NOTICE OF INTENT. Department of Environmental Quality Office of Air Quality and Radiation Protection Air Quality Division



Similar documents
Leak free means a system where no gasoline is leaked while the system is

NOTIFICATION OF PERFORMANCE TESTING FOR GASOLINE DISPENSING FACILITIES (GDFs) NESHAP 40 CFR, Part 63, Subpart CCCCCC (Sections

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

Title: Fuel Transport - Tank Truck

Healy Enhanced Vapor Recovery Troubleshooting Guide

Standards and best practice guidelines for vapour recovery at petrol service stations. Department of Environment, Climate Change and Water NSW

OREGON FIRE CODE Interpretations and Technical Advisories

ALL UST SYSTEMS. MOTOR FUEL, USED OIL, BULK HEATING OIL STORAGE (Federal/State Regulated Systems)

State of California Air Resources Board. Second Notice of Public Availability of Modified Text

Last Updated: June 1, 2014

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rules

The following definitions apply with regard to requirements specified in this document:

Subpart XX Standards of Performance. Terminals. Environmental Protection Agency

The GDF Tester Certification Program

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

BP WIND ENERGY POLICIES AND PROCEDURES

Waste Oil Collection / Storage

Attachment I. Technical Support Document. Request for State Implementation Plan Revision to Remove Stage II Gasoline Vapor Recovery Systems

CHAPTER 96: ALARM SYSTEMS

5.2 Transportation And Marketing Of Petroleum Liquids General

CHAPTER PETROLEUM CONTACT WATER

The following definitions apply with regard to requirements specified in this document:

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF REVENUE DIVISION OF MOTOR VEHICLES AMENDED RULES AND REGULATIONS RELATIVE TO

This page left intentionally blank

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure

NOTICE OF INTENT. Department of Environmental Quality Office of Air Quality and Radiation Protection Radiation Protection Division

STANDARD FOR SECONDARY CONTAINMENT TESTING OF UNDERGROUND STORAGE TANK SYSTEMS I. INTRODUCTION

California Gas Station ISD Requirements *

Recommended Fuel Piping Specification For UPP Piping, UL-971

Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either:

Chapter 24 Title Lending Registration Act. Part 1 General Provisions

Standard Hydraulic Piping Flushing Procedure

FIVE YEAR CERTIFICATION REPORT

UPDATE ON MAINE'S UNDERGROUND TANK LAWS

Commercial Licensing Regulation 4 - Motor Vehicle Body Repair. C. "Applicant" means a Person filing an application for a Motor Vehicle Body License.

Storage Tank Guidance for Real Estate Professionals

ABOVE-GROUND STORAGE TANKS

Source Sampling Manual Volume II

Petrol Storage Information Note

UST RULES CHANGES. Heather Peters, Environmental Specialist

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT

Butch Browning State Fire Marshal, Bobby Jindal Governor - Licensing Requirements

RULE DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

Alarm System Regulation Policy Adopted January 4, 1983

NOTICE National Emission Standards for Hazardous Air Pollutants for Perchloroethylene Dry Cleaning Facilities

NDEP Bureau of Corrective Actions Secondary Containment Regulations Guidance Document April 7, 2010 (Revision)

Fire Pump Plan Review March 2010


Section 1. The title of Section of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

FUELING AND FUEL STORAGE

[CHAPTER 481J] USED MOTOR VEHICLE SALES AND WARRANTIES

Petroleum (Consolidation) Regulations 2014

Emission Control Systems Warranties

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

Ethanol Vehicle and Infrastructure Codes and Standards Citations

DEPARTMENT OF CONSUMER AND INDUSTRY SERVICES DIRECTOR'S OFFICE

Performing Inventory Control For Storage Tanks

NEW YORK CITY FIRE DEPARTMENT

Underground Storage Tank Operational Compliance Field Guide

NOTICE OF INTENT. Department of Health and Hospitals Bureau of Health Services Financing

Ordinances Governing ALARM SYSTEMS. in the CITY OF ARLINGTON TEXAS. Amended by Ordinance No (May 27, 2014)

ALARM SYSTEM USER: Any person, firm, partnership, cooperation or other entity which uses an Alarm System at its Alarm Site.

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

CHECKLIST FOR INSTALLING OR CONVERTING EQUIPMENT TO DISPENSE E15, E30 E85 AND OTHER BLENDS OF ETHANOL General Information:

The On-Board Refueling Vapor Recovery (ORVR) Evaporative Emission (EVAP) system.

ARTICLE 5. ALARM DEVICES AND SYSTEMS

MODEL LAW ON MOTOR VEHICLE INSPECTION BY INDEPENDENT CONTRACTORS AND SELF INSPECTORS

ALARM SYSTEMS INFORMATION & REQUIREMENTS

LOCAL LAW BE ENACTED BY THE BOARD OF TRUSTEES OF THE VILLAGE OF MAMARONECK AS FOLLOWS:

Topic : Aviation Fuel Quality Control Regulation, Code or Standard

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF TRANSPORTATION DIVISION OF MOTOR VEHICLES AMENDED RULES AND REGULATIONS RELATIVE TO

EVAPORATIVE (EVAP) EMISSION CONTROL SYSTEM CLEANING PROCEDURE FOR EVAP CANISTER CHARCOAL LEAKAGE INCIDENTS

ALARMS. Chapter 32 ALARMS

Container Management for Hazardous Waste Generators Technical Guidance Document HW-2005-G1

ALARM SYSTEMS Ord. No Adoption Date: September 9, 2008 Publication Date: September 17, 2008 Effective Date: October 16, 2008

NFPA31FuelOilPiping 1 Revised

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil)

County of Santa Clara Department of Environmental Health Hazardous Materials Compliance Division Solid Waste Programs

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

LIFE SAFETY AND PROPERTY PROTECTION FIRM APPLICATION. ** All fees are NON-REFUNDABLE**

NSPS Subpart OOOO: Applicability and Compliance Basics

Notes. Material 1. Appropriate Flammable Liquids

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

RULE Department of Health and Hospitals Office of Public Health Center for Environmental Health

RULE. Office of the Governor Real Estate Appraisers Board. Appraisal Management Companies (LAC 46:LXVII.Chapters )

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

REFERENCE NUMBER : PPC/54. POLLUTION PREVENTION AND CONTROL ACT 1999 POLLUTION PREVENTION & CONTROL (ENGLAND AND WALES) REGULATIONS 2000(as amended)

Sec Adoption of Texas Department of Health Standards for Public Swimming Pool and Spa.

ORDINANCE CITY OF NEW ORLEANS COUNCILMEMBERS WILLIAMS, HEAD, BROSSETT, CANTRELL AND GUIDRY (BY REQUEST)

Chapter 95. Regulation 81 Military Personnel Automobile Liability Insurance Premium Discount and Insurer Premium Tax Credit Program

COMPLIANCE MANAGEMENT STRATEGIES. Presented by: Megan Kazmierczak, ECS Eclipse

According to L. R. S. 48:385, any discharge to a state highway ditch, cross ditch, or right-of-way shall require approval from: AND

AMERICAN SOCIETY OF CERTIFIED ENGINEERING TECHNICIANS

Dollars And Sense Financial Responsibility Requirements For UndergroundStorage Tanks

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

Fuels Safety Program. Liquid Fuels Handling Code Adoption Document Amendment

63rd Legislature AN ACT GENERALLY REVISING THE MONTANA DEFERRED DEPOSIT LOAN ACT; EXTENDING THE TIME

ORDINANCE NO O-01

ON-SITE WASTEWATER TREATMENT SYSTEMS ACT

Transcription:

NOTICE OF INTENT Department of Environmental Quality Office of Air Quality and Radiation Protection Air Quality Division Under the authority of the Louisiana Environmental Quality Act, La. R.S. 30:2001 et seq., and in accordance with the provisions of the Administrative Procedure Act, La. R.S. 49:950, et seq., the secretary gives notice that rulemaking procedures have been initiated to amend the Air Quality Division regulations, LAC 33:III.2132 (Log #). The proposed rule clarifies test procedures for vacuum assist type vapor recovery systems. The test procedures were not yet finalized by the California Air Resources Board (CARB) at the time of original rule promulgation. LAC 33:III.2132.D is rewritten and restructured for clarity. This proposed rule meets the exceptions listed in R.S. 30:2019 (D) (3) and R.S.49:953 (G) (3); therefore, no report regarding environmental/health benefits and social/economic costs is required. A public hearing will be held on September 25, 1997, at 1:30 p.m. in the Maynard Ketcham Building, Room 326, 7290 Bluebonnet Boulevard, Baton Rouge, LA 70810. Interested persons are invited to attend and submit oral comments on the proposed amendments. Should individuals with a disability need an accommodation in order to participate please contact Patsy Deaville at the address given below or at (504) 765-0399. All interested persons are invited to submit written comments on the proposed regulations. Commentors should reference this proposed regulation by. Such comments must be received no later than October 2, 1997, at 4:30 p.m., and should be sent to Patsy Deaville, Investigations and Regulation Development Division, Post Office Box 82282, Baton Rouge, LA 70884 or to fax number (504) 765-0486. Copies of this proposed regulation can be purchased at the above referenced address. You may contact the Investigations and Regulation Development Division at (504) 765-0399 for pricing information. Check or money order is required in advance for each copy of. This proposed regulation is available for inspection at the following DEQ office locations from 8:00 a.m. until 4:30 p.m.: 7290 Bluebonnet Boulevard, 4th floor, Baton Rouge, LA 70810; 804 31st Street, Monroe, LA 71203; State Office Building, 1525 Fairfield Avenue, Shreveport, LA 71101; 3519 Patrick Street, Lake Charles, LA 70605; 3501 Chateau Boulevard West Wing, Kenner, LA 70065; 100 Asma Boulevard, Suite 151, Lafayette, LA 70508. This regulation is also available on the Internet at http://www.deq.state.la.us/olae/irdd/olaeregs.htm. Gus Von Bodungen Assistant Secretary

TITLE 33 ENVIRONMENTAL QUALITY PART III. Air Chapter 21. Control of Emission of Organic Compounds Subchapter F. Gasoline Handling 2132. Stage II Vapor Recovery Systems for Control of Vehicle Refuelling Emissions at Gasoline Dispensing Facilities A. Definitions. Terms used in this Section are defined in LAC 33:III.111 of these regulations with the exception of those terms specifically defined below as follows: CARB California Air Resources Board. [See Prior Text] Stage II Vapor Recovery System a gasoline vapor recovery system that is CARB approved and recovers vapors during the refueling of motor vehicles. B. Regulated Sector 1. The provisions of this regulation shall apply in allthe following parishes designated as moderate or above for ozone nonattainment. These are: Ascension, East Baton Rouge, West Baton Rouge, Iberville, Livingston, Pointe Coupee, and Livingston Parishes West Baton Rouge. [See Prior Text in B.2-4] a. Ffacilities for which new construction commenced after November 15, 1990, must comply with these requirements within six months after promulgation of this regulationnot later than May 20, 1993; b. Ffacilities constructed before November 15, 1990, which dispensehave an average monthly throughput rate of 100,000 gallons or more of gasoline per month must comply within one year after promulgation of this regulationprior to November 20, 1993; c. Any facility described in both Subsection B.4.a and b of this Section shall meet the requirements of Subsection B.4.a of this Sectionies constructed before November 15, 1990, which have an average monthly throughput rate between 10,000 and 100,000 gallons of gasoline per month must comply not later than November 20, 1994; and 2

this regulation; d. All other facilities must comply within two years after promulgation of e. Eexisting facilities previously exempted from, but which become subject to, the requirements of this regulation shall comply with the requirements of this regulation within one year from the date on which the facility becomes subject. 5. No owner or operator as described in Subsection B.1, 2, and 3 of this Section shall cause or allow the dispensing of motor vehicle fuel at any time unless all fuel dispensing operations are equipped with and utilize a CARB certified vapor recovery system whichthat is properly installed and operated in accordance with the corresponding CARB executive order within guidelines of the National Fire Protection Association (NFPA) 30. The vapor recovery equipment must also be installed and operated within the guidelines of the National Fire Protection Association (NFPA) 30. The vapor recovery equipment utilized shall be certified by the California Air Resources Board (CARB) or equivalent certification authority approved by the administrative authority* to attain a minimum of 95 percent gasoline vapor control efficiency. This certified equipment shall have coaxial hoses and shall not contain remote check valves. In addition, only CARB or equivalent approved aftermarket parts and CARB or equivalent approved rebuilt parts shall be used for installation or replacement use. [See Prior Text in B.6-6.a] b. plans to test for proper operation of the Stage II equipment every five yearsin accordance with Subsection D.1.a of this Section or upon major system modification; [See Prior Text in B.6.c-c.ii] iii. the CARB or equivalent executive order number of the vapor recovery system to be utilized; and D. Testing, Labeling and Recordkeeping [See Prior Text in B.6.c.iv-C.2] 1. The facility owner/operator of the facility shall maintain the following records, on the facility premises for at least two years, and present them to an authorized representative of the Department of Environmental Quality upon request: a. application approval records; b. station operating license; 3

c. system installation and testing results; d. Stage II maintenance records. These maintenance records shall include, but not be limited to, daily visual inspections for malfunctions. Such malfunctions shall include: i. absence or disconnection of any component required to be used on a certified or equivalent system; blocked or restricted; ii. crimped or flattened vapor hose such that the vapor passage is iii. torn nozzle boots; iv. damaged faceplates or facecones; v. malfunction in the nozzle shutoff mechanism; and vi. inoperative vacuum producing device; e. inspection records; f. compliance records; g. training certification; and h. gasoline throughput records. These shall include, but not be limited to, all monthly gasoline delivery receipts and sales information. 2. A pressure decay/leak test (San Diego Test Procedure TP-92-1) shall be conducted and successfully passed, initially, after installation of the vapor recovery system and prior to initiating operation of the vapor recovery system, and once every five years thereafter. 3. A dynamic pressure drop test (San Francisco Bay Area Dynamic Back Pressure Test Procedure ST-27) shall be conducted and successfully passed, initially, after installation of the vapor recovery system and prior to initiating operation of the vapor recovery system, and once every year thereafter. 4. A liquid blockage test (San Diego Test Procedure TP-91-2) shall be conducted and successfully passed, initially, after installation of the vapor recovery system and prior to initiating operation of the vapor recovery system, and once every five years thereafter. 5. The test methods used are contained in the Environmental Protection Agency document entitled "Technical Guidance Stage II Vapor Recovery Systems for Control of Vehicle Refueling Emissions at Gasoline Dispensing Facilities, EPA-450-3-91-022b." 4

6. The facility owner/operator shall post operating instructions conspicuously on the front of each gasoline dispensing pump using a Stage II Vapor Recovery System. The instructions shall include: a. a clear description of how to correctly dispense gasoline with the vapor recovery nozzles utilized at the site; b. a warning that continued attempts at dispensing gasoline after the system indicates that the vehicle tank is full ("topping off") may result in spillage or recirculation of gasoline; and c. a telephone number established by the department for use by the public to report comments, questions or problems experienced with the system. 7. It shall be the responsibility of the owner/operator to have the installed equipment successfully pass the required test (see Subsection D.2, 3, 4, and 5 of this Section) prior to start-up of the facility. The owner or operator of the facility shall notify the department at least five calendar days in advance of the date that the testing is to be performed. The department reserves the right to confirm the results of the aforementioned testing at its discretion and at any time. Within 30 days after installation or major system modification of a vapor recovery system, the owner or operator of the facility shall submit to the department the date of completion of the installation or major system modification of a vapor recovery system and the results of all functional testing requirements. 8. Any equipment which has been tagged "out of order" by the department shall not be used until it has been repaired or replaced. 9. Any equipment having a defect, as determined through daily visual inspections or other means, shall be tagged "out of order" by the facility owner or operator and shall not be used until it has been repaired or replaced.have the installed vapor recovery equipment tested prior to the start-up of the facility. The owner or operator shall notify the department at least five calendar days in advance of the scheduled date of testing. Testing must be performed by a contractor that is certified with the Department of Environmental Quality. Compliance with the emission specification for Stage II equipment shall be demonstrated by passing the following required tests or equivalent for each type of system: a. vapor balance system: i. a static pressure test (CARB test procedure TP 201.3) shall be initially conducted and successfully passed after installation of the vapor recovery system and prior to initiating operation of the vapor recovery system and once every year thereafter; ii. a dynamic pressure drop test (San Francisco Bay Area Dynamic Back Pressure Test Procedure ST-27) shall be initially conducted and successfully passed after 5

installation of the vapor recovery system and prior to initiating operation of the vapor recovery system and once every year thereafter; and iii. a liquid blockage test (San Diego Test Procedure TP-91-2) shall be initially conducted and successfully passed after installation of the vapor recovery system and prior to initiating operation of the vapor recovery system and once every five years thereafter; b. vacuum assist system: i. a static pressure test (CARB test procedure TP 201.3) shall be initially conducted and successfully passed after installation of the vapor recovery system and prior to initiating operation of the vapor recovery system and once every year thereafter; ii. an air to liquid volume ratio test (CARB test procedure TP 201.5) shall be initially conducted and successfully passed after installation of the vapor recovery system and prior to initiating operation of the vapor recovery system and once every year thereafter; and iii. a liquid blockage test (San Diego Test Procedure TP-91-2) shall be initially conducted and successfully passed after installation of the vapor recovery system and prior to initiating operation of the vapor recovery system and once every five years thereafter. 2. The test methods used are contained in the Environmental Protection Agency document entitled, Technical Guidance Stage II Vapor Recovery Systems for Control of Vehicle Refueling Emissions at Gasoline Dispensing Facilities, EPA-450-3-91-022b and the CARB Stationary Source Test Methods, Volume 2, April 12, 1996, or latest revision. 3. The department reserves the right to confirm the results of the aforementioned testing at its discretion and at any time. Within 30 days after installation or major system modification of a vapor recovery system, the owner or operator of the facility shall submit to the department the date of completion of the installation or major system modification of a vapor recovery system and the results of all functional testing requirements. E. Labeling. The facility owner/operator shall post operating instructions conspicuously on the front of each gasoline dispensing pump using a Stage II vapor recovery system. The instructions shall include: 1. a clear description of how to correctly dispense gasoline with the vapor recovery nozzles utilized at the site; 2. a warning that continued attempts at dispensing gasoline after the system indicates that the vehicle tank is full ( topping off ) may result in spillage or recirculation of gasoline; and 6

3. a telephone number established by the department for use by the public to report comments, questions, or problems experienced with the system. F. Inspection 1. The facility owner or operator shall maintain the Stage II vapor recovery system in proper operating condition as specified by the manufacturer and free of defects that could impair the effectiveness of the system, including but not limited to: a. absence or disconnection of any component required to be used on a certified or equivalent system; or restricted; b. crimped or flattened vapor hose such that the vapor passage is blocked c. a nozzle boot that is torn in one or both of the following ways: i. a triangular-shaped or similar tear more than one half inch on a side or a hole more than one half inch in diameter; ii. a slit more than one inch in length; d. for balance nozzles a faceplate that is damaged such that the capability to achieve a seal with a fill pipe interface is affected for a total of at least one-fourth of the circumference of the faceplate; e. for nozzles in vacuum assist type systems, a flexible cone for which a total of at least one-fourth of the cone is damaged or missing; f. a nozzle shutoff mechanism that malfunctions in any manner; g. vapor return lines, including such components as swivels, antirecirculation valves, and underground piping, that malfunction, are blocked, or are restricted such that the pressure drop through the line exceeds by a factor of two or more the value as certified in the approved system; h. a vapor processing unit that is inoperative; i. a vacuum producing device that is inoperative; inoperative; j. pressure/vacuum valves, vapor check valves, or dry breaks that are 7

k. a vapor guard that is missing or damaged such that a slit from the outer edge of the open end flange to the spout anchor clamp exists or that has an equivalent cumulative damage; l. any equipment defect that is identified by the department as substantially impairing the effectiveness of the system in reducing refueling vapor emissions; or m. any gasoline leaks as detected by sight, sound, or smell. 2. The owner or operator shall perform daily inspections and accurately record the results of the inspections. 3. Any equipment having a defect, as determined through daily visual inspections or other means, shall be tagged out of order by the facility owner or operator and shall not be used until is has been repaired or replaced. 4. Any equipment that has been tagged out of order by the department shall not be used until it has been repaired or replaced. G. Recordkeeping. The facility owner/operator shall maintain the following records on the facility premises for at least two years and present them to an authorized representative of the department upon request: 1. application approval records; 2. certificate to operate; 3. system installation and testing results; 4. stage II maintenance records, which shall include, but not be limited to, daily visual inspections for malfunctions; 5. inspection records; 6. compliance records; and 7. training certification. EH. Enforcement 1. Enforcement of these regulations, authorized under R.S. 30:2054, shall include, but not be limited to, the following penalties: a. notices of violation; 8

b. warnings; c. cease and desist orders; d. suspension of license or permit to operate; e. revocation of license or permit to operate; f. monetary fines; and g. "red tagging" equipment to prevent its operation. 2. The administrative authority may consider requests from a small business stationary source for modification of: a. any work practice or technological method of compliance,; or b. the schedule of milestones for implementing such work practice or method of compliance preceding any applicable compliance date, based on the technological and financial capability of any such small business stationary source. No such modification may be granted unless it is in compliance with the applicable requirements of the Louisiana Environmental Quality Act and the Federal Clean Air Act, including the requirements of the applicable implementation plan. Where such applicable requirements are set forth in Federal regulations, only modifications authorized in such regulations may be allowed. FI. Fees. The fees are defined in LAC 33:III.223. AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2054. HISTORICAL NOTE: Promulgated by the Department of Environmental Quality, Office of Air Quality and Radiation Protection, Air Quality Division, LR 18:1254 (November 1992), repromulgated LR 19:46 (January 1993), amended LR 9