Assembly and Installation of NSK Linear Guides

Similar documents
NSK representative office Manila tel:

[ ] NSK Corporation Sales Locations DISTRIBUTED BY. Ann Arbor. Cerritos. Worldwide Sales Offices.

Construction (2) Characteristics (2) Rail Type (2) Carriage Type (3) Description of Specification (4) Accuracy Grade (5) Preload Grade (6)

Interchangeable Series for Industrial Automation Equipment

NSK LINEAR GUIDES FOR INDUSTRIAL AUTOMATION AND EQUIPMENT

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

Char-Lynn Hydraulic Motor. Repair Information Series. October, 1997

Trillium 40 Axis Spring Tensioner Wire Replacement Instructions

Round Housing with Side Ports

NSK Linear Guides. Interchangeable Series for Industrial Automation Equipment

2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13)

Regional Strategies 82/90

Installation & Operation Manual. Type 1801 External Seahorse Pantograph Wiper. without Control System

Accuracy counts! SENSORS WITH ANALOG OUTPUT

Self-aligning ball bearings

Stainless Linear Motion Rolling Guide series

S&G Model 2937 Group 1 Combination Lock

Char-Lynn Hydraulic Motors. Repair Information. W Series Geroler Motors 002, 003. April, 1999

Rebuild Instructions for and Transmission

IMPORTANT DOCUMENTATION DO NOT DISCARD!

Global Real Estate Outlook

Trunnion-Design Ball Valves

Q&A Session for Advanced Ball Screws 102: Troubleshooting for Design Engineers

Profile rail guides LLR

METROLOGIC INSTRUMENTS, INC. MS1690 Focus Area Imaging Bar Code Scanner Supplemental Configuration Guide

To install the I/O Module Board: 1. Remove AC power from decoder.

FEATURES PRODUCT SERIES IP5000/IP5100 HIGH PERFORMANCE POSITIONER COMPACT AND LIGHTWEIGHT RESISTANT TO HOSTILE ENVIRONMENTS DESIGNED TO IP55, NEMA 4

Drive shaft, servicing

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT

Supplies 1. Toner cartridges. Printing. Using color. Paper handling. Maintenance. Troubleshooting. Administration. Index

12.2 Compact Type, MSB Series

Reasons for reissue are in Section 6, REVISION SUMMARY.

STEERING HANDLEBAR/FRONT WHEEL/ FRONT SHOCK ABSORBER

SILASTIC 9161 RTV Silicone Elastomer

CAT.ES120-4 A. Precision Clean Regulator. Series SRP. High precision, low flow consumption stainless steel regulator

Service Kits For Compressors

Assembly and Usage Instructions

NOTCHED MARKER DISCS/HUBS BOX

PLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:

Guidelines with preventive maintenance schedule. Value up guidelines

758 Heavy-duty Ratchet Guy Wire Cutter

Quick release couplings SPC Self aligning and flat faced

EZ-Steer Assisted Steering System

Foreign Taxes Paid and Foreign Source Income INTECH Global Income Managed Volatility Fund

Global wage projections to 2030 September 2013

Make the invisible visible! SENSORS WITH EXCELLENT BACKGROUND SUPPRESSION

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page

Installation Instructions Avalanche XUV Cap IMPORTANT! IMPORTANT!

IWAKI MAGNETIC DRIVE PUMPS MDM. Patent JAPAN / U.S.A. / TAIWAN / EU / CHINA

IWAKI MAGNETIC DRIVE PUMPS MDM. Patent & Pat.Pend. JAPAN / U.S.A. / EU / CHINA / TAIWAN

SECO-CAPTO TOOLHOLDING FOR MAZAK MACHINES

Guide. Axis Webinar. User guide

SP/1/EN/5. Product Summary. KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue. The art of handling air

Reducing Cycle Times and Work in Process Management Costs: Aerospace and Defense Industry

OPERATOR S MANUAL SUPPORTED TORQUE CALIBRATION BEAM. Part Number Issue 4 Original Instructions (English)

AXLE SHAFTS - FRONT Pontiac Bonneville MODEL IDENTIFICATION DESCRIPTION & OPERATION TROUBLE SHOOTING REMOVAL & INSTALLATION

Cloud Open Frame PC Ultimate Flexibility for Professional System Integration Healthcare Fitness Home

GLOBAL DATA CENTER INVESTMENT 2013

PS-SEAL PTFE based high performance seal

FISCHER DataCenter Software for Evaluating and Archiving Measurement Data FISCHER DataCenter IP Inspection plan Software for Quality Assurance

HYDRAULIC LIFT TABLE CART 2200-LB.

Flue Installation. High Efficiency Condensing Boilers

PM 2 GRUNDFOS INSTRUCTIONS

How To Install A Gel Doc Xr+ Camera On A Computer Or Mouse Or Tv (For A Powerbook) With A Zoom Lens (For An Ipa) With An Iphone Or Ipa (For Mac) With The Zoom Lens

Machine needle shut-off nozzle type-a

LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions

STEERING SYSTEM - POWER

DODGE USAF 200/300 Direct Mount Pillow Block Bearings

DiscPlus DX195 and DX225 Air Disc Brakes

TEXTILE INDUSTRY. RINCO ULTRASONICS Ultrasonic welding technology

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

Brochure More information from

OD PRECISION MEASURING INSTRUMENTS

Tool And Material Checklist

Machine needle shut-off nozzle type HP

Cross-Roller Ring Series

Linear Recirculating Roller Bearing and Guideway Assemblies. Series RUE-E / RUE-E-KT-L

INGROUND, ROPED, AND HOLELESS JACK SEAL REPLACEMENT

Hard disk drive mounting bracket Instruction Manual


1.8 CRANKSHAFT OIL SEALS

ROTARY TUMBLER INSTRUCTIONS AND PARTS LIST

SLAM-SHUT VALVE. Type OSE. Europe, Middle East, Africa and Asia Pacific Documents Only. Process Management TM

16 April F Dodge Adjustable Track bar with Relocation Bracket 1

The quadrature signals and the index pulse are accessed through five inch square pins located on 0.1 inch centers.

Product Summary. KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue. The art of handling air. Special leaflet SP/1/EN/7

Spicer Axles & Brakes ABIB-0302

ROTARY TUMBLER INSTRUCTIONS AND PARTS LIST

Lenntech psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503

Installation instruction CASAFLEX - Connecting piece DN 100

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual

Slide the new steering column shaft through the steering column from the driver compartment.

BROWN BROTHERS HARRIMAN (LUXEMBOURG) S.C.A. Wells Fargo (Lux) Worldwide Fund

Fredriksons conveyor systems handle goods with a width from 20 mm up to 600 mm.

Brochure More information from

ORTHOBLOC Drive systems. Installation. This manual is to be given to the end user en / k. R max - 5 mm.

Kemet DIAMOND PRODUCTS

FOR ANY QUESTIONS, PLEASE CALL M-F 8:00a.m.-8:00p.m. EST. REAR BRAKES 1 AEROSPACE COMPONENTS

I BEAM TRACK INSTALLATION

AM/FM ANTENNA KIT (TOUR-PAK MOUNT)

Transcription:

Assembly and Installation of NSK Linear Guides

Linear Guide: Handling Precautions NSK linear guides are high quality and are easy to use. NSK places importance on safety in design. For maximum safety, please follow precautions as outlined below. (3) Precautions in use (1) Lubrication Do not contaminate. Temperature limitation. Confirm lubrication. a. Remove the rust preventative rail-coating before installation. If you are using oil as a lubricant, consult NSK for compatibility issues with the pre-packed factory grease. (2) Handling Handle with care. Do not drop. Do not disassemble. Do not use direct force. a. Interchangeable ball slides (randomly matching types between rail and ball slide) are installed to the provisional rail when they leave the factory. Handle the ball slide with care during installation to the rail. b. Do not disassemble the guide unless absolutely necessary. c. Ball slide will move easily. Make sure that the ball slide does not disengage from the rail. d. Standard end cap is made of plastic and may break if a direct force is applied. a. Make every effort not to allow dust and foreign objects to enter. b. The temperature of the place where linear guides are used should not exceed 80 C (excluding heat-resistant type linear guides.) A higher temperature may damage the plastic end cap. c. If the user cuts the rail, thoroughly remove burrs and sharp edges on the cut surface. d. When hanging upside-down (e.g. the rail is installed upside-down on the ceiling in which the ball slide faces downward), should the end cap be damaged, causing the balls to fall out, the ball slide may be detached from the rail and fall. For such use, take measures including installing a safety device. (4) Storage Do not hang upside down. Store in the correct position. a. Linear rail may bend if stored inappropriately. Place it on a suitable surface, and store it in a flat position. 1

Installation Procedures Thank you for choosing NSK linear guides. This manual briefly describes the recommended handling and installation of NSK linear guides for general industrial use. There are two methods of installing linear guides. The first uses a datum shoulder on the mounting base and provides accurate horizontal alignment in the same way used for machine tools. The other method uses the first rail as a reference for the second rail and is generally used when smooth motion versus high accuracy is required. NSK recommends the interchangeable series LH and LS linear guides for general industrial applications. Their self-aligning feature means a greater tolerance for alignment errors and less time spent on installation. Also, they are interchangeable between rail and slider, easily allowing the addition or replacement of parts. Provisional rail. For interchangeable LH and LS Series linear guides, the ball slides and the rails are stocked separately. The ball slides are mounted on plastic provisional rails that allows for easy transfer of the ball slide to and from the steel rail. 2

The ball slides are designed with retaining wires to prevent the balls from falling out when they are removed from the rail. However, NSK recommends that the ball slides should be stored on a provisional rail prior to installation to prevent contamination from dust and other foreign objects. The following is a description of how the ball slide should be removed from and replaced on the linear guide rail. The ball slide is held on the provisional rail using a rubber band. The rubber band should catch the bottom channel in the provisional rail and then twist around to secure the ball slide. When transferring the ball slide from the provisional rail onto the rail, or vice versa, butt the provisional rail up against the rail and slide the ball slide directly from one onto the other. It is a good idea to secure the ball slide onto the provisional rail with a rubber band after removal from the rail. Provisional rail. Linear guide rail. 3

If a ball is accidentally dropped from the ball slide, it should be cleaned and replaced to the appropriate groove. The correct groove can be determined by the size of the clearance between the balls (the groove missing the ball will have greater clearance than the other grooves). It is normal to have a gap of 1.5 ball diameters in each groove. The following section describes how to install the linear guides on the machine. Ball slides and rails are supplied separately. Each is wrapped in vinyl sheet, and packed in a container. Plastic and brass rail caps are an available option for use in high contamination areas to prevent debris build-up in the bolt holes which may damage the slider. Please request these at time of order. Brass cap. Plastic cap. 4

The rail is always shipped with rust preventive oil, which should be wiped off before use. LH and LS Series ball slides are pre-packed with grease, so no cleaning is required prior to installation. Now the linear guide is ready for installation. Place it carefully on the mounting surface. For Smooth Motion of General Machinery Snugly tighten the mounting bolts temporarily so that the rail is firmly against the bed. Then tighten the bolts with a torque wrench to the specified torque starting from one end. In NSK linear guides, the mounting bolt holes are processed after heat treatment using a precision machining center; therefore, the bolt hole pitch accuracy is as good as the positioning accuracy of the machine, which is considered very good. When tightening the bolts, be sure to start at one end and work in order to the other end. If the bolts are tightened at the middle first, it tends to leave the rail curved. If you suspect this has happened, loosen the bolts and start again. 5

The rail that has been tightened can now be used as a reference rail. Using a vernier calipers or other accurate tool, measure the distance between the two rails, and adjust each end until they are the same. Tighten a bolt snugly at each end of the rail. The next step is to install the table, and to use the table to align the rails. Firmly bolt the table to ball slides 1 and 2 on the firmly secured rail as shown in the diagram. Then position ball slide 3 at the left end of the adjusting rail, and bolt the table to this ball slide. Move the ball slide 3 to right and bolt the table to the ball slide 4. Move the table to one end of the rails, and start tightening the adjusting rail bolt sequentially to the specified torque while checking excessive friction of table movement. Continue moving the table down the rail tightening each adjacent bolt until they have all been tightened. This method of assembly is for general industrial machinery where smooth linear motion is the overall objective. When precision accuracy is required, read on to the following procedure. 6

For Greater Accuracy of General Machinery When bolting the first rail on the machine base, align it straight using a straightedge and a dial indicator. Bolt on the rail at the both ends lightly, and position a straightedge beside it. Set the straightedge parallel to the rail measuring distance A1 and A2 by a vernier calipers or some other accurate measuring tool. Move the dial indicator along the straightedge, and take readings at every bolt hole along the rail. Make fine adjustment of the rail to the straightedge until the desired reading is made, and tighten the bolt to the specified torque. When all of the bolts have been tightened, slide the dial indicator from one end of the rail to the other to ensure that the desired straightness has been achieved. Position the dial indicator on two ball slides on the reference rail as shown in the diagram. Tighten bolts of the adjusting side rail sequentially from the one end while noting the reading of the dial indicator. Straightness of NSK linear guides is controlled so that it can be easily adjusted manually for easy installation. During installation, it is recommended that accuracy is checked to ensure smooth operation. 7

This section describes the allowable tolerances for installation in order to maximize the performance of NSK linear guides. We recommend that the mounting errors e1 or e2 do not exceed the values shown in the table below. Recommended allowable installation error of the LS Series (Maximum) Unit: µm Item Clearance Z0, ZT Preload Z1, ZZ Model No. in two rails : e1 (height) in two rails : e2 in two rails : e1 (height) in two rails : e1 15 20 25 30 35 20 22 30 35 40 375/500mm 15 17 20 25 30 150/500mm Recommended allowable installation error of the LH Series (Maximum) Unit: µm Item Clearance Z0, ZT Preload Z1, ZZ Model No. in two rails : e1 (height) in two rails : e2 in two rails : e1 (height) in two rails : e1 20 25 30 35 45 55 65 30 40 45 5 65 85 110 375/500mm 20 25 30 35 45 55 70 150/500mm If the error readings are equal to or less than the above values, you have correctly assembled the parts. For maximum accuracy, keep the readings below what is shown in the table. If your readings are greater than these values, it is necessary to remove the parts and start over. Please contact your local NSK office with any questions or for assistance. Visit www.nsk.com for contact information. 8

K1 Handling Instructions To maintain the NSK K1 lubrication unit over a long period of time, please follow these instructions. Ball Slide NSK K1 End (rubber) seal Rail End (rubber) seal 1. Max. operating temperature: 50 C (122 F) Max. peak temperature: 80 C (176 F) If not installed immediately, they should be kept refrigerated. Avoid storage in direct sunlight. 2. Never leave the linear guide in close proximity to grease-removing organic solvents such as hexane, thinners, etc. Never immerse the linear guide in kerosene or rust preventative oils which contain kerosene. Note Other oils such as: water-based cutting oil, oil-based cutting oil, grease (mineral oil-as2, ester-ps2) present no problems to the K1 lubricating units performance. 9

Assembly Instructions for the K1 Lubricating Unit 1. Slide linear bearing on to the linear rail, using the plastic provisional rail supplied. 2. Remove the grease fitting from the end of the bearing. 3. Remove the Phillips screws (2 pieces). 4. Remove the end lubrication unit from end of bearing. 5. For maintenance free operation, install threaded plug; for re-greasing option, see points 10 & 11 below. 6. Install the cover plate from the K1 lubricating unit kit to the end of bearing, against the end cap. 7. Install K1 lubricating unit without fixing rings, so it can be expanded over the rail. 8. Put the three (3) fixing rings in position on the K1 lubricating unit. 9. Replace the end seal, in front of the K1 lubricating unit. 10. Install connector screw for grease fitting. 11. Replace the grease fitting in connector screw. 12. Install the extension Phillips screws (2 pieces, supplied with the K1 lubricating unit kit). Note The K1 lubricating unit has a shelf life. They should be installed immediately upon receipt. It is important to avoid direct sunlight and extreme heat conditions. 10

Lubrication There are two types of lubricating methods grease and oil for ball screws and linear guides. Use a lubricant agent and method most suitable to condition requirements and purpose to optimize functions of the ball screws and linear guides. In general, lubricants with low base oil kinematic viscosity are used for high speed operation. Lubrication with high base oil kinematic viscosity is used for oscillating operations, low speed and high temperature. The following are lubrication methods by grease and by oil. Grease Lubrication Grease lubrication is widely used because it does not require special oil supply system or piping. Grease lubricants made by NSK are: Various types of grease in bellowed container which can be instantly attached to the grease pump; NSK Grease Unit which comprises a hand grease pump and various nozzles. The units are compact and easy to use. NSK grease lubricants Table 9 shows the marketed general grease widely used for linear guides and ball screws for various applications, conditions and purposes. Table 9 Grease lubricant for linear guides and ball screws Type Thickener Base oil Base oil kinematic viscosity Range of use Purpose mm 2 /s (40 C) temperature ( C) AS2 Lithium type Mineral oil 130 10~110 For ball screws and linear guides for general use at high load. PS2 Lithium type Synthetic oil 15 50~110 For ball screws and linear guides for low + mineral oil temperature and high frequency operation. LR3 Lithium type Synthetic oil 30 30~130 For ball screws at high speed, medium load. LG2 Lithium type Synthetic oil 30 10~80 For ball screws and linear + synthetic guides for clean hydrocarbon oil environment. LGU Diurea Synthetic 100 30~120 For ball screws and linear guides for clean environment. NF2 Urea composite type Synthetic oil 27 40~100 For fretting resistant ball screws and linear guides. Intervals of checks and replenishments for grease lubrication Intervals of checks Items to check Intervals of replenishment 3-6 months Dirt, foreign matters such as cutting chip Usually once per year. Every 3000 km for material handling system which travels more than 3000 km per year. Replenish if checking results warrant it. Note: Please consult NSK Engineering for grease replenishment interval. 40

Worldwide Sales Offices NSK Ltd.-Headquarters, Tokyo, Japan www.nsk.com Americas & Europe Department tel: 03-3779-7120 Asia Marketing & Sales Department tel: 03-3779-7121 Africa South Africa: NSK South Africa (Pty) Ltd. Johannesburg tel: (011) 458 3600 Asia and Oceania Australia: www.nskaustralia.com.au NSK Australia Pty. Ltd. Melbourne tel: (03) 9764-8302 China: NSK Hong Kong Ltd. Hong Kong tel: 2739-9933 Kunshan NSK Co., Ltd. Kunshan tel: 0520-7305654 Guizhou HS NSK Bearings Co., Ltd. Anshun tel: 0853-3521505 NSK (Shanghai) Trading Co., Ltd. Shanghai tel: 021-62099051 NSK representative office Beijing tel: 010-6590-8161 NSK representative office Shanghai tel: 21-6209-9051 NSK representative office Guangzhou tel: 020-8732-0583 NSK representative office Anshun tel: 0853-3522522 India: Rane NASTECH Ltd. Chennai tel: 04114-65313, 65314, 65365, 66002 NSK representative office Chennai tel: 044-4334732 Indonesia: P.T. NSK Bearings Manufacturing Indonesia Jakarta tel: 021-898-0155 Korea: NSK Korea Co., Ltd. Seoul tel: 02-3287-0300 NSK Korea Co., Ltd., Changwon Plant Changwon tel: 0551-287-6001 Malaysia: NSK Bearings (Malaysia) Sdn. Bhd. Kuala Lumpur tel: 03-7958-4396 NSK Micro Precision (M) Sdn. Bhd. Kuala Lumpur tel: 03-961-6288 New Zealand: www.nsk-rhp.co.nz NSK New Zealand Ltd. Auckland tel: (09) 276-4992 Philippines: NSK representative office Manila tel: 02-759-6246 Singapore: NSK International (Singapore) Pte Ltd. Singapore tel: (65) 273 0357 NSK Singapore (Pte) Ltd. Singapore tel: (65) 278 1711 Taiwan: Taiwan NSK Precision Co., Ltd. Taipei tel: 02-2591-0656 Thailand: NSK Bearings (Thailand) Co., Ltd. Bangkok tel: 02-6412150~58 NSK Safety Technology (Thailand) Co., Ltd. Chonburi tel: (038) 214-317-8 Siam NASTECH Co., Ltd. Chachoengsao tel: (038) 522-343~350 Europe NSK Europe Ltd. (European Headquarters) www.eu.nsk.com Maidenhead, England tel: 0162-850-9800 France: NSK France S.A. Paris tel: 01 30 57 39 39 Germany: NSK Deutschland Gmbh Düsseldorf tel: 02102-481-0 NSK Steering Systems Europe Ltd. Stuttgart tel: 0771-79082-277 Neuweg Fertigung Gmbh Munderkingen tel: 07393-540 Italy: NSK Italia S.P.A. Milano tel: 02-995-191 Poland: NSK Europe Ltd. Warsaw Liaison Office Warsaw tel: 48-22-645-1525, 1526 NSK Iskra S.A. Kielce tel: 48-41-366-6111 Spain: NSK Spain S.A. Barcelona tel: 93-575-4041 Switzerland: Waelzlager Industriewerke Bulle AG (W.I.B.) Bulle tel: 026-9191100 Turkey: NSK Bearings Middle East Trading Co., Ltd. Istanbul tel: 90-216-442-7106 United Kingdom: NSK Bearings Europe Ltd. Peterlee, England tel: 0191-586-6111 NSK European Technology Co., Ltd. Ruddington, England tel: 0115-940-5409 NSK UK Ltd. Newark, England tel: 0163-660-5123 NSK Steering Systems Europe Ltd. Coventry, England tel: 024-76-588588 North and South America NSK Americas, Inc. (American Headquarters) Ann Arbor, Michigan, U.S.A. tel: 734-913-7500 Argentina: NSK Argentina SRL Buenos Aires tel: 011-4762-6556 Brazil: www.br.nsk.com NSK Brasil Ltda. São Paulo tel: 011-3269-4700 Canada: www.ca.nsk.com NSK Canada Inc. Toronto tel: 905-890-0740 Mexico: NSK Rodamientos Mexicana, S.A. de C.V. Mexico City tel: 5-301-2741 United States of America: www.us.nsk.com NSK Corporation Ann Arbor, Michigan tel: 734-913-7500 Sales Offices: Ann Arbor, Michigan tel: 734-913-7500 Cerritos, California tel: 562-926-2975 NSK American Technical Center Ann Arbor, Michigan tel: 734-913-7500 NSK Precision America, Inc. Bloomingdale, Illinois tel: 630-924-8000 NASTECH Bennington, Vermont tel: 802-442-5448 NSK Latin America Inc. www.la.nsk.com Miami, Florida tel: (305) 477-0605 NSK Ltd. has a basic policy not to export any products or technology designated as controlled items by export-related laws. When exporting the products in this brochure, the laws of the exporting country must be observed. Specifications are subject to change without notice and without any obligation on the part of the manufacturer. Every care has been taken to ensure the accuracy of the data contained in this brochure, but no liability can be accepted for any loss or damage suffered through errors or omissions. We will gratefully acknowledge any additions or corrections. LG Handbook Printed in Canada NSK 2005.