Hydraulic free standing tower for WTGS. Installation guide for tower and foundation

Similar documents
Pallet Jack. OWNER S MANUAL Model MH1230. Important Safety Instructions Assembly Instructions Parts and Hardware Identification

HYDRAULIC LIFT TABLE CART 2200-LB.

HYDRAULIC TABLE CART 500-LB.

Mini Pallet Jack OWNER S MANUAL

1 TON FOLDING CRANE CFC1000

2740 Whitten Rd Bldg 103 Memphis, TN Telephone

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

Embedded Parts Introduction - Anchors

REPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL)

IMPORTANT INFORMATION - PLEASE READ. Table of Contents. Introduction. General Information

TITAN 13 x 2 ½ BRAKES

Volkswagen B3 Passat Manual Transmission 02A 34 Manual Transmission - Controls, Assembly (Page GR-34) 02A 5-speed. Gearshift cable/lever installing

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

VS4760.V2. Instructions for: Diesel Engine Setting/Locking Tool Kit Renault dci Engines. Model No: 1. SAFETY INSTRUCTIONS

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)

Oregon Fuel Injection

MIC-WKT and MIC-WKT-IR

JANUS INTERNATIONAL CORPORATION INSTALLATION INSTRUCTIONS Pantheon Mini Operator

Installation, operation and maintenance manual

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual

R O A D M A S T E R, I N C.

R O A D M A S T E R, I N C.

Deluxe Welding Tool Chest

R O A D M A S T E R, I N C.

Owner s Manual Gantry Cranes

2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13)

ZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3.

Installation Manual. BYD Wall-mounted AC Charging Box

RATCHET RELEASE SHACKLE

Operating Instructions Parts List Manual Scissor Lift Pallet Truck

Owner s Manual Read and keep this manual. Patents World Wide

Flat Bottom Long Ram Hydraulic Jack

10 TON HYDRAULIC PRESS

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

R O A D M A S T E R, I N C.

R O A D M A S T E R, I N C.

INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS

specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST CHEVROLET PICKUP

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page

HAIR CLIPPER. Model No. HC5150 HC

Original Assembly Guide

Parts#MB Reverse Gear MAMBA (Monoblock for Cable operated) For 5 speed Trans., '87 to '06 Big Twin models (except '06 Dyna)

P7100 PUMP INSTALLATION INSTRUCTIONS Diesel Care & Performance Inc

In-Ground Basketball System Owners Manual

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

OPL BASIC. Dosing System for Professional Laundry machines. Contents

Assembly Instructions for the InteliTrack 3000 Rail Tracking System

OPERATING INSTRUCTION MANUAL FOR S-240 HYDRAULIC CUTTERS WITH PARTS LIST

Installation Instructions For Slider Casement Air Conditioners

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale

Multi-Pitch Pitching Machine USER MANUAL

1000-LB. TRAILER JACK OWNER S MANUAL

Fish Grader User Manual

Service Manual Rol-Lift

EZ-48-3AB Weather Station Mounting Tripod and Mast

HYDROFOK (Cable & Tube Blowing Machine with Hydraulic Power Unit)

1 DESCRIPTION OF THE APPLIANCE

Cooling system components, removing and installing

Number Wheeler P/N Description Set Rex P/N Notes Base 1 J Support, Right 1 J Support, Left 1 J Nut (M8)

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 46 Brakes - Mechanical Components (Page GR-46)

POLE MOUNT SYSTEM EX-3 INSTALLATION

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions

Cooktop Low-Profile Ventilation Hoods

Chapter 10 - Scaffolding Systems

Dismantling and Reassembly Guide

EC DECLARATION OF CONFORMITY FOR MACHINES

Fuel Injection Pump, Rotary ( )

R O A D M A S T E R, I N C.

PEDAL CAR - GO CART ASSEMBLY & OPERATING INSTRUCTIONS

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)

RE-3 : SOLID TOP RANGE RANGE TOP ONLY

SureSite Magnetic Liquid Level Indicator

Installation Instructions

Installation Guide for the TJ LCG PRO Suspension System (Low Center of Gravity) Available 4 or 5

Rebuild Instructions for and Transmission

Remote Head REMO ONE. Code Manual

15GAL STEEL OIL DRAIN WITH 110V PUMP

Instructions and precautions. Fork Height. Visit our website at:

Mini multi-purpose sewing machine

MP8000 Series Pneumatic Valve Actuators

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: No.: SE-...

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Fiberstars Lighted Laminar Flow Fountain Installation Manual

Table of Contents WARNING SYMBOLS AND DEFINITIONS

BUNK BED. Model No.: DA3797E - Espresso DA3797P- Pine. UPC CODE: (Espresso) (Pine) NOTE: Lot number: Date of purchase:

Time needed: ~3h for lid replacement only. Add 1h for operation harness in lid and ~2h more for installing drive unit and cable harness in trunk.

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: & OPERATING & MAINTENANCE INSTRUCTIONS GC04/12

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

Series Hose Reels

R O A D M A S T E R, I N C.

R O A D M A S T E R, I N C.

1 Ton Telescoping Gantry Crane

Welding Reel ERA 4000 Service Manual

Alfa Romeo 147 On board instruments installation guide

Assembly and Usage Instructions

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27A

Transcription:

Hydraulic free standing tower for WTGS Installation guide for tower and foundation

Warnings: This guide has been carefully checked by engineers of Yangzhou Shenzhou Wind-driven Generator Co., Ltd. Please excuse from specification alterations without notice. It is required to comply with the local law, regulation or the permission from local government before installing WTGS. Only under no wind weather should proceed with the installation, maintenance and dismantling of WTGS. Color or figuration of pictures might be varied against physical goods. Project of tower installation should be carried out by professional builder. Please pay attention to safety during installation. Please do not dismantle the inner structure of wind turbines until get any instructions from us. Any personal actions without our hints to dismantle should be excluded from the rights of warranty. 2

Contents Summary for WTGS hydraulic free standing tower ------------------------------------------------------------------ 4 Parameter ------------------------------------------------------------------ 5 Foundation blueprint for 500W-2000W hydraulic tower ----------------------------------------------------------------- 7 Foundation blueprint for 3KW-10KW (12M) hydraulic tower ---------------------------------------------------------------- 8 Foundation blueprint for 3KW-10KW (16M) hydraulic tower ----------------------------------------------------------------- 9 Foundation concrete placement ---------------------------------------------------------------- 10 Tower assembly ---------------------------------------------------------------- 11 Applications & cautions for hydraulic tower system ----------------------------------------------------------------- 14 Tower lay-down ----------------------------------------------------------------- 17 Maintenance ----------------------------------------------------------------- 19 3

1.Summary for WTGS hydraulic free standing tower Hydraulic towers, developed by Yangzhou Shenzhou Wind-driven Generator Co., Ltd (Named SWG in short),are applied to wind turbine generators from 500W to 10KW. Compared to the traditional guy cable tower, hydraulic tower enjoys the advantages of handsome exterior and taking small room (burdensome steel wires); Compared to the traditional tapered tower, the most outstanding merit for hydraulic tower is that wind turbine generator can be erected and laid down automatically through the appliance of hydraulic system to achieve installation and maintenance. So there is no need the cooperation of the crane, which will save the installation and maintenance cost to a great extent. Composed by three sections of steel pipe with different diameters, the hydraulic towers are supplied by tower base, hypo-cylinder, and hydraulic pump. Flanges are welded to the both sides of each tower for connections. Tower base will be placed on the foundation. Currently there are two models of hydraulic tower available, namely, manual hydraulic tower (8M) for 500W~2KW wind turbines and electric hydraulic tower (12M) for 3KW~10kw wind turbines. Notes: 16M electric hydraulic tower is also available for 3KW~10KW. 4

2. Parameter table Model Code No. in pic. 1 500W-2KW hydraulic free standing tower 3KW-10KW hydraulic free standing tower(12m) 3KW-10KW hydraulic free standing tower(16m) Height( m) - 8 12 16 Section No. - 3 3 3 Upper section Height (m) 2 4 4 parameter Diameter (mm) 114 325 325 Thickness (mm) 4 6 6 Middle section Height (m) 3 4 6 parameter Diameter (mm) 219 480 480 Thickness (mm) 5 8 8 Bottom section Height (m) 2.4 3.4 5.4 parameter Diameter (mm) 325 630 630 Thickness (mm) 6 8 8 Tower base Height (m) 0.6 0.6 0.6 parameter Diagram - Weight( kg) - 360 1408 2051 5

Upper flange(connectin g generator) Bottom flange(placed on foundation) C1( mm) 150 310 310 C2( mm) 120 200 200 C3( mm) 90 160 160 T1( mm) M12 M16 M16 N1 6 12 12 C4( mm) 500 940 940 C5( mm) 430 770 770 C6( mm) 326 635 635 T2( mm) Φ27 Φ40 Φ40 N2 12 14 14 Pic.1 6

7

8

9

6. Foundation concrete placement Dig the hole according to the tower foundation diagram and enlace or weld the re-bars by flat steel based on the collocation measurement of re-bars, and then put those re-bars into the hole and start to place the concrete after well collocating the re-bars. C25 concrete is suitable for the tower foundation. Vibrating spear can be used to thicken the concrete when placing concrete foundation. The concrete volumes, required to the above three kinds of tower, will be 1.6CBM, 7CBM and 7CBM respectively. 10

7. Tower assembly There are flanges on either side of each section of towers. Connect each section by bolts according to the diameter in turn. Please refer to Pic.2. Pic. 2 After assembling the tower, please position the tower base on the foundation (hypo-cylinder base should be positioned on the foundation when installing hydraulic tower for 3KW~10KW) Calibrate the flange plane by leveling instrument, and screw the bolts. Assemble the tower base and the assembled tower by the axis pin through manual forces or appliances such as hand pulling block or suspending bracket. The axis pin should be well positioned in case of falling off. And then adjust the height where placing the tower. For manual hydraulic tower of 500W~2KW wind turbines, the hypo-cylinder should be positioned 11

between tower and tower base by axis pin (please refers to the following Pic. 3). Pic. 3 For electric hydraulic tower of 3KW~10KW wind turbines, the hypo-cylinder should be positioned between tower and hypo-cylinder base by axis pin (please refers to the following Pic. 4). Notes: Before officially installing wind turbine and tower, a test of erecting and laying down tower should be proceed. Position the upper section of the tower on a wooden stand with its height 1~1.5M, and 12

connect the wind turbine to the tower (please refers to the uses manual for the wind turbines). Please also refer to the following Pic.5. Pic. 5 13

8. Applications & caution for hydraulic tower system Be prepared to connect the hydraulic system after successfully assembling tower and tower base. 8.1 Manual hydraulic system 1) Please screw the adaptor on the hypo-cylinder screws, (please refer to the following pic.). 2)Insert the oil tube plug of the hydraulic pump into the hypo-cylinder (please refer to the following pic.). 3)Please infuse the oil into the hydraulic pump; please operate according to the proceeding of hydraulic pump. 14

4 Position the reversing lever on the positive gear Caution: various ways of connecting oil tube will be varied from its positive gear, if the tower can not be erected placed in this gear, please try another gear. 5 Press the lever repeatedly, the tower will be erected as hypo-cylinder elongates gradually. It will take roughly 30 minutes to finish the process. Caution: Shift gears forbidden during tower erection. 15

6 Connecting the tower and tower base by bolts after tower erection, and grease the bolts and nuts to a certain extent. 8.2 Electrical hydraulic system 1 Connect the oil tube of hydraulic pump to the hypo-cylinder. 2 Infuse the hydraulic pump by oil 3 Make sure that the reversing lever is in neutral position, and power the hydraulic pump by connecting three-phase electricity or by the gasoline engine. 16

4 Position the reversing lever on the positive gear, and the hydraulic pump will starts to work with hypo-cylinder elongates gradually to erect the tower. 5 Connecting the tower and tower base by bolts after tower erection, and grease the bolts and nuts to a certain extent. 9. Tower lay-down Choose a windless day to lay down the tower and prepare a wooden stand (the same as the installation) 1. Disconnect electric connection and make the wind turbine stop working, please refer to users manual for wind turbines. 2. Connect the hydraulic system and make sure that axis pin and hydraulic circuit are installed correctly. 3. Screw out the bolts between the tower and the base. 4. Lay down the tower. 4.1 Manual hydraulic system 4.1.1 Position the reversing lever of hydraulic pump to the gear in reverse. 17

4.1.2 Press the lever to lean the tower. When the gravity incline exceeds pivot (about 20 degree), the tower will fall down automatically, at this time put the reversing lever in positive gear quickly in case that the tower falls down due to gravity forces. Move the reversing lever to the positive gear; lay down the tower slowly by controlling velocity of flow. 4.2 Electrical hydraulic system 4.2.1 Please position the reversing lever of the hydraulic pump to neutral gear. 4.2.2 Connect the hydraulic pump with power supply, and then pull the reversing lever to the reverse. 5. 18 Lay down slowly the tower with turbine to lean over the wooden stand.

10. Maintenance 1. Please check the bolts per year to see whether they are rusty or loose. If so, please replace them immediately. New grease should be covered on the bolts per year. 2. To avoid from any unpredictable loss we suggest laying down the tower before the coming of storm or any adverse weather. Yangzhou Shenzhou Wind-driven Generator Co.,Ltd Address: Xinhe Industrial Park, Xiannv Town Jiangdu City, Jiangsu Province, China Postal code: 225267 Phone: 0086-86292873/86290068 Fax: 0086-514-86290873 URL: www.f-n.cn URL: www.china-swtgs.com 19