Milli-Kelvin Cryo-Cooler Development at the Mullard Space Science laboratory I. Hepburn, J. Bartlett, G. Hardy

Similar documents
Mid InfraRed Instrument (MIRI) Cooler Subsystem Design

Thermal Storage Unit Using the Triple Point of Hydrogen

The D-Wave 2X Quantum Computer Technology Overview

OPTIMAL DESIGN AND OPERATION OF HELIUM REFRIGERATION SYSTEMS *

Environment-Laboratory Ambient Conditions

The Challenges of Low Temperature Research. Luke Mauritsen, Brian Smithgall Montana Instruments Corporation, USA

High-Capacity and Efficiency Stirling Cycle Cryocooler

High Voltage Power Supplies for Analytical Instrumentation

2. Room temperature: C. Kelvin. 2. Room temperature:

An introduction to cryogenics

Advances in Gas Cooler Design and the New Gas Cooler Product Selector

Chapter 18 Temperature, Heat, and the First Law of Thermodynamics. Problems: 8, 11, 13, 17, 21, 27, 29, 37, 39, 41, 47, 51, 57

Facilities Perspectives

Tutor in Systems Engineering / Project Management (2 posts)

AZ State Standards. Concept 3: Conservation of Energy and Increase in Disorder Understand ways that energy is conserved, stored, and transferred.

Zenergy Power Company Overview

E/M Experiment: Electrons in a Magnetic Field.

Shrinking a power supply and the challenge to maintain high reliability.

Zagadnienia termiczne instrumentu naukowego STIX misji kosmicznej Solar Orbiter

THERMAL MANAGEMENT OF COMPUTER SYSTEMS USING ACTIVE COOLING OF PULSE TUBE REFRIGERATIORS

HIGH-CAPACITY HIGH TEMPERATURE SUPERCONDUCTING POWER CABLES

Development of a Diaphragm Stirling Cryocooler [THO10-1]

Calculating particle properties of a wave

Adaptive strategies for office spaces in the UK climate

POROUS BURNER - A New Approach to Infrared

Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

LEAN LNG PLANTS HEAVY ENDS REMOVAL AND OPTIMUM RECOVERY OF LIGHT HYDROCARBONS FOR REFRIGERANT MAKE-UP

Chapter 5. Components, Symbols, and Circuitry of Air-Conditioning Wiring Diagrams

COURSE TITLE : REFRIGERATION AND AIR CONDITIONING COURSE CODE : 4029 COURSECATEGORY : A PERIODS/WEEK : 5 PERIODS/SEMESTER : 90 CREDITS : 4 OBJECTIVES

ENERGY TRANSFER SYSTEMS AND THEIR DYNAMIC ANALYSIS

Temperature. Temperature

Photography by Reidar Hahn

HEAT TRANSFER IM LECTURE HOURS PER WEEK THERMODYNAMICS - IM _1

ThermoStar Refrigeration Air Dryers

Vaporization of Liquid Nitrogen

JD(Doug) Rooks Western Area Applications Manager

STT -10 WIRE FEEDER. For Surface Tension Transfer TM. Process

HIGH EFFICIENCY PRESSURE OSCILLATOR FOR LOW-TEMPERATURE PULSE TUBE CRYOCOOLER

FXA Candidates should be able to : Define and apply the concept of specific heat capacity. Select and apply the equation : E = mcδθ

The Liquefaction of Hydrogen and Helium Using Small Coolers

HVAC Processes. Lecture 7

Brookhaven Magnet Division - Nuclear Physics Program Support Activities

Characteristics of an Integrated Germanium Detector Based Gamma-Ray Spectrometer for Monitoring Systems

High Performance Free-Piston Stirling Engines

Test 5 Review questions. 1. As ice cools from 273 K to 263 K, the average kinetic energy of its molecules will

Low Temperature Adsorption Versus Pore Size in Activated Carbons

HEAT UNIT 1.1 KINETIC THEORY OF GASES Introduction Postulates of Kinetic Theory of Gases

The Second Law of Thermodynamics

10 Project Costs and Schedule

Mixing Warm and Cold Water

Controlling a 2-phase CO 2 loop using a 2-phase accumulator

Large Systems Commissioning

Type: Single Date: Homework: READ 12.8, Do CONCEPT Q. # (14) Do PROBLEMS (40, 52, 81) Ch. 12

Multiple Choice For questions 1-10, circle only one answer.

QBITO Development and Students Involvement. Ignacio Barrios Tascón E-USOC, Universidad Politécnica de Madrid

1. The Kinetic Theory of Matter states that all matter is composed of atoms and molecules that are in a constant state of constant random motion

Physics Notes Class 11 CHAPTER 2 UNITS AND MEASUREMENTS

Overview of the Canadian Electric Field Instrument (CEFI) for Swarm

Experiment #4, Ohmic Heat

The Second Law of Thermodynamics

Technical Support and Preparation of Documentation for the ITER HTS Current Leads

Experimental and Predicted Performance of the BEI Mini-Linear Cooler

CALIBRATION OF A THERMISTOR THERMOMETER (version = fall 2001)

Calculation of Temperature in a Large Turbine Generator with Multilayer Roebel Transposition Coils

R&D Support Services. Ad Astra Rocket Company

Preview of Period 5: Thermal Energy, the Microscopic Picture

AMSC s Superconductor Cable Technologies for Electric Utilities

Moving Magnet Actuator MI FFA series

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

Motor-CAD Software for Thermal Analysis of Electrical Motors - Links to Electromagnetic and Drive Simulation Models

Energy Matters Heat. Changes of State

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO

Year project completed or estimated year of completion: October 2014

Minimum requirements for the 13 ka splices for 7 TeV operation

F B = ilbsin(f), L x B because we take current i to be a positive quantity. The force FB. L and. B as shown in the Figure below.

GTI Small-Scale Liquefaction Technology. March 2013

"Reliability and MTBF Overview"

Physical Quantities, Symbols and Units

Heating and air-conditioning industry

DETERMINING ASPHALT CONTENT FROM ASPHALT PAVING MIXTURES BY THE IGNITION METHOD

Climate solutions. evaporative cooling, adiabatic humidification and programmable controllers. energy saving solutions for data centers. carel.

Qualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation

BB-18 Black Body High Vacuum System Technical Description

Electronic Diesel Control EDC 16

FLASH TANK ECONOMIZER PRODUCT GUIDE

Progress of MoonLITE Penetrators

imagine SOLAR AIR CONDITIONING MADE EASY

Solar air collectors for industry and larger halls S Ø. Efficient dehumidification and air heating for free...

National Guide to College Credit for Workforce Training

Proton Nuclear Magnetic Resonance Spectroscopy

1. COSIMA Scientific Objectives

Chapter 17: Change of Phase

Joule Equivalent of Electrical Energy

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

Take the complication out of cooling. Data center cooling equipment and service from Alfa Laval

PS-6.2 Explain the factors that determine potential and kinetic energy and the transformation of one to the other.

WFIRST- AFTA: European Interests

Introductory Laboratory EST - Experiment 9 Calorimetry Introductory Laboratory Energy Science and Technology. Experiment 9. Physical Chemistry

Refrigerated Air Dryers. Catalogue

Transcription:

UCL DEPARTMENT OF SPACE AND CLIMATE PHYSICS MULLARD SPACE SCIENCE LABORATORY Milli-Kelvin Cryo-Cooler Development at the Mullard Space Science laboratory I. Hepburn, J. Bartlett, G. Hardy Engineering Model (2002-2008) 44 kg IXO Development (2008 -) <10kg Milli-Kelvin Cryo-Cooler Development (2010 -) <2 kg 1

Further information Bartlett et. al. Cryogenics 50 (2010) 582-590 Improved performance of an engineering model cryogen free double adiabatic demagnetisation refrigerator Bartlett et. al. Cryogenics 50 (2010) 647-652 Thermal characterisation of a tungsten magnetoresistive heat switch 2

Engineering model - 50 mk ADR cooler ESA Contract to Astrium (Stevenage) in association with MSSL in 2002. Develop and qualify 50 mk ADR cooler. Base temperature < 30 mk To be able to be pre-cooled by 4 K J-T (Planck cooler) To have high level magnetic shielding to protect spacecraft and X-ray detectors on cold finger Formal transfer of system to ESA June 2008. (System has stayed at MSSL on loan for continued component development) 3

50 mk EM ADR DGG stage Cold finger/detector stage CPA stage 4 K or lower interface DGG magnet CPA magnet booster coils CPA magnet cancellation coils DGG magnet booster coils DGG magnet cancellation coils 4

Construction and qualification Modular construction to enable sub-systems to be used in future systems. key sub-systems qualified Kevlar suspension system Low current superconducting magnets Heat switches 5

Kevlar suspension Kevlar suspends cooling parts of the ADR 6 kg suspended mass Kevlar tensioned to 720 N Passed vibration qualification Test system has remained strung since March 2004 (6.5 years) with no change. 6

Superconducting magnets Low current to magnetic field superconducting magnets (0.79 Amps per Tesla) Low current to minimize Joule heating in leads Minimize electrical power required Magnetic field lines Magnet coil layout Magnet system on vibration table 7

Heat switches Required to extract heat during magnetisation phase of ADR cycle Provide thermal isolation during cold phase. Superconducting heat switch qualified for use at the milli- Kelvin end of ADR Superconducting switch connected to cold finger 8

Modelling Mathematical thermal model developed during project. Model agrees very well with real system Model incorporates low temperature heat flow (i.e. Thermal boundary resistance) Model includes All heat loads. Base temperature. Hold time at required temperature. Recycle times Model used to investigate performance of future systems e.g IXO and milli-kelvin cryo-cooler 9

System mass breakdown Sub-system Assembly component Mass (kg) Paramagnetic including cold finger Magnet Complete CPA and DGG assembly including cold finger CPA mass 0.25 kg DGG mass 0.9 kg Magnet assembly (of which 11.196 kg is superconducting wire) 5.526 24.080 60% magnet mass due to cancellation coils and associated former structure Magnetic shielding Focal plane magnetic shield (passive shield) 12.9 Heat switches Gas switch 0.127 Superconducting lead switch 0.097 Miscellaneous Miscellaneous ADR parts 1.942 Sub total 44.672 10

As delivered performance (2008) System kept at 4 K for just over 1 year (cooled by a 4 K pulse tube cooler). No change during the year long operation Base temperature: 25 mk Limited by thermal boundary resistance inside pill Recycle time: 15 hours (Required 4 hours) Limited by superconducting heat switch Limited by maximum heat load to envisaged 4 K J-T cooler (peak load < 5 mw) Hold time at 50 mk with 1 µw: 10 hours (Required 24 hours) Limited by heat load from superconducting lead heat switch Hold time at 30 mk: 2.2 hours Thermal stability at 50 mk: ± 8 µk Limited by thermometer readout electronics 11

Improvements & new systems EM system on loan to MSSL for continued technology development (e.g. heat switches) Mathematical thermal model identified main area affecting performance - Superconducting heat switch. New heat switch developed magnetoresistive (MR) heat switch solid state switch Qualification project just started. Improvement in performance demonstrated with lab MR switch. Purity of material not high enough to obtain full performance. With required purity, performance New switch in EM ADR will exceed requirement. 12

IXO development (X-ray micro-calorimeter spectrometer.) IXO reduction in stray magnetic field enables reduced magnet coils significant mass saving (2 magnet coils rather then 10). No cold finger enables splitting of cooler stages and thus optimization. significant mass saving. Can use existing Kevlar suspension system as EM system. Same cooling stages as EM system. Magnet wire/manufacture same as EM system. Same heat switches as EM system (2 K operation) or with MR heat switch for 4 K operation. 13

IXO Magnet design Same wire as used in ESA system (can run at 4 K or below) FEA magnet design performed FEA thermal investigation performed FEA mechanical investigation performed with Ariane 5 vibration loads. Only 2 coils required rather then 10 for the EM system Magnet design robust Magnet field lines 14

IXO system model performance and masses Interface Temperature 2K 2K 4K S/C Switch + Gas Switch MR Switch + Gas Switch MR Switch + Gas Switch CPA mass 750 grams 500 grams 750 grams CPA 50 mk hold time 31 hours with 2 µw load (+parasitic) 32 hours with 2 µw load (+parasitic) 31 hours with 2 µw load (+parasitic) DGG mass 1000 grams 900 grams 1000 grams DGG stabilised temperature (ADR 1 st stage temperature) 0.6 K with 7µW load (+parasitic) 0.6 K with 7 µw load (+parasitic) 0.6 K with 7µW load (+parasitic) Re-cycle time 9 hours <6 hours <6 hours Pill stage mass (including structure) 2 350 grams 2000 grams 2350 grams Magnet mass 7094 grams 7094 grams 7094 grams Heat switch mass ~250 grams ~500 grams ~500 grams Total mass 9694 grams 9594 grams 9950 grams 15

Milli-Kelvin cryocooler Development started on a ground based milli-kelvin cryo-cooler. Provide continuous cooling from 4 K down to 50-100 mk from a 4 K cryo-cooler. Based on multi-stage ADR units 2 year project started in July 2010 with 0.5M funding from EPSRC (Engineering and Physical Sciences Research Council, UK). Cooler using technology developed as part of the EM ADR cooler and IXO development (e.g. Magnets and MR switch) Easier to transfer to flight system 16

Milli-Kelvin cryo-cooler Project time scales PDR January 2011 CDR May 2011 Testing end of 2011 Cryo Mech pulse tube cooler 4 K cryo-cooler interface Projected mass 2 kg for mk cryocooler module. mk cryo-cooler module Cold surface 50-100 mk base temperature. Module made from multiple ADR stages. Therefore temperature settable over range 50-100mK T< 4K. 17

Summary On-going 50 mk cooler programme builds on existing technology development ESA EM ADR Heat switch development Application to missions like IXO and the cryogenic spectrometer instrument with significant mass saving from original system. New generation of ground based cooler providing continuous mk temperatures in a very low mass system in development. Adaptable for use in space since largely using technology/components from EM / IXO development 18