Sør-Norge Aluminium AS



Similar documents
Sør-Norge Aluminium AS

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated)

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

PRODUCT DATA SHEET Sika Cable System

SIGMACOVER 280. PRODUCT DATA SHEET December 10, 2014 (Revision of March 1, 2014) DESCRIPTION

COATING & WRAPPING OF UNDERGROUND PIPING

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Division 9. SignaFlor Pad and Pour Flooring System

Tractor Painting Tips

Pictorial Surface Preparation Standards For Painting Steel Surfaces

Cold trichloroethylene degreasing Film Thickness 70± 10 µm 10 minutes at 170 C (PZ 770 alone) 5 minutes 30 sec. at 220 C (maximum curing conditions)

Note: Minor color change may occur in exposed service, but corrosion protection will not be compromised

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

PRODUCT DATA SHEET DESCRIPTION:

PHOENIX Product Data Sheet (Updated on 14-Jan-2012)

The Application Guide offers product details and recommended practices for the use of the product.

SIGMACOVER 300. PRODUCT DATA SHEET December 12, 2014 (Revision of November 1, 2013) DESCRIPTION

SECTION WATER STORAGE TANK PAINTING

NORSOK STANDARD M-501 Edition 6 (2012)

Installation Instructions

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

Approved. Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1 30 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

SPREFIX SPRAY INSULATION _ in the marine market.

BLACK JACK ALL WEATHER ROOF COATING

White rust on galvanized and galvanized pre-painted steel. Technical Information

Steel Panel Frame. Exterior Steel Sheeting. Optional Rigid Insulation. Optional Steel Insulation Liner

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

Solar Hot Water Heaters

TECHNISCHE FICHE - TECHNISCHE FICHE - Chat Board: Classic

GUIDELINES FOR HANDLING FABRICATION INSTALLATION AND CLEANING

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS

SIGMAFAST 210. PRODUCT DATA SHEET December 12, 2014 (Revision of April 1, 2013) DESCRIPTION

SURFACE PREPARATION. High pressure fresh water cleaning.

infosteel Guide to protection of steel against corrosion Indoor and outdoor structures 1st edition: May 2012 Value 10 EUR

Removable Insulation Blankets from A to Z

SC2000 CEMENT BONDING PROCEDURES

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated)

Solvent Cementing Instructions For Plastic Pipe & Fittings

USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102

RECOATING AND RENEWING SPF ROOFING SYSTEMS

TIGER Drylac U.S.A., Inc Swenson Avenue St Charles, IL T F office.us@tiger-coatings.us

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Evaluating Protective Coatings for Ballast Tanks

PAINTING OVER HOT DIP GALVANIZED STEEL

NORSOK STANDARD COMMON REQUIREMENTS SURFACE PREPARATION AND PROTECTIVE COATING

SEAMS SEAMING USING SEAM TAPE

Screen Melts. Introduction. Selecting Screen Material. Prefire Before Using. Spalling. Kiln Shelf

Surface Engineering Solutions Rebuild, Repair and Protect Industrial Equipment

RAPTOR TRUCK BED LINER - BLACK

3M Scotchkote Urethane Coating 165HB

A. Shop Drawing submittals shall include, but not be limited to, the following:

Introducing an All New Line of Cleaning Chemicals

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

Metal Rescue Rust Remover Technical Data

Facility Operations Physical Safety Guidance Document

SURFACE PREPARATION STANDARDS

Building and Grounds Maintenance Checklist

SECTION POLISHED CONCRETE FINISHING

Anodizing Reference Guide

CATHODIC PROTECTION SYSTEM DESIGN

Specifications for Programs: 737, 747, 757, 767, 777, 787

RTV159. RTV157 and RTV159 High Strength Silicone Adhesive Sealants

James M. Pleasants Company

Colorado State University. Durrell Center Roof Repair

DIN 2403 Identification of pipelines according to the fluid conveyed. Marking of pipes according to fluid transported

Are these noise cancelling devices needed to make your chiller quiet??

SECTION PRE-ENGINEERED BUILDING BLANKET INSULATION

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

SSPC-SP 6/NACE NO. 3

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

Araldite AV 170. Advanced Materials. One component epoxy adhesive. Structural Adhesives. Key properties. Description. Product data.

Mold Preventing I nterior System

expectation as hot dip galvanizing?

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

Temperature C Cure time to reach hours LSS > 1MPa minutes

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company

TIG WELDING TIPS by Tom Bell

pinta ACOUSTIC PANEL [1/7]

Profiles for floors of same height Cerfix Projoint

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Material Product Data Sheet Sealers for Thermal Spray Coatings

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

GUIDELINE SPECIFICATIONS

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS

RTV162. Electronic Grade Silicone Adhesive Sealant

BENTLEY ELEMENTS COLLECTION LVT

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

PR11 Plastic Repair, Adhesive

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

RPV - RP - RA air handling units

Aspect Metal Peel & Stick Tile Installation Guide

SECTION 560 COATING NEW STRUCTURAL STEEL

Cable ladder installation at S.C.M. Chemicals Limited s titanium dioxide Plant in Western Australia

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

Transcription:

Topic Sør-Norge Aluminium AS 2 Purchasing Terms Specification 2.7 Specification for surface treatment Publishing Unit BYG Date: 30.04.2015 by Hans Ove Håvik Document No. 2.7 Revision No. 2.0 Valid From: 04.05.2015 Table of Contents: Description of Surface Treatment of Steel and Aluminum Structures 2 1.1. Introduction 2 1.2. Source 2 1.3. Public Regulations and Requirements 2 1.4. Pre-treatment 3 Paint Systems and Corrosion Classes 4 1.5. General 4 1.6. Information In The Paint Systems 4 1.7. Painting Under Insulation 5 1.8. Trash 5 1.9. Control Routines 5 1.10. Fire Proofing of Penetrations and Sectioning 7 Attachments: No. Topic 1 Paint Products 2 Daily Report 3 Pre-treatment of Steel Constructions Before Delivery/Painting 4 Colors 5 Assembly instructions for Fireproofing and cable penetrations and cable trays Purchaser in this document is Sør-Norge Aluminium AS 2.7 Specification for surface treatment rev 2.0 Page 1 of 14

Sør-Norge Aluminium AS Description of Surface Treatment of Steel and Aluminum Structures 1.1. Introduction 1.1.1. Objective The norm has been created to get an optimally uniform treatment of the surfaces of steel constructions, with proper quality. The created systems will cover various environments and applications, and discrepancies from the norm should therefore only occur for particular objects. 1.1.2. General The Purchaser will always specify paint system in their inquiries. The products of the specified manufacturers shall be used unless otherwise described or agreed in writing beforehand. 1.1.3. Standards Pre-treatment: ISO 8501-1 which is equivalent to DIN 55928 Chemical purity: ISO 8502-1 to 4 Surface texture: ISO 8503-1 Ry 2-3 Adhesion test: ISO 4624 1.1.4. Deviations Any deviations from the norm must be approved in writing from the Purchaser. 1.2. Source This description is essentially built up similarly to Norsk Hydro s norm EH-015 and SØRAL s earlier Building Technical Specification section 1.5 Paint Work and Specification, with certain changes and updates. Abbreviations: Purchaser - Sør-Norge Aluminium AS Seller - Paint Supplier PUR - Polyurethane ISO - International Standardizing Organization TFT - Dry Film Thickness indicated in. (Micron) YL - Industrial Hygiene Air requirement RAL - International Color Code 1.3. Public Regulations and Requirements Current Norwegian regulations for health protection in connection with blast cleaning and paint work shall be followed at all times, see order no. 566, 377, 551, 431 and 470 from the Labor Inspection. Work hygiene product data sheets shall be present at the work place when buying and using paint products. 2.7 Specification for surface treatment rev 2.0 Page 2 of 14

1.4. Pre-treatment Sør-Norge Aluminium AS 1.4.1. Steel Treatment New steel, welds and edges from torch cutting shall have the same texture grade as specified for the project as a whole. Edges resulting from cutting and sawing shall be ground down, r minimum = 2 mm. Welding spatter and knobs shall be ground away. Rough hand welds shall be smoothed out. Holes in the welds shall be re-welded. 1.4.2. Degreasing Before blast cleaning or mechanical cleaning and whenever it is required, the surface shall be degreased with a suitable degreasing agent and cleaned with an emulsification agent and water. 1.4.3. Cleaning: 1.4.4. Blast Cleaning Blast cleaning shall be performed by pressured air at 7 bar min. with a free blast or as vacuum blasting. Water jet shall be used whenever possible. The blasting air shall be clean, dry and free of oil and grease. Blasting agent: Steel grit, aluminum-silicate (slag from heat power plants), metallurgic slag or olivine sand. Recommended particle size for all: 0.2 1.5 mm, with an average of 0.6 mm. After blast cleaning, dust and blasting agent shall be carefully removed with a broom, vacuum cleaning or oil and water free pressured air. 1.4.5. Mechanical Cleaning Mechanical cleaning by scraping, steel brushing, grinding is not a good cleaning method for advanced paint systems. This shall only be used following a specific description from the Purchaser and in that case only where blast cleaning is not possible for some particular reason. To achieve acceptable cleaning results, a 3M disk should preferably be used for the final cleaning, ISO 8501-1, St 2 -St 3. 1.4.6. Cleaning Quality after Pre-treatment The cleaning quality grade is specified for each paint system. Regarding characteristics for the cleaning quality grades, see the standard ISO 8501-1. 1.4.7. Roughness after Blast Cleaning For roughness checks, use ISO 8503-1, segment 2/3. 1.4.8. Priming Priming coats shall be applied to the blasted surfaces as soon as possible after the blasting to ensure that the surface satisfies the requirements for cleaning quality grade when the paint is applied. Environment conditions like temperature, humidity, air quality, etc. determine what procedures may be allowed. The time interval, which may vary according to the conditions, will be decided together with the Purchaser in each specific case. In case the surface gets dirty or new rust develops before priming, a new pre-treatment shall be performed in accordance with item 3. Strip coating shall be performed with a round brush as the first coat on sharp edges, hand welds, and places that are difficult to reach with the pressurized spray. 2.7 Specification for surface treatment rev 2.0 Page 3 of 14

Sør-Norge Aluminium AS 1.4.9. Cleaning Between Paint In case the steel surfaces get soiled from dirt or salt/acid between priming coats and the last paint coat, they shall be carefully rinsed/washed with fresh water and blasted dry with clean and dry pressurized air before more coats are applied. Alternatively the constructions can be covered. This shall be agreed with the Purchaser before starting the work. Paint Systems and Corrosion Classes 1.5. General Paint systems are specified according to environment classes and corrosion classes. Each system is given a number. Details for paint systems are included in attachment 1. The paint work shall be performed under quality climatic conditions. The steel surfaces shall not have been exposed to precipitation or fallout from ash plants before painting, and they shall have a temperature that is at least 3 C over the dew point of the steel. The relative air humidity shall not exceed 85% and the air temperature shall normally not be under 5 C. For other climatic conditions, the painting shall only be performed according to agreement with the Purchaser s supervisor and if necessary the paint Supplier. All instructions on the product data sheet from the paint Supplier must be carefully observed and followed. The Supplier has the full responsibility to ensure the corrosion protection is performed according to the specified requirements. All reparation areas where blast cleaning can be performed shall be treated in accordance with the main system. When applying a paint program, the paint for each coat shall be from the same manufacturer. Paint systems that include other environment and corrosion classes than the ones mentioned above, shall be agreed with the Purchaser s representative for each particular case. 1.5.1. Painting of Screw Connections, Edges, etc. Before each paint coat, screw connections and sharp edges, in addition to areas that are difficult to reach, shall be given an extra coat with a brush to ensure the dry film thickness is sufficient in these areas. A roller shall not be used for spot painting in the first coat or painting the first coat. 1.6. Information in the Paint Systems 1.6.1. Environment/Object The environment where the system is suitable. 1.6.2. Cleaning Degree of blast cleaning or specification for other cleaning. 1.6.3. Dry Film Thickness () Total is a minimum requirement. For single coats, a moderate deficiency in is allowed. For some systems it is important that the single coats are not too thick. All recommendations from the manufacturer shall be followed. 1.6.4. Normally, priming, middle, and cover coats are used. 2.7 Specification for surface treatment rev 2.0 Page 4 of 14

Sør-Norge Aluminium AS 1.6.5. Paint Type The paint type for each coat is listed. All paint shall be approved by the Purchaser before use. All paint for the same project shall be from the same manufacturer and shall be of first class quality. The Supplier should be certified according to ISO 9001. 1.6.6. YL-group YL indicates Industrial Hygiene Air Requirement. There are 7 groups, 00, 0, 1, 2, 3, 4, and 5. See also order number 431 from the Labor Inspection Authority. 1.6.7. Tools Indicates which paint tools may be used. HTS = High Pressure Spray LFS = Air Atomization Spray 1.6.8. Covering Ability Specified as m²/l for each coat and is an approximate value. Some manufacturers use the term coverage. 1.6.9. Time Intervals between Paint Time intervals between each coat shall be in accordance with recommendations from the manufacturer. The items in this description are only guidelines. 1.7. Painting under Insulation Normal steel surfaces shall be painted when the conditions make it necessary. Stainless steel surfaces which can be exposed to high humidity and chlorides shall be painted before insulating. Pre-treatment before painting stainless steel surfaces shall be performed as light blast cleaning (sweep blasting) with a non-metallic and chlorine free blasting agent. Valves and other equipment shall be treated the same way as the piping or container to which they belong. 1.8. Trash Blasting agents and left over paint are considered special waste and shall be treated and disposed by the Supplier in accordance with all regulations. 1.9. Control Routines 1.9.1. Work Control The Supplier shall perform control checks of their own work. The Supplier is also obligated to help the Purchaser s control supervisor with the checks they deem necessary, also when arriving, securing, etc. 1.9.2. Documentation The Supplier shall keep daily reports for the work, including all control checks. See attachment 2. The report shall include: Objects, weather conditions, air temperature, % RH, steel temperature, pre-treatment/cleaning method, performed strip coating, numb coats, paint type, product number, color, of each coat + total, and adhesion test. The adhesion test shall be in accordance with the guidelines in ISO 4624 (Pull off Test). The 2.7 Specification for surface treatment rev 2.0 Page 5 of 14

Sør-Norge Aluminium AS minimum adhesion shall be 3 MPA. The Purchaser s control supervisor shall be given the opportunity to review the control check results as the work progresses. A copy of the documentation shall be delivered to the Purchaser s control supervisor as agreed, minimum once per week. 1.9.3. Clearance Approval before Painting The paint work must not commence until the Purchaser s control supervisor has given the approval to start. Clearance is required for both the first and the following coats. This also applies for delivery/constructions ordered by the Purchaser to be performed externally. 1.9.4. Approval The Purchaser s control supervisor shall be given the opportunity to approve the work before each paint coat. This is especially important for the primer coat, the last middle coat and the top coat. If the dry film thickness is too thin, more paint shall be applied before approval. 1.9.5. Flaws and Deficiencies The paint specifications can only be deviated from if agreed in writing. If the wrong product has been used or if the procedure is faulty, repainting, in accordance with the specifications, shall be performed at no extra cost for the Purchaser. This can alternatively be accomplished after delivery/mounting of the construction if the progress so requires. Price Estimate, according to NS 8405 item 32.5 is omitted as a whole for paint work. In case the Purchaser reaches the conclusion that access or other conditions hinder repainting, the warranty period shall be extended by 5 years. Proof for the cause of possible damages and flaws in the total warranty period are irrelevant to the Purchaser. Furthermore, price reduction resulting from flaws or damages will be demanded, calculated from the reduced value of the construction. As a minimum, the price reduction shall be equal to the difference resulting from the work not being in accordance with the contract, plus whatever extra costs the Purchaser may endure. 1.9.6. Colors The colors that are described in attachment 4 shall be used for constructions and equipment. 2.7 Specification for surface treatment rev 2.0 Page 6 of 14

Sør-Norge Aluminium AS 1.10. Fire Proofing of Penetrations and Sectioning 1.10.1. General For fire proofing, FLAMMASTIK (manufactured by Jak. J. Alveberg AS) or an equivalent product shall be used. Sealing of penetrations and paint application shall be performed in accordance with the Supplier s description. Furthermore, when nothing else is prescribed, the sealing shall be of the same fire class as the part of the building where the sealing is being applied. The Purchaser shall approve the product and application method before the work is performed. 1.10.2. Laying Cable Cable trays/bridges shall end 50 cm from the penetration to insure good sealing and access. Drawing No. 24479, attachment 1, show respectively penetrations in fire class A60 and A120, and also fire sectioning with painting of cables horizontally, vertically, and diagonally. 1.10.3. Penetrations for Piping and Ventilation Shall be sealed with rock wool and fire retardant paint, FLAMMASTIK or an equivalent product or approved fire retardant caulking if practical. Sealant foam or building foam must not be used. 1.10.4. Marking The places where the proofing is done shall be clearly marked according to the case worker s instructions. The marking will contain the type of material, the performing company, date and person. 1.10.5. Documentation Product sheets and MSDS sheets shall be supplied to the Purchaser by the Supplier prior to the material being delivered. 2.7 Specification for surface treatment rev 2.0 Page 7 of 14

Paint System A1 Paint Type Tools Dry Industry Atmosphere Indoors Max. Temp., Approx. 100 C Cleaning: Blast Cleaned Sa 2½ Total : min. 170 Primer 2-comp. Zinc Rich Epoxy Brush-HTS 1 50 Paint System A2 Paint Type Tools Alternating temperature and condensation indoors. Max. Temp., Approx. 100 C Cleaning: Blast Cleaning Sa 2½ Total : min. 220. Middle 2-comp. epoxy mastic Brush-HTS-Roller 1 60 Cover 2-comp. PUR Brush-HTS-Roller 1 70 Primer 2-comp. Zinc Rich Epoxy Brush-HTS 1 60 Middle 2-comp. epoxy mastic Brush-HTS-Roller 1 100 Cover 2-comp. PUR Brush-HTS-Roller 1 70 Primer 2-comp. Zinc Rich Epoxy Brush-HTS 1 60 Paint System A3 Paint Type Tools Areas with highly corrosive environment. Max. Temp., Approx. 100 C Cleaning: Blast Cleaning Sa 2½ Total : min. 320. Middle 2-comp. epoxy mastic Brush-HTS-Roller 2* 200 Cover 2-comp. PUR Brush-HTS-Roller 1 70 Primer 2-comp. Al.pig. epoxy mastic Brush-HTS 1 60 Paint System B1 Paint Type Tools Dry Industry Atmosphere Indoors Max. Temp., Approx. 100 C Cleaning: Steel brushing, St 2-3. Total : 170. Middle 2-comp. Al. pig. epoxy mastic Brush-HTS-Roller 1 60 Cover 2-comp. PUR Brush-HTS-Roller 1 60 Paint System B2 Paint Type Tools Altern. temperature and condensation indoors Max. Temp., Approx. 100 C Cleaning: Steel brushing, St 2-3 Total : 220. Primer 2-comp. Al. pig. epoxy mastic Brush-HTS 1 60 Middle 2-comp. Al. pig. epoxy mastic Brush-HTS-Roller 2* 120 Cover 2-comp. PUR Brush-HTS-Roller 1 60 Paint System B3 Paint Type Tools Areas with highly corrosive environment. Max. Temp., Approx. 100 C Cleaning: Steel brushing, St 2-3. Total : 320. Primer 2-comp. Al. pig. epoxy mastic Brush-HTS 1 60 Paint System C1 Paint Type Tools Dry Industry Atmosphere Indoors Max. Temp., Approx. 100 C. Base: Hot Galvanized Units and Aluminum. Cleaning: Degreasing with solvents, clean with synth. agent or light blast cleaning. Total : min 170. Middle 2-comp. Al. pig. epoxy mastic Brush-HTS-Roller 3 or 200 more* Cover 2-comp. PUR Brush-HTS-Roller 1 60 Primer Hot Galvanized/Aluminum 80 Middle 2-comp. epoxy mastic Brush-HTS-Roller 1 60 Cover 2-comp. PUR Brush-HTS-Roller 1 50 Paint System C2 Paint Type Tools Alternating temperature and condensation indoors. Max. Temp., Approx. 100 C Base: Hot Galvanized Units and Aluminum. Cleaning: Degreasing with solvents, clean with synth. agent or light blast cleaning. Total : min. 220. Primer Hot Galvanized/Aluminum 80 Middle 2-comp. epoxy mastic Brush-HTS-Roller 1 100 Cover 2-comp. PUR Brush-HTS-Roller 1 50 Paint System C3 Paint Type Tools Areas with highly corrosive environment. Primer Hot Galvanized/Aluminum 80 2.7 Specification for surface treatment rev 2.0 Page 8 of 14

Max. Temp., Approx. 100 C. Base: Hot Galvanized Units and Aluminum. Cleaning: Degreasing with solvents, clean with synth. agent or light blast cleaning. Total : min. 320. Middle 2-comp. epoxy mastic Brush-HTS-Roller 2* 200 Cover 2-comp. PUR Brush-HTS-Roller 1 50 * Large color difference between each coat 2.7 Specification for surface treatment rev 2.0 Page 9 of 14

Attachment 1 Paint Products Paint products that can be used at the Purchaser s: Jotun Carboline International Paint Systems: Environment Class 1 Environment Class 2 Environment Class 3 Corrosion Class A Corrosion Class B Corrosion Class C Dry industry atmosphere Alternating temperature and condensation indoors Areas with highly corrosive environment Painting of new steel and reparation with blast cleaning Reparation without blast cleaning Painting over hot galvanized units and aluminum Paint System No. A1 A2 A3 B1 B2 B3 C1 C2 C3 Environment/Object Dry Industry Atmosphere Indoors Painting of new steel/reparation with blast cleaning Sa 2½ Alternating temperature and condensation indoors. Painting of new/reparation with blast cleaning Sa 2½ The form for daily reports shall be used here (Attachment 2) Areas with highly corrosive environment. Painting of new steel/reparation with blast cleaning Sa 2½ The form for daily reports shall be used here (Attachment 2) Dry Industry Atmosphere Indoors Steel brushing, St 2-3 Alternating temperature and condensation indoors. Steel brushing, St 2-3 The form for daily reports shall be used here (Attachment 2) Areas with highly corrosive environment. Steel brushing, St 2-3 The form for daily reports shall be used here (Attachment 2) Dry Industry Atmosphere Indoors Hot galvanized units/aluminum, light blast sweeping Alternating temperature and condensation indoors. Hot galvanized units/aluminum, light blast sweeping The form for daily reports shall be used here (Attachment 2) Areas with highly corrosive environment. Hot galvanized units/aluminum, light blast sweeping The form for daily reports shall be used here (Attachment 2) 2.7 Specification for surface treatment rev 2.0 Page 10 of 14

Area/Object being treated: Issued by: DAILY REPORT Date: Attachment 2 Project: Area: m² Contractor: Person in charge. Date: Cleaning: _ Air temp.: Approval of Method: Cleaning agent: Surface temp.: surface treatment Abrasive: Particle size: Dew point: SØRAL Contr- Standard: Relative air humidity: actor Strip Observations at start of work Coat coat Air Steel Dew Relati Minimum Maximum Batch no. s ----- Date: Time temp. temp. point ve dry film thickness dry film thickness Prod. no. No. Spot humi my my coating dity Approval of paint application Approval of surface treatment SØRAL Contractor Report no.: Sub- Contr. Signature: Date: Paint Supplier Signature: Date: Signature: Date: Sub- Paint contractor Supplier Approval of paint film SØRAL Contractor Subcontractor Signature: Date: Paint Supplier Specification No.: NOTES: Approval of final control System No.: SØRAL Contractor Drawing No: Responsible: DISCREPANCIES: Yes No If yes, specify in separate form. Subcontractor Signature: Date: Paint Supplier 2.7 Specification for surface treatment rev 2.0 Page 11 of 14

Pre-treatment of Steel Constructions before Delivery/Painting Attachment 3 Unless specified otherwise, the following shall be complied with before delivery/painting: All sharp edges shall be rounded to a diamet 2 mm minimum. All welds shall be cleaned from slag and grinded. Weld spatter shall be removed. Laminations and nicks in the steel surface shall be grinded out. The construction shall be designed in such a manner that difficult access for painting and or maintenance can be avoided. The construction shall be designed to avoid gathering of water, dirt and pollution. 2.7 Specification for surface treatment rev 2.0 Page 12 of 14

Colors Attachment 4 Pipe System: *Heat System Green RAL 6000 *Cooling System Blue RAL 5012 *Sanitary System Yellow Green RAL 6018 *Oils Brown RAL 8004 *Gases, Flammable Ochre Yellow RAL 1007 *Gases, Non-Flammable Gray RAL 7004 *Acids and Alkalis Light Violet RAL 4005 *Pressurized Air Light Blue RAL 5024 *Vacuum Cleaner Pipes Ruby Red RAL 3003 Machine Constructions: *Indoor Steel Structures Blue RAL 5012 *Outdoor Steel Structures Gray RAL 7038 *Moveable parts that may cause injury Yellow RAL 1023 *Lifting Equipment Yellow RAL 1023 Electrical Cabinets: *Steel Structures Gray RAL 7030 Steel Building Structures: *Indoors and outdoors Gray RAL 7038 *Railings - indoors Yellow RAL 1023 Containers: *Anode remnants Yellow RAL 1004 *Used tires Yellow RAL 1004 *Cable Stubs Yellow RAL 1004 *Aluminum Aluminum RAL 9006 *Discarded glass Yellow RAL 1004 *Paper Blue RAL 5007 *Other waste Green RAL 6002 *Iron scraps Red Brown RAL 3009 *Fiber waste Yellow RAL 1004 *Wood waste Beige RAL 1001 2.7 Specification for surface treatment rev 2.0 Page 13 of 14

2.7 Specification for surface treatment rev 2.0 Page 14 of 14