Sludge Trap Tank with Basket Filter included, ECODEPUR SPT According with European Standard

Similar documents
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Guide to working on Public Sewers

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

Guidelines for Precast Concrete Grease Interceptors

Ontario Electrical Safety Code - Info Sheet

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

National Precast Concrete Association

WASTEWATER MANAGEMENT SYSTEM

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE

Septic System Owner s Manual

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

Permeable Pavement Construction Guide

Properly maintaining your septic system will help reduce the. It s Your Septic System. Homeowner s Guide. Here s How to Take Care of It

TECHNICAL BULLETIN. Location of the system. Percolation tests for drainage fields. Cesspool sizing. Suggested Information notices

Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05

Prepare a drainage system layout and specification notes for a low- rise building.

opti-drän system Keeps your basement and building dry

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

On Site Sewage System Maintenance Inspections. March Building and Development Branch Ministry of Municipal Affairs and Housing

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

SEPTIC SYSTEM. Taking care of your. ... what you need to know

Understanding Septic Tank Systems

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Design and Construction of Cantilevered Reinforced Concrete Structures

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

ACO Water Management: Civils + Infrastructure

Homeowners and Home Buyers Guide to Wells and Private Sewage Systems

KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850

September September Consulting Structural and Civil Engineers. 100 St John Street London EC1M 4EH. akt-uk.com

40 ltr Domestic Grease Trap GTO ltr Commercial Grease Trap GTO2. Rotational Moulders providing State of the Art Product Design and Developement.

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

septic systems What is a Septic System? How does a Septic System Work?

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE TRANSACTION INSPECTIONS

Section 3: Septic Tanks. 3. Septic Tanks

Maintenance Guidelines For Homeowners

Grease and Oil Wastes Problems andsolutions A grease trap is a device used for removing oil and grease from wastewaters. Grease traps perform this

Septic Records and Maintenance Guidelines

How To Retaining Wall Guide

SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Nature's Cleaning Process

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

SECTION STORM DRAINAGE TABLE OF CONTENTS

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

BRIDGES ARE relatively expensive but often are

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION

ThermoStar Refrigeration Air Dryers

Septic System. Responsibility! Is Your. You should know that:

OAR52 A-1 (September, 1981)

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

DO-IT-YOURSELF SEPTIC SYSTEM INSPECTION FIELD GUIDE (Mound System)

CHAPTER PETROLEUM CONTACT WATER

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

PART 5 : WASTEWATER DRAINAGE

Residential Foundations and Basements

SHORELINE SANITATION

Septic System Management Plan for Below Grade Systems

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Septic Systems and Their Maintenance

Frequently Asked Questions About Septic System Maintenance Inspections

Introduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References

Looking after your Septic Tank System

SECTION GRAVITY SANITARY SEWERS

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES

SECTION 1 GENERAL REQUIREMENTS

Northeast Tri County Health District

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Gas Meter Clearances and Service Installation Requirements

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Installation Instructions

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

WASTEWATER TREATMENT OBJECTIVES

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Please also see 10 golden rules for correct Saniflo installation on

Emergency Spillways (Sediment basins)

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

HOW A SEPTIC SYSTEM FUNCTIONS

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

APPENDIX G SETTLEMENT

On Site Treatment Systems

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

Transcription:

Sludge Trap Tank with Basket Filter included, ECODEPUR SPT According with European Standard 12566-1

INTRODUCTION The Sludge Trap Tank with Basket Filter included, ECODEPUR SPT are equipments appropriated to the treatment of wastewater contaminated with sludge and sand, according with European Standard 12566-1. It can be used as a primary treatment system, used before Light liquid Separators or others wastewater treatment systems. This system has included a basket filter, improving the reduction of organic matter and the retention of suspended solids. The sludge trap process works in two phases, solids retention and settlement. The Sludge Trap Tank with Basket Filter included, ECODEPUR SPT are equipments appropriated to the treatment of wastewater contaminated with sludge and sand, according with European Standard 12566-1. It can be used as a primary treatment system, used before Light liquid Separators or others wastewater treatment systems has CE marking, in accordance with the legal obligations that stems from the entry into force of the Directive 89/106/EEC on Construction Products, fulfilling all the requisites of the European Standard EN 12566-1.

Initial type testing, Watertightness, structural behavior, hydraulic efficiency and nominal capacity, were made by AIMPLAS Instituto Tecnológico del Plástico Notified Body n.º 1842, (Parque Gustavo Eiffel, 4, 46980, Valência Espanha), and are describe in the Report AT- 0375/11. The raw material used (Linear Polyethylene) was tested by an independent entity, in line with the requirements of Standard EN12566-1, guaranteeing high mechanical resistance and corrosion protection. The equipment production under controlled conditions, the use of quality raw materials and the finished product inspection, in accordance with the demands of ISO Standard 9001:2008, guarantee the final product quality. The Sludge Trap Tank with incorporated Grid system, ECODEPUR SPT Separators has 5 Year Guarantee against any manufacturing defects. FEATURES CE Marking according EN 12566-1; Materiel Tested in Accordance With EN 858 1 and EN 1825-1; Basket filter included, high quantity of suspended solids retention; High mechanical resistance and corrosion protection; Light and easy to install and maintain; Totally watertight Vent Point Without power consumption; Low cost; Without odors when correctly ventilated. MAIN CHARACTERISTICS Primary treatment of wastewater contaminated with sludge and sand; Manufactured with anti-uv additive, by rotomoulding system, that gives a high mechanical resistance and corrosion protection to the equipment; Polyethylene Cover 400 mm; Basket filter included.

OPERATION The operation of the The Sludge Trap Tank with Basket Filter included, ECODEPUR SPT is based on two different process: - Solids retention: The basket filter permits the solids retention; - Settlement: the sludge and sand settles, occurring the separation between the liquid and solid faze.

DIMENSIONS Type Volume (l) D L H He Hs C Pipe weight (kg) SPT VT1.5 1.500 1.210 1.350 1.250 185 230 400 110 60 SPT VT2.0 2.000 1.530-1.620 205 255 400 125 75 SPT VT3.0 3.000 1.500 1.910 1.540 235 280 400 160 120 SPT VT4.0 4.200 1.890-1.910 280 330 400 200 125 SPT VT5.0 5.000 1.800 2.360 1.870 275 320 400 200 180

INSTALLATION The installation of the Sludge Trap Tank with Basket Filter included, ECODEPUR SPT, shall follow the procedures down below: Make an excavation with following size: a) Length (Le + 0.50) m b) Width (D + 0.50) m The excavation depth must be defined case-by-case, depending on the installation hydraulic profile. When the equipment is to be installed NOT BURIED our technical services must be contacted (internal and external pressures always have to be in balance). 2. Excavation base should be perfectly levelled and compacted by mechanical means; 3. In normal areas (without high groundwater level and/or clay soil), create a bed in minimum of 15 cm of sand mixed with cement, in the following proportions: 50 Kg of cement to 1 m3. In high groundwater areas and/or in clay soils, should be used concrete C12/15 to give greater sustainability to the base. 4. After used concrete, create a bed in minimum of 10cm of sand. 5. Place the separator in the excavation (due to its low weight, the equipment can be fitted without using machines), taking into account the direction of flow of input / output; 6. Fill it with clean water through the input pipe, as shown in the diagram below and simultaneously burying the equipment successive layers of 30 cm, as shown in section 7: 7. In normal areas - Bury the equipment with sand until the pipes level and compact with water. The sand must be mixed with cement in the proportion of 100 Kg of cement for 1 m 3 of sand. In high groundwater areas and/or in clay soils, it must be buried in sand up to its centre line and compacted with water. In these cases the sand must be mixed with cement in the proportion of 200Kg of cement to 1m 3 of sand. 8. When the equipment is installed in an concrete box, the gap between the equipment and the walls shall be completed with sand following the methodology set out in paragraphs 6 and 7, so that the internal and external pressures are always balanced, a drain should be performed box; 9. Connect the inlet and outlet pipes and cover the equipment with sand (the maximum height of sand over the separator should not exceed 30 cm). Do not start operations for one week, to allow the sand to settle.

10. When vehicles are expected to cross over the installation area, or the land height over the equipment is more than 30 cm, there are two options: Land firm areas A suitable slab must be laid, supported on firm outside areas, around the surface of the equipment. Less firm areas - A simple box should be built from bricks or concrete rings, to avoid pressure being transferred to the equipment. The gap between the equipment and the walls shall be completed with sand 11. In areas more than 30 cm deep, the inspection box must be seated on the protecting slab, never supported directly on the tank. 12. Installation of the equipment should allow access of people in all areas to perform maintenance equipment, in safe conditions. Don't use excavation soils, debris or other not specified material, in the equipment installation MAINTENANCE The Sludge Trap Tank with Basket Filter included, ECODEPUR SPT does not need special care from a structural point of view, due to the high resistance and corrosion protection of the material from which they are made. Periodical remove of the solids in the basket filter and Sludge accumulated in the bottom of the equipment. ECODEPUR recommend a 1 or 2 annual check, Sludge settle in the bottom shouldn t achieve more than 50 % of the equipment volume. GUARANTEE Five (5) years, covering any manufacturing defects. ECODEPUR S.A. will be responsible for introducing corrective measures aimed at correct equipment operation, if necessary. ECODEPUR S.A. will not be responsible if there are clear indications of poor installation, misuse or poor maintenance.