Michael C. Price Principal

Similar documents
San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil

Appendix H. Hazardous Materials. Regulatory Agencies Involved in Hazardous Materials Pollution Prevention and Solid Waste in Alameda County

What Constitutes Environmental Due Diligence?

Risk-Based Decision Making for Site Cleanup

STATEMENT OF BASIS HYPERGOL SUPPORT BUILDING SWMU 65 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION KENNEDY SPACE CENTER BREVARD COUNTY, FLORIDA

Environmental Forensics

UNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM

PCB Cleanups. Kurt Limesand EPA Region 7 Waste Remediation and Permitting. 5/1/13 U.S. Environmental Protection Agency 1

WCD LITIGATION SUPPORT AND CLAIMS EXPERIENCE

PROFESSIONAL HISTORY:

NASA Stennis Space Center Environmental Resources Document

N00639.AR NSA MID SOUTH a STATEMENT OF BASIS SOLID WASTE MANAGEMENT UNIT 63 FORMER UNDERGROUND WASTE TANK MILLINGTON SUPPACT TN

4.8 Hazards and Hazardous Materials

Hazardous Materials in Project Development

PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards

Site Cleanup in Connecticut

RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT

CHAPTER PETROLEUM CONTACT WATER

Redeveloping Former Gas Stations

October 25, Mr. Howard Peak, Chairman Board of Directors Brooks Development Authority 8030 Challenger Drive Brooks AFB, TX

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS

Incorporating Greener Cleanups into Remedy Reviews

Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015

Commercial Real Estate Loans: Environmental Due Diligence for Lenders

FINAL RESOURCE CONSERVATION AND RECOVERY ACT PARTIAL CLOSURE REPORT FOR BUILDING 111 WITH TRANSMITTAL LETTER NAS BRUNSWICK ME 11/5/2010 NAS BRUNSWICK

Ulf Lindmark Litigation Support Experience

Street Address (number and street): City: County: ZIP Code: B. CURRENT SITE PRIORITY INFORMATION Was free product present this quarter?

Site Description and History

EMERGENCY PETROLEUM SPILL WASTE MANAGEMENT GUIDANCE. Hazardous Materials and Waste Management Division (303)

Before beginning any construction or demolition activities at your construction site,

DOCUMENTATION OF ENVIRONMENTAL INDICATOR DETERMINATION

Table 2-1 Chronology of Site Events

BP Texas City Refinery

4.7 HAZARDS AND HAZARDOUS MATERIALS

Federal Environmental Requirements for Construction Projects

APPENDIX G Materials Storage and Handling Guidelines

Exhibit A - Scope of Work

CURRENT AND FUTURE IN SITU TREATMENT TECHNIQUES FOR THE REMEDIATION OF HAZARDOUS SUBSTANCES IN SOIL, SEDIMENTS, AND GROUNDWATER

1. Page 1, Incoming Soil Materials, Testing Frequency :

Environmental Impairment Liability Application 2

Guide to the Remediation Report & Fee Submission Form

UNDERGROUND OIL STORAGE TANKS

Underground Storage Tanks

Environmental Compliance Consultation: DOE PCB Questions and Answers Part I

Case Study: Habitat Restoration

The Comprehensive Environmental Response,

Pollution Liability Exposure: Adjustments your automotive business should consider to maintain compliance

M00263.AR MCRD PARRIS ISLAND a

FINAL PLAN OF REMEDIAL ACTION

West Virginia Department of Environmental Protection Industrial Facility Closure Guidance Document. Revised July 2009

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

INTRODUCTION TO GREEN & SUSTAINABLE REMEDIATION: THREE APPROACHES

Title 27A. Environment and Natural Resources Chapter 1 - Oklahoma Environmental Quality Act Article III - Jurisdiction of Environmental Agencies

NAPCS Product List for NAICS 54162: Environmental Consulting Services

DRY CLEANING PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN

BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

Compliance Bulletin Hazardous Waste Lighting Waste reviewed/revised March 2012

Facility Name, Address, State & Zip Code

DOCUMENTATION OF ENVIRONMENTAL INDICATOR DETERMINATION Interim Final 2/5/99 RCRA Corrective Action Environmental Indicator (EI) RCRIS code (CA725)

Planning for Polychlorinated Biphenyl (PCB)-Containing Disaster Debris. June 2011

Contract Number GS-10F-0036X

COMPLIANCE MANAGEMENT STRATEGIES. Presented by: Megan Kazmierczak, ECS Eclipse

This page intentionally left blank

The Comprehensive Environmental Response,

This guidance was prepared to parallel the Low Hazard Exemption process guidance prepared by the Waste and Materials Management Program.

ENVIRONMENTAL CONTRACTORS & CONSULTANTS

KANSAS STORAGE TANK PROGRAM ABOVEGROUND STORAGE TANK OVERVIEW March 2, 2015

ENVIRONMENTAL AND TOXIC TORT LITIGATION

ENVIRONMENTAL PROTECTION AGENCY

OZONE SPARGE TECHNOLOGY FOR GROUNDWATER REMEDIATION. Charles R. Plummer, P.E., M.S., Michael D. Luckett, P.E., Shaun Porter, and Robert Moncrief

Sustainable Group - Terraphase JV, LLC Statement of Qualifications

ERP Update. Columbus Air Force Base (AFB) is. The Environmental Restoration Program. Rail Spur RS034. History & Mission of Columbus AFB

Performance Management for Environmental Remediation Projects. William C. Lattin, PMP US Department of Energy Idaho Operations Office

CHAPTER VI OTHER ENVIRONMENTAL STATUTES

MBJ Environmental Programmes

ESSENTIALS OF ENVIRONMENTAL LAW. Craig B. Simonsen, Paralegal Seyfarth Shaw LLP

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Citgo Service Station (Former Gulf Oil/Chevron) Jarrettsville Pike Baltimore County Jacksonville, Maryland Open Case No.

CHAPTER SOIL TREATMENT FACILITIES

WHO WILL PAY FOR THE PORTLAND HARBOR CLEANUP?

Guide to Tank Insurance

RCRA Corrective Action Workshop On Results-Based Project Management: Fact Sheet Series

RCRA Corrective Action Environmental Indicator (EI) RCRIS code (CA750) Migration of Contaminated Groundwater under Control

Twenty-four contracting services environmental claim scenarios you may not have thought about.

Water Muddle Up and Clean Up

4.7.2 Regulatory Framework

U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist

DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS. By Frank Westfall and Robert Winterburn

Summary of Regulatory and Mandatory Timeframes for Remediation 1

Ex Centrale Gas (RA) Eni Div. Exploration & Production

DOLLARS SPENT THROUGH FY03 COMMENTS ENVIRONMENTAL RESTORATION

DOCUMENTATION OF ENVIRONMENTAL INDICATOR DETERMINATION RCRA Corrective Action Environmental Indicator (EI) RCRIS code (CA750)

N O T E S. Environmental Forensics. Identification of Natural Gas Sources using Geochemical Forensic Tools. Dispute Scenarios

PCB STORAGE. 1) 2-drum unit (4 x 2 x 4 ) 2) 4-drum unit (4 x 4 x 4 ) 3) 8-drum unit (8 x 4 x 4 ) 4) 16-drum unit (8 x 8 x 10 )

DOCUMENTATION OF ENVIRONMENTAL INDICATOR DETERMINATION Interim Final 2/5/99 RCRA Corrective Action Environmental Indicator (EI) RCRIS code (CA750)

1. PUBLIC HEALTH STATEMENT

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

ACE Commercial Risk Services

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

Transcription:

Michael C. Price Principal CREDENTIALS B.S., Chemistry, University of Tampa, 1986 B.S., Marine Science/Biology, University of Tampa, 1986 ASTM-Risk-Based Corrective Action Training FIELDS OF SPECIALIZATION Polychlorinated Biphenyls (PCBs) Contamination Investigations; RCRA, CERCLA, TSCA Risk Assessment: Selection of Completed Exposure Pathways. Calculation of Multimedia Risk Values RCRA Program: Groundwater Quality Assessment; RCRA Facility Investigations; and Post Closure Monitoring HSRA Program: Reportable Quantities Screening Method; Risk Reduction Standards; and Compliance Status Reports TSCA Program: Site Investigation; and Site Remediation Hydrocarbon Assessments and Remediation: Underground Storage Tanks, and Pipelines Risk-Based Corrective Action Environmental Due Diligence Property Assessments Analytical Data Review and Validation Mobile Laboratory Operations EXPERIENCE SUMMARY Mr. Price has over 30 years of experience specializing in the implementation of site investigations and assessments. Responsibilities have included managing multi-disciplined projects that include strategic planning, site investigation and implementation under various regulatory programs. Prior to co-founding Genesis Project, Inc., Mr. Price was a Project Scientist for Geraghty & Miller Inc. in Atlanta, Georgia. During this period, Mr. Price served as a principal investigator for investigations under RCRA, State Superfund and TSCA. Mr. Price was also responsible for establishing and supervising mobile laboratory operations at numerous facilities throughout the U.S. In addition, Mr. Price was previously a Laboratory Director for Envirolab, Inc., and participated in contamination assessments and water quality investigations for a variety of sites and facilities throughout Florida. His duties included laboratory management, sampling event scheduling, quality control evaluations, data interpretation and consultation, report review and interfacing with clients and regulatory representatives.

Michael C. Price/2 SELECTED PROJECTS RCRA Program Oxford, Alabama Served as Project Manager for investigation associated with the RCRA permit involving PCB contamination of city recreational playing fields. This project required a fast-track preliminary investigation, the development and implementation of a comprehensive soil investigation and remediation plan, and the supervision and documentation of contamination removal and disposal. Real-time plume delineation of PCB impacted soils was utilized during all phases of the project. Anniston, Alabama Serving as Project Manager for investigation activities associated with the RCRA permit and pursuant to two Consent Orders. Developed and implemented soil and sediment investigations in various areas surrounding the facility. Investigation activities include realtime plume delineation of PCB impacted soils and sediments. Provided expert witness testimony concerning the result of the investigations, the distribution of PCB types and potential sources at the various locations. Columbia, South Carolina Served as Project Manager for the implementation of a RCRA RFI Work Plan for 21 solid waste management units (SWMU) and areas of concern (AOC) at a RCRA facility in South Carolina. The investigation resulted in no further action for 12 SWMUs or AOCs. An Interim Measures Status Report and Work Plan was developed and implemented for five SWMUs and an AOC for the removal of impacted soils to facilitate a plant expansion. A fuel oil recovery system is currently being developed to address a LNAPL at an AOC.

Michael C. Price/3 CERCLA Program Anniston/Oxford, Alabama Currently serving as Site Remediation Manager involving an Administrative Order on Consent with the EPA for the investigation and remediation of residential properties involving PCB contamination of soil. Duties have included assisting in the preparation of sampling and remediation plans, scheduling sampling events, contacting property owners and assisting in implementing the field work. This project, which includes EPA oversight, is part of an extensive investigation of the greater Anniston/Oxford, Alabama area. This project is currently in progress. TSCA Program Anniston, Alabama Served as Project Manager for investigation associated with the RCRA permit involving PCB contamination within a large warehouse formerly used for PCB production. This project required the preparation and implementation of a multi-media assessment of both the interior and exterior surfaces of the building as well as soil immediately adjacent to the structure. In order to fully assess these areas soil, debris, and wipe samples were collected. Real-time analysis of PCB impacted material and surfaces were utilized to direct the fasttrack investigation, which was completed in approximately one week. The results of the investigation were used to prepare a remediation plan, which is currently under implementation. Milledgeville, Georgia Served as a Project Manager for the investigation and remediation of a PCB spill at an aircraft manufacturing facility. The investigation concluded that no soil was impacted and only concrete and piping associated with the equipment were impacted due to the leak. The results of the investigation were incorporated into the development of a Remediation Plan. The Remediation Plan was implemented and resulted in a clean closure from EPA Region IV.

Michael C. Price/4 HSRA Program Cleveland, Georgia Served as the Project Manager for the HSRA investigation and remediation of a pesticide release from a facility destroyed by fire. The project included Consent Order negotiations, a site investigation, RQSM scoring, waste characterization and removal oversight. The investigation resulted in limited site remediation at the facility, which met Type I Risk Reduction Standards. A Compliance Status Report recommending removal of the site from the HSRA list is currently being reviewed by the State. Atlanta, Georgia Served as Project Manager for the investigation of a formaldehyde release from a laminate manufacturing facility. The project included development and implementation of a soil and groundwater investigation to delineate the extent of contamination. The results of the investigation concluded that no remediation was necessary, and the facility met the Type I Risk Reduction Standard. A Compliance Status Report recommending removal of the site from the HSRA list is currently being reviewed by the State. Hydrocarbon Investigation/Remediation Anderson, South Carolina Served as Project Manager for the investigation and remediation of a diesel fuel spill along a pipeline in South Carolina. "Real Time" analysis techniques were utilized to delineate soil and groundwater impacts prior to remediation. This approach resulted in one site mobilization and reduced the cost of an analytical laboratory. The impacted media at the site included free-phase diesel fuel, adsorbed phase and dissolved phase impacts. A Risk Assessment approach was utilized to determine the extent of remedial action. This approach concluded that free-phase hydrocarbon and elevated soil impacts were the only remedial action required at the site. During soil removal at the site, on-site techniques were used to limit the amount of excavation. This strategy resulted in significant savings for the client.

Michael C. Price/5 Environmental Due Diligence Property Assessments Atlanta, Georgia Served as the Project Manager for a fast track investigation and remediation project associated with a multi-million dollar real estate transaction. The project initially involved the removal of hydrocarbon-impacted soils associated with two former above ground storage tanks. However, during preliminary activities, several USTs were discovered on the property. A fast track project was implemented to remove the USTs and determine whether a release had occurred which would require additional investigation and terminate the sale of the property. Soil impacts were present, however the investigation concluded that impacts did not cause an impact to groundwater above applicable standards and therefore has no further action was necessary. The entire project was completed in one week. Mobile Laboratory Services Phoenix, Arizona Served as Site Manager for a mobile laboratory during the implementation of a RCRA Facility Investigation at Luke Air Force Base, Arizona. Principal constituents of concern included chlorinated solvents, aromatic hydrocarbons, ketones and petroleum hydrocarbons. Duties included equipment acquisition, analysis method development, and supervising the on-site analysis of several hundred soil samples.