GSAR RESPONSE ASSESSMENT AND DECISION MAKING SUPPORT

Similar documents
Definitions. The following definitions are applicable to this OG:

Backcountry Avalanche Rescue Reference

University of Victoria EMERGENCY RESPONSE PLAN

MODULE III PLANNING &TRIAGE

PROGRAMS & COURSES (2015)

The purpose of ESF #9 is to identify search, rescue, and recovery roles and responsibilities within the City of Tucson during a disaster.

FIRE & SAFETY DIVISION COURSE CALENDAR

Rosalie LO, PsyD Senior Clinical Psychologist Certified Traumatologist. Corporate Clinical Psychology Services Hospital Authority Hong Kong

Advanced Training Onshore (mountains, forests, etc.) Advanced Training Offshore (vessels, ships, open water, swift water, etc.)

EMERGENCY MANAGEMENT BRITISH COLUMBIA A STRATEGY TO ADVANCE SUPPORT FOR LOCAL AUTHORITY EMERGENCY MANAGEMENT PROGRAMS OCTOBER 14, 2015

Medical Helicopters in Wilderness Search and Rescue Operations

EMRG-1783 Search and Rescue Management Level 1. SELECTED PRE READ MATERIAL From SAR Management Level 1 Participant Manual

Nova Scotia EMO. Hazard Risk Vulnerability Assessment (HRVA) Model. Guidelines for Use. October, 2010

PROCESS FOR RISK ASSESSMENT

Fire and Emergency Services Guide

Presented by Capt Iefan Blake Senior Helicopter Pilot Air Mercy Service

How To Handle A Train Accident In Whitefish

Incident / Accident Report Form

Risk Management: Coordinated activities to direct and control an organisation with regard to risk.

SEARCH AND RESCUE SAFETY PROGRAM GUIDE

The Colorado Mountain Club Emergency Action Plan (EAP)

MONTANA STATE PARKS INCIDENT MANAGEMENT PLAN TEMPLATE

Adventure Studies Department 900 McGill Road, Kamloops, British Columbia, Canada, V2C 0C8 Application Package

Criminal Justice and Public Safety Program of Study & Course Syllabus

PUBLIC SAFETY LIFELINE VOLUNTEERS INJURY, DISABILITY, ACCIDENTAL DEATH, LIABILITY AND GENERAL INSURANCE COVERAGE

Memorandum of Understanding

FIDUCIARY ADVISORY SERVICES

SURVIVAL FACTORS GROUP CHAIRMAN S FACTUAL REPORT, Revision 1 1

City of Sault Ste. Marie Emergency Response Plan

CSA Z1600 Emergency Management and Business Continuity Programs

Recovery of Persons from the Water

Risk Assessment Tool and Guidance (Including guidance on application)

BUSINESS CONTINUITY POLICY

Patient Experiences with Acute Inpatient Hospital Care in British Columbia, 2011/12. Michael A. Murray PhD

Vulnerability Assessment. U.S. Food Defense Team

WMD Incident Management Simulation and Tutor

Desktop Scenario Self Assessment Exercise Page 1

University of Ottawa Pandemic Plan

City of Greater Sudbury HOT WEATHER. Prepared by:

July New Limitation of Actions Act. Q&A p Transition Rules p. 11 Table of Concordance p. 12

Emergency Management for Small Community Leaders. Establishing Local Emergency Priorities and Managing the Local Emergency Response

EXECUTIVE CRISIS MANAGEMENT TRAINING. Presented by Roseanne Rostron, CBCP Raido Response

From Emergency to Preparedness: The Story of BCIT s Emergency Management Plan April 2009 BCLA Glen Magel / Tricia Daum

Business Continuity Template

Dynamic: Dynamic risk management is carried out by all personnel at an operational incident.

Policy : Enterprise Risk Management Policy

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou

2013 Flood Recovery Framework

FACULTY OF EDUCATION

DEFINING RISK AND ITS ROLE IN DISASTER MANAGEMENT

Columbia River Project Water Use Plan. Monitoring Program Terms of Reference LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN

FREDERICK-FIRESTONE FIRE PROTECTION DISTRICT STANDARD OPERATING GUIDELINES

Hospital Emergency Operations Plan

10. Matters referred from the Fire Fighter Advisory Committee (FFAC), including but not limited to:

SEARCH AND RESCUE STANDARDOPERATING PROCEDURES THEORIES OF SEARCH MANAGEMENT

Working Group Members: Food Safety, BC Centre for Disease Control Air Quality, BC Centre for Disease Control Health Emergency Management, PHSA

Strategies for occupational therapists to address elder abuse/mistreatment

Nursing Home Emergency Preparedness: A Comprehensive Citywide Approach in New York City. September 22, 2015, 1:00 PM EDT #DisasterLearning

CORPORATE PANDEMIC PREPAREDNESS PLAN

Written Submission to Federal Review Panel for New Prosperity Gold-Copper Mine Project

Climate resilient infrastructure

Ocean County ERC. Emergency Response Crisis Counseling

Introduction. Catastrophic Incident Annex. Cooperating Agencies: Coordinating Agency: Department of Homeland Security

Municipal Revenue Sources Review An Analysis of Tax Policy Objectives

Business Continuity, Risk Management & Pandemic Planning

Guidance on Risk Assessment and Control

Emergency Response Planning. Construction Projects

The correct answers are given below. Some talking points have been added for the teachers use.

Top Rope Climbing Instructor. Application Package (Please specify course dates and location on your application form)

ADVANCED ALL-HAZARDS INCIDENT MANAGEMENT

It should be noted that this revised standard does not address the construction industry, window cleaning belts, and sports-related activities.

BCU Awarding Level 1 Certificate in Coaching Paddlesport. Candidate Assessment Pack. Candidate Details. Candidate Name:

Shell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development.

Risk Management and Internal Audit Specialized Training Course Audit Risk Assessment Methodology

EMERGENCY SUPPORT FUNCTION (ESF) 14 LONG TERM RECOVERY AND MITIGATION

Federal Emergency Preparedness and Response System

FINDING THE RISK IN RISK ASSESSMENTS NYSICA JULY 26, Presented by: Ken Shulman Internal Audit Director, New York State Insurance Fund

PUBLIC SAFETY. Industry Solutions Harness the Power of GIS for Public Safety

Thermal Bridging of Masonry Veneer Claddings and Energy Code Compliance

STEP-BY-STEP BUSINESS CONTINUITY AND EMERGENCY PLANNING MAY

Submitted By Dutchess County Emergency Response Coordinator John Murphy Date:

Ministry of Public Safety and Solicitor General Disaster Financial Assistance Q&A

Utica College Performance Review Form

CONTINUITY OF OPERATIONS PLAN TEMPLATE

Loads and Seismic Design National Building Code Wind and Snow Importance Factors

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

Hockey Resume of Jason Fothergill

Transcription:

GSAR RESPONSE ASSESSMENT AND DECISION MAKING SUPPORT Title of Project Partner Type of Project Project Description Project Length(years) SAR NIF Funding Contribution from Other Sources Total Ground Search and Rescue Response Assessment and Decision Making Support British Columbia Search and Rescue Association Response Through the development, peer review and testing of a risk assessment matrix and a decision making guide, the project will help SAR volunteers in meeting the requirements for assessing overall risk in SAR response. 2 $ 479,834.90 $ 102,500.00 $ 582,334.90 We would like to acknowledge the financial support of the Government of Canada for this project through the Search and Rescue New Initiatives Fund (SAR NIF).

CONTEXT The British Columbia Emergency Response Management System (BCERMS), the Incident Command System (ICS) based structure under which all emergency response in the province operates, has the following objectives: provide for the safety and health of all responders, save lives, reduce suffering, protect public health, protect government infrastructure, protect property, protect the environment, and reduce economic and social losses. To fulfill the number one objective of BCERMS Emergency Management British Columbia (EMBC) develops policies under which SAR Volunteers operate, including The Public Safely Volunteer Lifeline Safety Policy. The Search and Rescue Safety Program Guide and Provincial Operating Guidelines (initially published in 2009) provide additional direction and guidance specific to Search and Rescue related issues.

Project Development Process BCSARA application for SAR NIF funding Research SAR-related risk assessment materials September 2013 SME Steering Committee Model development December 2013-February 2014 SAR Group feedback sessions Model adjustment Material preparation RADeMS Conference

MATRIX DEVELOPMENT Initial work done by Ross Cloutier and Neil Brewer to research existing Risk Assessment Matrix (RAM) models. Materials presented to advisory group for discussion at September 2013 meeting in Kamloops. Josh Anderson Chris Armstrong Aaron Beardmore Neil Brewer (Project Manager) Ross Cloutier (Risk Management Consultant) Pascal Haegeli Mike Hudson Karl Klassen Jim Lavalley Jim McAllister Gilles Valade Jeremy Vandekerkhove Kent Harrison SAR Rescue Canada Parks Canada Kent Harrison SAR Bhudak Consultants Avisualanche Consulting South Columbia SAR Canadian Avalanche Centre Rescue Canada Director-at-large, BCSARA Canadian Avalanche Centre Vernon SAR

ALTERNATIVE RISK ASSESSMENT TOOL FORMATS HEAT MAPS/MATRICES CHECK LISTS DYNAMIC TOOLS Impact Risk Management Actions Hazard Risk Assessment Quick Card Significant Moderate Considerable management required Risks may be worth accepting with monitoring Must manage and monitor risks Management effort worthwhile Extensive management essential Management effort required Circle one: Task Date: South Location: Time: Columbia Explanation of task or training: Team Leader/Instructor SAR Members present: Training Minor Accept risks Accept, but monitor risks Manage and monitor risks Hazard: Low Medium High Likelihood Circle a Risk factor Very Low Low Medium High Very High What measures have been taken to control risks: Notes: Continue Task/Training Stop and Think MULTI-ELEMENT RISK ASSESSMENT TOOL GENERIC SAR INCIDENT RESPONSE 0 = FEW 9 = MANY 0 = LOW 9 = HIGH 0 = LOW 9 = HIGH 0 = LOW 9 = HIGH 0 = LOW 9 = HIGH 0 = SUFFICIENT 9 = MARGINAL 6 7 8 4 5 0 HAZARDS SEVERITY RESOURCES VULNERABILITY URGENCY EXPECTATION RESOURCES Control Measures Identify the Hazards URGENCY Assess the Risks TOOLS PRESSURE EXPECTATION EXPOSURE HAZARDS Completed by: SEVERITY VULNERABILITY

ALTERNATIVE RISK ASSESSMENT TOOL FORMATS

ALTERNATIVE RISK ASSESSMENT TOOL FORMATS MILITARY EXAMPLE COMBINATION HEAT MAP/FORM

MATRIX DEVELOPMENT GENERIC IMPACT VS LIKELIHOOD MATRIX (HEAT MAP) EXAMPLE FROM MISSION SAR

ASSESSING SAR OPERATIONAL RISK (from Colorado Mountain Rescue) Activity: (defined by catastrophic potential as some activities are more dangerous than others) helicopter long-line, swiftwater, rope rescue, mountain rescue, avalanche rescue or a search Personnel physical elements (skills, knowledge & experience): physical conditioning, physical skills, rescue techniques, emergency medical providers, experience in the environment, food & water, sleep Personnel mental elements: hazard recognition, situational awareness, adaptability and flexibility, deviations from established plans, judgment and leadership, teamwork, knowledge of resources available Personnel emotional elements: ego, who comes first, Go fever, subjects emotional and psychological state, inter-team dynamics, leader control and authority External influences: public and official pressure, subject friends and family, media, other outside influences Survivability: who it is that is being rescued, what the medical necessity is Equipment: its appropriateness, its quality/quantity, maintenance, knowledge of how to use it Planning: time available, completeness, quality of information available, unknowns

MATRIX DEVELOPMENT TRANSITION TO SPECIFIC ELEMENTS OF A SAR RESPONSE GO MUST MANAGE TO GO NO GO UNTIL MANAGED TO GO NO GO Activity No Risk Low risk Moderate risk High risk Natural Hazards Personnel Skills & Experience No danger to personnel Some danger to personnel Danger to personnel No danger to personnel Some danger to personnel Danger to personnel Significant danger to personnel Significant danger to personnel Personnel Mental Strong Team Issues to address Significant Concerns Dysfunctional Team Personnel Emotional Strong Team Issues to address Significant Concerns Dysfunctional Team External Influences Insignificant external pressures on decision making Noticeable external pressures on decision making Significant external influences on decision making Loss of control of some decision making Urgency Very urgent response required Urgent response required Some urgency required in response No urgent response required Equipment Excellent equipment and use knowledge Good equipment and good use knowledge Fair equipment or fair use knowledge Poor equipment or poor use knowledge Planning Extensive time to plan Adequate time to plan Minimal time to plan No time to plan

MATRIX DEVELOPMENT SPECIFIC ACTIVITY DESCRIPTIONS ADDED GO MANAGE TO GO NO GO UNTIL MANAGED TO GO NO GO Swiftwater Rescue activity-specific descriptors Activity No Risk Low risk Moderate risk High risk Elements: grade of river; load above river, on surface, surface & suspended, suspended & bottom, activities within standard practice Natural Hazards No danger to personnel Some danger to personnel Danger to personnel Significant danger to personnel Elements: grade of river, wave morphology, continuity of rapids, surface velocity, vertical drop, river bottom, % of surface flow downstream, temperature of water, clarity of water, hard hazards, wildlife, water toxicity, hydraulic hazard/consequence Personnel Skills & Experience No danger to personnel Some danger to personnel Danger to personnel Significant danger to personnel Elements: personnel appropriately trained, experience in the location, EMTs available, team rested & fed, skill margin Personnel Mental Strong Team Issues to address Concerns Dysfunctional Team Elements: team situation awareness, hazard analysis done, plan deviation, in or outside the team comfort zone, teamwork level, knowledge of other resources, leadership strength Personnel Emotional Strong Team Issues to address Concerns Dysfunctional Team Elements: humility level, calmness level, ego level, competitive level, who comes first, Go Fever level, subject state, inter-team dynamics, within the chain of command External Influences Insignificant external pressures on decision making Noticeable external pressures on decision making Significant external influences on decision making Loss of control of some decision making Elements: public, family, media, other agency, management Urgency Very urgent response required Urgent response required Some urgency required in response No urgent response required Elements: recovery; subject location, stability, fitness, thermal protection, hypothermia, panic level, age, medical issues Equipment Excellent equipment and use knowledge Good equipment and good use knowledge Fair equipment or fair use knowledge Poor equipment or poor use knowledge Elements: equipment appropriateness, complexity of the system, PFD quality, thermal protection, boat type, power options (paddle, oar, engine) Planning Extensive time to plan Adequate time to plan Minimal time to plan No time to plan Elements: information quality, pre-plan preparation, time to review operational plan, management team consensus

Assessing SAR Operational Risks DEVELOPMENT OF X AND Y AXIS COMPONENTS (ELEMENTS) 1. SAR Operation Risk Risks associated with: Complexity Activity Hazards Environmental Conditions Vulnerability (team exposure) External Influences 2. Team Capability Risks associated with lack of: Personnel Training Personnel Experience Personnel Preparedness (mental and physical) Planning Resources

MATRIX DEVELOPMENT SAR GROUP PRESENTATIONS (16)

Matrix Potential Scoring Systems 1, 2, 3, 4, 5 SAR Operation Risk Score SAR Operational Complexity How complex & complicated is the task? Very Low Low Moderate High Very High 1 2 3 4 5 Activity Hazards How much hazard is inherent in the activity? Very Low Low Moderate High Very High 1 2 3 4 5 Environmental Conditions How high are the environmental hazards? Very Low Low Moderate High Very High 1 2 3 4 5 Vulnerability How exposed and vulnerable are the team members? Very Low Low Moderate High Very High 1 2 3 4 5 External Influences Level of pressure due to survivability, media, family or other? Very Low Low Moderate High Very High 1 2 3 4 5 Team Capability Score Personnel Training What level of training do personnel have? Very High High Moderate Low Very Low 1 2 3 4 5 Personnel Experience What level of experience do personnel have? Very High High Moderate Low Very Low 1 2 3 4 5 Personnel Mental & Physical Preparedness How mentally & physically prepared are personnel? Very High High Moderate Low Very Low 1 2 3 4 5 Planning How much planning has there been? Very High High Moderate Low Very Low 1 2 3 4 5 Resources What is the level of resources available? Very High High Moderate Low Very Low 1 2 3 4 5 Total Score: Total Score:

Matrix Potential Scoring Systems -1, 0, +1 SAR Operation Risk Score Team Capability Score SAR Operational Complexity How complex & complicated is the task? Low Moderate High -1 0 +1 Activity Hazards How much hazard is inherent in the activity? Low Moderate High -1 0 +1 Environmental Hazards How high are the environmental hazards? Low Moderate High -1 0 +1 Vulnerability How exposed and vulnerable are the team members? Low Moderate High -1 0 +1 Personnel Training What level of training do personnel have? High Moderate Low -1 0 +1 Personnel Experience What level of experience do personnel have? High Moderate Low -1 0 +1 Personnel Mental & Physical Preparedness How mentally & physically prepared are personnel? High Moderate Low -1 0 +1 Planning How much planning has there been? High Moderate Low -1 0 +1 External Influences Level of pressure due to survivability, media, family or other? Low Moderate High -1 0 +1 Total Score: Resources What is the level of resources available? High Moderate Low -1 0 +1 Total Score:

MATRIX DEVELOPMENT FINAL CARD FORMAT

RATING GUIDES Accompanying information to help define the rating categories. 1. Ground Search 2. Rope Rescue 3. Mountain Rescue 4. Swiftwater Rescue

RATING GUIDES OPERATION RISK SCORE GROUND SEARCH

RATING GUIDES RESPONSE CAPABILITY SCORE GROUND SEARCH *

RISK ASSESSMENT CYCLE Response Continues SAR Response Situation Changes STOP and Assess Apply Mitigation Identify Hazards Define Risk Review Resources

RADeMS REFERENCE GUIDE 8 ½ X 5 ½ SPIRAL-BOUND BOOKLET (WITH 2 CARDS)

SMART PHONE APPS Android and ios search BCSARA Results can be named, saved and e-mailed.

DOWNLOADABLE EXECUTABLE FILE Visit BCSARA web site Results can be named, saved and printed.

JIBC ON-LINE PRESENTATION http://host.jibc.ca/gsar/

PROMOTIONAL MATERIALS 18 x 24 POSTERS 6 X 3 ½ STICKERS STAINLESS STEEL WIDE-MOUTH WATER BOTTLES

EXAMPLE SEARCH AND RECOVERY, RAINBOW FALLS, SEPTEMBER 2015 Initial call at 1732hrs on Sept 5 th. Information was that 2 people were missing at Bear Creek Falls. CDFL (long-line) response initiated with Chilliwack Search and Rescue. On scene at Rainbow Falls at 1830hrs. Third subject is the only one who made it out of the falls. Voice contact with first subject uninjured but stuck on cliff near bridge. CDFL on scene at 1900hrs Second subject located (by helicopter) at 1920hrs. Subject declared deceased due to location (fall) and position in water.

EXAMPLE SEARCH AND RECOVERY, RAINBOW FALLS, SEPTEMBER 2015 SITUATION Subject is deceased. 1 hour of daylight left for aircraft to recover subject, then return to Hope via Chilliwack. Rescuer would have to remain attached to line. Retrieval would involve tying a rope around the subject s legs. Still need to rescue first subject, but can do that without helicopter.

EXAMPLE SEARCH AND RECOVERY, RAINBOW FALLS, SEPTEMBER 2015 1 2 2 2 1 8 0 0 0 1 0 1

EXAMPLE SEARCH AND RECOVERY, RAINBOW FALLS, SEPTEMBER 2015 DECISION Postpone body recovery until 0700hrs next morning.

EXAMPLE SEARCH AND RECOVERY, RAINBOW FALLS, SEPTEMBER 2015 1 2 1 2 0 6 0 0 0 0 0 0

EXAMPLE SEARCH AND RECOVERY, RAINBOW FALLS, SEPTEMBER 2015 Many thanks to Chilliwack Search and Rescue and Valley Helicopters for their assistance.

CONTACT INFO Neil Brewer Project Manager, NIF 201307 H 604-796-3573 C 604-795-0267 grants@bcsara.com brewernj@telus.net