PIPING IDENTIFICATION AND VALVE TAGGING STANDARD

Similar documents
IDENTIFICATION FOR PIPING AND EQUIPMENT

Facility Operations Physical Safety Guidance Document

MECHANICAL PIPING PAINTING & IDENTIFICATION REQUIREMENTS

A. Shop Drawing submittals shall include, but not be limited to, the following:

DIN 2403 Identification of pipelines according to the fluid conveyed. Marking of pipes according to fluid transported

AUTOMOTIVE LED LIGHT CATALOG

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

G SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years

ENHANCED LABORATORY HVAC SYSTEM

4 Installation Requirements

Innovent LASER Packaged Fresh Air Conditioning Units

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SECTION GENERAL PROVISIONS FOR HVAC WORK

Fire Alarm System Plans Review Checklist Property location Date of Review

CODE NOTES. Insulation Requirements in Commercial Buildings for Mechanical and Service Hot-Water Piping

Mobile Home Pre-Inspection Checklist

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

15430 SAFETY SHOWERS AND EYEWASHES

PERMITS REQUIRED & PERMIT EXEMPTIONS

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

Builder Specifications for Solar Ready Homes

When Should Examination Preparation Begin?

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

Exhibit C Design Review Guidelines

HOW TO INSULATE A CRAWLSPACE

University of Tennessee Safety Guidelines

B. Shop Drawings: Diagram power, signal, and control wiring.

Operating instructions

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

BUILDING PERMIT SPECIFICATIONS

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

Does Wall Township require an inspection by the building department on resale of a home?

Flammable and Combustible Liquids. Slide 1 (of 23)

LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado

Quick response concealed horizontal sidewall sprinkler

SECTION FIRE HYDRANTS

Commercial Semi-Instantaneous Water Heaters

SECTION PIPE HANGERS AND SUPPORTS

Chapter 7 Plumbing Connections

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Compressed Gas Cylinder Safety

How To Get A Building Permit In Florida

Make Your Own SNOWBREEZE AC For Rs.1500 ($30) Can be converted into an energy saving and humidified room heater in winter

Element D Services Plumbing

Digi-Motor Installation Guide

General Information on Starting a Restaurant Business in Alabama

Fire Pump Plan Review March 2010

Cooling Capacity CFM in. w.c. (125 Pa)

Excerpts from the Canadian National Building Code (NBC)

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

How to Prevent Liquid Damage Property Losses

[4] SA1.2 The student demonstrates an understanding of the processes of science by observing,

RayClic Connection System Installation Instructions

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Scope: Communications and Electronic Systems addressed in this section include:

IMPORTANT: BEFORE INSTALLING ANY HEATING TERMINAL UNIT TO A DOMESTIC WATER HEATER, CONSULT THE LOCAL PLUMBING CODES.

Facilities Maintenance Standards rev

FIRING RANGE PHASE 1 DESIGN

Housing Services Guidance for tackling condensation, damp and mould in your home

User Manual. Gas fired condensing wall hung boiler. G.C.N : (12 kw) G.C.N : (18 kw) G.C.N : (24 kw)

OSHA Office of Training and Education 1

Sprinkler Identification Number. Page 1 of 6 MARCH 2014 TFP288. Worldwide Contacts.

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin Inch PowerVent LED Indicator Explanations & Troubleshooting Table

General Fire Code Requirements Within Commercial Tenant Spaces

Chilled Water HVAC Systems

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

MAGNUM Original Sauna Stove 6.6 kw 9.0 kw 10.5 kw MAGNUM Cenik and Lite Sauna Stoves 6.6 kw 9.0 kw 10.5 kw Use and Installation

HomeSpec REPORT SUMMARY

How Ground/Water Source Heat Pumps Work

Recreational Vehicles

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

SunMaxx Solar Filling Station Operating Instructions

BP WIND ENERGY POLICIES AND PROCEDURES

G26 Corp L11 Revised LENNOXOEMPARTS.COM. Service Literature G26 SERIES UNITS

*Trademark of The Dow Chemical Company A business unit of The Dow Chemical Company and its subsidiaries Copyright 2003 The Dow Chemical Company.

Arapahoe County Residential Water Heater Installation and Inspection Guide

SunMor SM-V30 Solar Water Heater Installation Manual

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

1932 Lexington Houston, Texas (713) Recommendations for installation of cooling systems

WHEN IS A PERMIT REQUIRED?

Refrigeration Installation 101

Automatic Door Selection Guide

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

P KILNS BUILT TO LAST DELIVERY AND INSTALLATION CHECKLIST AND ACCEPTANCE FORM FOR HERCULES & EASY-LOAD FRONT-LOADING KILNS

Thermwire. Selection Guide. Freeze Protection Heating Cable. Thermwire -Wrap. Pre-Assembled. Thermwire-Comp. Thermwire-Melt.

Selecting Energy Efficient New Windows in Florida

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

How To Safely Dig For Natural Gas

Transcription:

PURPOSE 1. The general purpose of the Piping Identification and Valve Tagging Standard is to provide a series of guidelines for contractors, A/E s and FM employees to adhere to or follow when labeling piping and tagging valves which are located on the campus of CMU. 2. This Standard is not to be regarded as a specification but merely as a document providing guidance and uniformity in the completion of labeling and tagging in the field. GENERAL 1. Piping and valves shall be painted, tagged and stenciled as described herein. 2. Painting of piping or valves shall also be included in the Painting Division of the Specifications. PRODUCTS 1. All paint shall be suitable for application to the particular type surface in question. 2. Paint for piping and valves shall be approved by CMU project manager. 3. Piping labeling shall be made from temperature sensitive vinyl material and follow the FM Piping Identification Key. 4. Valve tags shall be made from GravoPLY and engraved with information. EXECUTION Pipe Service Labeling 1. All pipes for any service shall be identified as to their service by commercially available, color coded self-sticking vinyl pipe markers. 2. Marking shall include pipe content and direction of fluid flow to include the following minimum requirements: All markers to be in positions that are visible to personnel Marking shall conform to pipe service identification fluid and term Shall conform to the FM Piping Identification Key Shall conform to information as noted on the drawings Shall conform to the FM Terms and Abbreviations Standard Piping both exposed and furred in shall be labeled unless otherwise directed Paint pipe content banding, legend, and flow direction marker near each valve At every point where the pipe or pipe enters and exits through a wall or changes direction On each riser and tee joint At 25 foot intervals on long continuous pipe runs Arrows (flow direction markers) shall point away from content marking, and in direction of flow If flow can be in both directions, apply double-headed arrows. 3. Background Banding (paint) Refer to ANSI Z535.1 Safety Color Code PAGE 1 OF 6

Color Key Fire Protection Red Dangerous Yellow Service Sprinkler Natural Gas Width of color band for outside diameter or insulated pipe and or un-insulated pipe Pipe Diameter Width of Color Band ¾ inch thru 2 inch 8- inch 2-½ inch thru 6 inch 12-inch 8 inch thru 10 inch 24-inch Over 10 inches 32-inch 4. Legend Color of Letters Fire Protection White Outside diameter of insulated pipe and/or un-insulated pipe and height of labeled letters Pipe Diameter Letter Height ¾ inch thru 1 ¼ inch ½ inch 1 ½ inch thru 2 inch ¾ inch 2 ½ inch thru 6 inch 1 ¼ inch 8 inch thru 10 inch 2-½ inch Over 10 inch 3-½ inch * for pipes < ¾ in diameter a permently legible tag is required 5. Waste vent, rainwater piping, and buried lines are not to be labeled 6. The following piping whether concealed or exposed, shall be painted in its entirety. This pertains to outside cover if pipe is insulated. Natural Gas Non-potable Water VALVE TAGS General Information Each tag shall be attached to the valve assembly (do not place tag on valve handle or wheel) by means of steel wire Tag Size: 2 x 3 x 1/8 GravoPLY Tag Color: Color to adhere to FM Piping Identification Key. PAGE 2 OF 6

Tag Information shall be engraved on both sides with the following: a) Line # 1 (Top of Tag): Valve Number All valves shall be numbered consecutively (not by system). b) Line # 2 (directly below Valve #): Service Term and Abbreviation Refer to FM Piping Key or FM - Terms and Abbreviations Manual for service term and abbreviation information. c) Line #3 Operational Information 1. always open 2. normally open summer 3. normally closed summer 4. normally open fall 5. normally closed - fall 6. normally open winter 7. normally closed winter d) Line #4 Valve location Bldg Code valve number Service Abbr. Example: MU-176-CHWR 176 Chilled Water Return CHWR Normally open summer MU-176-CHWR PAGE 3 OF 6

VALVE SCHEDULE 1. Upon completion of the valve tagging, furnish to the owner a complete schedule of all valves installed, this schedule shall include: a. number of the valve b. service controlled c. location of the valve d. space or area controlled by the valve e. color code 2. Install valve schedule on the wall next to the entry door of the mechanical room. Verify location with the CMU project manager. 3. Provide three (3) copies of schedule in loose-leaf form complete with binder and plastic protective envelope for each sheet. The Owner shall provide a template of the schedule to be utilized by the Contractor. REFERENCES ANSI A13.1-1981 PAGE 4 OF 6

FACILITIES MANAGEMENT PIPING IDENTIFICATION KEY revised 4.14.06 SERVICE TERM SERVICE ABBREVIATION ON PIPE INDENTIFICATION COLOR FLOW DIRECTION REQUIRED CHILLED WATER SUPPLY CHWS WHITE on GREEN X CHILLED WATER RETURN CHWR WHITE on GREEN X DOMESTIC WATER COLD DWC WHITE on GREEN DOMESTIC WATER HOT SUPPLY DWHS BLACK on YELLOW X DOMESTIC WATER HOT RETURN DWHR BLACK on YELLOW X HOT WATER HEATING SUPPLY HWHS BLACK on YELLOW X HOT WATER HEATING RETURN HWHR BLACK on YELLOW X LOW PRESSURE STEAM LPS BLACK on YELLOW HIGH PRESSURE STEAM HPS BLACK on YELLOW CONDENSATE RETURN CNDR BLACK on YELLOW X NATURAL GAS G BLACK on YELLOW LOW PRESSURE AIR LP A WHITE on GREEN HIGH PRESSURE AIR HP A BLACK on YELLOW FIRE STAND PIPE FSP WHITE on RED FILTERED WATER RETURN POOL FWRP WHITE on GREEN X FILTERED WATER SUPPLY POOL FWRS WHITE on GREEN X WATER BRINE WTR B WHITE on GREEN WASTE WATER WW GREEN on WHITE VACUUM VAC WHITE on GREEN TOWER WATER TW WHITE OR GREEN WATER CITY WTR C WHITE OR GREEN SNOW MELT HEAT SYSTEM SMHS BLACK OR YELLOW PAGE 5 OF 6

DOCUMENT CONTROL PAGE: Document Published: May 25, 2006 Prepared By: Reviewed By: Approved By: John Latoski / Dan Methner Steve Lawrence, FM operations staff, PEP staff Steve Lawrence Revision History: Date Revision Approved By: PAGE 6 OF 6