When considering Roof drainage design the following should be taken into account:

CHAPTER 11 STORM DRAINAGE

Technical Solution Sheet : Mechanical Services (Including duct heating)

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

CHAPTER 11 STORM DRAINAGE

16. Storm water drainage

Home Drainage & Causes of Basement Flooding. Water

CHAPTER 3 STORM DRAINAGE SYSTEMS

Module 19: Roof drainage

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

1 DESIGN FACTORS THE RUBEROID BLUE BOOK 1

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Cast iron swing grate in cast iron frame. 300x300 ID concrete chamber. Available chamber depths 400mm or 600mm deep. K&C Roadway SITE PLAN

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Separation of common services (above and below ground) INDUSTRY BULLETIN. Background. Separation distances. Proximity of services below ground

How To Drain A Drainline Grating

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Sanitary Sewer Overflow (SSO) Incident Report Form

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Available in Base or Survey Standard or Survey Professional series with different modules add-ons to suit your technical requirement and budget.

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Basements and Deep Building Construction Policy 2014

3. QUALITY ASSURANCE REQUIREMENTS

Conservatory Roof Structural Information Guide

WATER MANAGEMENT POLICY

Architectural Processing and Inspections for Home Mortgage Insurance

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

CHAPTER 11 STORM DRAINAGE

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding

Uniclass L L2123 EPIC J3413. CI/SfB (52.5) Heavy duty channel drainage system ACO S Range

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

Introduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

ACO Water Management: Civils + Infrastructure

4.3 Cisterns and Rain Barrels

DRAINAGE PART 3 HA 102/00 SPACING OF ROAD GULLIES SUMMARY

PART 6 HA 113/05 DRAINAGE

a guide to PREVENTING HOME FLOODING DURING STORMS

PART 5 : WASTEWATER DRAINAGE

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

SECTION INLETS INLET LOCATIONS

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

CERTIFYING DRAINLAYER

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

From Civil 3D, with Love

Type of Sewer Systems. Solomon Seyoum

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

Council Policy. This Policy assists in the implementation of the Council Plan Revised 2010, in particular Strategy 3.1.

Requirements for Building Application Submission

CHAPTER 2 HYDRAULICS OF SEWERS

Geberit Pluvia Syphonic roof drainage system. Stands up to every kind of rainfall

STORM DRAINS CHAPTER 7

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

Building Regulations 1997

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

City of West Linn Public Works Design Standards Table of Contents

PRIVATE WELL SEPARATION

Table 4.9 Storm Drain Inlet Protetion Applicable for

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

ACO Water Management: Civils + Infrastructure

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

Riprap-lined Swale (RS)

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

SUSTAINABLE URBAN DRAINAGE SYSTEMS

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

SECTION STORM DRAINAGE TABLE OF CONTENTS

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

Heating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

Integrated Local Flood Management and Drainage Strategy OVERVIEW

Standard terms and conditions

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:

CHAPTER 5. Storm Sewer

CITY UTILITIES DESIGN STANDARDS MANUAL

Downspout to storm sewer. Leaky laterals

System components and Design

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal

CHAPTER 9 VENTS. copper drainage tube Type DWV, Schedule 40 plastic piping, or borosilicate glass.

REGISTRATION EXAMINATION, JUNE 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

FLAT ROOF BOX SPAN CARPORTS

Protect Your Home From Flooding. A guide for Lethbridge Residents

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Additional Services Agreement. Part 3: Schedule of our requirements

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

Transcription:

4: Drainage (Below Ground Stormwater) Duplicate solution of 0.04 Roof Plumbing (Roof and Stormwater) Roof and Stormwater AIM The aim of this technical solution is to clarify the requirements for sizing stormwater drains and eaves gutters. PLUMBING REGULATIONS 2008 The Plumbing Code of Australia (PCA) is adopted by and forms part of the Plumbing Regulations 2008. Part D1 of the PCA specifies the objectives and performance requirements related to the installation of roof drainage systems. AS/NZS 3500.3 Plumbing and drainage - Part 3: Stormwater drainage & Section 2 of AS/NZS 3500.5 Plumbing and drainage - Part 5: Housing installations are Deemed to Satisfy documents listed in Part B3 of the PCA and both contain sections on Surface and Roof Drainage Systems - design. The Plumbing Regulations 2008 also specify that roofing (stormwater) work must comply with SAA/SNZ HB114 Guidelines for the design of eaves and box gutters. Part D2 of the PCA specifies the objectives and performance requirements related to the installation of surface and subsurface drainage systems. AS/NZS 3500.3 is a deemed to satisfy document listed in Part D2 of the PCA and contains sections on Roof drainage systems Surface drainage systems - design, Roof drainage systems installation, Surface drainage systems design and Surface and subsoil drainage systems - installation. SURFACE DRAINAGE SYSTEMS DESIGN AS/NZS 3500.3 Summary of methods to design surface drainage systems Two methods of design are used depending on the area of the proposed allotment: 1. Nominal method for single dwellings (rural) and single dwellings (urban) where the allotment size is less than 1000m². This method does not involve any calculations and some rules are provided regarding diameter of pipes, depth of cover, gradient and layout. 2. General method for all buildings. This method involves hydraulic design calculations to determine design flows, and procedures to determine the design of channels and drains. Nominal method - Minimum diameter of pipe 1. For single dwellings in rural areas, and single dwellings on urban allotments with areas less than 1000m², the minimum diameter of pipe shall be DN90; and 2. For other properties, downstream of a stormwater or inlet pit, shall be the greater ofthe diameter of the largest pipe entering the pit, or - DN150. An exception to this is at footpath crossings where multiple pipes of DN100 or less may be used. www.vba.vic.gov.au Page 1 of 6

External connections The external connection can be to the street gutter, a street drainage pipe or inter-allotment drain (see Figure 1). Layout of systems AS/NZS 3500.3 lists a range of requirements for the layout of stormwater drains. It is important to consider: 1. The allowance for possible stormwater discharges from adjacent properties, 2. Protection of buildings, and 3. The location of stormwater drains in relation to the sanitary drainage system. Example of layout and sizing Figure 2 is from Appendix K of AS/NZS 3500.3 which details a solution to stormwater drainage on an urban allotment not exceeding 1000m². The drainage system is constructed of approved non-metal materials. Solution 1. The layout should comply with AS/NZS 3500.3 so that the overland flow path is directed away from the building. 2. The stormwater drains are sized in accordance with AS/NZS 3500.3 as follows: between a downpipe outlet and a stormwater or inlet pit, DN90 between the stormwater pits A & B, DN150; and between pit B and the street kerb, two drains of DN100 or less 3 Minimum cover for PVC-U from AS/NZS 3500.3 under the paved driveway within the property, 75mm below the underside of brick or unreinforced concrete for light vehicle loadings. Elsewhere for single dwelling properties 100mm. under the paved footpath outside the property, 75mm below the underside of the paving. FIGURE 1 TYPICAL ARRANGEMENT OF INLET PIT AND FOOTPATH CROSSING www.vba.vic.gov.au Page 2 of 6

4. The minimum gradient for stormwater drains (from AS/NZS 3500.3) for DN90, DN100 and DN150 is 1:100. 5. Stormwater pits, A & B are sized based on AS/NZS 3500.3 Each pit would be 450mm x 450mm with a minimum fall of 20mm between the invert of the inlet and outlet. FIGURE 2 SOLUTION TO STORMWATER DRANAGE ON URBAN ALLOTMENT ROOF DRAINAGE SYSTEMS DESIGN AS/NZS 3500.3 & SAA/SNZ HB114 Elements of Roof Drainage Design 1. Catchment areas Vertical walls abutting a roof must be included in the catchment area. For hipped roofs with eaves gutters a simplified formula can be used to calculate catchment area, but the slope of the roof must be known. Refer to AS/NZS 3500.3 and SAA/SNZ HB114 which simplify the roof catchment calculations. (see Appendix A) SAA/SNZ HB114 for example calculations for typical roof styles. (see page 14 step 2) for the method using the slope factor for a pitched roof to an eaves gutter (hip & valley with no abutting vertical walls or flat roofs). The catchment area of a roof and any vertical walls is greatly influenced by the direction of wind driven rain, therefore the combined catchment area must be used for sizing purposes. 2. Rainfall intensity Rainfall intensities are given in Appendix E AS/NZS 3500.3 The appendix gives five minute duration rainfall intensities. There is also reference to an Average Recurrence Interval (ARI) of 20 and 100 years. The ARI is used in accordance with Table 3.3.4 AS/NZS 3500.3 where the risk of property damage, inconvenience or injury to people is taken into account For example: external gutters eaves gutters 20 years ARI Internal gutters, box gutters 100 years ARI For a 500 year ARI, multiply 100 year ARI x 1.5 Table E1 lists latitude and longitude of selected places, some of which are marked on the maps. If there is any doubt regarding www.vba.vic.gov.au Page 3 of 6

the rainfall intensity for a particular area, refer to the relevant council / shire for accurate rainfall intensity figures. 3. Overflow measures for eaves gutters Always consider what will happen if the gutter overflows. If water cannot flow back into the building, e.g. gutter fixed to rafters without eaves linings, no overflow measures are required. If water can flow back into the building; e.g. through eaves linings, then overflow methods must be provided. Blockages can occur in eaves gutters anywhere along the gutter; therefore an overflow device at the outlet may not prevent such overflows. Examples of acceptable overflow measures for eaves gutters can be found in Appendix G of AS/NZS 3500.3. Simplified ways of providing for overflow of external eaves gutters can also be found in SAA/SNZ HB114. Design Example The following example is shown to illustrate the procedure adopted by SAA/SNZ HB114 to design eaves gutters and downpipes. A house is to be constructed in Melbourne. The plan is shown in Figure 4. There roof pitch is 23. Gutter overflow could cause significant damage, therefore overflow measures are required. Step 1: Determine the 5min/20 year ARI for the locality From AS/NZS 3500.3 Figure E6, the ARI for Melbourne is 130mm/hour. Step 2: Select eaves gutter and gutter slope The eaves gutter selected is quad spouting with an effective cross sectional area of 6125mm² installed with a slope of 1:500. Step 3: Determine downpipe size From Table 3.5.2 in AS/NZS 3500.3, or Table 3.2 in SAA/SNZ HB114, the minimum size downpipes compatible with spouting of 6125mm² cross sectional area (installed at a 1:500 gradient) are 90mm diameter round or 100mm x 50mm rectangular. A minimum gradient of 1:500 is preferred. Step 4: Select 100 x 50 rectangular downpipe. From Figure 3.5.2(B) in AS/NZS 3500.3 or Figure 4 in SAA/SNZ HB114 the maximum catchment per downpipe is 47m². Step 5: Determine minimum number of downpipes To calculate the minimum number of downpipes, divide the roof catchment area by the allowable maximum catchment per downpipe. Min number of downpipes = roof catchment area allowable maximum catchment per downpipe = 223.8 47 = 4.76m² = Five downpipes are required (round up to the next whole number) Step 6: Determine the average catchment area per downpipe To calculate the average catchment per downpipe, divide the roof catchment area by the number of downpipes. Average catchment per downpipe = Roof catchment area No. of downpipes = 223.8 5 = 44.76m² www.vba.vic.gov.au Page 4 of 6

Step 7: Divide the roof into approximately equal catchment areas and determine downpipe positions Divide the roof into five catchments and nominate the high points between downpipes (see Figure 5). Step 8: Select an overflow method if required The example building requires overflow measures. SAA/SNZ HB114 and AS/NZS 3500.3 both provide various methods depending on the type of gutter used. For this job select Example 1 from Figure 1 in SAA/SNZ HB114 where the gutter is installed with a minimum h f mm value between the top of the front bead of the gutter and the top of the fascia (see Figure 6). SAA/SNZ HB114 also provides information to size box-gutters, rain-heads, sumps and overflow devices plumbers must be aware of design requirements, and apply them on the job. The minimum h f value is based on 100 I 5 for Australia (see Table G1 minimum h f values) in AS/NZS 3500.3 There are many possibilities for downpipe positions. In some cases depending on roof shape or building layout extra downpipes may be needed as it is not always possible to achieve approximately equal catchment areas. Valley gutters should be at high points to allow drainage away from internal angles. The sub catchment areas may not add up exactly due to rounding off during calculations. In this particular example, as per step 5, no catchment area should exceed the allowable 47m². FIGURE 3 PROVIDING FOR OVERFLOW OF EXTERNAL EAVES GUTTERS (h f ) www.vba.vic.gov.au Page 5 of 6