Nanoscale Fabrication & Characterization Facility. Anatech Hummer 10.2 Users Guide

Similar documents
VCR Ion Beam Sputter Coater

Balzers Sputter Coater SCD 050

SALES SPECIFICATION. SC7640 Auto/Manual High Resolution Sputter Coater

CPL SYSTEMS / GROENEVELD AUTOMATIC GREASING SYSTEM COMPLETE SYSTEM CHECK PNEUMATIC PUMP

EQUIPMENT CALIBRATION/MAINTENANCE

TB-A A. O. SMITH - FVIR INTELLI-VENT TROUBLESHOOTING CHART # LED STATUS PROBLEM SOLUTION

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin Inch PowerVent LED Indicator Explanations & Troubleshooting Table

After the reactor has been running and the air in the chamber has been purged the co2 can be introduced and the dial in process can begin.

BAL-TEC SCD 005. Scientist in charge: Lhoussaine Belkoura 07/14/06. softcomp soft matter composites 1

Recharge Procedure for Telemark TVP-2000 and TVP-3500

Approval of this procedure is provided by signatory indicated in the approval block at the footer of Page #1, for and on behalf of Jabiru Pty. Ltd.

Before starting, check if the toilet is well connected see the 12V connection scheme

COMMON LABORATORY APPARATUS

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

Boiler Preparation, Start-Up and Shutdown

Waters Corporation. Waters 2690/5 USER & TROUBLESHOOTING GUIDE

Ion Beam Sputtering: Practical Applications to Electron Microscopy

Laser Cutter User Manual

EVANS ELECTRONIC TEMPERATURE CONTROL TROUBLESHOOTING GUIDE for systems equipped with electric coolant valve and external PC board.

Written By: Walter Galan

FLUSHOMETER - TANK SYSTEM

Written By: Walter Galan

CARING FOR YOUR WATER HEATER

Kawasaki Vulcan 1500 Mean Streak Installation Instructions

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Bydureon 2 mg powder and solvent for prolonged-release suspension for injection in pre-filled pen How to use Bydureon pre-filled pen

SC7610 Sputter Coater. Operating Manual

PC1131 Electric Air Compressor

Operating Manual Color Changing Fountains

FPV MONITOR. User Manual

123 Industrial Loop Road Paynesville, MN Phone: MASTER MANUFACTURING MASTER GARDNER

Air Sleeve Maintenance

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

Name: Due: September 21 st Physics 7230 Laboratory 3: High Resolution SEM Imaging

USER MANUAL OPERATION AND USE OF CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

Written By: Walter Galan

Instructions For SF 6 Refill Kit

Fuel Cell Characterization Lab

PC1130 Electric Air Compressor

FLOWMETER INSTALLATION INSTRUCTIONS

SELECTION, APPLICATION AND MAINTENANCE

Installation Instructions S

RAINBOW ELECTROPHORESIS 1 An Introduction to Gel Electrophoresis

PERIODIC TABLE / STATIONS LAB

INSTALLATION AND SERVICE MANUAL

FILLING AND PURGING THE SYSTEM

Operations and Maintenance Manual

TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES EFFECTIVE: OCTOBER 2007

E - THEORY/OPERATION

Calibrating Differential Pressure Sensors

Trouble Shooting. Pump

K575X Sputter Coater Instruction Manual

Sport Ice Elektro 124

Introduction 1 The system 1 The meter 2 The display 3 The mode 3 The measurement 4 Coding the meter 4 How to obtain a drop of blood 6 Application of

Operation & Maintenance Manual

Measurement of Specific Heat Capacity Using Differential Scanning Calorimeter

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

OPERATION MANUAL. Pen type, separate electrode SOIL PH METER Model : PH-220S

6/2016 E&M forces-1/8 ELECTRIC AND MAGNETIC FORCES. PURPOSE: To study the deflection of a beam of electrons by electric and magnetic fields.

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

MAP COFFEE MIA CAPSULE COFFEE MACHINE INSTRUCTION MANUAL MODEL: CM4725. Read this manual thoroughly before using and save it for future reference

Lasers Design and Laser Systems

ACCUMULATOR INSTALLATION

1. Three-Color Light. Introduction to Three-Color Light. Chapter 1. Adding Color Pigments. Difference Between Pigments and Light. Adding Color Light

The Determination of an Equilibrium Constant

The Versatile Differential Pressure Transmitter. By David Gunn Honeywell Process Solutions

Electron Beam and Sputter Deposition Choosing Process Parameters

Electric Brake Trouble Shooting Guide

INSTALLATION INSTRUCTIONS BOOST CONTROLLER. Pro Control Input (Optional) Tach. Signal. Speed. Gray. Signal. Green Blue. Orange.

MODEL J SERIES CONVERTER


National- Spencer Inc.

Description of functions

Diesel: Troubleshooting

Electronic Brake Controller Hayes Brake Controller Company ENERGIZE III P/N # 81741B or ENERGIZE XPC P/N #81745 OPERATION MANUAL

Laddomat Charging unit

Please read and keep these instructions. Run water through your machine before first use

Coal fired steam locomotive CHARYBDIS

TUTTNAUER OLD AUTOCLAVE OPERATING PROCEDURE

Munchkin Heat Exchanger Maintenance

HEAT SIPHON ANSWERBOOK

GROENEVELD AUTOMATIC GREASING SYSTEMS

Coating Technology: Evaporation Vs Sputtering

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

Safety, Operation and Maintenance Manual with Parts List

Dehumidifier Users manual. For Models: DH45S DH65S

Michelin User Guide. Hi-power Rapid Tyre Inflator


OTF Oil Fired Pool Heater

Table of Contents. Use. Troubleshooting. Setup. Welcome. 11 How to arm/disarm system/camera(s) 19 Sync Module setup issues. 3 Installing the Blink app

SunMor SM-V30 Solar Water Heater Installation Manual

Vacuum Pumping of Large Vessels and Modelling of Extended UHV Systems

ATL Fuel Level Sender Probes

Chapter 5 - Aircraft Welding

Auto-belay Cable Replacement Process

sciencemuseumoutreach Kitchen Science 1 Demonstrations to do at home

Model 43AP Pneumatic Controller, Style B

MAINTENANCE & TROUBLESHOOTING

Heat Surge Model X5C Fire Place Insert Service Manual Applies to all units w/ circuit board

Transcription:

Nanoscale Fabrication & Characterization Facility Anatech Hummer 10.2 Users Guide The Anatech Hummer 6.2 is a rough vacuum system, designed to coat samples in preparation for SEM electron beam analysis. The system uses argon gas as a process gas.

Au/Pd Sputter Operation Procedure: 1) Log into FOM. 2) The system should be off and vented to atmospheric pressure. 3) With the power button off open the lid and carefully remove the glass chamber. 4) Place your sample/samples on the bottom plate. 5) Replace the sputter glass chamber on the lower plate while making certain the seals are clean and aligned properly. 6) Gently lower the top plate onto the glass chamber while make sure all hoses and cables are clear. 7) Open the gas delivery valve to the argon tank and check that the delivery pressure is set to 5-6 psi. 8) Check that the process switch is set to plate. 9) Set the voltage control to 0 volts. 10) Turn on the power switch. You should hear a beep and the lights should start to turn on. 11) Press the vacuum button to start the mechanical pump. You may have to press slightly on the chamber lid to initiate a seal. 12) Within a few seconds you should see the pressure begin to drop on the Torr display. At.099 the gas button will light.

13) Wait until the pressure reaches a minimum of.030 torr. If it does not reach the set point with in 10 minutes contact support staff to trouble shoot the issue. 14) Allow the pressure to stabilize below.030 torr for 30 seconds and them press the gas button. 15) If necessary, adjust the gas control valve to set the desired pressure..070 torr is ideal but anywhere from.05 to.08 torr is acceptable. 16) Using the attached rate chart, determine the amount of time necessary to get the desired thickness that you require. 17) Turn on the HV button and slowly adjust the voltage to 2400 volts. The current should be between 10-15 milliamps. If the current is no in that range, slowly adust the gas pressure to maintain 10-15 milliamps at 2400 volts. 18) Once you have reached your desired thickness, turn the voltage to 0 volts. 19) Turn off the HV and the Gas buttons. 20) Press the stop button. 21) Shut off the power button and allow a few seconds for the system to reach atmospheric pressure. 22) Open the lid. 23) Remove the glass chamber. 24) Remove your samples. 25) Re-install the glass chamber and slowly close the top lid. 26) Log out of FOM.

Carbon Coater Operation Procedure: 1) Log into FOM. 2) The system should be off and vented to atmospheric pressure. 3) With the power button off open the lid and carefully remove the glass chamber. 4) Place your sample/samples on the bottom plate. 5) Replace the glass chamber (labeled carbon) on the lower plate while making certain the seals are clean and aligned properly. 6) Place the carbon top plate on the glass chamber. 7) Remove the gas supply hose from the sputter top plate and connect it to the carbon top plate. 8) Open the gas delivery valve to the argon tank and check that the delivery pressure is set to 5-6 psi. 9) Make certain the current control for the carbon unit is set to zero amps. 10) Turn on the power switch for both the carbon and the Hummer unit. You should hear a beep and the lights should start to turn on. 11) Press the vacuum button on the hummer unit to start the mechanical pump. You may have to press slightly on the chamber lid to initiate a seal. 12) Within a few seconds you should see the pressure begin to drop on the Torr display. At.099 the gas button will light. 13) Wait until the pressure reaches a minimum of.030 torr. If it does not reach the set point with in 10 minutes contact support staff to trouble shoot the issue.

14) Allow the pressure to stabilize below.030 torr for 30 seconds and them press the gas button. 15) If necessary, adjust the gas control valve to set the desired pressure..100 torr is ideal. 16) Using the attached rate chart, determine the amount of time necessary to get the desired thickness that you require. 17) Warm up the electrode tip by turning up the current to 5 amps for 10 seconds. 18) Turn it back to zero amps for 20 seconds. 19) Repeat steps 17-18 three times until the tip glows orange. 20) When the tip glows bright orange, increase the power until the tip starts to turn white. 21) Reduce the current until the tip is yellow. 22) Increase the current again white watching the current meter carefully. You should see the current drop when you are around 40 to 60 amps. When this happens, quickly reduce the current by 10 amps for the deposition. 23) When your desired deposition is complete, turn the current control to zero and turn off the main power switch. 24) Once the system vents, remove the gas delivery hose and re-attach it to the hummer top plate. 25) Remove the carbon top plate, glass chamber and your samples. 26) Re-install the sputter glass chamber and slowly close the top lid. Log out of FOM.