LMI AEROSPACE FAI REPORT AS9102(B) GUIDELINE 2015

Similar documents
SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS

First Article Inspection (FAI) Training

Supplier Quality Assurance Requirements Manual

Q2A First Article Inspection (FAI) AS9102

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

Supplier Quality Requirements Manual SQRM

Purchase Order Clauses and Conditions

INTRODUCTION: PURPOSE:

Helical Products Co., Inc.

ATTACHMENT "Q" PURCHASE ORDER QUALITY CLAUSES

First Article Inspection 9102B Updated FAQs Page 1 Revision Date: 19-FEB-2015

UNCONTROLLED COPY FOR REFERENCE ONLY

Supplier Requirements Manual M M 0 3

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Quality Control Procedures QCP 5.4 Page 1 of 5

Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

QP-740. Supplier Management Handbook

AS9100 Quality Manual

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

Supplier Quality Assurance Requirements Manual

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

Gulfstream Production Certificate Operations

TECHNICAL BULLETIN SUBJECT: AFT FUSELAGE BULKHEAD AT FS 231.4, INTRODUCTION OF.

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

Specifications for Programs: 737, 747, 757, 767, 777, 787

Self-Audit Checklist

How To Ensure Quality Assurance

Standard Operating Practice S.O.P. No

Surgi Manufacturing Quality Manual

Supplier Quality Requirements and Clauses

GLOBAL AEROSPACE PROCEDURE

Quality Management System General

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

ISO/IEC QUALITY MANUAL

VENDOR QUALIFICATION APPROVAL FORM

Specification for Rotary Drill Stem Elements

QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER

TITLE: Control of Software

Product Order Quality Requirements Meggitt (Orange County), Inc.

How To Manage A Plant

PERFORMANCE EXCELLENCE Procurement Standards

Chandler-Arrow Division Arrow Supplier Quality Requirements

SPECIFICATION Aluminum Module Frames. Allowed anodization before fabrication for clear frames.

Pacific Gas and Electric Company

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Acceptability of Printed Circuit Board Assemblies

AEROSPACE QUALITY MANAGEMENT SYSTEM STANDARDS - AS 9100 SERIES., 28/1/2005 S.Lichtenstein 1

Supplier Quality Requirements F16 Program

Quality Assurance Provisions

Bogue Machine Company, Inc. Business Instruction

Cartel Electronics. AS 9100 Quality Systems Manual

Quality System Manual

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

Supplier Quality Requirements (SQR) for External Process and/or Product Providers

DWG 001. Blueprint Reading. Line Standards Drawing Symbols. Instructor Guide

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

Supplier Quality Assurance


PFMEA Process Failure Mode and Effects Analysis. James Davis, General Dynamics

Quality Management System Manual Revision L

Doc Edition Section Question Answer Q1 9th /

REV G D Boeing Partner Network REFERENCE ONLY Copy 1 of 15

Fokker Aerostructures B.V. Quality Procurement department

Mechanical Installation

3.1 It is the responsibility of the Supplier to obtain current copies of non UTC documents noted below at

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ PHONE: (520) FAX: (520)

Manufacturing, Supply & Quality Plan for Tower Bolts. SL Tower Bolt Market Penetration

STEEL fabrication quality SySTEmS guideline

BOEING DEFENSE, SPACE AND SECURITY ST. LOUIS REQUIREMENTS FOR SUPPLIER MATERIAL REVIEW AUTHORITY (MRA) Revision date 14 May 2010 Revision Letter D

LYCOMING O-360. Engine Installation

This Business Management System Manual is based on ISO 9001:2008 requirements

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

SOLDERING PROCEDURE SPECIFICATIONS PROCEDURE QUALIFICATION RECORDS. and SOLDERER PERFORMANCE QUALIFICATION RECORDS

Quality Supplier Requirements for Beckwith Electric Co., Inc.

SUPPLIER QUALITY SYSTEM AUDIT

Purchase Order Clauses

Quality Assurance Manual ISO 9001:2000. Uncontrolled copy

NOTE WARNING. Electric Leveling Motor Brake Replacement Instructions ELECTRIC LEVELING MOTOR BRAKE REPLACEMENT INSTRUCTIONS. Content.

Quality Control Procedures QCP 13.0 Page 1 of 6

Essentials Welding QA/QC Plan Sample

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Camar Aircraft Parts Co. Procedures Manual

QUALITY CONTROL MANUAL

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Acceptance Codes APPENDIX - A. Acceptance Criteria

Delegated Quality Actions Requirements KJ-14. Compiled by: Responsible for the Process: Approved by: Filip Zieliński

Transcription:

LMI AEROSPACE FAI REPORT AS9102(B) GUIDELINE 2015

/ (c) 636-288-7139

NET-INSPECT Go to www.netinspect.com Put in your User ID information and hit Sign in

NET-INSPECT Put in your User ID; Password and Company and hit Log in.

NET-INSPECT Click on First Articles

NET-INSPECT Click on Generate/View First Articles Click on Generate E-First Article Report

NET-INSPECT LET S GET STARTED

FAI Objectives Provide objective evidence of compliance to AS9102B and customer requirements Strive for a more consistent FAI process across all LMI facilities Reduce questions and confusion, relative to completing FAI documentation Eliminate Customer rejections/returns of FAI packages

STANDARD GUIDLINES Standard FAI Guidelines Do not combine detail and assembly requirements on one FAI. Even if it is built on the same router, you must complete a Detail and Assembly FAI separately All internal LMI FAI packages will need to be either stored in OnBase or uploaded to Net-Inspect

Form 1 Guidelines The FAI is about TRACEABILITY Proof of compliance to specific Standardized and Customer requirements. All information should be documented in order to provide a level of confidence that the requirements have been fully enacted. Form 1 is utilized to capture the details of a subassembly or assembly. Only Modified hardware is to be placed on Form 1 Standard hardware (non modified) is to be placed on Form 2.

Form 1 Guidelines Box 1: Part Number Part Number of the Detail, Assembly or Kit per PO line item. Box 2: Part Name Name of the Part as shown on the Drawing or PO line item. Box 3: Serial Number Serial Number of the part, as assigned by the Customer or Organization if applicable. Box 4: FAI Report Number Unique FAI Report Number required on all forms in Box 4 if not created in Net-Inspect. (i.e. shop traveler, work order, etc.) NOTE: N/A if not applicable. Sheet Number: This field is auto generated in Net-Inspect

Form 1 Guidelines Box 5: Part Revision Level Parts List Revision Revision should be recorded as listed on Engineering Parts List. (See FAI Appendix for specific Customer Requirements) Box 6: Drawing Number Record the basic drawing number, sheet number and/or authority dataset file name associated with the FAI part. There may be multiple base drawings (part and spray dot) list all that apply. Include any build-to standard drawing(s). Include any DL, MPL, etc. Box 7: Drawing Revision Level Record Eng. Document revision level. There may be multiple base dwgs (part and spray dot) list all that apply. Box 8: Additional Changes Record supplemental Engineering document no. and revision or condition of Supply Document and revision that are incorporated in the product but not reflected in referenced Drawing/Part Revision level.

Form 1 Guidelines Box 9: Manufacturing Process Reference: The work order number (release/work order number or router number) will be entered here. See Appendix for Customer Requirements Box 10: Organization Name Name and address of the site performing the FAI. Box 11: Supplier Code Supplier Code is a unique number assigned by the Customer. It is sometimes referred to as Vendor Code, Vendor Identification Number, Supplier Number, etc. Box 12: P.O. Number Customer Purchase Order Number, PO Revisions (if any) PO Line Item Number and if applicable, the contract no.

Form 1 Guidelines Box 13: Detail Part or Assembly FAI: Check as appropriate Box 14: Full FAI or Partial FAI: Mark as applicable For a partial FAI list original FAI Part Number and Previous Revision. List the Reason for the Partial FAI BOX 15, 16, 17, 18 These sections are required ONLY if Assembly FAI is checked in Field 13. NOTE: Net-Inspect will not allow you enter anything in these boxes if Partial Detail FAI is checked.

Form 1 Guidelines Box 19, 20, 21, and 22 Net-Inspect will automatically fill in these boxes when you sign and submit the FAI to the customer. Creator Signature and Reviewed by Signature may be the same. Box 23 and 24 These boxes will remain open until the customer Approves and Sign the FAI electronically on their end.

Form 2 Guidelines Form 2 will capture materials (Including Standard Catalog Hardware), processes and functional testing applicable to the first article part or assembly. These processes are to be listed in chronological order as they appear in the manufacturing process. Form 2 shall address all materials, processes and specifications where the resulting output cannot be verified by subsequent monitoring or measurement. Process Codes are NOT the same as Finish Codes. Column 7 of Form 2 is for the Codes associated to Special Processes. Example: Boeing s Finish Code F-18.05 is for a sealed Chromic Acid Anodize Finish, in accordance with BAC5019. This is a Special Process, coded as 304 in Boeing s D1-4426. The Code 304 is what should be entered under Column 7 of Form 2. The Finish Code F-18.05 also calls for primer application per BAC5736. This is not a Special Process, therefore N/A would be entered under Column 7 for the Primer. For verification of the application of the finishes, the Finish Code (F-18.05) would be bubbled and recorded on Form 3. The Part Mark specification/requirement will be bubbled and recorded on Form 3. After all materials and processes have been documented, enter N/A in to each of the fields on the next line to indicate that there are no additional entries.

Form 2 Guidelines If a substitution material and/or process is used per customer substitution documentation, that substitution MUST be recorded on Form 2. Evidence of traceability between the material cert and work order / traveler should be maintained and furnished. Material requirement contained in engineering definition should be reflected on the material certification. EXAMPLE:.200 sheet AMS-QQ-A-250/12 When Engineering requires Heat Treatment and / or Aging Both Heat Treat and Age condition(s) are to be recorded on Form 2 as a Special Process in accordance with Customer Approved Supplier Processor List (ASPL). It is not necessary to record test results on Form 3, however, a reference to the certification should be included. In both cases, Form 3 needs to reflect testing requirements and results or reference to the Special Process Certification

Form 2 Guidelines Box 1, 2, 3 & 4 and Sheet Number(s): Net-Inspect will automatically fill in these boxes for Form 2. Box 5: Material or Process Enter the name of the material used and / or the actual process performed. For metallic material, include alloy (2014, 2024, 7075, etc.) temper, or condition of the material with the following annotation example: 7075-T3511 Aluminum Include all materials that are incorporated into the FAI part, (e.g. weld / braze filler, sealant, etc.) and Standard Catalog Hardware (e.g. AN, MS Fasteners) do not include processing material such as acid etchants. NOTE 1: Report Grain Direction (where specified in Engineering) and material thickness on Form 3. NOTE 2: All MODIFIED Standard Catalog Hardware / COTS goes on Form 1.

Form 2 Guidelines Box 6: Specification Enter material or process specifications number (include permitted alternates, if used and its governing document), Class and material form (e.g. sheet, bar, etc.). At a minimum, identify all specifications that are called out directly on the build documentation (Engineering Drawing). Box 7: Code Enter Customer assigned material or process code when applicable. NOTE: See Appendix for applicable customer requirements. If none required, list N/A.

Form 2 Guidelines Box 8: Supplier Code Customer given Supplier code of the organization / address performing special process or supplying material, as applicable. Record the customer assigned supplier code number found in the Approved Supplier Processor List (ASPL) of the applicable customer. Box 9: Customer Approval Verification Indicate YES if the special process or material source is to be approved by the customer. Enter N/A if customer approval is not required. NOTE: DO NOT enter NO. Box 10: Certificate of Conformance Number Number of the Certificate (e.g. special process completion cert number, raw material test report number, heat lot number, standard catalog hardware compliance report number, PO number, traceability number).

Form 2 Guidelines Box 11: Functional Test Procedure # Complete if a Functional Test Procedure is called out as Design Requirement. Box 12: Acceptance Report Number The functional test certificate indicating that test requirements have been met. NOTE: Enter N/A if no data. Box 13: Comments Enter Comments as applicable. Box 14, 15: Prepared By and Date These are Auto Generated in Net-Inspect once the FAI has been saved / Signed.

Form 3 Guidelines Unidimensional features will be supported by CIS/MBD and must show evidence of QA validation. All dimensions shown on drawing face must be bubbled and reported on Form 3. (Referenced Dimensions are NOT required, but may be bubbled see Customer Requirements) Stock Material and Temper should be included on bubbled print and included on Form 3; also, verify any feature you are milling. All GD&T controls will be bubbled on drawings and reported on Form 3. This also applies to the supporting BASIC dimension, UNLESS it is reported via the CMM report attached to the FAI. Engineering established Datum Systems and/or targets must be demonstrated in CMM alignment reporting. CMM report coordinate data must be reported in the same format as the coordinate system established by the Model as required. Non-modified features of extrusion drawings shall be recorded on Form 3.

Form 3 Guidelines When attaching a nut plate to a detail, bubble and record: Hole to Hole dimensions (required in the nut-plate spec) Rivet attach hole diameter with countersink size Applicable for detail parts For assemblies, recorded as the flushness requirement. All reportable dimensions for installed rivet (requirements are found in the installation spec.). Be aware of restraining requirements for datum. When recording the results, if there are two requirements for a particular characteristic number; there should be two results listed: This can be accomplished by creating a line item for each requirement OR You can click the add more results button in Net-Inspect on Form 3

Form 3 Guidelines Box 1, 2, 3 & 4 and Sheet Number(s): Net-Inspect will automatically fill in these boxes for Form 3. Box 5: Characteristic Number Unique assigned number for each Design Characteristic. Must correlate with the bubbled engineering characteristics. Box 6: Reference Location Location of the Design Characteristic (e.g. drawing zone, page number and section, specification, etc. If the Eng. Is divided into zones, it is required by all our customers to list the sheet and zone the characteristics falls in. It is also required to provide the cutout view label when applicable. SEE NEXT SHEET FOR Box 6 Examples.

Form 3 Guidelines Box 6: Reference Location Note: If the engineering is divided into zones, it is required by all of our customers to list the sheet and zone the characteristic falls in. It is also required to provide the cutout view label when applicable. EX: Sheet 2, Zone B3 would be listed as 2B3 EX: Sheet 4, Zone E2, Cutout View would be listed as 4E2A-A Specification controlled features like lightening holes or beads should list the specification that controls the feature EX: A hole called out as SS5100-4 on sheet 1 zone C5 should list SS5100-4 for the dimensions specific to the spec and for location of the hole itself note 1C5 For characteristics that extend past one particular zone, list the range on the drawing If the engineering is not divided into zones, at least provide the sheet number on which the part is shown. EX: For characteristics defined by designed tooling, try to list the drawing zone if possible. If not, list the tool used to inspect that feature. EX: For characteristics that originate from the PO, list PO.

Form 3 Guidelines Box 7: Characteristic Designator Key, Flight Safety, Critical, Major Characteristics as defined by the Customer. NOTE: N/A if no data Box 8: Requirement Specified requirement for the Design Characteristic (e.g. drawing dimensional characteristics with nominal and tolerances included, drawing notes, specification requirements, etc. EX: A flag note in the PL states that flange heights should be within +/-.01 The flange height S/B.75; The requirement in the Fai should then be written as.75 +/-.03 For tooling controlled features (MTX, form block, set-back router jig, etc.) list the tool used to inspect and list the tolerance afterwards. Ex: Contour per HPB ±.03 Ex: When a single design that applies to multiple characteristics may be recorded as one characteristic number. 5X.098 -.103.25R TYP NOTE:. Any general notes or flag notes for a specific dimension or feature should be listed on Form 3. It is acceptable to reference back to Form 2 for special process results. Notes that do not apply to the FAI part should be listed on Form 3 as N/A and may be grouped on one line.

Form 3 Guidelines Box 9: Results List measurement(s) obtained for the Design Characteristics. All measurements shall be listed in the same units of measure as indicated on the drawing. For Multiple Characteristics list each characteristic as individual values or list once with the minimum and maximum of measured values attained. If a characteristic is found to be non-conforming then that characteristic must be listed separately with the measured value noted. Ex: A.75 flange running.72 at bottom and.76 at top should be listed as.72 to.76. If a Design Requirement requires verification testing, then the actual results will be recorded on the form. If a laboratory report or certificate of test is included in the FAIR, then these results need not be written on the form, record PASS OR FAIL in Box 9 and add See Form 2 in Comments Blk. The laboratory report or certificate of test must show specific values for requirements and actual results. For metallurgical characteristics with visual verification requirement that are rated against standard photographs, color chip or surface chip, list the photo number of the closest comparison. A statement of conformance is acceptable (record the reference number in this field). For processes that require verification per Design Characteristic, include statement of compliance (e.g., certification of compliance, verification indicator such as accept., etc.). Ex: For MTX and tool controlled features the statement is started in block 8. Block 9 should note within and a range such as, 01 to.015. For part marking, ensure that marking is legible, correct in content and size and properly located, per applicable specification. For attribute data, use the verbiage pass or fail to record the result.

Form 3 Guidelines Box 10: Designed Tooling If a specially designed tool(including NC programming) is used as a media of inspection, record the tool identification number. This does not include standard measurement hand tools Box 11: Non-conformance Number Record both the customer and internal LMI nonconformance document reference number if the characteristic is found to be non-conforming. A delta FAI for the non-conforming characteristic(s) will be required on the next run of parts. Box 12, 13: Signature / Date These will be auto generated when signed and submitted. Box 14: Additional Data / Comments This field area is reserved for optional fields as deemed necessary by the organization. Add additional columns as required by the Organization or Customer. (See Unique Customer Specific FAI Requirements )

CMM Report Guidelines Identify CMM reports to reflect the FAI Report Number, Drawing Number, Revision, Model Release, and Manufacturing Process Reference. Create report headers that clearly identify each point group targeting a specific part feature or characteristic including Datum or targets used for alignment, all GD&T controls and supporting BASIC dimensions. Consider use of drawing identifiers as reflected on the Engineering to tie the maps and CMM reports back to the Engineering. Provide specific Point Maps if required (See Unique Customer Specific FAI Requirements A sufficient number of mapped views should be provided to illustrate point placement for features and surfaces inspected. Maps are to be clearly labeled including alignment points to the drawing established Datum System. Datum or target origin X, Y & Z values identified on Engineering, must be clearly identifiable on report and alignment maps. Maps do not need to show or list every point taken in the report, but do need to visually demonstrate placement of point groups. Maps provide the reviewer with a visual perspective of the measurement process and features inspected.

FAI Package Contents FAI PACKAGES SHALL INCLUDE THE FOLLOWING AS APPLICABLE AND BE TRACEABLE TO THE FAI Bubble drawing, model screen shot or sketch denoting design characteristics / parts list delineating all of the unique part characteristics including all drawing, general and flag notes. This must include your approval and traceability to the authority dataset. Unique characteristic accountability must correspond with unique identifier on bubbled drawing / sketch / screen shot or link to CMM report. Material Certifications Process Certifications Completed FAI forms Non-Conformance documents Test reports / results Casting / Forging approvals Completed Work Order and Re-Work Orders that represent the manufacturing process as required. Copy of Customer Condition of Supply (e.g. TSSP, etc.). Photos

FAI Package Contents FAI PACKAGES SHALL INCLUDE THE FOLLOWING AS APPLICABLE AND BE TRACEABLE TO THE FAI Customer approval of frozen planning Outside Data Sheet (Outside Processor) or Manufacturing Engineering Planning Instruction Control Number Supplier Information Requests (SIR) Other fabrication records as indicated CMM Reports - point maps and set-up instructions as required Along with the Part Number, a unique identifier should be logged on the document(s), such as: FAI Report Number Manufacturing Process Reference Number

Source Inspection Communicating with Source Inspection When there is an interpretation of requirements that differs from the standards documented Request that the source inspector provide the basis for the different requirements Involve the Quality Manager and / or Quality Engineer in the discussion This will ensure that LMI Aerospace, Inc.'s Standard is a consistent approach to First Article Inspections and are being maintained.

Unique Customer Specific FAI Requirements To be used in conjunction with SQRM-001 and SP7.5-01 Aviation Partners Boeing (APBP140-1, Q19 rev 10/25/12) Per AS9102 & LMI FAI STD-001 The following requirements are unique to the 767/737/757 Wing Mod Programs Source Inspection is required on all first article parts and delta first article parts, as well as assemblies and assembly details. All general notes, flag notes, standard drawing notes, standard process specifications and part specific notes must be addressed within the FAIR and bubbled along with all applicable dimensions. For non-applicable notes, state actual results or as N/A. Functional testing on first article parts must be witnessed by a LMI Source Representative. (i.e. Leak Test, Switches, Wiring, etc.). All dimensions on provided drawings must be inspected and documented on FAI documentation. The CATIA (CAT Part) is the sole geometric dimensional authority except as defined by drawing. This clearly defines that should a conflict arise between the requirement in the model and the requirements on the drawing, the drawing has precedence unless otherwise stated contractually.

Unique Customer Specific FAI Requirements To be used in conjunction with SQRM-001 and SP7.5-01 Aviation Partners Boeing Continued (APBP140-1, Q19 rev 10/25/12) NOTE: Any dimensions within ( ) are not reference dimensions for APB drawings. Provide supplier code noted on D1-4426 APL Must include name and address source, on Form 2, Column 8. On Form 2, Column 7; enter process code listed on D1-4426 if none, put N/A. Full completion of FAI in Net-Inspect is required. AIRBUS Per AS9102 & LMI FAI STD-001 Bell Helicopter Products & Programs (BHT QPS 200, section 11.0) Per AS9102 & LMI FAI STD-001 Mfg. Lot / Job Number & Date of Manufacture are required on Form 1, Box 9. ODS Number (if applicable) goes on Form 1, Box 5. Physical Change (if applicable) goes on Form 1, Box 5.

Unique Customer Specific FAI Requirements Bell Helicopter Products & Programs Continued (BHT QPS 200, section 11.0) BOTH Drawing Revision and Parts List Revision on Form 1, Box 7. On Form 2, Column 7; enter process code listed within QPS 101 APL. Provide supplier code noted on QPS 101 APL Must include name and address source, on Form 2, Column 8. Provide Bell SMDAR Number if applicable on Form 3, Column 11. If a Lapse in shipment of 2 or more years to Bell, provide a copy of the most recent FAI with parts. If manufacturing of product changes to use a newly purchased and/or acquired piece of equipment within your facility; a new FAI must be performed. When an FAI provided to Bell is not complete (marked in field 19, Form 1 of AS9102) due to disposition nonconforming characteristic(s) or authorized deferment of an attribute being documented on the FAI, a partial FAI reflecting subsequent compliance of these characteristics shall be submitted to Bell with compliant product no later than the item s second shipment to Bell unless authorized in writing by Bell Quality.

Unique Customer Specific FAI Requirements Bombardier QD 4.6-40, Section 7.5.1) Per AS9102 & LMI FAI STD-001 Note: For the Airbus program: The FAIR shall include the actual weight and the last issue of the part, which can be located in the Part List of the drawing. (In the comments Column 13, Form 2) Embraer Per AS9102 & LMI FAI STD-001 Gulfstream (SQAR-9100, section 6.1) Per AS9102 & LMI FAI STD-001 Form 2, Column 7; Finish and Process Codes per Parts List Form 2, Column 8; Vendor Code per ASL Israeli Aircraft Products & Programs (CAG 9000, section 4.7.5) Per AS9102 & LMI FAI STD-001 Mark the item "First Article" or "FAI" with rubber stamp next to the part number identification.

Unique Customer Specific FAI Requirements Lockheed (QCS-001 Appendix QX, Table 1Quality Clause, Q2A) Per AS9102 & LMI FAI STD-001 Mitsubishi Aircraft Corporation (MITAC) Products and Programs (MJET-SQC-01, Sect. 2.2.7) Per AS9102 & LMI FAI STD-001 Northrop Grumman Products and Programs ((GQAP) Issue #28 5/23/11) Per AS9102 & LMI FAI STD-001 Sikorsky (ASQR-01, Sect. G; SA908 section 3) Per AS9102 & LMI FAI STD-001 Form 3, Column 14 must have segregation as follows A Inspection Measurement Equipment B Production Inspection Measuring Equipment C Inspector ID

Unique Customer Specific FAI Requirements Spirit (MAA 1-10042-X) Per AS9102 & LMI FAI STD-001 The CMM/Faro Arm report does not need to be bubbled, but does need to correspond to the engineering feature listed on Form 3 (i.e. profile Bubble #17, See CMM report 92-114)d. Production Planning / Shop Traveler. Material Certifications (including standards, sealants, paints, metals, plastics, pre-pregs, etc. Contractual amendments. Triumph - Vought Aircraft Products & Programs (SQR-011) Per AS9102 & LMI FAI STD-001 The following items/documents (as applicable) shall become a part of the electronic record and shall be referenced and attached to the electronic FAI file for the applicable part number: CMM Reports point maps and set-up instructions are mandatory. Identify CMM report to reflect the FAI report number, drawing number, revision & model release and Manufacturing process Reference. Provide specific Point Maps A sufficient number of mapped views should be provided to demonstrate point placement for all features and surfaces inspected including alignment points clearly labeled. Copy of all rework travelers Photos (as applicable)