Expression of Interest (EOI) For Study, Development and Implementation of Load Balancing Solution For the ICSI Webserver



Similar documents
ENQUIRY NO.NIE/PS/ DATE: 02/09/2014

PUNJAB NATIONAL BANK EXPRESSION OF INTEREST (EOI) FOR EARLY WARNING SYSTEM LOAN ACCOUNTS

APV9650. Application Delivery Controller

ZEN LOAD BALANCER EE v3.04 DATASHEET The Load Balancing made easy

Expression of Interest (EOI) For Software Escrow Services. IDBI Bank proposes to invite response to the EOI for Software Escrow Services

APV x600 Series. Application Delivery Controller APV1600, APV2600, APV4600, APV5600, APV6600, APV8600, APV9600

Mingyu Web Application Firewall (DAS- WAF) All transparent deployment for Web application gateway

Request for Proposal (RFP) for. Corporate Agency Arrangement for General Insurance Business

Tender document. for. Providing Managed Internet Leased Line Network. at Chandigarh Police Headquarters, Sector 9, Chandigarh

Office of the Competition Commission of India Hindustan Times House, K.G. Marg, New Delhi

ZEN LOAD BALANCER EE v3.02 DATASHEET The Load Balancing made easy

Empanelment of Vendors for Load Testing

Semantic based Web Application Firewall (SWAF V 1.6) Operations and User Manual. Document Version 1.0

Data Sheet. VLD 500 A Series Viaedge Load Director. VLD 500 A Series: VIAEDGE Load Director

State Health Society, Bihar Pariwar Kalyan Bhawan, Sheikhpura, Patna-14

Expression of Interest. Scanning of Documents

SiteCelerate white paper

Proof of Concept Guide

TENDER FOR. SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF UTMs. Tender No. IT/ 01/IIMP/ 05/2015

REQUIREMENTS AND INSTALLATION OF THE NEFSIS DEDICATED SERVER

EOI - Empanelment of Vendors for Load Testing. Expression of Interest (EOI) Empanelment of Vendors for Load Testing

1 ST CORRIGENDUM - RFP For Procurement Of Web Application Firewall (Subscription Model) RFP No. IDBI/PCell/RFP/ /18 dated 24 th January 2015

IDBI Bank Ltd. value which should be sized on this appliance second for 2048 Bit SSL encryption." appliance/hardware and should be upgrade to 15 Gbps

Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi TENDER NOTICE FOR INTERNET CONNECTIVITY

Expression of Interest (EOI) For. Enterprise Content Management Solution (ECM)

NEFSIS DEDICATED SERVER

CA Single Sign-On r12.x (CA SiteMinder) Implementation Proven Professional Exam

Load Balancing Security Gateways WHITE PAPER

Deployment Guide. AX Series with Microsoft Office SharePoint Server

SUPPLY AND INSTALLATION OF INTERNET BANDWIDTH SERVICES

UNIFIED PERFORMANCE MANAGEMENT

Deployment Guide Microsoft IIS 7.0

AppDirector Load balancing IBM Websphere and AppXcel

How To Run A Web Server On A Linux Or Windows Computer (For Free) On A Cheap Server (For Cheap) On Your Own Computer (Free) On An Old Hard Drive (For A Free) Or Ipad (For Low Cost)

SBI FUNDS MANAGEMENT PRIVATE LIMITED REQUEST FOR PROPOSAL FOR WEB SECURITY SOLUTION

FortiWeb for ISP. Web Application Firewall. Copyright Fortinet Inc. All rights reserved.

Deployment Guide May-2015 rev. a. APV Oracle PeopleSoft Enterprise 9 Deployment Guide

Deployment Guide AX Series with Active Directory Federation Services 2.0 and Office 365

Dated 14 July, Director (A&F) NHIDCL

(RFP) PURCHASE OF BLADE SERVER

NetScaler: A comprehensive replacement for Microsoft Forefront Threat Management Gateway

REAL-TIME WEB APPLICATION PROTECTION. AWF SERIES DATASHEET WEB APPLICATION FIREWALL

LIMITED TENDER FOR DESIGN, DEVELOPMENT AND IMPLEMENTATION OF WEBSITE FOR NON TIMBER FOREST PRODUCE (NTFP)

Cisco Application Networking for IBM WebSphere

A Guide to New Features in Propalms OneGate 4.0

White Paper A10 Thunder and AX Series Load Balancing Security Gateways

Deployment Guide AX Series with Citrix XenApp 6.5

Disaster Recovery with Global Server. Load Balancing

Radware s AppDirector and AppXcel An Application Delivery solution for applications developed over BEA s Weblogic

Quotation document for Supply and implementation of Wildcard Secure Sockets Layer (SSL) Certificate. Quotation No. IKM/QUOT/03/2015/754

Expression of Interest (EOI) For. End to End Solution For Enterprise Data Warehouse Solution In Punjab National Bank

DEPLOYMENT GUIDE Version 1.2. Deploying the BIG-IP System v9.x with Microsoft IIS 7.0 and 7.5

Microsoft SharePoint 2013 with Citrix NetScaler

Barracuda Load Balancer Online Demo Guide

Microsoft Lync Server 2010

DPtech ADX Application Delivery Platform Series

Request for Proposal (RFP) for. Corporate Agency Arrangement for General Insurance Business HO : Near Bajrang Bhawan, Delhi Road

Deployment Guide. AX Series with Microsoft Exchange Server

HUAWEI OceanStor Load Balancing Technical White Paper. Issue 01. Date HUAWEI TECHNOLOGIES CO., LTD.

*TKtr *W4>K. Government of India itwm mitm Ministry of Labour & Employment W T HSlPT&llem. Directorate General of Mines Safety TENDER NOTICE

WEB APPLICATION FIREWALLS: DO WE NEED THEM?

Document Control Sheet

Availability Digest. Redundant Load Balancing for High Availability July 2013

DEPLOYMENT GUIDE DEPLOYING F5 WITH MICROSOFT WINDOWS SERVER 2008

Reference No. RFP/IT/CO/2016/2 Dated 29/02/2016. IMPORTANT DATE: Last date for submission of Quotes: 10 th March, 2016

Secure remote access to your applications and data. Secure Application Access

Cisco ACE 4710 Application Control Engine

Cisco Application Networking for BEA WebLogic

5 Easy Steps to Implementing Application Load Balancing for Non-Stop Availability and Higher Performance

TENDER FOR. Supply, Installation, Commissioning and Maintenance of 04 Mbps Internet Leased Line at NSIC Head Office, Okhla, New Delhi for One Year.

Imperva s Response to Information Supplement to PCI DSS Requirement Section 6.6

Invitation for Expression of Interest for providing software development services

Customer Service Description Next Generation Network Firewall

Networking and High Availability

The Application Delivery Controller Understanding Next-Generation Load Balancing Appliances

Cisco Application Networking Manager Version 2.0

Understanding Slow Start

Deployment Guide Jan-2016 rev. a. Deploying Array Networks APV Series Application Delivery Controllers with Oracle WebLogic 12c

Flexible Routing and Load Control on Back-End Servers. Controlling the Request Load and Quality of Service

Deployment Guide Oracle Siebel CRM

E-GOVERNANCE MISSION MODE PROJECT (MMP) CRIME & CRIMINAL TRACKING NETWORK & SYSTEMS (CCTNS) IMPLEMENTATION OF CCTNS IN GOA

DEPLOYMENT GUIDE DEPLOYING THE BIG-IP SYSTEM WITH MICROSOFT INTERNET INFORMATION SERVICES (IIS) 7.0

CENTRAL INFORMATION COMMISSION BLOCK IV, 5 TH FLOOR, OLD JNU CAMPUS, NEW DELHI TENDER DOCUMENT

Tender for development, upgradation of web based software application for Student Information System (SIS) INVITATION OF THE BID

Exhibit B5b South Dakota. Vendor Questions COTS Software Set

SSL-TLS VPN 3.0 Certification Report. For: Array Networks, Inc.

Content Scanning for secure transactions using Radware s SecureFlow and AppXcel together with Aladdin s esafe Gateway

TENDERS ARE INVITED FOR INFORMATION TECHNOLOGY CONSULTANCY SERVICES

Internet Based Trading Services through ASP

WAN Optimization, Web Cache, Explicit Proxy, and WCCP. FortiOS Handbook v3 for FortiOS 4.0 MR3

BANK OF UGANDA REPUBLIC OF UGANDA

Brocade Virtual Traffic Manager and Microsoft IIS Deployment Guide

Basic & Advanced Administration for Citrix NetScaler 9.2

Stingray Traffic Manager Sizing Guide

Microsoft SharePoint 2010 Deployment with Coyote Point Equalizer

QUOTATION FOR UTM 4/26(1)/2009/EDP-HO 06/08/2015

Website development, maintenance and hosting of for India Brand Equity Foundation (IBEF) Request for Proposal [RFP] Date: March 23, 2015

Transcription:

Expression of Interest (EOI) For Study, Development and Implementation of Load Balancing Solution For the ICSI Webserver Cost to be submitted with EOI: NIL Publish Date: May 28, 2014 Last date of submission: June 11, 2014 by 3:00 PM EOI opening Date: June 12, 2014 at 11:00 AM Institute Website: www.icsi.edu ICSI: EOI-Study, Development and Implementation of LBS Page 1 of 15

Statement of Confidentiality The information contained in this EOI Document or subsequently provided to Bidder(s) / Applicants whether verbally or in documentary form by or on behalf of Institute of Company Secretaries of India (hereinafter ICSI ) or by any of their employees or advisors, shall be subject to the terms and conditions set out in this EOI Document and all other terms and conditions subject to which such information is provided. The purpose of this EOI document is to provide the Bidder(s)/Applicants with information to assist the formulation of their proposals. This EOI Document does not purport to contain all the information each Bidder/Applicant may require. This EOI document may not be appropriate for all persons, and it is not possible for the ICSI, their employees or advisors to consider the investment objectives, financial situation and particular needs of each Bidder/Applicant who reads or uses this EOI document. Each Bidder/Applicant should conduct its own investigations and analysis and should check the accuracy, reliability and completeness of the information in this EOI document and where necessary obtain independent advice from appropriate sources. ICSI, its employees and advisors make no representation or warranty and shall incur no liability under any law, statue, rules or regulations as to the accuracy, reliability or completeness of the EOI document. ICSI may in their absolute discretion, but without being under any obligation to do so, update, amend or supplement the information in this EOI Document. ICSI: EOI-Study, Development and Implementation of LBS Page 2 of 15

Table of Contents: S NO Particular Page No 1 INTRODUCTION 4 2 SCOPE OF WORK 5 3 CURRENT SETUP AT ICSI 9 4 ELIGIBILITY CRITERIA 11 5 DOCUMENTS ESTABLISHING BIDDER/APPLICANT S ELIGIBILITY 12 6 GENERAL CONDITIONS 13 7 INFRASTRUCTURAL DETAILS 14 8 DECLARATION 15 ICSI: EOI-Study, Development and Implementation of LBS Page 3 of 15

1. INTRODUCTION: The Institute of Company Secretaries of India (ICSI) is a statutory body set up by an Act of Parliament. It is functioning under the overall administrative jurisdiction of Ministry of Corporate Affairs, Government of India, and its Headquarters is located at ICSI House 22 Institutional Area Lodi Road New Delhi-110 003. ICSI intends to implement Load Balancer for the ICSI webserver. ICSI invites Expression of Interest (EOI) to Study, Develop and Implement Load Balancer for the ICSI webserver. Eligible firms having deep understanding of Load Balancer and the experience to provide the above solutions are invited to submit their Expression of Interest (EOI) as per the details provided in this document by last date as mentioned in the first page. The Expression of Interest should be sent to Shri Sutanu Sinha, Chief Executive, The Institute of Company Secretaries of India, by name at the Institute s Headquarters in the envelope super scribing EOI for Study, Development and Implementation of Load Balancer for the ICSI webserver at ICSI House 22, Institutional Area, Lodi Road, New Delhi-110 003 The ICSI will not be responsible for any postal delays. Application through e-mail is not valid. The ICSI reserves the right to accept or reject any or all the applications without assigning any reasons, whatsoever. (B. Pradhan) DIRECTOR ICSI: EOI-Study, Development and Implementation of LBS Page 4 of 15

2. SCOPE OF THE WORK 1. Bidder will study the existing infrastructure, applications of the ICSI and suggest Load balancer solution to cater the peak load of approximately 50 k transactions (Financials and non-financials both) in a day. 2. The solution should be scalable both in terms of the number of servers and number of end users. There shall be no limitations on these two accounts. The solution shall further be near linear scalable as per the increase in network elements and users without affecting performance in online and batch process mode. It shall also support parallel servers for load balancing. 3. The solution should comply with all functional, legal and regulatory requirements of the respective OEMs. 4. Solution should have standard and customizable user friendly reports. 5. The solution should ensure integration with various payment gateway applications for collection of various Fees and other applications & CRM systems needs to be handled in optimal way to achieve the desired goal of ICSI. 6. The solution should maintain logs and keep a record of events for later verification. Proposed Solution required should include, but not limited to, the following: 1. The Proposed solution should include the separate multiple high end enterprise servers for web/application/database. The solution should include licenses for all H/W, Operating Systems, Database and Application Software. 2. The proposed solution should be in the form of hardware box. This is to ensure bidder should not give/offer solution in software form only. 3. Appliance should have minimum 8 GB memory with dual Power support. Memory should be good enough to ensure high performance and compatible for all OEMs. 4. Appliance should have LCD screen /LED on the front of Appliance and should display alerts and fault information for an administrator to monitor the system. 5. The proposed solution should Support minimum 2 Million TCP connections and minimum 100k TCP L4 CPS. The expected load is maximum 100000 Internet users for the site www.icsi.in and while the users open multiple sessions and explorer window which are new connections to the load balancer. The reason to have minimum 2 Million TCP connections is to ensure there are ample of available connection table for new request during peak time and have option to scale the appliance higher with new applications and services for more users for later time. 6. Minimum 15000 SSL handshakes per second/cps @1024 Key size and 3000 SSL handshakes per second/cps @2048 Key size without any SSL session reused with bulk throughput of 2 GBPS SSL handshakes per second. The proposed solution should support at least 10k of concurrent SSL users connected at 2048 key size. 7. The Proposed Solution should support High Availability and should support HA Cluster, as it would help move services from failed appliance to active appliance seamlessly without disconnecting any user sessions. Failover should happen in within 3 sec. 8. Load Balancer appliance should have various Topology Deployment like ICSI: EOI-Study, Development and Implementation of LBS Page 5 of 15

a. Single Arm Mode (single arm or one leg mode is quite easy and used for most sites as this installation does not change any current IP schema and break application flow). b. Two Arm mode (This is inline or two arm mode generally used for layer 2 load balancing). 9. Appliance should have capability to Perform load balancing in a. Proxy mode ( reverse proxy mode), this is equivalent to star token system which does proxy connection from user to internal applications for hiding internal resources b. Transparent mode (client transparency mode). In case the server needs client details transparency mode help track end user IPs. 10. The appliance should support X-forwarder option. The appliance should have option to enable x-forwarder option per service to log actual client IP in web server log. 11. The proposed solution should have capability to handle and configure multiple load balancing (Layer 7) protocols on same appliance. The proposed solution should support multiple protocols like http, https, ftp, TCP, TCPS, Radius applications which can be configured with its own profile per service and be able to route the applications independently of server location or network schema, hence more applications will benefit from load balancer services. 12. The proposed solution should have capability of Rate Limiting and TCP Surge Protection. Appliance should support rate limiting connections for client to backend servers at the same time support TCP Surge protection, In an event of connection surge from end client the appliance should be able to queue the connection without dropping them. 13. The proposed solution should have the capability to configure multiple services on same Virtual IP with different ports and services options. In case the applications have same IP schema and need port based server selection, the load balancer should be able to ensure port based server selection for minimizing IP overuse and have support for same Virtual IP for port based grouping. 14. The proposed solution should have the capability of Rate shaping & QoS Support Solution so that all applications work optimally without impacting user experience. (Rate shaping helps connection control and request per source to prevent DoS attacks and ensure minimum resources are available for all users, e.g. 10 connections per second per source ip to ensure that one ip does not overload the server TCP stack and server process). 15. The appliance should have feature of Cluster failover with within 3 second failover (Cluster help move services from failed server to cluster server and hence help continuity for applications access Multiplexing Server Side Connection). 16. Load balancing should support minimum IP based persistency, session based cookie persistency and headers inspection, URL redirection, hash IP, round robin, shortest repose time and least connections, these are various algorithm support for maximum options and help granular control per service and applications. 17. SSL offloading : The appliance should have feature of SSL Offloading which should have a. Dedicate SSL Chipset for SSL Offloading. SSL offloading should be done by dedicated hardware instead of shared of CPU used for load balancing. b. Minimum 2 Gbps SSL Throughput Max. SSL Bulk Crypto should be minimum 1 Gbps for ensuring SSL connections are used with good performance. ICSI: EOI-Study, Development and Implementation of LBS Page 6 of 15

c. SSL be card based for 1024 and 2048 bits certificates and support 4096 bit. All Server certificate that are 1024 or 2048 bit need to be supported, Appliance should also support 4096 bit for future requirement. d. SSL Renegotiate DoS protections from Various SSL Attacks. 18. HTTP and TCP Layer Acceleration: The appliance should have feature of Compression with a. Appliance should support minimum 2Gbps Hardware or Software Compression (Compression helps speed up the application access for end users and enable faster transactions and speed) b. Per browser and service control for Mime (Multipurpose Internet mail extension) type reporting (MIME is a identifier of browser version and helps control compression per browser, like pdf compression in ie6 has issues as reported by Microsoft so mime selection can prevent pdf compression issue by disabling pdf compression for ie6 but enabled for other version hence controlling compression support per service) c. Support TCP Optimization. 19. Caching : The appliance should have feature of Caching with a. Per file type/content type TTL control. This feature ensures the load balancer perform compression for valid file types and avoid private data caching b. Per service application cache details and responses. The cache report per service help identify cache performance and optimization capability c. Dynamic content caching. Should have intelligence to caching of dynamic content so enables the correct content is delivered to the end user always d. Push static content to local client machine. Appliance should be able to push static contents to client browser to reduce WAN Bandwidth cost. e. Change expiry timers. Should support change lifetimes of content passed by the backend servers to the client. These lifetimes can be made specific to any parameter that the user may want to identify. Should support OBEY OR DISOBEY lifetimes set by the backend server. f. Customize Cache Timers. Cache period configurable i.e. for e.g. can NS set the MAX-AGE value in the Cache Control g. Per service caching filter support. Per service filter helps granular control and optimizing cache performance per site. h. Appliance support asymmetric acceleration. Appliance should support ASSYMMETRIC deployment without any need to deploy any WAN optimization device. The user can log into the application from any location and get similar experience from any appliance i. Support content and white space Stripping. Reduce Web page load time on but stripping unwanted Data on WAN. j. Support Content Reordering. This feature will help to reorder the Web page content to improve user experience and reduce the page loading time 20. IPv6 Support: The product should support IPv6 ALG and NAT64. 21. WAF as well as ADC and Load Balancer should complied and support IPv4 and IPv6 both. This feature helps Dual Stack Support for old as well as new schema. 22. Should support rewrite of Legacy Web Server Support for Rewrite Legacy/ Hard coded IP address on Web Server with IPv6 Addresses. ICSI: EOI-Study, Development and Implementation of LBS Page 7 of 15

23. Web Application Firewall: a. The proposed solution should have Web Application Firewall with Minimum throughput of 1 Gbps for Internet segment. The proposed solution should provide minimum 1 Gbps throughput with all features enabled (load balancing, SSL offloading, Compression, Cluster, Caching, Web application firewall-advanced and logging) to ensure the solution is scalable and more applications can be added later. The proposed Solution should have Inbuilt Web Application Firewall in the same appliance. The Appliance should be able to handle Top 10 OWASP Attacks as well as Zero Day Attacks, Should have Vulnerability Scanner or Support integration with 3rd Party Vulnerability Scanner example Cenzic, Whitehat, Qualsy etc, Should Support Application compliance reporting, should support HTTP, XML, JASON & AJAX protocol, Should support positive and negative signature Module, should support inbuilt reporting. b. Solution should Support Layer 3 to Layer 7 Support with advance protection for http request and response. Application firewall should be able to prevent any attack from Layer 3 to layer 7. c. The solution should have reporting feature on same appliance Should be able to generate WAF report on same appliance. 24. Reporting & Management: a. The solution should Support High Speed Logging Solution should Support integration with RSA Envision and 3rd Party Logging Engine. b. The solution should support Customize Logging. Customize Logging Attributes to reduce Logging size. c. The proposed solution should give real Time Reporting and Monitoring. This feature will help to get real time report and fault identification etc. e.g. real server response and outstanding requests, real server/virtual server status and system statistics etc. Reporting is important and required for ensuring real time and historical trending and base lining for trending usage, Should support reporting of all modules on same platform/appliance. d. The appliance should have feature of SSH, HTTPs and Console access The appliance should have multiple management options which are secure and easy to use for configuration. e. The appliance should Support for segmentation and routing per service Segmentation controls application flow to respective gateway per server and helps multiple segment control for various applications. ICSI: EOI-Study, Development and Implementation of LBS Page 8 of 15

3. CURRENT SETUP AT THE ICSI Infrastructure: 1. ICSI.edu and ICSI.in domain hosted are on data centers 2. ICSI.edu domain has one server hosting both Web Application and Database. 3. ICSI.in domain is to provide the online services and is integrated with total of 8 servers i.e. 1 application server, 4 database servers, 1 email server, 1 sharepoint server and 1 SMS server. 4. Out of the above mentioned 4 database servers, 3 servers are also being used offline by the users in the Institute for data entry, processing and reporting purpose. These 3 database servers are synchronized with remaining one database server (which is working online for icsi.in domain) and vice versa. 5. www.icsi.edu website is HTTP enabled and www.icsi.in is both HTTP and HTTPS capable and enabled. 6. ICSI.edu is primarily hosting static contents and links to other sites including icsi.in. 7. Users are redirected to ICSI.in from ICSI.edu for accessing online services. 8. No load balancing solution is implemented in the current setup. 9. The internet bandwidth of the data center where icsi.in domain is hosted is 20 MBPS. The said bandwidth is also used by the users of the site. 10. Icsi.edu domain is hosted with unlimited bandwidth. Payment Gateway Following Online Payment Gateway are currently implemented in the ICSI. Number of gateways may be increase or decrease as per the requirement of the ICSI 1. Billdesk 2. Axis Bank 3. City Bank 4. Tech Process Applications Tentative list of the online services (Accessible through https://www.icsi.edu ) provided by the ICSI to its stakeholders is placed below. Number of services may increase or decrease as per the requirement of the ICSI 1. Online Services for Members Payment of New Admission Fee/ Annual Membership Fee / CP fee / Restoration Fee / CP renewal Fee / CSBF Fee Duplicate Payment Receipt Without login Various e-letters generation Integrated Emailing and SMS facility for transactions Membership Profile Membership Directory Without login ICSI: EOI-Study, Development and Implementation of LBS Page 9 of 15

Address Change Facility to restrict fields from display in Membership Directory Credit Hours Certificate (Member) / Credit Hours Updation (RO/Chapter/HQ) Placement Grievance Redressal Registration for National Convention E-Cart Services 2. Online Services for Students Registration (Foundation, Executive ) Without login Professional Registration Registration Denovo Extension of Registration Exemption (qualification based) Switchover Enrollment for Examination Center Change (After Enrollment) Medium Change (After Enrollment) Module Change (After Enrollment) Online payment facility / Offline Payment facility through Challan Duplicate Payment Receipt Without login E-cart Services Integrated Emailing and SMS facility for transactions Password Change/Reset facility Without login E-Admit Card through Third Party Portal - Without login Result cum E-mark sheet through Third Party Portal - Without login Facility of Registration for result through e-mail - - Without login Enrollment Status - Without login Student Profile / Overall Status Registered Companies and PCS for training - Without login Registration Status - Without login Denovo Registration Status - Without login ICSI: EOI-Study, Development and Implementation of LBS Page 10 of 15

4. ELIGIBILITY CRITERIA: 1. The Bidder/Applicant shall be a company incorporated, registered under the Indian Companies Act, 1956 or by a competent authority in case of foreign Bidder/Applicant companies. 2. The Bidder/Applicant must not have been declared bankrupt / insolvent or should not have filed for bankruptcy / insolvency in the past five years or in the process of being declared bankrupt / insolvent before any designated authority in any country. 3. The company shall have a minimum audited annual turnover of INR 50 lakhs or equivalent each year during last 3 financial years in Load Balancer domain. 4. Bidder/Applicant shall have full cycle implementation of Load balancer application(s) relating to online Services (including payment gateways) to stakeholders in a reputed organization with at least three implementations in last three years in India. 5. The Bidder/Applicant should not have been black-listed by central/ state governments/ PSUs. ICSI: EOI-Study, Development and Implementation of LBS Page 11 of 15

5. DOCUMENTS ESTABLISHING BIDDER/APPLICANT S ELIGIBILITY: The following documents are required to be submitted along with the EOI bid. Nonsubmission of any documents or submission of incomplete, misleading or false information may render the bidder liable for summarily rejection or cancellation of its EOI. 1. A copy of Certificate of Incorporation from Registrar of Companies or from competent authority in case of foreign companies, signed by the Company Secretary / authorized signatory of the Bidder/Applicant Company. 2. Copy of Articles of Association and Memorandum of Association. 3. Latest audited Annual Report of the Company for last three financial years, i.e. Year 2010-11, 2011-12 and 2012-13. 4. Board resolution in favor of the Authorized Signatory including attestation of the signatures of the Authorized Signatory by the company s bankers. 5. Certificate regarding Bidder/Applicant Company not being bankrupt/ insolvent from statutory Chartered Accountant/ Company Secretary of Bidder Company. 6. Experience / Implementation Certificate from at least three separate companies wherein the Bidder/Applicant has done a full cycle implementation of Load balancer application(s) preferably relating to reputed organization / educational institute/university/college etc in last three years in India. 7. List of Directors on the Board of the Company/ proprietor in case of single or joint proprietors with their address (es), contact telephone numbers, email id etc. ICSI: EOI-Study, Development and Implementation of LBS Page 12 of 15

6. GENERAL CONDITIONS 1. The vendor must be a reputed service provider. The authority for all products provided from the manufacturer must be submitted. The EOI received without authority are liable to be rejected. 2. All the pages should have page no. and authenticated by authorized Person 3. Hard copy and soft copy (in USB/Pen Drive/CD) of EOI should be submitted in sealed cover. 4. The Purpose of this EOI is to shortlist the LBS Vendors and prepare a RFP on the basis of their study and presentation on the LBS. The EOI bidders will help the Institute to develop the RFP for the job but it no way restricts the Institute to go for inviting bids through open tendering process. 5. The Bidders/Applicants are advised to study the requirements of the Institute in details before submitting their application/bid and the presentation.. 6. AMENDMENT OF EOI DOCUMENTS a) At any time, prior to the date of submission of bids, ICSI may, for any reason, at its own initiative modify EOI document by amendments. b) The amendments shall be notified on ICSI s web site, i.e. at https://www.icsi.edu and these amendments will be binding on all the Bidders/Applicants. c) In order to afford prospective Bidders/Applicants a reasonable time to take the amendment into account in preparing their bids, ICSI, at its discretion, may extend the deadline for the submission of bids suitably. 7. Bid shall remain valid for 180 days from the date of opening of bids. A bid valid for a shorter period shall be rejected. 8. The last date for receipt of sealed EOI in the Institute and opening of bids is mentioned on the first page of the document. No separate communication will be issued in this regard. Bids will be opened in the presence of the intending vendors or their authorized representatives, who wish to be present. In the event of due date being a closed holiday or declared Holiday for Central Government offices, the due date for opening of the EOI will be the following working day at the appointed date, time & venue. 9. Site for study / inspection / delivery / installation is as under: The Institute of Company Secretaries of India Plot no. C-37,Sector 62, Noida (U.P.) 10. The vendors shall be invited for a presentation of their solution subsequently. ICSI: EOI-Study, Development and Implementation of LBS Page 13 of 15

11. For any further details /clarifications pertaining to presentation, Office of Shri Ankur Yadav, Senior Director Information & Technology in ICSI (0120-4522012) may be contacted. 7. INFRASTRUCTURAL DETAILS S. No. Particulars. Response 1 Name and complete address of the Company 2 Tele/Fax/E-mail/Cell No. Of the company 3 Detail of Contact Persons authorized by the company to execute documents on its behalf, with ICSI (Designation, Tel, E-Mail) 4 Details of registered office, if any along with contact person s name and Contact detail (Tel / Mobile & E-Mail) 5 Income-tax registration number along with documentary evidence 6 A) Sales tax registration number along with documentary evidence B) Please also specify if you are registered with appropriate Authority under Works Contract Act, 1999. (Please provide details) 7 List of clients to whom services (as per this EOI) in last 3 year provided with details of company, value of business, concerned person name & his telephone no. (Please attach full details) 8 Current Load Balancing Solution related assignments on hand, if any 9 Turnover in last three financial years, i.e. Year 2010-11, 2011-12 and 2012-13. 2013-2014 ICSI: EOI-Study, Development and Implementation of LBS Page 14 of 15

8. DECLARATION 1. The undersigned certifies he/she is authorized to obligate the represented firm and further agrees with all terms, conditions, and requirements of the ICSI s EOI. 2. We have no objection if enquiries are made about the work listed by us in the accompanying sheets / annexure. 3. We agree that the decision of the ICSI in selection process will be final and binding on us. 4. We confirm that we have not been barred / blacklisted / disqualified by any Regulators / Statutory Body in India and we understand that if any false information is detected at a later date, the assignment shall be cancelled at the discretion of the institute. 5. All the information furnished by us here in above is correct to the best of our knowledge and belief. Place: SIGNATURE OF THE APPLICANT Date: NAME & DESIGNATION SEAL OF ORGANISATION ICSI: EOI-Study, Development and Implementation of LBS Page 15 of 15