1899 CASE STEAM TRACTION ENGINE COMES BACK TO LIFE!

Similar documents
DTU Animal Cart Programme

Do-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow

1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.

TARIFF CODE and updates standard

16 April F Dodge Adjustable Track bar with Relocation Bracket 1

TUTORIAL. REbUILdING. REAR CALIpER O-RING CONVERSION CORVETTE Part #: HT-2

TUTORIAL. REbUILdING. front CALIpER O-RING CONVERSION CORVETTE Part #: HT-1

Power Cube Open Source Ecology Page 1. Power Cube. Version 4

TRANS-05, Torque Tube Removal, Rebuilding, and Installation

Evolution of the Flathead Compiled by Fred Mills

SELF-STEERING AXLE TABLE OF CONTENTS

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Packaged Terminal Air Conditioner Wall Sleeve Installation

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering

Installation Guide for the TJ LCG PRO Suspension System (Low Center of Gravity) Available 4 or 5

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

S&W Race Cars and Components, Inc.

MASTER CYLINDER. Section 2. Master Cylinder. Tandem Master Cylinder. Master Cylinder

TECHNICAL CHARACTERISTICS

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

Build a Trade-Show Booth for Under $200!

AUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District

Chapter 5 - Aircraft Welding

Boiler Plan II Table of Contents

ESTATE WAGON MODEL 300 OWNER MANUAL

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

How to build a Pizza Oven in 4 days

Front axle components, overview

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

TITANIUM FABRICATION CORP.

Hive Top Ventilation Shims

TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion

Wilesco D365, D366, D367, D368, D405, D406 D407, D409 Operating Instructions

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

DO NOT attempt to repair hub and wheel bearing assembly.

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

SPIRAL STAIR KIT INSTALLATION MANUAL

Go-kart for little race-drivers

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

Lamination Production. by: John Roberts / Sko Die, Inc

Dave s Sheet Metal Bending Brake

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

SECTION PIPE HANGERS AND SUPPORTS

How to modify a car starter for forward/reverse operation

Cummins. Remanufacturing. Genuine Performance. Every Time.

Pepper Mill Instructions by Fred Kachelhofer

Best Barns USA Assembly Book

Deluxe Welding Tool Chest

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.


DANA 30 MANUAL HUB CONVERSION KIT

SAMPLE TEST PAPER - I

2. This is a close up of a typical area where the rocker is rusted out leaving holes under where the rocker moulding would be..

SPECIFICATIONS FOR BOON EDAM TOMSED MODEL TUT-65TMB

*Specify Oversize When Ordering

IKG Bar Grating: Anchoring

Clad Direct Glaze Window Installation Instructions

INSTRUMENTATION & CONTROLS VALVE & AUTOMATION EXPERTS VALVE REPAIR TUBE SERVICES

March 14, Installation of Bay, Bow and Garden Windows

SLACK PERFORMANCE KARTS

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

Where to order engine kits The displacer cylinder CONTINUED

1.8 CRANKSHAFT OIL SEALS

CALCULATION & DRAFTING STANDARDS MANUAL PROCEDURE: C&D 515 Bill of Materials Standard REV 0.0 5/6/04

Mobile Home Pre-Inspection Checklist

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

AMC Engine codes -- ALL OF THEM! (By Frank Swygert, Publisher, "American Independent Magazine" (AIM))

James M. Pleasants Company

Engineering & Design: Coordinate Dimensioning

Vehicle Restraint Installation Manual

FOR ANY QUESTIONS, PLEASE CALL M-F 8:00a.m.-8:00p.m. EST. REAR BRAKES 1 AEROSPACE COMPONENTS

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

FLASH TANK ECONOMIZER PRODUCT GUIDE

Owner s Manual Read and keep this manual. Patents World Wide

Part #20195 WORKBENCH BRACKET SYSTEM INSTRUCTIONS

INSTRUCTION BOOK FOR. Lace And Grommet Theater-Type Screens

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

DIY ALL STEEL SHED FRAMES

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

Originators of the Flexible Water Tube design

Maxi-Stamper. 200 to 1,000 Tons STAMPING OUT DOWNTIME

BUILDINGA 1/10 SCALE FLATBED TRAILER

Manual piston sampler...m 11

Alfa Romeo 147 On board instruments installation guide

FRICTION MATERIALS & BONDING SERVICES

Building Pluto Subwoofers with Large PVC Pipe

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Autobody/Collision and Repair Technology/Technician CIP Task Grid

Rehab Inspection Report Page 1

One of the most important parts of our business, is protecting yours. Here s how.

Rebuild Instructions for and Transmission

Compressors Buying Guide

MODEL T200-F18 MODEL T125-F18 Finish Nailers

BODY-12, Door Handle - Removal, Installation, and Adjustment

How to Set Up Corvette IRS Rear Camber (basic do-at-home version)

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL

Gravity Racing Challenge STEM Team Competition Open Class High School Division Car Assembly Plans And Rules

Transcription:

1899 CASE STEAM TRACTION ENGINE COMES BACK TO LIFE! By Jim Tombrink Engine number 7357, an 1899 Case Steam Traction Engine rated at 12 HP was painstakingly restored with a brand new boiler by Ed Litzsinger. The final product is amazing and better than new, but let's start at the beginning. This engine was purchase by Dick Tombrink from Ed Meehan in Roundup, Montana around 1983. The engine was not running at that time. Mr. Meehan had replaced the boiler with a 1906 boiler from Clarence Young, near Ulm, MT. The high pressure cylinder, head, piston, and piston rod in the engine were missing and not to be found. Dick made patterns for a high pressure head, the intermediate head between high and low pressure cylinders, and the two pistons. The patterns were shipped to AFFCO foundry in Anaconda, MT and consequently poured in 1985. The high pressure cylinder was fabricated from pipe and bored to accept a piston cylinder sleeve. The (then restored) steam engine was displayed and run at the Antique Tractor Club annual Threshing Bees from 1986 until 1995. Periodically, the boiler was checked SPECIAL INSERT PAGE 1

with ultrasound thickness testing to determine the thickness of the boiler plate (sort of a health check that would determine the amount of pressure the boiler could safely carry). In 1995, the boiler crown sheet was found to be too thin to operate any longer. The crown sheet is the part of the boiler that is the pressure boundary between the boiler and the top of the firebox. Engine number 7357 was retired and ended up in the far corner of the shop. Over the years, it was discussed what would the future be for this steam engine. Dick did not want to sell it to anyone with the premise that it was a running engine since the boiler was not serviceable. It could have become a static display somewhere to never run again, but hesitation to let this engine rest prevailed. Fate had other plans for Engine number 7357 in the sleepy corner of the shed as the passing time turned into our friend. A NEW OWNER Ed Litzsinger has long been a boiler repair man and has his own shop in Billings, MT (E.L. BOILER WORKS). As the antique steam bug had bitten him, the only remedy was to own one. Ed looked for an engine for some time and I do know he had tried to purchase another engine but the owner wouldn't sell. Ed realized that a good steam engine with a good boiler with an owner willing to sell is rare these days. Owning a boiler shop, an impossible project for most of us would not scare Ed away. Ed purchased this Case Traction Engine from Dick in May 2011. SPECIAL INSERT PAGE 2

THE RESTORATION Ed started on this engine in October of 2011. Many nights, weekends, slower times in the boiler shop, in between jobs; all were dedicated to seeing this engine run again. Perseverance finally paid off as the engine was finally finished in 2013 with about 18 months of work into it. Ed described the project as, "A lot of work.fun WORK". A new boiler was fabricated (saving and reusing the steam dome on the existing engine) and welded which is usually the stumbling block unless you have a bigger checkbook to hire someone else to do it. Ed stated that after building a boiler and only having materials and hours from his crew into it; his labor not counting; it is easy to see why a new boiler is 40 to 50 thousand dollars. The new boiler had all welded stay bolts (bolts in the boiler to retain the flat areas flat when the boiler is under pressure). Since a new boiler was being built, Ed chose to upgrade the boiler metal thickness from the original factory 5/16" to 3/8". The stay bolts were upgraded from the factory 3/4" to 7/8" diameter. The original crown sheet was 5/16" and was upgraded to a thicker 3/8". Thirty new SA 178 Grade 8 tubes were installed, cut to length and rolled into place. The tube sheet on both ends of the boiler (supporting the boiler tubes) was also upgraded to a thicker 1/2" material. Larger hand holes (3" x 4") were incorporated in the new design to allow for easier access and proper clean out of the boiler during downtimes. The new boiler was degreased with an external boiler supplying the steam to clean it out. SPECIAL INSERT PAGE 3

A new firebox was built and inserted from the bottom of the boiler (just like they did in the Case factory in 1899). The new firebox had to be welded in as well. New grates for the firebox were poured in Wisconsin and delivered to Billings to support the future fires in this boiler. SPECIAL INSERT PAGE 4

The engine was mounted 5 or 6 times on the boiler to ensure that holes were drilled in proper places and everything would line up. The critical part of engine mounting and alignment was finding reference points to work from and maintain proper dimensions. This also helped to keep the engine level on the boiler. "Level, plumb and square" as Ed puts it. New wing sheets (plates that carry the engine and tie it to the boiler) were built. The gear alignment from the engine through the intermediate and to the bull gears on the wheels was shimmed to ensure everything was in alignment. The front steering saddle needed new steel tied to the cast iron. This was achieved with nickel rod welding. The large rear axle links on each side of the engine were custom cut with a water jet. The smoke stack was installed and preheater mounted. Finally high temperature paint, good to 425 degrees F was used to paint the new boiler and engine. For the finishing touch, Ed brought someone in to paint the Case eagle on the smoke box door. During the entire process, an AI (authorized inspector) was out frequently to inspect every tack and weld on the boiler. The boiler was hydro tested (pressure tested with water) to 225 psig (1 ½ times working pressure). The boiler thickness was checked with an ultrasound thickness meter in many locations and recorded to satisfy the state boiler inspector and provide an as built report to verify metal thicknesses for pressure ratings. The 3/8 boiler calculations (leaving out the older 5/16" steam dome) would have SPECIAL INSERT PAGE 5

allowed for a boiler pressure of 538 psig. Ed wanted the extra thickness as a buffer for the corrosion that happens over time and this boiler will most certainly last longer than any of us writing (or reading) this article. A new 140 psig safety was installed. The final R stamp was given on March 14, 2013. SPECIAL INSERT PAGE 6

Finally this engine was first steamed (with out wood) using another boiler to supply the steam to it. The engine ran flawlessly and no boiler leaks detected. Ed wanted to see how low of a pressure the engine itself would operate. Ed reported that he ran the boiler down to 6 psig before the engine stopped turning. That is good indication of the health of the engine. This engine will be displayed again with new boiler, repairs, and paint at the 2013 Threshing Bee on August 17 th & 18 th. Please feel free to come out and welcome this engine back to life. As a final act of kindness, the old boiler was not scrapped. Ed turned it into a cutaway boiler for educational purposes and it now resides at the Tractor Club grounds for those interested in what the inside of boiler looks like. Looking back at all of the time, money, and efforts; Ed stated, "I'd do it again, it's challenging". SPECIAL INSERT PAGE 7