Surface Water Drainage Guidance Infiltration Techniques



Similar documents
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

Taylor Wimpey UK Ltd. December 2007

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

Development at 2 St Albans Road, Kingston, London, KT25HQ

Sustainable Drainage Systems (SUDS) A guide for developers

16. Storm water drainage

Basements and Deep Building Construction Policy 2014

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

SOAK UP YOUR STORMWATER

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Low Impact Development Checklist

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

Type of Sewer Systems. Solomon Seyoum

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

BMP #: Dry Wells / French Drains

Planning, Health and Environment Division

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment

Recommendations for future developments

CHAPTER 11 STORM DRAINAGE

Stormwater Management Functional Servicing Report

Water Supply and Wells

East Riding of Yorkshire Council

CHAPTER 11 STORM DRAINAGE

Designed and produced by geo-graphicsdesign.com DP 300 3/02

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

BMP 6.4.6: Dry Well / Seepage Pit

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Scheduling Maintenance for Infiltration Basins and Trenches

ORDINANCE NO

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

Essex County Council Flood Investigation Report

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

ANNEX 2 Emergency / Pollution Incident Response Plan

Guidance Notes: GARDEN FLOODING

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Building over or close to a public sewer

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual

City of West Linn Public Works Design Standards Table of Contents

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Creating the environment for business

On Site Treatment Systems

Vital Earth Composting Facility Flood Risk and Drainage Statement

CHAPTER 2 HYDRAULICS OF SEWERS

BUILDING SURVEYING

SEPTIC TANKS AND SOAKAWAYS TO HOUSES AND THE BUILDING REGULATIONS

Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Town of Beaumont. Lot Grading Guidelines

SECTION EARTH MOVING

Riprap-lined Swale (RS)

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Bolton s Flood Risk Management Strategy

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

Quick Guide to Application for Clearance for Drainage Works for issuance of Certificate of Statutory Completion (CSC) Minor Project

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

PART 6 HA 113/05 DRAINAGE

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Council Policy. This Policy assists in the implementation of the Council Plan Revised 2010, in particular Strategy 3.1.

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario.

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

Emergency Spillways (Sediment basins)

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems

Foul Drainage, systems and responsibility. Environmental Protection

2 ND SEPTEMBER Report of the Bi-Borough Executive Director for Transport and Technical Services

City of Shelbyville Site Inspection Checklist

SECTION INLETS INLET LOCATIONS

Follow the Drop. Activity Overview Students observe and collect information about water runoff on their school property. Objective Students will:

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No M (Supersedes Report No.

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

SUMP PUMP DISCHARGES INFORMATIONAL PACKET

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding

Transcription:

Surface Water Drainage Guidance Infiltration Techniques 1.0 INTRODUCTION This summary guidance document has been prepared by Hydrock Consultants Limited (Hydrock) on behalf of the Somerset Drainage Boards Consortium (SDBC). A full document (Ref. R/09191/001/2) has been prepared for SDBC, however this document has been produced for issue to those developers proposing infiltration devices within the Somerset Levels and Moors area and provides a simple summary of the points in the overall guidance document. Current best practice guidance promotes the use of SUDS methods of surface water disposal. However the geological and hydrological conditions prevalent in the Somerset Levels and Moors region means that to design SUDS strategies to modern standards, specifically infiltration solutions, can prove problematic in some situations / locations. The inappropriate use of infiltration drainage solutions may inadvertently increase flood risk within an area. 2.0 INFILTRATION DESIGN CRITERIA The design and construction procedures for infiltration devices, specifically soakaways, is prescribed in document BRE Digest 365, and is the recommended method that should be adopted for all proposed soakaway designs within the study area. There are effectively two steps in the design process, the determination of whether infiltration would be feasible on the site and, if so, the design of the proposed soakaway structure. The evidence and results to support such a proposal should be undertaken by a technically competent Civil Engineer and would require the approval of SDBC. A list of the minimum evidence that should be submitted to SDBC in light of a proposed soakaway structure is included in Appendix A. Examples of calculations and various scenarios are detailed in Section 3.0. Ground Investigation A Ground Investigation should assess the soil infiltration rate, depth to groundwater and, if necessary, note any geotechnical implications. Soil Infiltration Rate The infiltration rate of the ground at a subject site should be determined within a site specific trial pit(s), ideally in the approximate location of the proposed soakaway. For potentially large area soakaways, a trial pit should be dug at intervals of approximately every 10m. Trial pits should be dug to the same depth as that anticipated for the proposed soakaway (around 1.0m 1.5m below the anticipated invert level of the pipe discharging to the proposed soakaway); be between 0.3m 1.0m wide; and, approximately 1m 3m long, with trimmed vertical sides. The trial pit(s) should be rapidly filled three times to its effective depth (i.e. the anticipated soffit level of the soakaway structure) within the same, or on consecutive, day(s). The depth of water should be recorded at regular intervals on each occasion, until the trial pit(s) is near empty. - 1 -

The soil infiltration rate should be calculated as follows: f = V p75-25 a p50 x t p75-25 f: soil infiltration rate (m/s) V p75-25 : volume of water in the trial pit between 75% - 25% effective depth (m³) a p50 : internal surface area of trial pit up to 50% effective depth, including the base area (m²) t p75-25 : time for water to fall from 75% - 25% effective depth (secs) The average calculated infiltration rate should be used for design purposes. Depth to Groundwater To ensure the adequate performance of a proposed soakaway structure and in accordance with the requirements of the Environment Agency, a minimum 1.0m buffer should be ensured between the bottom of a proposed soakaway structure and the groundwater table. As such the groundwater level at a subject site should be determined via a site specific trial pit(s) / borehole(s), ideally in the approximate location of the proposed soakaway. The groundwater level should be monitored daily over a minimum one week period between mid- April mid-november (to coincide with the period where water levels are maintained at a relatively high level), and the highest level recorded. Geotechnical Implications To ensure that the introduction of potentially large volumes of rainwater into the ground does not adversely affect existing sub-surface drainage patterns and/or surrounding ground stability it may be necessary, at the discretion of SDBC, and certainly for infiltration drainage proposals within areas of Blown Sand geology, to undertake a Geotechnical Assessment by a suitably qualified professional. Such an assessment should identify whether the site or surrounding area could become susceptible to inundation settlement, the effect of any ground slopes on downhill waterlogging, and, any other adverse impacts that could likely result from a proposed infiltration means of surface water disposal. - 2 -

Construction Storage Volume Calculations The soakaway storage volume should be calculated either as detailed below or via a computer modelling package such as WinDes, or similar. S = I O S: soakaway storage volume (m³) I: inflow from the impermeable area drained to the soakaway (m³) O: outflow infiltrating into the soil (m³) Inflow I = A x R A: impermeable area to be drained to the proposed soakaway (m²) R: total rainfall in design storm (m) In line with Document H, Drainage and Waste Disposal, of the Building Regulations 2000, soakaways should be designed to accommodate a minimum of a 1 in 10 year return period event for the critical storm duration (i.e. that storm which would require the largest storage volume). It is advised that the following 1 in 10 year return period rainfall values be used for infiltration proposals within the study area: Table 2.0: 1 in 10 year Rainfall Values for Study Area Storm Duration (mins) 5 10 15 30 60 120 240 360 600 M10-D (mm/m) 8.64 12.44 15.25 19.59 24.80 30.26 36.60 40.90 46.41 Outflow O = a s50 x f x D a s50 : Internal surface area of proposed soakaway up to 50% effective depth, excluding the base area (m²) f: soil infiltration rate [see Section 5.2.1] (m/s) D: storm duration (sec) Review of Suitability It is generally considered that rainwater discharge direct from roof areas to soakaways would not require additional pollution control measures. However, any discharge from paved areas should pass through a suitable form of oil interception device prior to discharging to a soakaway. In line with Document H, Drainage and Waste Disposal, of the Building Regulations 2000 proposed infiltration structures should not be sited within 5.0m of building and / or highway foundations; nor in areas of unstable land; and, be sufficiently far away from any existing watercourses / ditches. For the purposes of this area, sufficiently far away is considered a minimum of 5.0m. It should also be ensured that any proposed soakaway discharge from full to half-volume within the required maximum 24 hour duration, to allow for subsequent storm inflow. The half drain time (ts50) should be calculated as follows: t s50 = S x 0.5 a s50 x f - 3 -

3.0 EXAMPLES Example 1 A proposal involves the development of two new dwellings. Rainwater run-off would occur from the combined 100m² proposed roof area and 150m² proposed paved area. Soil Infiltration Rate The Ground Investigation undertook a trial pit of dimensions 2.00m deep, 1.00m wide and 3.00m long and was filled three times to a depth of 1.50m (effective depth). The three tests drained from 75% -25% effective depth in 417mins, 500mins and 625mins respectively. Using equation f = V p75-25 a p50 x t p75-25 V p75-25 : 3.00 x 1.00 x (1.125 0.375) = 2.25m³ a p50 : (3.00 x 0.75 x 2) + (1.00 x 0.75 x 2) + (1.00 x 3.00) = 9.00m² t p75-25 : 417, 500 & 625 respectively (mins) = 2.25 (9.00 x 417) = 0.00060 = 6.0 x 10-4 = 2.25 (9.00 x 500) = 0.00050 = 5.0 x 10-4 = average infiltration rate to be used for design = 2.25 (9.00 x 625) = 0.00040 = 4.0 x 10-4 Depth to Groundwater Periodic monitoring of the groundwater level over a one week period in July recorded a maximum groundwater level of 5.50m below ground level. Geotechnical Implications The underlying geology was identified as Blown Sand, and as such a Geotechnical Assessment was commissioned and subsequently undertaken by a suitably qualified professional. The report concluded that the nature of the underlying geology in that particular location and distance to existing adjacent structures would mean that the proposed use of soakaway drainage would not result in demonstrable harm to existing adjacent areas or the proposal site. Storage Volume Calculations For the purposes of this example a soakaway with dimensions 1.50m effective depth and 3.00m long was proposed due to site constraints, with the width (W) to be determined to suit the critical storm event. The soakaway would be constructed of a granular fill material and have an approximate 30% void space. Inflow (I = A x R) A: 100m² + 150m² = 250m² R: M10-5 = 8.64mm = 0.00864m = 250 x 0.00864 = 2.16m³ - 4 -

Outflow (O = a s50 x f x D) a s50 : 2 x (3.00+ W) x (1.50 2) 4.50 + 1.50 Wm² f: 5.0 x 10-4 m/s D: 5min = 300sec = (4.50 + 1.50 W) x (5.0 x 10-4 ) x 300 Storage Volume Effective volume of soakaway with 30% void space: 1.50 x 3.00 x W x 0.3 = 1.35 Wm³ Satisfactory storage of M10-5, using S = I O: = 2.16 -(4.50 + 1.50 W) x (5.0 x 10-4 ) x 300 = 2.16 0.9 W = 1.26 W = 1.26 1.35 = required soakaway width for M10-5 storm = 0.93m Calculations were then repeated for a range of critical storm durations. Table 3.0: Required Soakaway Widths for range of Storm Durations Storm Duration (mins) Required Soakaway Width (m) 5 0.93 (as above) 10 0.97 15 0.82 30-0.37 60-3.41 120-10.39 240-25.22 360-40.42 600-71.41 The calculations have indicated the critical storm duration to be 10 minutes in this situation, i.e. greatest soakaway width. A soakaway of dimensions 1.50m effective depth, 3.00m long and 0.97m wide was shown to be suitable for the M10-10 critical storm in this situation. Review of Suitability The proposed soakaway design must also ensure that: a suitable form of oil interception device would be fitted to the inflow pipe from the proposed paved areas; would be >5.0m from any proposed or existing building, highway or watercourse / ditch foundations; would not be within an area of unstable land; and, the invert level of the structure would be >1.0m above the maximum recorded groundwater level (in this - 5 -

instance a 3.50m buffer is provided, taking the soffit level of the proposed structure as 0.50m below ground level combined with a 1.50m effective depth, and a depth to groundwater of 5.50m). The proposed soakaway is also shown to discharge from full to half-volume within the required maximum 24 hour duration, using, t s50 = S x 0.5 a s50 x f = (((1.50 x 3.00 x 0.97) x 0.3) x 0.5) (((3.00 + 0.97) x 2) x 0.75) x (5.0 x 10-4 ) = 219.90sec = 3min 40sec Example 2 A proposal involves the development of one new dwelling. Rainwater run-off would occur from the 50m² proposed roof area. Soil Infiltration Rate The Ground Investigation undertook a trial pit of dimensions 2.00m deep, 1.00m wide and 3.00m long and was filled to a depth of 1.50m (effective depth). Water from the first test did not appreciably drain despite being monitored for several days. No further tests or calculations were considered necessary. Depth to Groundwater Periodic monitoring of the groundwater level over a one month period in August recorded a maximum groundwater level of 1.00m below ground level. Based on the conclusions of the infiltration testing and groundwater level monitoring it was acknowledged that a soakaway means of surface water disposal from the site would not be feasible. Discussions between the developer and SDBC concluded that a discharge to an adjacent rhyne would be possible, provided certain conditions were met. Example 3 A proposal involves the development of four new dwellings. Rainwater run-off would occur from the combined 200m² proposed roof area and 250m² proposed paved area. Soil Infiltration Rate The Ground Investigation undertook a trial pit of dimensions 2.00m deep, 1.00m wide and 3.00m long and was filled three times to a depth of 1.50m (effective depth). The three tests drained from 75% -25% effective depth in 417mins, 500mins and 625mins respectively. Using equation f = V p75-25 a p50 x t p75-25 V p75-25 : 3.00 x 1.00 x (1.125 0.375) = 2.25m³ a p50 : (3.00 x 0.75 x 2) + (1.00 x 0.75 x 2) + (1.00 x 3.00) = 9.00m² t p75-25 : 417, 500 & 625 respectively (mins) - 6 -

= 2.25 (9.00 x 417) = 0.00060 = 6.0 x 10-4 = 2.25 (9.00 x 500) = 0.00050 = 5.0 x 10-4 = average infiltration rate to be used for design = 2.25 (9.00 x 625) = 0.00040 = 4.0 x 10-4 Depth to Groundwater Periodic monitoring of the groundwater level over a one week period in July recorded a maximum groundwater level of 5.50m below ground level. Geotechnical Implications The underlying geology was identified as Blown Sand, and as such a Geotechnical Assessment was commissioned and subsequently undertaken by a suitably qualified professional. The report concluded that the nature of the underlying geology in conjunction with the topography of the site in relation to adjacent existing buildings, could potentially result in waterlogging of several adjacent downhill properties and could affect the stability of the land both beneath the proposal site and under adjacent land. As such it was acknowledged that a soakaway means of surface water disposal from the site would not be feasible, even though the infiltration rate indicated this to be potentially acceptable. Discussions between the developer and SDBC concluded that no rhynes were within a practicable connection distance of the site. Subsequent discussions with Wessex Water concluded that a discharge to an adjacent surface water sewer would be possible, provided certain conditions were met. - 7 -

Surface Water Drainage Decision Flow Chart - 8 -

Minimum Evidence Check List Site Site location plan Site plan showing impermeable area to be drained to soakaway Ground Investigation Plan showing location of trial pit(s) and dimensions Infiltration rate calculations from all trial pit tests Written results of groundwater level assessment and nature of geology Geotechnical Assessment Report, if necessary Construction Drawing showing plan layout of proposed soakaway(s) Drawing showing cross-section of proposed soakaway(s) (including maximum recorded groundwater level) Storage volume calculations Emptying time calculations R/09191/002/01 June 2010 Hydrock Over Court Barns, Over Lane, Almondsbury, Bristol, BS32 4DF, UK. Tel: 01454 619533 Fax: 01454 614125 E-mail: bristol@hydrock.com www.hydrock.com - 9 -