ONBOARD MAINTENANCE PAINT GUIDE

Similar documents
Tractor Painting Tips

Additional Information. Paint Application

Technical Data SeaQueen

SC2000 CEMENT BONDING PROCEDURES

TECHNICAL DATA SHEET HAMMERITE METAL PAINT. Smooth Hammered Satin Aerosol

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

BLACK JACK ALL WEATHER ROOF COATING

Minor Cracks in Horizontal Surfaces

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

The Application Guide offers product details and recommended practices for the use of the product.

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated)

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Acrylic Enamel Topcoat

PRODUCT DATA SHEET Sika Cable System

SIGMACOVER 280. PRODUCT DATA SHEET December 10, 2014 (Revision of March 1, 2014) DESCRIPTION

Metal Rescue Rust Remover Technical Data

Resurfacing Concrete. Page 1 of 5

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

SIGMAFAST 210. PRODUCT DATA SHEET December 12, 2014 (Revision of April 1, 2013) DESCRIPTION

Approved. Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1 30 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Onboard Maintenance Painting Guide

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

PHOENIX Product Data Sheet (Updated on 14-Jan-2012)

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

MARTIN TESTING LABORATORIES (MTL) PAINTS AND COATINGS TESTING CAPABILITIES

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated)

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

3M Scotchkote Urethane Coating 165HB

SIGMACOVER 300. PRODUCT DATA SHEET December 12, 2014 (Revision of November 1, 2013) DESCRIPTION

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

Note: Minor color change may occur in exposed service, but corrosion protection will not be compromised

Material Product Data Sheet Sealers for Thermal Spray Coatings

3.8 HSP (High Solids Polyurethane)

T R A N S F E R A B L E F U L LY

Pictorial Surface Preparation Standards For Painting Steel Surfaces

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

White rust on galvanized and galvanized pre-painted steel. Technical Information

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

RockSolid Deck Restoration Application

SEE HOW TO MAKE LIME PLASTER WHY USE LIME? PATTI STOUTER, BUILD SIMPLE INC. FEBRUARY 2013

Wecryl Waterproofing System under surfacing supplied by others

Solvent Cementing Instructions For Plastic Pipe & Fittings

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

Scotch-Weld TM. DP410 Off-White. Product Data Sheet. Product Description. Key Features Rapid cure at room temperature; cure rate may be accelerated

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

PRISM Low VOC Single Stage Color Flat (76), Satin (77), Semi-Gloss (78), & Gloss (79)

UNILIC ACRYLIC EMULSION

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

Product Information. D8115 Matte and D8117 Semi-Gloss Clearcoat System

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

Epoxy Floor Coating Problem Solving Guide

WATERPROOFING OF WET ROOMS

( I ) GENERAL TECHNICAL TERMS SURFACE PREPARATION HEALTH & SAFETY PAINT APPLICATION AIRLESS SPRAY APPLICATION TROUBLE SHOOTING CHART CONVERSION TABLES

COATING & WRAPPING OF UNDERGROUND PIPING

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

RAPTOR TRUCK BED LINER - BLACK

Chrome Finishing For 3d Powder Prints

Application of Exterior Wood Finishes

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

RECOATING AND RENEWING SPF ROOFING SYSTEMS

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

PAINT. PAINTING WALLS Interior Walls -Exterior Walls PAINTING DOORS CLEAN UP

Installation System. Existing Resilient Sheet Floors

Evaluating Protective Coatings for Ballast Tanks

INDEPENDENTS AIL RET 2012

PAINTING OVER HOT DIP GALVANIZED STEEL

RUST BULLET, LLC 300 Brinkby Avenue, Suite 200, Reno, NV

BENTLEY ELEMENTS COLLECTION LVT

K2 STONE NATURAL VENEER

SURFACE PREPARATION. High pressure fresh water cleaning.

Vinyl Composition Tile Installation System

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data March, 2002

RESTORE 10X Advanced Resurfacer FAQs Page 1 of 11

SSPC-SP 6/NACE NO. 3

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

DuPont ChromaOne Acrylic Urethane Single Stage

REPAIR MANUAL MATERIALS

You have just purchased the most portable and economical spray chrome system in the world!

REFLECTIT. Reflectit Application Instructions Spray and Roller DS % Acrylic Coating Providing a Pearlescent Appearance

SECTION 560 COATING NEW STRUCTURAL STEEL

Blister Repair with Binding Resin for Spas, Marine and Gel Coat Structures

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

Concrete Repair. Applications and Procedures

09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS

General Surface Preparation

AUTO COLLISION REPAIR CERTIFICATE I COURSE DESCRIPTIONS. Total: 18 Credit Hours

High-performance, 2-part epoxy anchoring adhesive

How to repair your existing low slope flat roof.

Elastic, 1-part-polyurethane, liquid waterproofing membrane

Division 9. SignaFlor Pad and Pour Flooring System

1. Initial Precautions 2. Technical Precautions and Suggestions 3. General Information and Cure Stages 4. Understanding and Controlling Cure Time

Colours to stand the test of time. paint range

COATINGS MANUAL HRSD 9.0 THIRD PARTY INSPECTION GUIDELINES. 9.1 The Value of Third Party Inspection. 9.2 When to Use Third Party Inspection

Imron 1.2 HG High Gloss Waterborne Polyurethane (WG Quality)

How To Test A Base Axe

COLLISION REPAIR TECHNOLOGY CONTEST DESCRIPTION

Eclipse. Technical Data Sheet. Polyurethane topcoat. Product Group

Technical Data Sheet L Top coats. Mat Clear

Joint Surface Preparation Standard. NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning

Transcription:

ONBOARD MAINTENANCE PAINT GUIDE

CONTENT Page A practical Onboard Maintenance Paint Guide 1.0 2.0 3.0 INSPECTION AND PLANNING 4 HSE 6 SURFACE PREPARATION 8 The purpose of this guide is to provide easy and practical support on how to plan onboard maintenance, and the safe and efficient process of paint application. 4.0 5.0 6.0 PREPARATION OF THE PAINT 10 PAINT APPLICATION 12 STOCK KEEPING 14 Onboard maintenance is often carried out at short notice without a great deal of planning. This may lead to an insufficient coating result. By having a well planned and executed Onboard Maintenance Program, the appearance and the performance of the coating will meet your ex pectations. As a result, maintenance intervals will be longer and the vessel will have a better cosmetic appearance throughout its lifetime. Long term paint consumption and maintenance cost will be reduced and the crew will spend less time on paint jobs. Ultimately, vessel lifetime can be prolonged and cost during dry-docking will be reduced. 2 3

1.0 INSPECTION AND PLANNING Be sure to set aside enough time for the crew to do the job. 1.2 Calculation Calculate the expected volume for the area by using the Onboard Maintenance Manual paint calculator. Consult the TDS for recoating intervals. Make sure you have sufficient volumes of all paint types needed for the job. 1.1 Evaluation Divide the vessel maintenance into smaller manageable areas. Evaluate the condition of the area designated for maintenance and the extent of defects that needs to be repaired. Refer to the Onboard Maintenance Manual s (OMM) maintenance chart for suitable paint for the area to be painted. Check type of existing coating in order to assure paint compatibility, refer to Technical Data Sheet (TDS). Weather conditions Take into consideration current weather conditions, forecast and the time of day. The temperature of the substrate should be minimum 3 C above the dew point of the air to avoid condensation. Remember to include risk of condensation also after the paint is applied. Recording Keep a record of what type of paint you apply to the different areas and the volume used. Safety Read the Safety Data Sheets (SDS) for the products before application. Make sure all Health, Safety and Environmental (HSE) requirements and recommendations concerning paint application are followed. 4 5

2.0 Consult the Safety Data Sheet (SDS), available for all products. HEALTH, SAFETY, ENVIRONMENT Health Avoid breathing in the vapours/fumes by working in ventilated areas, and if necessary use respirator mask. Use safety goggles or glasses. Avoid skin contact by wearing gloves and boiler suit. Safety Store the paint in a dry shaded area, preferably in the paint locker. Assess and secure the area to be repaired for flammable liquids or gases that may ignite when using mechanical power tools. Be sure to have good ventilation during painting operations. Remove all naked lights and unprotected electrical equipment while painting. Environment Do not allow the spillage of paint residues to enter drains or water sources. Material and container must be disposed as hazardous waste. 6

3.0 SURFACE PREPARATION 3.1 Cleaning Clean all surfaces using water soluble detergent and high pressure fresh water. Remove salt, oil, grease, loose coating, dirt and detergent prior to de-rusting. 3.2 De-rusting When de-rusting, turn smaller patches of rust into one larger area by removing the paint between the rust patches. Remove rust manually or mechanically by use of power tools. Mechanical removal is recommended as it offers higher efficiency and better results. Work to limit edges as these are often a weak spot. Edges are recommended to be feathered. This is done by grinding or sanding the edges to create a diagonal shape. Avoid smooth surfaces to secure adhesion. 3.3 Remove particles After de-rusting remember to remove all particles etc. from the prepared surface prior to painting. If possible, use the working air available on deck. 3.4 Avoid contamination Paint immediately after the surface is prepared in order to avoid contamination, increased salt levels and flash rust on bare metals. In case of contamination If the surface is contaminated prior to painting, a final wash is recommended. Use high pressure fresh water. Alternatively hose down thoroughly with fresh water combined with manual scrubbing. Power tools: Manual tools: Power grinding Needle gun Sand blasting Rotary wire brushing Rotary discs Bristle blasting Rust-pickers Scrapes Chipping hammers or chisels Wire brushing 8 9

4.0 PREPARATION OF THE PAINT Consult the TDS for the correct mixing ratio and the correct hardener. One component paint For one component paint, be sure to stir the paint using a mechanical mixer for minimum two minutes, until the paint is homogeneous before use. A A C B B Two component paint When part mixing a pre-calculated volume, measuring can be done by using a scoop/cup or a measure stick. Consult the TDS for the correct mixing ratio. Stir both component A (base) and component B (curing agent) separately before adding them together in a clean tin. Then stir the two components together for minimum two minutes, until you have a homogeneous mixture, using a mechanical mixer. If stirring is done manually, more time is needed. Thinning Jotun Smart Pack products are tailor made for brush and roller application, therefore thinning is not needed. For other paint types, follow TDS guidelines. Induction Adhere to induction time and pot life stated in the TDS before applying the paint. 10 11

5.0 PAINT APPLICATION Ensure surface is dry and free from contamination prior to application of the subsequent coat. Paint brush For pitted and difficult to reach areas and for primer application direct on steel, brush application is recommended. Good quality natural fibre or synthetic brushes. Brushes must be clean before re-using them for other different paints. Dip the brush often to keep it well filled with paint. Do not dip the brush deeper than half the length of its hairs. On flat, vertical surfaces, apply the last stroke of paint in a vertical direction to reduce sagging. Spray gun For larger jobs, we recommend to use a spray gun. Do not use an airless spray for applying stripe coats. Check pressure at nozzle, nozzle size, spray angle and that the filter is clean prior to application. Paint film thickness Consult the TDS for the specified wet and dry film thickness. Too low film thickness gives poor protection and too thick film thickness may result in loss of adhesion, cracking and solvent entrapment. Roller When paint application is done with a roller, use a roller board to assure an even distribution of paint on the roller. Pitted areas should be touched up by brush before roller application. Rollers must be clean. Phenolic rollers with short hair are recommended. Dip the roller often to keep it well filled with paint. Over rolling can cause paint pick up, specially associated with fast drying paint. Finish by rolling in one direction to ensure a uniform finish. IMPORTANT Paint application should not be done under these conditions: During rain, high humidity (above 85%), snow, mist and fog. On surface wet with condensation. Condensation occurs when the steel temperature is below the dew point of the atmosphere. Make sure the steel temperature is at least 3 C higher than the measured dew point. The substrate temperature is under the minimum drying limit of the coating. (Refer to TDS) Untreated or contaminated surface. If dry to recoat maximum painting interval is exceeded or not achieved. (Refer to TDS) 12 13

6.0 STOCK KEEPING Updated manual Be sure to have the Onboard Maintenance Chart and an Onboard Maintenance Paint Guide available in the paint locker at all times. Labeling Label the racks and shelves with the right products. Consulting Always consult the Technical Data Sheet for expiry day of the paint. Be sure to follow first in first out principle to avoid expiration of the paint. Availability Have available a mechanical mixer, spray equipment and good quality brush and rollers. In addition ensure there is a choice of equipment to treat defected areas and suitable detergents. Properly closed To keep product quality and avoid contamination, used/opened paint drums must be properly closed after use. Where two component products have been mixed, leave it to go hard and dispose in the authorized manner. Inventory control Keep count of the ratio stored of A- and B- components for two component products. If the amount of B- components does not correspond with the amount of A-components left in the paint locker at any given time, chances are that the mixing is not correct. Cleaning All equipment, mixers, spray pumps, brushes etc. should be cleaned as soon as possible after use. 14 15

Jotun A/S P.O. Box 2021, N-3202 Sandefjord, Norway Tel:+47 33 45 70 00 jotun.com 8MM0539006/1214/2K metrobranding.no