Deliverables and Milestones Tables

Similar documents
Data transport in radio astronomy. Arpad Szomoru, JIVE

Managing Application Performance with JBoss Operations Network and OC Systems RTI

Which is right for you?

7/15/2011. Monitoring and Managing VDI. Monitoring a VDI Deployment. Veeam Monitor. Veeam Monitor

Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name]

Automated job scheduling

Microsoft Dynamics NAV

EERQI. European Educational Research Quality Indicators. WP 14 Project Portal - Project information & dissemination

Efficient Verification for Avionic Product Development

Contact for all enquiries Phone: info@recordpoint.com.au. Page 2. RecordPoint Release Notes V3.8 for SharePoint 2013

Data Validation and Data Management Solutions

Monitoring, Managing and Supporting Enterprise Clouds with Oracle Enterprise Manager 12c Name, Title Oracle

UPDATE MANAGEMENT SERVICE The advantage of a smooth Software distribution

June 10, E-Learning System Project Team. FROM: Michael Dieckmann. Project Charter for Desire2Learn Project.

LOFAR Software Development Roadmap

The fi rst fully network-based integrated OR

How To Improve Your Business

The Partnership. You Can Count On. Seth Pomeroy, Partner NDH Group, Ltd May, 2015

SCADA Questions and Answers

Cisco Unified Workforce Optimization for Cisco Unified Contact Center Express 8.5

Managing Large Imagery Databases via the Web

Case Management Implementation Guide

Advanced Server Virtualization: Vmware and Microsoft Platforms in the Virtual Data Center

SECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

A Service for Data-Intensive Computations on Virtual Clusters

Eucalyptus-Based. GSAW 2010 Working Group Session 11D. Nehal Desai

Collaborative Open Market to Place Objects at your Service

Monitoring, Managing and Supporting Enterprise Clouds with Oracle Enterprise Manager 12c Jan van Tiggelen, Senior Sales Consultant Oracle

Re: RFP # 08-X MOTOR VEHICLE AUTOMATED TRANSACTION SYSTEM (MATRX) FOR MVC ADDENDUM #10

New 64-bit Web browser for AIX 5L, and systems monitoring facility for AIX 5L and VIOS available for no charge

XpoLog Center Suite Log Management & Analysis platform

Hardwarekrav. 30 MB. Memory: 1 GB. Additional software Microsoft.NET Framework 4.0.

Day-Care Environment Communication and Database

HHSN W 1 QSSI - Quality Software Services, Inc

Scalable Services for Digital Preservation

Cybersecurity for Energy Delivery Systems 2010 Peer Review. Philip A Craig Jr Pacific Northwest National Laboratory Field Device Management

elivering CRM Success in the Cloud

RCL: Design and Open Specification

D01.1 Project Management Plan

LOTUS to SharePoint Migration Services

Getting Started Hacking on OpenNebula

DSA1.4 R EPORT ON IMPLEMENTATION OF MONITORING AND OPERATIONAL SUPPORT SYSTEM. Activity: SA1. Partner(s): EENet, NICPB. Lead Partner: EENet

Cross-Platform Software Considerations for Internet of Things

Internal Communications Channels

Cloud Computing with Red Hat Solutions. Sivaram Shunmugam Red Hat Asia Pacific Pte Ltd.

Digital Advisory Services Professional Service Description Network Assessment

Offer from Zissor for the Zissor WEB portal for search and viewing of the digitized newspaper archive of Newbury Weekly News

Software Cost. Discounted STS Rate Units Total $0.00 $0.00 $0.00 $0.00 Total $0.00

E N T R E P R E N E U R I A L S K I L L S P A S S P R O J E C T Q U A L I T Y A S S U R A N C E P L A N

Risk Assessment. Integrated Procurement System (Case Study) U.S. Department of Housing and Urban Development. Month, Year

EMC E Exam Name: Virtualized Data Center and Cloud Infrastructure Design Specialist

wespot IST (FP7/ ) under grant agreement N

Cisco Enterprise Mobility Services Platform

OnX Oracle Cloud Services

Content Management Playout Encryption Broadcast Internet. Content Management Services

Standard operating procedure

Quattra s Cloud Vision & Framework Value

Microsoft Office Project Server 2007

RESPONSES TO QUESTIONS AND REQUESTS FOR CLARIFICATION Updated 7/1/15 (Question 53 and 54)

State of Alaska Enterprise Messaging and Directory Services Strategy Vision and Scope

Cisco Network Optimization Service

PRACE WP4 Distributed Systems Management. Riccardo Murri, CSCS Swiss National Supercomputing Centre

Content Distribution Management

Client Requirement. Why SharePoint

AWWA/WEF Information Management & Technology Conference, March 4-7, 2007, Austin, TX

Planning and Surviving a System Upgrade Lessons Learned

2003 Patricia Ensworth Page 1

MicroStrategy Course Catalog

BSM Transformation through CMDB Deployment. Streamlining the Integration of Change and Release Management

The Document Review Process: Automation of your document review and approval. A White Paper. BP Logix, Inc.

Outage Management System Implementation. Status Report

Career Tracks- Information Technology Family

Building a CA PPM Roadmap

IST STREP Project. Deliverable D3.3.1u Middleware User s Guide Multi-Radio Device Management Layer.

NIST Cloud Computing Program Activities

A. Document repository services for EU policy support

Data Sheet Netrounds Control Center

OPERATIONAL EXCELLENCE REDEFINED

C o v e r. Thin Client Application Options. SIMATIC Thin Client s FAQ h April 2009 e et. Service & Support. Answers for industry.

Adrian Cristal (BSC), Osman Unsal (BSC) Reviewer

Openbravo Services for Partners

RCL: Software Prototype

Securing Enterprise Mobility for Greater Competitive Advantage

Task Area 1: IT Services for Biomedical Research, Health Sciences, and Healthcare

INDIGO DataCloud. Technical Overview RIA INFN-Bari

Security Center Unified Security Platform

Deliverable D 6.1 Website

Testing Tools using Visual Studio. Randy Pagels Sr. Developer Technology Specialist Microsoft Corporation

Make the Most of Big Data to Drive Innovation Through Reseach

Fundamentals of LoadRunner 9.0 (2 Days)

OpenNebula Open Souce Solution for DC Virtualization. C12G Labs. Online Webinar

The ITIL v.3. Foundation Examination

FirM - Federated Identity & Resource Management For Domino

INVESTRAN DATA EXCHANGE

The Construction of Seismic and Geological Studies' Cloud Platform Using Desktop Cloud Visualization Technology

Customer Timeline - New in Summer Web Lead Capture - New in Summer Built-In Dashboards - New in Summer 2012

HP Application Lifecycle Management (ALM) HP Quality Center Roman Zednik HP Software Austria

West Georgia Technical College

ETERE SNMP CONSOLE: A centralized, automatic and real-time monitoring of broadcast system networks

EMC IT AUTOMATES ENTERPRISE PLATFORM AS A SERVICE

Transcription:

Deliverables and Milestones Tables The following tables list the deliverables and milestones for the project as originally listed in the DoW. The deliverables are split into two sections: completed and remaining. The milestones are listed together. Note that the status of the deliverables are categorized as: x = Ongoing effort 4 = Deliverable completed and presented to Project Manager 3 = Deliverable in draft form 2 = Most work completed 1 = Some work started 0 = No work started --> = Deliverable has been identified as actively delayed Completed deliverables are available in several different formats. A physical copy of each has been printed (as possible) for each and presented to the Commission with the Period Report. The report is also provided in digital form with a simple HTML index which links completed deliverables with digital copies of the final product. Additionally, all deliverables and milestones are also linked in the project wiki: http://www.jive.nl/nexpres/doku.php?id=nexpres:nexpres-deliv-table-1 http://www.jive.nl/nexpres/doku.php?id=nexpres:nexpres_p1_milestones Table of completed deliverables D# Title Partner Due (month) Status D1.01 Appoint Programme Manager 1 1 4 D1.02 Appoint Project Assistant 1 1 4 D1.03 Form Board (protected due to email addresses) 1 1 4 D1.04 Create Project contact lists (multiple lists collected on that page) 1 1 4 D1.06 Form Management Team 1 1 4 D1.07 Convene Advisory Board 1 3 4 D1.08 Convene Management Team 1 3 4 D2.01 EVN-NREN meeting 1 12 9 4 D4.01 Communications Manager Appoint 1 1 4 D4.02 Online Resources: website, wiki 1 1 4 D4.04 Display 1 3 4 D4.05 Visual Guide/Elements 1 6 4 D4.06 Publish Print Items 1 9 4 D4.08 Project Fact Sheet 1 1 4 page C.1 of.5

D5.01 Mixed e-vlbi/recorded-vlbi at stations jive5ab 1 3 4 D5.02 Metrics, selection criteria and user feedback 1 4 4 D5.03 Definitions of specifications monitoring and remote control D7.01 Workflow Manager requirements from telescope operators D7.02 Workflow Manager requirements from correlator operators 14 4 4 6 4 4 1 4 4 D8.01 Interface design document of storage element API 13 6 4 D8.02 Hardware design document for simultaneous I/O storage elements 13 8 4 Remaining deliverables D# Title Partner Due (month) Status D1.05 Conclude Consortium Agreement 1 17 1 3 D1.09 to EC 1 12 3 D1.10 Period 2 Report to EC 1 24 0 D1.11 Period 3 Report to EC 1 36 0 D2.02 EVN-NREN meeting 2 12 22 0 D2.03 EVN-NREN meeting 3 12 32 0 D2.04 Presentation on regions of increasing interest to Radio Astronomy and Networking 12 19 0 D3.01 evsag meeting 1 8 16 0 D3.02 evsag meeting 2 8 32 0 D4.03 Meeting Support 1 36 0 D4.07 Publish Print Items 1 23 0 D5.04 Automated job scheduling: Disk unit reservation system, GUI for starting different correlator systems, 2011, Merging domino into jive5ab 1 19 9 > D5.05 VDIF Mark5 conversion software 1 15 2 D5.06 Control systems and scheduling mechanisms for 4-Gbps recording equipment 1 18 1 D5.07 Unattended correlation 1 19 1 D5.08 Monitoring, remote control and client software including the authorization and authentication layer 14 22 1 page C.2 of.5

D5.09 Control systems and scheduling mechanisms for 4-Gbps at correlator: The EVN Experiment Database, The Correlator Control System Database, JIVE NEXPReS Network Upgrade 1 23 x D5.10 Corner-turning platform 1 24 0 D5.11 FS-integrated remote control system 14 28 2 D5.12 Automated delayed correlation 1 29 0 D5.13 Real-time correlation with simultaneous recording at the correlator 1 30 0 D5.14 Report on tests with Wettzell & Effelsberg stations 14 36 1 D5.15 Streamlined data reduction pipelines & user access 1 36 0 D6.01 Proof-of-concept system for reserving and provisioning On-demand networking capacity D6.02 Operational use of BoD on at least one e-vlbi connection D6.03 Configuration of 10 Gbps BoD for the LOFAR archive network 1 20 1 1 36 0 1 24 0 D6.04 BoD scheduling interface for LTA 1 30 0 D6.05 Demonstration of BoD for an operational LTA 1 33 0 D6.06 Demonstration of integrated BoD testing and validation 1 30 1 D6.07 Demonstration of international BoD connectivity at 4 Gbps D6.08 Demonstration of international BoD connectivity at 10 Gbps D7.03 Workflow Manager implementation: initial reports (Web Portal and Technology Overview, Workflow Languages Overview) 1 18 1 1 30 0 11 18 1 D7.04 Demo of automated correlation 1 24 0 D7.05 Real-time middleware components 11 24 0 D7.06 Demo of real-time correlation 1 34 0 D7.07 Demo of global correlation 1 36 1 D8.03 Design document of storage element allocation methods 3 16 10 0 D8.04 Design document of transparent local/remote application programming interface for storage elements D8.05 Performance and integration test report of simultaneous I/O storage elements 13 17 15 0 6 21 0 D8.06 Test report of storage element allocation methods 3 22 0 page C.3 of.5

D8.07 Test report of transparent local/remote application programming interface for storage elements D8.08 Design document of integration system of allocation methods with transparent multi-gbps access 5 22 0 1 26 0 D8.09 Integration test report of LTA and pipeline integration 2 32 0 D8.10 Demonstration tests of the integrated system 1 32 0 D8.11 Final report on Networked Storage on Demand 13 35 0 Milestones Table Milestone # Name Work package(s) involved Due (month) Means of verification M1.01 Prepare to EC all 11 D1.09 M1.02 Prepare Period 2 Report to EC all 23 D1.10 M1.03 Prepare Period 3 Report to EC all 25 D1.11 M2.02 Select location for EVN-NREN meeting 1 WP 2 6 D2.01 M2.02 Select location for EVN-NREN meeting 2 WP 2 19 D2.02 M2.03 Select location for EVN-NREN meeting 3 WP 2 29 D2.03 M3.01 Select location for evsag meeting 1 WP 3 13 D3.01 M3.02 Select location for evsag meeting 2 WP 3 29 D3.02 M4.01 Establish Online Resources WP 4 1 D4.02 M4.02 Design Display WP 4 1 D4.04 M4.03 Design Visual Guide/Elements WP 4 3 D4.05 M4.04 Design Print Items WP 4 6 D4.06 M4.05 Design Print Items WP 4 20 D4.07 M5.01 Definition of specifications monitoring and remote control WP 5 4 D5.02 M5.02 Automated job scheduling WP 5 9 D5.03 M5.03 Unattended correlation WP 5 19 D5.06 M5.04 Control systems and scheduling mechanisms for 4-Gbps at correlator WP 5 23 D5.08 M6.01 Overall BoD system architecture WP 6 20 4 D6.01 M6.01b Full architecture description WP 6 20 D6.01 M6.02 10 Gbps Bod for LOFAR/LTA WP 6 24 10 D6.03 M6.03 Demonstration of integrated BoD testing WP 6 30 18 D6.06 M6.04 Demonstration of international 4 Gbps BoD WP 6 18 20 D6.07 page C.4 of.5

M7.01 Workflow Requirements WP 7 4 D7.01/ D7.02 M7.02 This Milestone Number Does Not Exist n/a n/a n/a M7.03 Workflow Manager WP7 18 D07.3 M7.04 Identify telescopes and compute clusters for upcoming correlation demonstrations WP7 21 D07.4 M7.05 Real-time Middleware Components WP7 24 D07.5 M7.07 Identify elements that are mature enough for integration into WFM M7.08 Face-to-face meeting to start preparation/integration for first demo of automated integration M7.09 Face-to-face meeting to start preparation/integration for final demo M8.01 Hardware decision for subsequent prototyping and integration tests (AALTO) M8.02 Review of prototype test results, decision of the architecture and scope of subsequent integration tests (JIVE) WP7 14 12 D07.7 WP7 15 D07.6 WP7 28 D07.7 WP 8 8 D8.02 WP 8 15 D8.08 page C.5 of.5