an ADU?

City of Fort Smith Building Permit Process Frequently Asked Questions

How To Get A Building Permit In Houston

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

MOBILE HOME LAW. Revised November 2001

A Homeowners Guide To Code Enforcement

Sample Drawing Package for One and Two Family Dwelling Applications

TOWN OF SPENCER Office of Development & Inspectional Services

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained).

Residential Building Permit Process

Guidelines for Earthquake Bracing Residential Water Heaters

City of Beacon Building Department

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

RRIO Checklist. Use of checklist: Definitions: Limitations

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Building Information Packet

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

City of Elk River BASEMENT Office Use Only

Residential Plan Routing Information

Department of Licenses and Inspections PARTNERS FOR GOOD HOUSING

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

BUILDING SAFETY UNIT

FREQUENTLY ASKED QUESTIONS: 1) Q: When is a building permit required?

How To Make A House Safe

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

TOWN OF TRURO BUILDING PERMIT APPLICATION

RESIDENTS DAMAGE ASSESSMENT FORM

How to Obtain a Building, Electrical, Plumbing Permit for the Remodeling of Single and Two-Family Dwellings in the City and County of San Francisco

Frequently Asked Questions

APPLICATION FOR NEW CONSTRUCTION

RHODE ISLAND DIVISION OF STATE FIRE MARSHAL

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

The City of Basehor, Kansas

NEW OR ADDITIONS TO GARAGE/SHOP/STORAGE PERMIT REQUIREMENTS

Floyd County Department of Inspections 120 West Oxford Street PO Box 218 Floyd, VA Phone: Fax:

Building Code Clarifications - 7. Fire Resistance

Estimated Cost of Repair

Policy on Water Heater Installations Policy No. UPC Effective: September 1, 1995 Revised: February 10, 1996

SECTION 105 PERMITS. Gas:

dpd Seattle Permits CAM Establishing an Attached Accessory Dwelling Unit (ADU) What is an ADU?

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief

Building Construction and Development in Norristown: A User s Guide to the Land Development and Building Permit Process 1/25/11

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors.

Transcription:

DALY CITY RESIDENTIAL ADDITIONS GUIDELINES City of Daly City California

RESIDENTIAL ADDITIONS GUIDELINES City of Daly City TABLE OF CONTENTS SUBJECT PAGE Background...1 Plan Requirements...1 Who Draws the Plans...1 Energy Requirements...2 Plot Plan...2 Floor Plans...2 Details and Elevations...2 Special Smoke Detector Requirements...3 Daly City Municipal Codes...3 Submitting an Application...3 Obtaining Permits and Beginning Construction Work...4 Construction and Demolition (C&D) Debris Recycling Program...5 Inspection Scheduling...6 Permit Expiration...6 Enforcement...6 Additional Information...6 Daly City s Top 10 List of the Most Common Plan Check Comments...7 Sample Floor Plan...8 Sample Plot Plan...9 i

A GUIDE FOR CONSTRUCTION OF RESIDENTIAL ADDITIONS BACKGROUND The purpose of this handout is to provide direction to those wishing to provide additional floor space to their homes. This handout is intended to provide information regarding the planning, plan preparation, permit, and construction inspection processes. The addition of living space usually takes one of two forms: 1. Living area constructed within the existing foundation, such as rooms downstairs; 2. Living area constructed outside the original foundation, such as a one or two story rear addition. Generally, adding rooms downstairs is feasible if the rooms do not or intrude into required parking areas. Additions to the outside of the house are limited by the lot coverage ordinances. Contact the Planning Division for specific lot coverage information at (650) 991-8033. Prior to designing an addition, it is a good idea to visit the Planning and Building Divisions in City Hall. Staff will provide specific information regarding the requirements and regulation of the proposed project. This initial direction may save time and money. PLAN REQUIREMENTS After consulting with the Planning Division regarding parking and lot coverage, design and preparation of plans may begin. The City requires three complete sets of plans be submitted for review. A set of plans consists of: A plot plan Floor plans Any required elevations and details Energy calculations Three complete sets of plans are to be submitted. This enables all City divisions and departments to review the plans simultaneously, thereby saving you time. The minimum paper size for plans is to be 11 inches by 17 inches or larger. Sample floor and plot plans are attached (see pages 9 and 10). WHO DRAWS THE PLANS The City does not require plans be prepared by an architect or engineer in most cases. This includes: Construction of rooms downstairs, inside the original foundation; One and two story additions prepared in accordance with the conventional light-frame construction provisions of the California Building Code (CBC). Second-story additions and one or two story additions not meeting the CBC conventional construction provisions require drawings prepared by a California registered architect or engineer. Supporting 1

calculations will need to be provided demonstrating structural compliance with the building code. The designer s wet stamp and signature will need to appear on the first page of the calculations and on each plan sheet. ENERGY REQUIREMENTS Applications for rooms down and additions must be accompanied by Title 24 energy calculations. Forms CF-1R and MF-1R signed by the owner and designer must appear on the plans. PLOT PLAN The plot plan shows the layout of the house on the lot. Plot plans are normally drawn on a one eighth inch (1/8 ) to one foot (1 ) scale. The plot plan must show: Length and width of the lot; Location of the building structure(s) on the lot with the new and existing portions clearly indicated; Length and width of the existing and proposed driveway; Utility connections; If the project is an addition, the method of carrying roof runoff from the addition to the street is to be shown. FLOOR PLANS Floor plans are drawn on a ¼ to 1 scale. Floor plans must include: All floors, the garage and all rooms; Usage and ceiling height of each room; All plumbing fixtures, existing and new; Windows, including existing and proposed, and indicate size and type; Doors, including size and type; All proposed electrical fixtures, switches, outlets and smoke detectors in the addition; Furnace, water heater and the laundry facilities. Clearly indicate what is new construction and is existing. DETAILS AND ELEVATIONS Plans for additions outside the existing foundation must include details and elevations. Details should include: Footing/foundation design; The method of attachment of the addition to the existing structure at the foundation, each floor level, and the roof; A flashing detail; A nailing schedule; A plan for erosion control during construction; Details for any other feature which may require additional explanation. 2

SPECIAL SMOKE DETECTOR REQUIREMENTS The CBC requires smoke detectors be installed when rooms are added or additions are made to singlefamily homes. Install smoke detectors: In each (existing and new) bedroom or sleeping area, and At points centrally located outside of each bedroom or sleeping area. Smoke detectors are to receive their power as follows: In existing construction, from a battery; In new construction, from the building s electrical system with a battery backup. DALY CITY MUNICIPAL CODES The installation of a fire separation is required when additional living space is created. When new habitable space is added, the garage is to be insulated and sheetrocked as follows: Insulate walls with R-13 insulation and floor/ceiling assemblies adjoining living spaces with R- 19 insulation. Sheetrock walls supporting living space above, and walls and garage floor/ceiling assemblies separating the garage from living space. Sheetrock must be 5/8 inch thickness type X, fire-rated material. The water heater, if located in the garage, must be raised: The code requires the unit be elevated so that the flame is a minimum of eighteen inches (18 ) above the floor. This eliminates a potential fire hazard. Strapping the water heater to prevent movement during earthquakes is also required. For more information, obtain the water heater handout from the Building Division. The use of plastic piping materials for plumbing drain, waste and vent systems is not permitted. This material is more subject to fracture than metallic piping in the event of an earthquake. The City requires all new roof assemblies to have a minimum Class B fire rating. For more information, obtain the roofing requirements handout from the Building Division. Compliance with these special code requirements will need to appear as notes or details on the plans as applicable. SUBMITTING AN APPLICATION A completed application form is to be submitted along with building plans. It is a simple application that may be completed in advance, if you wish. Applications are available at the Building Division. 3

A plan check fee is collected at the time of application. The fee is dependent upon the size and extent of the proposed construction work. Plans are normally reviewed within ten (10) working days. Or you may take advantage of Express Plan Check: Express Plan Check is available on Tuesday mornings between 8 a.m. and 10 a.m. It provides same day plan review. Single-story residential additions or rooms constructed within the existing walls are eligible for Express Plan Check. Following completion of the plan check, the City will mail you notification either approving or denying your application: If approved, permits are ready to be obtained and permit fees will be calculated. You will need to come into our office to pay these fees and obtain the permits prior to beginning work. If denied, you will receive a list of plan check comments. Plans will need to be revised and resubmitted to comply with the comments. OBTAINING PERMITS AND BEGINNING CONSTRUCTION WORK Permits may be obtained by the homeowner or a licensed contractor: A homeowner may obtain permits if he/she or the immediate family intends to do the work. If the work is to be done by others without compensation, the owner will need to furnish proof of worker s compensation insurance. If the work is to be done by others for compensation, the permit will need to be obtained by a State of California licensed contractor. After paying permit fees (and if required, C&D deposit) and obtaining permits, the work may begin. As work progresses, inspections must be obtained before any work is covered or concealed. Normally, inspections are scheduled for the following: Foundation (before concrete is placed) Underfloor plumbing Framing Rough electrical, plumbing and mechanical Insulation Sheetrock nailing Final inspection 4

CONSTRUCTION AND DEMOLITION (C&D) DEBRIS RECYCLING PROGRAM Projects covered under Daly City s Construction and Demolition Debris Recycling Ordinance (described below) will require payment of a refundable deposit at time of permit issuance. Projects Covered by the Ordinance: All alterations of a building when the value of the project exceeds $15,000. All new construction of a building when the value of the project exceeds $25,000. All roofing tear offs greater than 100 square feet All complete demolitions of a building. In addition, for all covered projects exceeding $30,000 in value, a C&D Waste Management Plan must be submitted and approved prior to permit issuance. Deposit Required: Complete Demolition: $3,000 Roof Tear-Off (greater than 100 square feet): $300 New Construction or Alteration Residential: 3% of project value (Minimum: $300 Maximum: $5,000) Commercial: 3% of project value (Minimum: $300 Maximum: $30,000) Deposit Refund: The C&D deposit will be returned to the Permit Applicant upon satisfactory proof that either 60% of the C&D debris has been diverted from disposal and has been recycled and/or reused OR the C&D debris has been taken to an Approved Recycling Provider. The City must receive all refund requests no later than 180 days after the final inspection by submitting the C&D Deposit Refund Request Form along with your receipts. Approved Recycling Service Providers: A list of potential recycling service providers is available at the Building Division counter and from RecycleWorks (a San Mateo County program) online at www.recycleworks.org. For more information on salvage and reuse options, contact RecycleWorks at (888) 442-2666. 5

INSPECTION SCHEDULING Inspections are scheduled by telephoning our office before 3:30 p.m. the working day before you need the inspection. Please have your permit number ready when calling. You will be given the choice of a morning or afternoon inspection. Inspection hours are normally between the hours of 8:30 and noon and 1:30 and 5:00, Monday through Friday. (Friday inspections are limited so call in early!) You may call our office between 8:00 and 8:30 the morning of the inspection to speak with an inspector and ask for an approximate inspection time or to cancel the inspection. PLEASE NOTE: If the work inspected is found to be incomplete or incorrect, or if no one is present when the inspector arrives, an $86 reinspection fee will be charged. This fee covers the City s cost of having to return to the site for another inspection. Rooms are not to be occupied or otherwise used until a final inspection has been approved. PERMIT EXPIRATION A building permit expires if work is suspended or abandoned for a period of 180 days. The building code requires the permittee make substantial progress on the construction project and schedule an inspection within this time period to maintain an active permit. If a permit expires, it will need to be renewed before work may recommence. Permit renewal fees will need to be paid. ENFORCEMENT If your application was submitted as a result of the City undertaking enforcement action on your property, it is important that the application materials be approved, permits be issued and the work be completed in a timely fashion. Lapses in any of these processes will result in resumption of enforcement action and incurring of enforcement fees at our standard hourly rate for staff time incurred. ADDITIONAL INFORMATION For zoning, parking and lot coverage information, contact the Planning Division at (650) 991-8033. For building code, applications, or permitting requirements, contact the Building Division at (650) 991-8061. 6

DALY CITY S TOP 10 LIST OF THE MOST COMMON PLAN CHECK COMMENTS 1. OCCUPANCY SEPARATION. When the house does not have a fire-resistive occupancy separation between the house and garage, provide 5/8 type X gypsum board on all walls and ceiling of the garage; and provide R-13 insulation in the walls between the habitable space and garage and R-19 insulation in the ceiling of the garage (DCMC 15.08.060). 2. OCCUPANCY SEPARATION DOORS. Provide a self-closing, tight-fitting solid wood door 1-3/8 in thickness, or, a self-closing tight-fitting door having a fire-protection rating of not less than 20 minutes between the garage and habitable areas (CBC 302.4, Exception 3). 3. WATER HEATERS - PROTECTION FROM FIRE DAMAGE. Water heaters generating a glow, spark or flame capable of igniting flammable vapors may be installed in a garage, provided the pilots and burners or heating elements and switches are located at least eighteen inches (18 ) above the floor level in residential garages (DCMC 15.20.060). 4. WATER HEATERS PROTECTION FROM SEISMIC DAMAGE. Water heaters shall be anchored to resist horizontal displacement due to earthquake motion (CPC 510.5). 5. CEILING HEIGHTS. Habitable space shall have a ceiling height of not less than 7-6. Kitchens, halls, bathrooms and toilet compartments may have a ceiling height of not less than 7 0 (CBC 310.6.1). 6. SMOKE DETECTORS. (CBC 310.9). (a) New bedrooms or legalized bedrooms: Provide smoke detectors, hardwired with battery backup, in all bedrooms and adjacent spaces. (b) Existing bedrooms; Provide smoke detectors, battery operated, in all existing bedrooms and adjacent hallway or spaces. 7. HEATING. Dwelling units shall be provided with heating facilities capable of maintaining a room temperature of 70 F at a point 3 feet above the floor in all habitable rooms (CBC 310.11). 8. PLUMBING PIPING. Note on the plans: no plastic plumbing pipe allowed (DCMC 15.20.040 and 15.20.090). 9. RESIDENTIAL ENERGY REGULATIONS. (State Title 24, Climate Z.3). (a) Provide Residential Energy Calculations revised October 2005. (b) Provide Certificate of Compliance CF-1R form on the plans. (c) Provide Mandatory Measures MF-1R form on the plans. (d) Provide notes on the plan for R-value of the insulation called for on the energy calculations. (e) Provide notes on the plan for the U-valve of all exterior windows and glass doors called for on the energy calculations. (f) Provide notes on the plan for the general fluorescent lighting in the bathroom and/or kitchen called for on the energy calculations. 10. BEDROOM EMERGENCY EGRESS. Specifying openable dimensions of the proposed bedroom window on plan. Bedroom window for purposes of emergency escape and rescue shall have a minimum clear openable Width dimension = 20 inches; and minimum clear openable Height dimension = 42 inches (CBC 310.4). 7