Feasibility Site Report

Similar documents
Financing Options to support Energy Efficiency & Contractors

Estimating Database Checklist

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

HOMEOWNER S PERMIT GUIDE

[LENDER] CONSTRUCTION LOAN AGREEMENT

NAHB PRODUCT DEFINITION

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

CHARLOTTE COUNTY Community Development Department

All contents copyright by 203KMortgageLender.com. All rights reserved. No part of this document or the related files may be republished to

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Notice to Property Owners

FHA 203(k) Information Package

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Building Permits: When are they required?

Important Information for Owners of Buildings in Flood Zones

NMLS ID: AmeriFirst Home Mortgage

Dream It. FInance It. BuIlD It.

Does Wall Township require an inspection by the building department on resale of a home?

Self-Home Inspection Checklist

Total Home Inspection Checklist

Building Condition Assessment Report

PERMITS REQUIRED & PERMIT EXEMPTIONS

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Building Condition Assessment Report

Renovation Financing 1

Fannie Mae HomeStyle: LifeStyle Home Improvement Loan 8/29/14

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator

Open House and Home Tour Checklist

WHEN IS A PERMIT REQUIRED?

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

COMMONWEALTH OF MASSACHUSETTS DISTRICT COURTS DEPARTMENT CHELSEA DIVISION C.A. NO.

203K Streamline. Help qualified borrowers purchase or refinance AND renovate..with a single loan!

Cost of Repair Worksheet

The Verona 4 BEDROOMS I 3 ½ BATHS I 3,220 SF I PLAN 4628

InfoforBuilding.com Owner-Builder Spreadsheet

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

FHA 203k Inspections Changing climate in home buying markets: FHA 203k Inspections. FHA 203k Inspections. FHA 203k Inspections. FHA 203k Inspections

HOME INSPECTION CHECKLIST

Exterior Condition Report

Inspecton Report. Property Address:

Seller s Property Disclosure Statement. Property address: Seller:...

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Home Management Checklist: Spring

FHA Streamline 203(k)

Building Permits Permit Counter

ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services

NSP3 Rehabilitation Standards Certification

PRMI 203K Streamline Loan. FHA Renovation Loan

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

South Carolina Home Inspector Standards of Practice

HOMESTYLE RENOVATION. Look at the possibilities

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

REPAIRING YOUR HOME CONSTRUCTION LOAN PROCEDURES

Substantial Improvement/ Damage Review

Region IV 1371 Peachtree Street. N.E. Suite 700 Atlanta, GA 30309

The City of Basehor, Kansas

203K Loan Parameters

SECTION 4 REHABILITATION MORTGAGES 203(k) Standard & 203(k) Limited

BUILDING PERMIT SPECIFICATIONS

APPLICATION FOR NEW CONSTRUCTION

Botetourt County, Virginia. Frequently Asked Questions

PEPPER VINER HOMES WARRANTY GUIDELINES

Specification Of Repairs

3rd Annual Design Drafting Contest

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Estimated Cost of Repair

A Homeowner s Guide to Building Permits

Applications for building permits will not be reviewed until all of the required information has been submitted.

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

INVOICE. DATE: May 11, DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl.

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

17,280 square feet Overview:

PROPERTY INSPECTION REPORT

Commercial Construction Permit Application

HVAC 95% + Energy Efficient Furnace KC Heating and Air. Derald Smith Plumbing. Mountain Vista Homes Customer Care Department

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: Inspection Date: Saturday, February XX, XXXX

Vision Home Inspection

FHA Streamlined 203(k) Loan Program

Inspection Report. provided by: Delaware Property Inspection. Inspector: Richard Hiddemen (302)

you haven t seen sawgrass until you ve seen old landing & coronado drive, rehoboth beach, de

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Welcome to the world of Renovation loans

PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit

MANUFACTURER WARRANTY LIST

Structure Survey Findings:

This report presents the findings and recommendations of the assessment of energy use and

Presents. FHA Streamlined(K) & 203(k) Training. July 20, /18/2011. FHA Streamlined(k) Rehab Program

Transcription:

Required Document for HomeStyle: Total rehabilitiation cost exceeds 15,000 OR At the recommendation of the HomeBridge Renovation Concierge Department Feasibility Site Report (AKA Feasibility Study) SUBJECT PROPERTY BORROWER LENDER In certain instances where total rehabilitation costs exceed 15,000 but are a single repair item (ie: swimming pool), a Feasibility Study may not be required HomeBridge Renovation Concierge Department approval required SUMMARY OF REVIEW The planned construction on the subject property is in line with the contractor s proposal. The scope of work and the proposed price are adequate for the geographical and economic conditions of the area. The borrower and contractor will most likely work with the reviewing authority in the planning of the proposed construction and repairs. OBJECTIVE OF THIS FEASIBILITY STUDY The objective of this feasibility study is primarily to assist in reducing the risk for the financial institution. Also to further assist them to facilitate their investment and provide an overview about the planned construction/renovation as well as the construction industry means and methods for which this document is produced as it relates to the subject property. The feasibility may form the basis of an important investment decision and in order to serve this objective, the document covers various aspects of construction/renovation scope of work and the preliminary budget. This further assists the financial institution to better facilitate the physical, financial and administrative management of the project. The document also provides the borrower/homeowner with specific information about the property and the cost of repairs and/or construction. 2014,ALL RIGHTS RESERVED. This document contains material protected under International and Federal Copyright Laws and Treaties. Any unauthorized reprint or use of this material is prohibited. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information storage and retrieval system without express written permission from the author / publisher.

Property Information Subject Property Address Lender Lender Contact Prepared by Prepared for Borrower(s): Best Phone Contact FHA Case No. N/A on HomeStyle Property Details Number of stories 1 Number of units 1 Mixed use property No Type of Construction Frame Electric service & Amps 200 Fuel source Gas Oil LP Gas City Sewer Septic City City water Well City Hot water source HWT Approximate Age Occupied at time of inspection No Utilities on or off Electric On Gas Oil LP On Water On Email Address Borrower(s) Current Address of Inspection: Thursday, January 02, 2014 Additional Testing Services, Certifications or Cost Items that may be necessary Recommendations ITEMS CHECK ARE RECOMMENDED Underground oil tank Certification N/A Radon Test N/A LBP Certification N/A Termite Inspection X Well Water Certification N/A Structural Engineers report N/A Septic Certification N/A Soils report N/A Site survey N/A Chimney Certification X Architectural Plans N/A Asbestos certification N/A Note: The Home Inspection is performed to identify those items that require repairs for a property to comply with HUD's Minimum Property Standards as defined in HUD Handbook 4905.1. The Borrower may wish to consider the above recommended inspections to further protect their interests beyond scope of the inspection. All repairs must be performed in conformance with local zoning ordinances and codes. All work within this Report to be Performed by a Licensed Contractor The Subject Property will not be Habitable During Construction

Feasibility Site Report Property Address Lender Contact Buyer(s) Name Thursday, January 02, 2014 FHA Case Number Direct Cost of Construction 95,048.00 1 Masonry Division Total 1,900.00 Repair masonry brick foundation at rear of breezeway 1 1,000.00 1,000.00 1 900.00 900.00 Total Labor 1,000.00 Total Materials 900.00 2 Siding Division Total 750.00 Fascia at breezeway needs to be recapped with coil 1 500.00 500.00 1 250.00 250.00 Total Labor 500.00 Total Materials 250.00 3 Gutters & Downspouts Division Total 100.00 Clean out all gutters at garage 1 50.00 50.00 1 50.00 50.00 Total Labor 50.00 Total Materials 50.00 4 Roof Division Total NO WORK 5 Shutters Division Total NO WORK 6 Exteriors Division Total NO WORK 7 Walks Division Total NO WORK 8 Driveways Division Total NO WORK 9 Painting (Exterior) Division Total NO WORK 10 Caulking Division Total NO WORK 11 Fencing Division Total NO WORK 12 Grading Division Total NO WORK

13 Windows Division Total 1,100.00 Replace all basement windows. 1 300.00 300.00 1 800.00 800.00 Total Labor 300.00 Total Materials 800.00 14 Weatherstrip Division Total NO WORK 15 Doors (Ext) Division Total NO WORK 16 Doors (Int) Division Total NO WORK 17 Partition Walls Division Total 29,640.00 Modify 1st floor floor walls for new design 1 5,100.00 5,100.00 1 4,500.00 4,500.00 Modify 2nd floor floor walls for new design 1 5,240.00 5,240.00 1 4,000.00 4,000.00 Update 2nd floor bathroom complete gut 1 5,000.00 5,000.00 1 5,800.00 5,800.00 Total Labor 15,340.00 Total Materials 14,300.00 18 Plaster/Drywall Division Total 6,655.00 Install new GWB in renovated areas 1st and 2nd floor 1 3,800.00 3,800.00 1 2,855.00 2,855.00 Total Labor 3,800.00 Total Materials 2,855.00 19 Decorating Division Total 1,800.00 Paint entire interior 1 1,000.00 1,000.00 1 800.00 800.00 Total Labor 1,000.00 Total Materials 800.00 20 Wood Trim Division Total NO WORK 21 Stairs Division Total 3,400.00 Install railings 1st floor and basement to code 1 1,200.00 1,200.00 1 2,200.00 2,200.00 Total Labor 1,200.00 Total Materials 2,200.00 22 Closets Division Total NO WORK 23 Wood Floors Division Total NO WORK 24 Finished Floors Division Total NO WORK 25 Ceramic Tile Division Total NO WORK 26 Bath Accessories Division Total NO WORK

27 Plumbing Division Total 5,138.00 Install new 80 Gallon HWT 1 250 250.00 1 800.00 800.00 New plumbing 2nd floor bath and kitchen 1 2,588 2,588.00 1 1,500.00 1,500.00 Total Labor 2,838.00 Total Materials 2,300.00 28 Electrical Division Total 3,965.00 Repair all non compnoncompliant wiring in basement 1 50 50.00 1 125.00 125.00 Ceiling fan in master B/R needs to be removed and wire 1 125.00 125.00 1 75.00 75.00 New lighting fixtures and recessed lighting 1 500.00 500.00 1 1,000.00 1,000.00 GFI's needed in kitchen and bathroom with renovation 1 1,565.00 1,565.00 1 525.00 525.00 Total Labor 2,240.00 Total Materials 1,725.00 29 Heating Division Total 12,600.00 HVAC Replacement 1 4,800 4,800.00 1 7,800.00 7,800.00 Total Labor 4,800.00 Total Materials 7,800.00 30 Insulation Division Total 1,100.00 Reinstall insulation in crawl space 1 800.00 800.00 1 300.00 300.00 Total Labor 800.00 Total Materials 300.00 31 Cabinetry Division Total 18,800.00 Supply and install new cabinets and counter top 1 3,500 3,500.00 1 12,000.00 12,000.00 Supply and install new Granite type counter top 1 800 800.00 1 2,500.00 2,500.00 Total Labor 4,300.00 Total Materials 14,500.00 32 Appliances Division Total NO WORK 33 Basements Division Total 2,300.00 Install sump pump system in basement 1 1,000.00 1,000.00 1 1,300.00 1,300.00 Total Labor 1,000.00 Total Materials 1,300.00 34 Cleanup Division Total 5,800.00 Selective demolition 1 2,500.00 2,500.00 1 2,000.00 2,000.00 Project cleanup during construction 1 500.00 500.00 1 800.00 800.00 Total Labor 3,000.00 Total Materials 2,800.00 35 Miscellaneous Division Total NO WORK Total Direct Cost of Construction 95,048.00

FHA Case No. RECAP TOTALS Borrower's Name & Property Address FHA Case Number Lender's Name & Address HUD 203(k) Consultant / Plan Reviewer's Signature X January 2, 2014 Construction Item Total Escrow 1 Masonry 1,900.00 Construction Cost Sub Total 95,048.00 2 Siding 750.00 Contingency Reserve 15% 14,257.20 3 Gutters/Downspouts 100.00 Subtotal 109,305.20 4 Roof Permits estimated cost 1,400.00 5 Shutters Total cost of Construction 110,705.20 6 Exteriors 5 Draw Inspections @ 225 1,125.00 7 Walks 8 Driveways Total allowable Fees 1,125.00 9 Painting (Ext.) Total cost of Construction 111,830.20 10 Caulking 11 Fencing 12 Grading 13 Windows 1,100.00 14 Weatherstrip 15 Doors (Ext.) Borrower 16 Doors (Int.) 17 Partition Wall 29,640.00 18 Plaster/Drywall 6,655.00 19 Decorating 1,800.00 20 Wood Trim 21 Stairs 3,400.00 CoBorrower 22 Closets 23 Wood Floors 24 Finished Floors 25 Ceramic Tile 26 Bath Accessories 27 Plumbing 5,138.00 Contractor 28 Electrical 3,965.00 29 Heating 12,600.00 30 Insulation 1,100.00 31 Cabinetry 18,800.00 32 Appliances 33 Basements 2,300.00 34 Cleanup 5,800.00 HUD Consultant 35 Miscellaneous Direct Cost of Repairs 95,048.00 HomeStyle transactions that require a Feasibility Study: HUD Consultant provides draw schedule AND performs draw Inspections

HUD 203(k) Consultant INVOICE TO: Borrower DATE: 01/02/14 Subject Address: DESCRIPTION AMOUNT Feasibility Report with Site Visit 425.00 Other/Notes: Balance due 425.00 Represents cost of Feasibility Study prepared by HUD Consultant