MS-6/2009 Model Specification and Checklist for Polyethylene (PE) Pipe for the Sliplining of Sewers

Similar documents
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Sewer Line Rehabilitation

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

SECTION ABANDONMENT OF SEWER MAINS

DIVISION 4300 STORM DRAINAGE

Section 2100-Trenching and Tunneling

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

FY08 SEWER POINT REPAIRS BID TABULATION

SECTION GRAVITY SANITARY SEWERS

SECTION IX SLIP LINING PIPELINES

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

INSTALLATION OF INSITUFORM LINER

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

SPR PE Steel Reinforced Liner

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION SANITARY SEWER PIPE

SANITARY SEWER SPECIFICATIONS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Section SEWER PIPE INSTALLATION AND TESTING

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

SECTION 802 GRAVITY SEWER PIPE

Specifications for Residential Property Owners Connection to New Public Sewer

Native InDesign 2890 SaniTite Brochure 1/8" CMYK April 17, 07

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

SECTION PRECAST CONCRETE UTILITY STRUCTURES

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

CHAPTER 6 - SANITARY SEWER

SECTION STORM DRAINAGE TABLE OF CONTENTS

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

Wastewater Capital Projects Management Standard Construction Specification

TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL Pre-Insulated Piping

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

CLEANING, INSPECTION, AND TESTING OF SEWERS

The Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

725-R-599 PIPE LINING. (Revised ) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

LS 2540 SEWER LATERALS AND INSPECTION TEES

Town House Center Highway North Huntingdon, PA 15642

SECTION 603 SANITARY SEWER FORCE MAINS

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS

SECTION POLYVINYL CHLORIDE (PVC) PIPE

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

SECTION BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

Section 402. STORM SEWERS

SECTION STORM DRAIN SYSTEM

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

SECTION CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION STORM DRAINAGE SYSTEM

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Sewer Rehabilitation Design Requirements

SECTION ACCEPTANCE TESTING FOR SANITARY SEWERS

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

SECTION UNDERGROUND ELECTRIC SERVICE

SECTION FACILITY STORM DRAINAGE PIPING

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

SECTION NONREINFORCED CONCRETE SEWER PIPE

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

INDEX. Sec. No. Items Page Nos.

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

PIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes

Let Us Give Utilities the Respect that they Deserve.

SANITARY GRAVITY SEWER LINE TESTING. B. Section CCTV Inspection of Gravity Sewer Lines

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

02780 LINER FOR SEWER REHABILITATION

CITY OF COLFAX REQUIREMENTS AND STANDARDS FOR CLOSED CIRCUIT TELEVISION SEWER LATERAL INSPECTIONS

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION EARTH MOVING

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

CW GRAVITY SEWERS TABLE OF CONTENTS

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

ASTM C76, Class III, Wall B, except as modified herein. Clean natural sand, ASTM C33. Artificial or manufactured sand will not be permitted.

Transcription:

MS-6/2009 Model Specification and Checklist for Polyethylene (PE) Pipe for the Sliplining of Sewers The Plastics Pipe Institute March 2009 1

DISCLAIMER This guideline has been prepared by the Plastics Pipe Institute (PPI) for educational purposes and is offered in good faith as a service to the industry. While all information in this guideline is believed to be accurate at the time of its publication, it is offered without warranty of any kind, either expressed or implied (including warranties of merchantability and fitness for a particular purpose). If additional or more detailed information is needed, particularly of unusual or special applications, the pipe supplier or manufacturer should be contacted. The Plastics Pipe Institute and its members accept no responsibility for any loss or damage arising from its use. The Plastics Pipe Institute does not endorse the proprietary products or processes of any manufacturer, and assumes no responsibility for compliance with applicable laws and regulations. INTRODUCTION To properly prepare a specification for a sliplining project, information on the project must be collected. The checklist is intended to be a starting point and is designed to help collect the information needed to specify the PE liner for a project. 2

CHECK LIST 1. Select a pipe liner diameter. For a sliplining project, the first step is to verify the inside diameter of the existing pipe. Also determine the type of pipe to be sliplined. This information is necessary to select the liner size. As a rule of thumb, when sliplining, the liner should be about 10% smaller that the existing pipe to insure that the liner will fit inside the existing pipe. Differential settlement bends and other small of-sets make it difficult to install liners larger than 90% of the ID of the original pipe ID. TV inspection and field evaluations will influence using the rule of thumb or using a larger or smaller fitting liner. Example: The existing pipe is concrete pipe with an ID of 12. What is the 90% of the ID? 12 x 90% = 10.8 inches. The closest pipe size to 10.8 inches is 10.75 inch OD IPS HDPE pipe. See Appendix for pipe sizes and liner sizes. 2. Determine a liner wall thickness. For gravity flow sewer applications, usually the ground water level determines the liner thickness. In the PPI PE Handbook (2nd ed.), Chapter 11, Pipeline Rehabilitation by Sliplining with PE Pipe, Table 1, Allowable Height of Water shows that a not-grouted PE 4xxx DR 26 pipe can handle 4 feet of water for 50 years with a safety factor of 2. The table shows that by grouting, a greater depth can be obtained. In most situations, grout is no needed. Grout is used when the existing pipe is in very bad condition or there are large voids. Grouting is standard practice for culverts. Example: A sewer line has a burial depth from four feet on one end to 20 feet on the other end. There is not ground water above the pipe on the shallow end. Where the pipe is buried 20 feet deep, the ground level is 4 feet above the pipe most of the year. Since the ground water level is 4 feet, Table 2 shows that a DR 26 PE 4xxx pipe will handle the hydrostatic loading. 3

3. Determine the flow capacity To determine the flow capacity, the installed slope of the old line is needed. For a comparison, we will assume that the slope of both lines is the same and is 0.001. Example: Using Manning s equation in the PPI PE Handbook (2 nd ed., p. 404), the flow rate for 12 concrete pipe with a slope of.001 and n factor of 0.015 is determined to be 438 gpm. The PE liner pipe is 10.75 OD DR 26 pipe. The slope is 0.001, and the n factor is.009. The flow rate after lining is 433 gpm. 4. Design necessary accesses. Before any design is done, a field survey of the existing line is needed. The existing sewer line must be evaluated to determine the actual condition of the old sewer pipe and the above ground conditions related to traffic, other utilities and the impact of excavations. The existing line must be inspected with closed circuit television to determine the condition of the old line (dropped joints, dirt, bellies, and repairs). The TV inspection can be used to locate services. Below are details needed: a. Insertion pit: 4

b. Sealing the annular space between the liner and the existing pipe at the manhole is important. c. Service connections must be connected to the liner. Electrofusion sewer saddles offer an excellent connection. 5

d. Strap-on saddles are another alternative where existing conditions do not allow electrofusion. 6

e. Connections to new concrete manholes. 7

f. Connections to cast in place manholes. 5. Develop the contract documents. The contract documents usually contain technical specifications and pay items. The sample specifications show a specification created using the above example information: 8

Appendix Table 1 provides typical existing sewer ID s and liners with an OD approximately 10% smaller that the existing sewer. Liner sizes are for solid wall HDPE pipe meeting OD requirements for ASTM F 714 and D 3035. Table 1 Sewer ID and Liner OD Dimensions Existing Sewer Liner ID OD 4 3.5 6 4.5 8 6.626 10 8.625 12 10.75 15 12.75 18 16.00 21 18.00 24 20.00 24 22.00 30 28.00 36 32.00 42 36.00 48 42.00 54 48.00 60 54.00 72 63.00 Table 2 shows the wall thickness required for various ground wall elevations. Table 2 PE 4 xxx DR Required for Groundwater above Liner Pipe* Height of Water Above Pipe (50 years) SDR With no grout With grout 32.5 2.0 feet 10.0 feet 26 4.0 feet 20.0 feet 21 7.9 feet 39.5 feet 17 15.4 feet 77 feet *The figures in this table represent a safety factor of 2.0 with an assumed deflection of 3%. For PE 3xxx, refer to PPI PE Handbook, 2 nd ed., chapter 11, Table 1. 9

MODEL SPECIFICATION 1.0 Intent 1.1 The intent of sliplining is to rehabilitate non-pressure gravity flow sewer lines by the insertion of a polyethylene liner pipe into the sewer line. When complete, the liner should extend from one manhole to the next manhole in a continuous, watertight length. 2.0 Reference Specifications and Publications 2.1 This document references American Society for Testing and Materials (ASTM) standard specifications, which are made a part hereof by such reference and shall be the latest edition and revision. It is incumbent upon the owner s representative to have a working familiarity with the following ASTM Standards: o ASTM D2321, Practice for Underground Installation of Flexible Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications o ASTM D3035, Specification for Polyethylene (PE) Plastic Pipe (DR- PR) Based on Controlled Outside Diameter o ASTM D 3350, Standard Specification for Polyethylene Plastics Pipe and Fittings Materials o ASTM F 585 Practice for Insertion of Flexible Polyethylene Pipe into Existing Sewers o ASTM F714, Specification for Polyethylene (PE) plastic pipe (SDR- PR) Based on Outside Diameter o ASTM F 1417 Standard Test Method for Installation Acceptance of Plastic Gravity Sewer Lines Using Low-Pressure Air o PPI Handbook of Polyethylene Pipe 3.0 Sewer Liner Pipe and Fittings Requirements: 3.1 The polyethylene material dimensions and performance properties of solid wall polyethylene pipe shall be in accordance with ASTM D 3035 or ASTM F 714. The polyethylene material used to manufacture the pipe and fittings shall be high density polyethylene compounds which meet or exceed the cell classification PE 345464C in accordance with ASTM 3350-06*. 3.2 The polyethylene material dimensions and performance requirements for polyethylene fittings shall be in accordance with ASTM D 3261 for molded fittings or ASTM F 2206 for fabricated fittings or ASTM F 1055 for electrofusion fittings. *When pressurized pipelines are sliplined, Polyethylene pipe made from resins with a minimum cell classification of PE 445474 C can be used. 10

4.0 Liner Pipe Dimensions and Saddles 4.1 Saddles fittings for connecting laterals to the liner shall be electrofusion or strap-on sewer saddles. Strap-on sewer saddles shall be used only where it is not possible to use electrofusion saddles. The saddles shall be equipped for joining with a casketed hub, or plain outlet for mechanical couplings or electrofusion couplings joining. 5.0 Submittal Requirements Submittal information shall confirm products are manufactured in accordance with Sections 2 and 3 of this specification. 6.0 Rejection Any PE piping materials may be rejected for failure to meet any of the requirements of the specification. 7.0 Installation Procedures The following installation procedures shall be observed unless otherwise specified by the Owner s Representative: 11 7.1 Cleaning of Sewer Line: Prior to any sliplining of a line so designated, the Contractor shall clean debris out of the sewer line. The method of removal shall not damage the existing line. 7.2 Television Inspection: Video tapes. CD s or DVD s of the existing line shall be provided by the Owner s Representative for use by the contractor in planning the work. To confirm line condition, the contractor may inspect the line prior to starting the project. The contractor shall be responsible for locating services, obstructions and other problems prior to the sliplining and connecting the services. 7.3 Bypass Piping: The Contractor shall be responsible for bypass piping if required. The bypass shall be made by plugging an upstream manhole and pumping the sewage into a down stream manhole or adjacent system. The pump and bypass lines shall be adequate capacity and size to handle the flow. The contractor shall be responsible for any leakage during the operation of the bypass. 7.3.1 Butt fused HDPE pipe shall be used for the bypass. 7.3.2 Under no circumstances will the dumping of raw sewage onto private property or into the city street be allowed. 7.3.3 At the end of each working day, temporary tie-in shall be made between the relined section and the existing system. 7.3.4 The bypass piping shall be operated in way that allows residents to have service.

7.4 Line Obstructions: It is the responsibility of the Contractor to clear the line of obstructions, solids, dropped joints, or collapsed pipe that would prevent insertion or damage the liner during insertion. Excavations to remove obstructions shall be approved by the Owner s Representative prior to the commencement of work. 7.5 Excavation: Insertion pits shall be only at locations shown on the drawings. If additional insertion pits are required, the Owner s Representative shall approve the insertion pits and their locations prior to starting this work. The insertion pit size shall be no larger than is necessary. 7.5.1 The pit shall be sloped as required by the manufacturer or supplier. The sides of the pit must be supported and conform to OSHA requirements. 7.5.2 The pit shall be wide enough to install the liner without damage. 7.5.3 Ground water pumping or well pointing shall be the responsibility of the Contractor. 7.5.4 After insertion of the liner, the trench surrounding the liner pipe or surrounding the liner pipe and the top of the old pipe shall be filled with suitable properly compacted material. Sand stabilized with cement, crushed stone or flowable fill may be used. Backfill shall be compacted as noted on the plans. 7.6 Joining of HDPE Liner Pipe: 7.6.1 Solid wall HDPE pipe shall be joined in accordance with ASTM F 2620. All butt fusion welds shall be made by trained personnel. Butt fusion equipment shall be inspected prior to arrival at the job site. The equipment inspection form shall be available to the Owner s Representative. 7.6.2 The Owner s Representative can require on site training of the operator. Equipment not in satisfactory condition will not be allowed to fuse the pipe. 7.6.3 Solid wall HDPE pipe can be joined using stainless steel full encirclement clamps when insertion pipes are not located at the manhole. 7.7 Insertion of the Fused Liner: The polyethylene liner can be installed by pulling or pushing or a combination thereof. 7.7.1 During insertion, precautions shall be taken to protect the liner pipe from scratches and gouges. The liner shall be protected from ragged edges of the broken sewer pipe. 12

7.7.2 The liner pipe shall be allowed to relax and come to thermal equilibrium before sealing the annular space between the liner and the existing sewer pipe at the manhole. The liner must extend at least 8 into the manhole. 7.8 Manholes 7.8.1 Replacement: When a manhole is replaced, the replacement manhole shall be equipped with a boot connection. The boot will allow a secure connection to HDPE pipe. See detail d. 7.8.2 Sealing Polyethylene Pipe in existing Manhole: The annular space between the polyethylene liner and the existing sewer line shall be sealed where the liner enters or exits manholes. The pipe shall be allowed to relax and come to thermal equilibrium for a period of 24 hours before sealing. Seal the upstream manhole liner connection, connect services to the liner, and then seal the downstream manhole connection. Acceptable materials are urethane foam, oakum or low shrink grout. 7.8.2.1 Foam sealant shall not protrude into the manhole and shall be finished over with a quick-set, nonshrink cement grout. 7.9 Service Connections: After the liner has been secured in the upstream manhole, each existing service connection shall be reconnected to the new liner. Remove at least the top half of the host pipe to expose the liner for sewer service saddle connections. 7.9.1 Connections between the saddle outlet and to existing clay, concrete, or PVC laterals may be made using a bell connection on the electrofusion saddle if so equipped, or with mechanical neoprene connectors. Connections to HDPE laterals may be made using electrofusion couplings. 7.9.2 Prior to backfilling the service connection, the annular space between the original host sewer pipe and the liner upstream and downstream of the lateral connection shall be sealed. Acceptable materials for sealing are urethane foam and oakum or low shrink grout. 8.0 Backfill: 8.1 At all points where the liner pipe has been exposed (such as the insertion pit, at a service connection, or other points to remove obstructions), the polyethylene pipe and fittings shall be encased in cement-stabilized sand or other material as specified by the Owner s 13

Representative. The purpose of this encasement material is to support the liner and prevent deflection. 8.2 When encasement material is used, debris and soil shall be removed along each side of the existing pipe or the liner down to the spring line. 8.3 After the encasement materials is in place and accepted by the Owner s Representative, backfill shall be placed and compacted as required. 9.0 Final Acceptance: 9.1 After installation of the liner, the Contractor shall, at the option of the Owner s Representative, either TV inspect the sewer line or conduct a low pressure test on the liner. 10.0 Cleanup: 10.1 After the installation work has been completed and all testing found acceptable, the Contractor shall clean up the entire project area and return the ground cover to grade. All excess material and debris not incorporated into the permanent installation shall be disposed of by the Contractor. Sidewalks, driveways, and street surfaces shall be recovered. 14