DNV GL approval of manufacturer scheme



Similar documents
ROLLED STAINLESS STEEL PLATES, SECTIONS AND BARS

DNVGL-CP-0209 Edition March 2016

General Description of The CMC- Services

DNVGL-RU-0050 Edition October 2014

DNVGL-CP-0393 Edition December 2015

Cable Trays and Ducts (Metallic)

Electrical Shore Connections / Cold Ironing

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

CERTIFICATION OF OFFSHORE MOORING CHAIN

Fuel Treatment and Conditioning Systems

Outline of a quality system and standard for the certification of conformity

Quality Management System

Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment

EA-6/02 M: EA Guidelines on the Use of EN and ISO/IEC for Certification to EN ISO Publication Reference PURPOSE

TYPE CERTIFICATION OF WIND TURBINES

Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd

Rules for Classification and Construction Materials and Welding

NORSOK STANDARD M-650 Edition 4. Qualification of manufacturers of special materials

Supplier Quality Assurance Requirements Manual

Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD position paper from SG17 - EN :2009

Check-list for auditors. Audit visit at candidate registered laboratories

Helical Products Co., Inc.

Qualification of Auditor and Lead Auditor to perform an assessment according NSQ-100

STANDARD. Maritime training providers DNVGL-ST-0029: DNV GL AS

COMMISSION REGULATION (EU)

Presentation by BSI on the main changes to the IATF ISO/TS certification scheme

Guiding Principles for the contents of Particular Materials Appraisals (Version approved at the WGP on 21 November 2006)

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes

OLB certification process for Forestry Companies GP01

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company

Quality Management System Manual

Quality Management System Manual ISO9001:2008

IMPLEMENTATION DATE: 1 st OCTOBER 2015

a. Are the foundry s employees trained and familiar with portions of the system applicable to their position?

Jim Harris Continuous Improvement Leader

Specification for Rotary Drill Stem Elements

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Supplier Quality Assurance

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

Alternative Steel Materials to BS 5950

INTEROPERABILITY UNIT

Draft Maritime Labour Certificate and Declaration of Compliance Regulations, 2015

Regulations for certification of quality management systems

Fire Protection Industry Scheme Reference SP205 Part 1

TG TRANSITIONAL GUIDELINES FOR ISO/IEC :2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

IMPLEMENTATION DATE 1 st OCTOBER 2015

ISO/IEC QUALITY MANUAL

Network Certification Body

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

EA-04/15. Accreditation. For Non-Destructive. Testing. Publication. Reference. EA - 4/15 Accreditation for Non-Destructive Testing PURPOSE

JIS G3445 Carbon steel tubes for machine structural purposes

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

General Rules for the certification of Management Systems

Comparison ISO/TS (1999) to VDA 6.1 (1998)

REGULATION (EEC) No 2309/93

GLOBAL ENGINEERING SPECIFICATION

AS9100 Quality Manual

American National Standard For Electrical Rigid Steel Conduit (ERSC)

FSSC Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART I

Pressure Vessel acc. to PED for Chemical Industry fabricated in China

Owner-User Pressure Equipment Integrity Management Requirements

Quality & Safety Manual

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

High strength steel for steel constructions

UNCONTROLLED COPY FOR REFERENCE ONLY

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

UK Aerospace Industry Controlled Other Party (ICOP) Auditor Authentication Scheme

Rules for the certification of Food Safety Management Systems

SUPPLIER QUALITY PROGRAM, V (U)

Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004

Welding coordination Tasks and responsibilities

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

Specific Conditions for the Assessment of Management Systems and Product Certifications

Building Diagnostic Tests as Assessment Tools 診 斷 樓 宇 狀 況 的 測 試 : 樓 宇 檢 驗 的 評 估 工 具

Surgi Manufacturing Quality Manual

All kinds of fittings and piping for the energy markets, including large-size and heavy walled machined pipes. A strategic choice

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1

DNV GL Assessment Checklist ISO 9001:2015

CONTROL PROCESS NATURAL ORIGIN AND ORGANIC CANDLES AND HOME FRAGRANCES

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998

1 SUBJECT AND FIELD OF APPLICATION SPECIAL RULES CERTIFICATION ACCORDING TO THE STANDARDS EN 9100 EN 9110 EN

Welded Fabric. The CARES Guide to Reinforcing Steels Part 5. Installation of welded fabric on a major contract. 1.0 Introduction

Safety Storage Cabinets

Supplier Quality Requirements (SQR) for External Process and/or Product Providers

Surveillance Report. Bascule span to the Railway bridge Jernbanebroen over Limfjorden

Certification Process Requirements

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

Management of Safety and Environmental Protection (SEP)

EN :2002 (E) Issue 1 ( )

1 The purpose of this Code is to provide an international standard for the safe management and operation of ships and for pollution prevention.

Supplier Quality Manual

ISO/TS 16949:2002 Guidance Document

STEEL fabrication quality SySTEmS guideline

Transcription:

CLASS PROGRAMME Approval of manufacturers DNVGL-CP-0346 Edition May 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by anyone else but DNV GL and/or its licensees to offer and/or perform classification, certification and/or verification services, including the issuance of certificates and/or declarations of conformity, wholly or partly, on the basis of and/or pursuant to this document whether free of charge or chargeable, without DNV GL's prior written consent. DNV GL is not responsible for the consequences arising from any use of this document by others. The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version.

FOREWORD DNV GL class programmes contain procedural and technical requirements including acceptance criteria for obtaining and retaining certificates for objects and organisations related to classification. May 2016 Any comments may be sent by e-mail to rules@dnvgl.com This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any use of this document.

CHANGES - CURRENT This is a new document. Changes - current Class programme DNVGL-CP-0346. Edition May 2016 Page 3

CONTENTS Changes - current...3 Contents Section 1 General...6 1 Introduction...6 2 Objective...6 3 Scope... 6 4 Application...6 5 Abbreviations...6 Section 2 Approval procedure... 8 1 General... 8 2 Initial approval... 9 3 Renewal of the approval...10 4 Extension or change of approved range... 10 5 Survey report...11 6 Final approval report by manufacturer... 11 7 Evaluation by DNV GL...11 8 Issuance of certificate... 11 9 Validity...12 10 Suspension or withdrawal of certificates...12 Section 3 Documentation requirements... 13 1 Introduction...13 2 Approval report...13 3 Statistics of previous production... 13 4 General documentation of manufacturing route and equipment...13 5 Manufacturing summary... 13 6 Manufacturer products specification...14 7 Manufacturers own certificate form...14 Section 4 Approval testing... 15 1 General requirements... 15 2 Manufacture of test products...15 3 Witnessing of approval testing... 15 4 Testing requirements...15 5 Retesting...16 Class programme DNVGL-CP-0346. Edition May 2016 Page 4

Appendix A : Typical procedure to be followed to obtain initial approval of manufacturer... 17 Changes historic...18 Contents Class programme DNVGL-CP-0346. Edition May 2016 Page 5

SECTION 1 GENERAL 1 Introduction The DNV GL approval of manufacturer (AoM) scheme is a procedure by which the Society approves manufacturers for supply of products in accordance with the Society's rules and standards. Section 1 2 Objective The objective of AoM is to verify the manufacturers ability to consistently manufacture materials and products to the given specification and according to the DNV GL rule requirements. The objective of this program is to provide general requirements for approval of manufacturers of metallic materials. The additional requirements for AoM of specific types of materials and products are further described in individual programs. 3 Scope This programme covers the procedures for initial approval, renewal of approval and extension or change of approval, and is based on the requirements given by the Society's rules and standards. It gives the general requirements related to the approval process including the manufacturers application, test plan proposal, works survey, manufacture and testing of sample products, and the general documentation requirements. 4 Application This programme gives the general provisions for obtaining a certificate as "approved manufacturer" by the Society. It is applicable for metallic material manufacturers delivering products in accordance with the Society's rules and standards. 5 Abbreviations Table 1 Abbreviations Abbreviation AoM AR BCA BOC CC CTS CP COD CTOD EAF GCHAZ HAZ Full text Approval of Manufacturer As rolled Steel grade with qualified brittle crack arrest properties Basic oxygen convertor Continuous casting Controlled thermal severity Class programme Steel grade with qualified CTOD properties Crack tip opening displacement Electric arc furnace Grain coarsened heat affected zone Heat affected zone Class programme DNVGL-CP-0346. Edition May 2016 Page 6

Abbreviation IC LF N NDT Full text Ingot casting Ladle furnace Normalizing Non-destructive testing Section 1 NDTT NR TM VAD VD VOD WPQR WPS WWA QT Nil ductility transition temperature Normalizing rolling Thermo-mechanical rolling Vacuum arc degassing Vacuum degassing Vacuum oxygen decarburizing Welding procedure quealification record Welding procedure specification Welding workshop approval Quenching and tempering Class programme DNVGL-CP-0346. Edition May 2016 Page 7

SECTION 2 APPROVAL PROCEDURE 1 General 1.1 Introduction In order to be certified, the manufacturer shall demonstrate the ability to consistently manufacture products according to the Society's requirements and, if relevant, to a given specification. To this effect the manufacturer shall submit documentation showing that the necessary manufacturing, testing and inspection facilities are available and are supervised by qualified personnel. Works surveys by the Society's representative are required, e.g. to confirm compliance with the submitted documentation. The manufacturer shall also carry out a test program witnessed by the Society's representative, and the obtained test results shall be submitted for assessment by the Society. The following are the main steps of the initial approval process (see App.A): request for approval. (Manufacturer) communicate approval requirements, handle quotation/contract. (Manufacturer/DNV GL) prepare and submit initial documentation and test plan. (Manufacturer) review of relevant documentation, e.g. product description, manufacturing route, inspection and testing procedures and quality system. (DNV GL) review and acceptance of test plan prepared and provided by the manufacturer in accordance with the applicable individual approval programme. (DNV GL) manufacturing of test products, survey and reporting by the Society's surveyor. (Manufacturer/DNV GL) approval testing in accordance with the accepted test plan, witnessed by the Society's representative. (Manufacturer/DNV GL) prepare and submit final approval report including all required documentation and test results reports. (Manufacturer) review and assessment of approval report. (DNV GL) provided the manufacturer is found to have adequate qualifications, approval report is complete and test results are found to meet the applicable requirements, an AoM certificate will be granted. AoM certificates are published on DNV GL s approval-finder. (DNV GL). Section 2 1.2 Request for approval The manufacturer requesting approval (including renewal or extension of existing approvals) shall send a formal application to the Society's local office. The Society provides a quotation for the requested service. 1.3 Sub-contracting Sub-contracting part of the production shall be described in the "approval documentation", see Sec.3. Sub-contracting of relevant production steps shall be entrusted only to those sub-contractors named in the approval documentation, unless the sub-contractor is holding a relevant AoM certificate. (Further limitations may be given on the AoM certificate) The Society may require surveys of relevant sub-contractors in the course of the approval procedure. The manufacturer requesting approval by the Society shall ensure adequate quality of the sub-contracted production steps. 1.4 Limitations Approval is limited to the facilities/production line and premises/plant used for manufacturing of the test products. The manufacturer shall clearly indicate which manufacturing and production facilities that shall be included in the approval, and shall produce the test products accordingly. Class programme DNVGL-CP-0346. Edition May 2016 Page 8

The Society's scope of surveys, assessments and approval testing is limited to the process and products covered by the application for approval. Significant changes to the manufacturing facilities or processes shall be reported to the Society. The Society may request new surveys and approval testing as found necessary. Relocation of approved manufacturing facilities either in full or part will normally require new initial approval. Where required by the rules Pt.2, the manufacturer shall prepare a product specification for the manufacturing process, material composition, etc. The approval is limited to the process and composition etc., as given by this product specification. Section 2 2 Initial approval 2.1 Approval process A flowchart illustrating a typical approval process for initial approval is given in App.A. 2.2 Request for approval The request for approval shall be sent to the local DNV GL office together with the following information: name and site address of the manufacturer a table with a list of products for which approval is requested including the range of approval a description of manufacturing, testing and inspection facilities and equipment. 2.3 Documentation requirements for initial approval The manufacturer shall prepare the approval documentation as required in Sec.3 and by the relevant individual approval programme. 2.4 Test plan proposal The manufacturer shall prepare a detailed test plan in accordance with Sec.4 [2] and by the relevant individual approval programme. 2.5 Works survey for initial approval The manufacturer shall organize a works survey together with the Society's surveyor. Focus will normally be given to quality control of critical production steps, and that manufacturing, testing and inspection facilities are available and supervised/operated by qualified personnel. The surveyor will decide the scope of the survey, and may request additional documentation when preparing for the works survey. Manufacture of test products and approval testing may require separate visits. In case of adequate preparation and agreement with the Society, these steps of the approval process may be combined in one or two visits. 2.6 Manufacture of test products The manufacturer shall establish a schedule for the production of test products, see Sec.4. The surveyor shall be invited for witnessing of all critical manufacturing steps. 2.7 Approval testing Approval testing shall be performed in accordance with Sec.4. Class programme DNVGL-CP-0346. Edition May 2016 Page 9

3 Renewal of the approval 3.1 Request for renewal Application for renewal should be made not later than three months before the expiry date of the certificate. Applications received after the expiry of the certificate may require new initial approval if deemed necessary by the Society. Section 2 3.2 Documentation requirements for renewal of AoM certificate For renewal of the AoM certificate, the manufacturer shall submit an assessment report confirming that original approval conditions are maintained and no significant changes have been made to manufacturing process, equipment and procedures. A brief summary report giving statistical information related to certified products supplied to vessels classed by the Society in the previous validity period shall be included. If no products have been subject to certification by the Society for a period of two years, the Society reserves the right to require additional surveys and approval tests. 3.3 Renewal survey Manufacturer shall invite the Society's surveyor for renewal survey in order to revisit the critical manufacturing steps and to verify that the approved conditions are maintained. During the survey the manufacturer shall provide evidence that the applicable versions of relevant rules, standards and approval programs are applied, and that all requirements given therein are implemented. 3.4 Approval testing for renewal If there are no significant changes to the manufacturing process, equipment and procedures, new approval testing will usually not be required for renewal of the AoM certificate. However, significant changes to the approved conditions may render new approval testing necessary, although a reduced scope of testing would typically be accepted, depending on the significance of the change. 4 Extension or change of approved range 4.1 Request for extension An existing AoM certificate may be extended or changed with respect to the range of approval. Extension of the range of approval may be applied for at any time. 4.2 Documentation requirements for extension For extensions of, or for significant changes to the approved products or process, the approval documentation specified in Sec.3 shall be re-submitted highlighting the changes to the already approved manufacturing process. A new manufacturing summary and a new testing and inspection plan shall be submitted, including information about new equipment, extended capacity of the existing equipment or change of the product scope. 4.3 Test plan and test products For test plan proposal, see Sec.4 [2]. Class programme DNVGL-CP-0346. Edition May 2016 Page 10

4.4 Survey for extension of the approval A works survey for extension of the approval may be deemed necessary, e.g. if range of products for extension are produced using a manufacturing process, equipment or procedures that were not part of initial approval. Manufacturer shall invite the Society's surveyor for extension survey. 4.5 Approval testing for extension For extensions of an existing approval to include new products, material or application areas, full approval testing (same as for initial approval) according to Sec.4 will normally be required unless otherwise agreed with the Society. Section 2 5 Survey report For initial, renewal or extension of the approval, the surveyor will prepare a survey report including applicable checklists. The manufacturer shall give the surveyor the necessary access and information in order to complete the report and checklists. 6 Final approval report by manufacturer On completion of the approval testing, the manufacturer shall prepare and submit a detailed approval report. The approval report shall preferably be organized with the same indexing as given in this program as well as in the relevant individual approval programme. The report shall contain all the information requested in [2.2], [2.3] and [2.4], as well as Sec.3 and Sec.4. The report shall include the request for approval, information on manufacturing route and equipment, documentation of all relevant tests and test results, and include original test records endorsed by the surveyor. The language of the submitted documentation shall be English. The approval report shall be signed and dated by the manufacturer s representative, and submitted to the local DNV GL office. Incomplete report, or test results not complying with the given requirements may be returned to the manufacturer for correction. 7 Evaluation by DNV GL The evaluation of compliance with the approval requirements is based on the final approval report, the surveys, and the survey report with applicable checklists. In case of insufficient documentation or test results the manufacturer will be informed for further actions. 8 Issuance of certificate Provided the manufacturer is found to have adequate qualifications, the approval report is in compliance with the applicable requirements, all tests are completed and the test results comply with the applicable requirements, an approval of manufacturer certificate will be issued. The certificate will include a list of products covered by the approval. The certificate will be forwarded to the manufacturer, and an entry made in the Society's list of approved manufacturers on the internet (the Approval Finder). Class programme DNVGL-CP-0346. Edition May 2016 Page 11

9 Validity The AoM certificate is valid for three (3) years with no intermediate assessment unless otherwise requested by the Society. Guidance note: The surveyor shall be given the opportunity to survey and check at any time all plants and equipment used in the manufacture and testing. The manufacturer shall assist the surveyor to enable him to verify that approved processes are adhered to and to witness the selection and testing as required by the rules. Section 2 ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- Renewal of the certificate must be done before the expiry date. For renewal the validity time is extended with three years. Certificates which have expired at the time of renewal will be adjusted according to previous validity date. For extension of a certificate the validity period will not be changed unless the extension is combined with a renewal, i.e. that all corresponding requirements for renewal are fulfilled. Any significant alteration to the approved condition during the period of validity, e.g. as described in the approval documentation (Sec.3 of this programme and relevant individual approval programme) shall be reported to the Society. The Society will decide if a new survey/re-testing shall be performed. Any changes to the name of the manufacturer shall be brought to the attention of the Society. In order to change the name on a certificate the manufacturer shall present formal evidence of the new name, and send an application to the Society accordingly. New requirements introduced in the Society's rules or class programs during the period of validity may require updating of the approval documentation or additional approval testing. Unless otherwise required by the Society, the new requirements shall take effect at the next extension or renewal of the AoM certificate. 10 Suspension or withdrawal of certificates An approval of manufacturer certificate may be suspended or withdrawn at any time if the Society finds it justified. Provisions for suspension and withdrawal of a certificate are given by DNV GL rules RU SHIP Pt.1 Ch.1. Class programme DNVGL-CP-0346. Edition May 2016 Page 12

SECTION 3 DOCUMENTATION REQUIREMENTS 1 Introduction This section is specifying the general documentation required for initial approval. For alterations to the equipment, processes, procedures etc. covered by an existing certificate, the corresponding documentation shall be updated and submitted to the Society for evaluation (surveys, renewal and/or extension of the approval may be required). Further documentation requirements are given in the individual approval of manufacturer programs. Section 3 2 Approval report This section includes the general documentation to be provided in the approval report applicable for all relevant AoM's. Only information relevant for the manufacturing of the products covered by the AoM certificate shall be submitted. See also Sec.2 [1.3] and Sec.2 [6]. 3 Statistics of previous production A report giving statistical information about recent production, e.g. with respect to chemical composition and mechanical properties of similar grades and products shall be submitted. The report shall preferably be based on products subject to third party verified certification. 4 General documentation of manufacturing route and equipment All procedures and documentation to be submitted as required by this programme and by each of the individual programs shall be traceable and dated documents with track of revisions etc., and should in general be part of the manufacturer s QA manual. The following shall be submitted: organisation structure and quality assurance system including quality control responsibilities manufacturing process description, visualized in flow charts indicating all process steps, and in particular the associated testing and inspection points list of the manufacturers written procedures for testing and inspection. The procedures need not to be submitted (except as given below), but shall be available for review at the manufacturer s works upon request list of equipment used for chemical analysis, mechanical testing, metallographic examination, nondestructive testing, dimensional and thickness measurements, pressure testing, etc. evidence of calibration for all relevant manufacturing and testing devices documentation of the qualifications of personnel engaged in testing and inspection, including level of certification of non-destructive testing personnel. Where the number of relevant personnel exceeds 10, a list of personnel and their qualifications will suffice manufacturers formal procedures (e.g. from quality manual) for product and test samples identification and traceability. 5 Manufacturing summary The manufacturer shall establish and submit a manufacturing summary for all products, material grades and dimensional ranges which shall be covered by the certificate. Several grades and/or size ranges may be combined into one manufacturing summary where this is convenient. The manufacturing summary shall specify the sequence of all important manufacturing and sampling/testing steps, and the conditions for control, e.g. by reference to instructions or procedures. Class programme DNVGL-CP-0346. Edition May 2016 Page 13

Supply of materials and subcontracted activities relevant for the approval shall be indicated, and the names of suppliers/subcontractors and their approval details shall be provided as appropriate. Production steps performed by subcontractors are subject to documentation and testing requirements as given by the approval programs. Where a manufacturer applies for extension of an existing approval to cover e.g. larger diameters, new supplier of starting material, etc., the manufacturing summary shall be updated accordingly. Section 3 6 Manufacturer products specification Where required by the Society's rules, standards, approval programs or by the Society's representative, the manufacturer shall prepare a separate product specification document. The product specification shall specify all relevant limitations to the approved product and manufacturing process, i.e. where these are supplementary to the basic requirements of the rules, e.g.: chemical composition with narrower range limitations rolling parameters for NR, TM, BCA, COD steels testing requirements and acceptance criteria for special steels, e.g. small scale test for BCA steels. The specification shall be a traceable document, numbered, dated, with revision numbering and signed by the manufacturer. It will be referred on the AoM certificate, and shall be made available to the surveyor on request. 7 Manufacturers own certificate form Where DNV GL certification of products using the manufacturer s own certificate form is intended (e.g. in the format of EN 10204 type 3.1 or ISO 10474 type 3.1 etc.) a blank copy of the certificate form and a filled in certificate for a representative product/material shall be submitted. Legends and entries may be in national language, but all information which is required in order to enable assessment as per the DNV GL rules shall be in English language (e.g. in addition to the local language where relevant). Class programme DNVGL-CP-0346. Edition May 2016 Page 14

SECTION 4 APPROVAL TESTING 1 General requirements Unless otherwise specified, the testing and the test results shall comply with the appropriate requirements of the rules, e.g. RU SHIP Pt.2. In case of newly built manufacturing facilities or newly developed types of products, material grades or manufacturing processes, the Society may request additional tests, increased number of test products and other dimensions of the products for testing. Further requirements are given in the individual approval of manufacturer programs. Section 4 2 Manufacture of test products The manufacturer shall propose a detailed inspection and test plan (a formal document, dated and with version number), based on the relevant individual approval program. The test plan proposal shall be accepted by the Society before manufacturing of the products to be tested. Surveyor shall be invited to witness all critical manufacturing steps for the production of test material/ products, and for marking of the samples from which test specimens will be prepared. He shall also be given access to carry out a visual examination of the products intended for approval purposes for his reporting, e.g. of the surface condition. Records and data for the manufacture of the test products shall included in of the approval report. 3 Witnessing of approval testing The surveyor shall be given necessary access for verification of the calibration status of all relevant testing equipment, that is, testing equipment that will be used for testing of products supplied to DNV GL class. This is also applicable for tests carried out at laboratories recognized and/or approved by the Society. The surveyor shall be invited to witness all approval testing. Chemical composition test and metallographic analysis is exempted from this requirement unless specifically requested by the Society. If the required testing facilities are not available at the manufacturer, the approval tests may be carried out at a testing laboratory recognized and/or approved by the Society. In such case the surveyor shall be invited for witnessing at the relevant laboratory. The test reports shall be made available to the surveyor for endorsing. 4 Testing requirements Unless otherwise specified, the testing procedures, test pieces shape, and test pieces location and orientation shall comply with the applicable requirements of the rules and/or the applicable standards. The test results shall fulfil the requirements of the rules, e.g. RU SHIP Pt.2 or the applicable standard/specification, whichever is stricter (unless otherwise agreed). The following general reporting requirements apply for approval of material manufacturers: sketches, drawings and photos showing the position of test blocks shall be included in the test report. Type of test blocks and their dimensions shall be reported and wherever necessary supported with photographic evidence photographs of the tested specimens shall be included in the report. The dimensions of the specimens and the fracture surfaces must be recognizable. The plots of registered load-deformation (stress-strain) curves obtained for the tensile tests shall be included. The loading rates shall be reported. Class programme DNVGL-CP-0346. Edition May 2016 Page 15

5 Retesting In case the test results for any of the approval tests fails to meet the requirements, the manufacturer shall do an evaluation of the root cause for the failure and implement corrective and preventive actions. The root cause analysis report also describing corrective and preventive actions shall be submitted to the Society for evaluation. Retesting of the same product/heat may be carried out as relevant (e.g., see RU SHIP Pt.2 Ch.1 Sec.2 [3.7] for retesting of materials), although possible acceptance of the retest results will always be based on special consideration by the Society. Section 4 Note: The Society will usually require new approval testing on new products, e.g. materials deriving from new heats. ---e-n-d---o-f---n-o-t-e--- Class programme DNVGL-CP-0346. Edition May 2016 Page 16

APPENDIX A : TYPICAL PROCEDURE TO BE FOLLOWED TO OBTAIN INITIAL APPROVAL OF MANUFACTURER Step No. Activity Type of document Manufacturer Forwarding DNV GL 1 Request for approval E-mail/letter X 1) 2 Approval requirements, quotation Rules, approval programs X 1) Appendix A 3 Prepare and submit initial documentation and test plan Detailed documentation and test plan X 1) 4 Review initial documentation and test plan, agree on test plan, request more information if necessary 5 Prepare for works survey and invite the surveyor Email/letter X 1) Email/letter X 1) 6 Works survey, give comments as applicable Survey report X 1) 7 Produce test product under surveyors witnessing, stamping of test product Inspection and test plan X 1) X 1) 8 Approval testing under surveyors witnessing Test reports X 1) X 1) 9 Prepare final approval report including all approval test results Approval report X 1) 10 Review, request more information or testing if necessary Comments, draft certificate X 1) 11 Issue and forward approval certificate Certificate & invoice X 1) 1) X = responsible for forwarding Class programme DNVGL-CP-0346. Edition May 2016 Page 17

CHANGES HISTORIC There are currently no historical changes for this document. Changes historic Class programme DNVGL-CP-0346. Edition May 2016 Page 18

DNV GL Driven by our purpose of safeguarding life, property and the environment, DNV GL enables organizations to advance the safety and sustainability of their business. We provide classification and technical assurance along with software and independent expert advisory services to the maritime, oil and gas, and energy industries. We also provide certification services to customers across a wide range of industries. Operating in more than 100 countries, our 16 000 professionals are dedicated to helping our customers make the world safer, smarter and greener. SAFER, SMARTER, GREENER