VE-COMMERCE Logistic Campus



Similar documents
Antwerp East Port Logistic Campus

A59 A29 A16 A17 A58 Roosendaal

MEGAHUB LOGISTICS CENTER Center of Consumers. Hämeenlinna Lahti Turku Tampere

Conclusions. How to optimize your. Medtec Supply Chain in Europe

the location warehouse Port of moerdijk

Network Assessment Client Risk Report Demo

LOGISTIC INVESTMENT OPPORTUNITY MOERDIJK ORIONWEG 6

Element D Services Plumbing

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

Security Assessment Report

LogisticsCentre IV Distribution Center

Voorbeeld. Preview. praktijkrichtlijn Food safety management systems - Guidance on the application of ISO 22000:2005 (ISO/TS 22004:2005,IDT)

Decree of the Ministry of the Environment. on fire safety of garages

INVENTORY AND CONDITION FORM CONCERNING THE PROPERTY AT

Data Center Due Diligence List

Voorbeeld. Preview ISO INTERNATIONAL STANDARD. Cranes Requirements for test loads

Citrix Access Gateway: Implementing Enterprise Edition Feature 9.0

TEXAS ASSOCIATION OF REALTORS

Arran House, Raleana Road, E14 9RN Price: 449,888 Tenure: Leasehold Lease 125 from 1997

Nederlandse norm NEN-ISO/IEC (en)

DATACENTER COLOCATION. Flexible, Secure and Connected

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Voorbeeld. Preview. NEN-ISO/IEC (en)

All Weather Hall. Efficient, multipurpose & quick to build

The UPLANDS at ORO VALLEY Sterling Features

New Providence Wharf, London, E14 Price: 449,888 Tenure: Leasehold Lease 999 from 2004

Fire Safety Requirements for Child Care Centre

LogisticsCentre IV Distribution Center

EXCLUSIVE MANDATE INFORMATION MEMORANDUM. Teichweg 3, Giessen

Logistics Warehouse. Janco Logistics (HK) Ltd. DSC Services

Previder Datacenters it starts here

VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A

483/503 GARRETTS GREEN LANE GARRETTS GREEN BIRMINGHAM B33 0TL

More than shelving & racking. All for your storage demands.

Press release. Grand Opening of Phase I of the Katoen Natie Khonaini Logistics Terminal Jubail, Kingdom of Saudi Arabia March 17 th, 2014

Lighting Management solutions

Voorbeeld. Preview. NEN-ISO (en) Road vehicles - Roof load carriers - Part 4: Magnetic fixing devices (ISO :2004,IDT)

Product description NCC Data Center

Denver Fire Department Idle Pallet Storage Guidelines Per NFPA 13_Chpt 12

6. GIVE FULL DETAILS OF TYPE OF WORK, OPERATIONS AND ATTACH BROCHURES IF APPLICABLE:

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security.

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

BUILDING DESIGN FOR HOMELAND SECURITY. Unit IV Vulnerability Assessment

BUILDERS RISK / WRAP-UP LIABILITY APPLICATION

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

Summit Series Single Section and Double Section Homes

RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE

Archive Solutions BRUYNZEEL. Solutions for an efficient archive. Bruynzeel. Focus on efficiency and accessibility. Focus on sustainability

The Peaks Features List

164,491 SF Food Production Facility Situated on 10 Acres Available in

25 PARSON STREET WILNECOTE TAMWORTH B77 5BD

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Facility Assessment for East Main Street, Huntley, IL

How To Plan A Building

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

Material test chamber with mechanical convection

Application for Builders Risk & Wrap-Up Liability Coverage

EMERGENCIES IVAO BE 28 OCT by Bob van der Flier IVAO-TA12 & PATCO

High-speed folding doors. F Series

Enclosures DuraSystems Barriers, Inc. The Passive Fire Protection Specialists

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Heating oven with mechanical control

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

BROWACOM PRODUCTS. Our web-pages can be found from:

SPRINKLER RULES & STANDARDS IN EUROPE CEA 4001 & EN 12845

Sheldon Clayton Logistics

Transcription:

LOCATION & ACCESSIBILITY

LOCATION VE COMMERCE Logistics CAMPUS, a unique campus located in the logistic heart of Europe Right off the highway A67 (which links Antwerp to Duisburg/Dortmund) and the A73 (which links Maastricht to Amsterdam), Groep Heylen is building a 140.000 m² state of the art logistic campus. The Venlo E- Commerce Logistic Campus The site is situated on the business park Trade Port Nord and is a unique AAA - view location with multimodal transport flows. The campus consists of a modern and multi-functional distribution center with a total of 140.000 m² warehouse surface, which can be divided in separate and linkable units of approx. 15.000 m². Spread out over the campus there s plenty of employee parking, completely separate from the lorry traffic. To guarantee an efficient handling of all the logistic processes, the warehouse is built with a maximum amount of loading docks per unit.

LOCATION Address Tenure Site Total LFA Site coverage Construction Date Floor Load Floor Flatness Clear Height # Loading docks Greenportlane (John Hicksstraat) 5928 RC VENLO VE-COMMERCE LOGISTICS Freehold 220.000 Sqm 140.000 Sqm + built-so-suit 64% A-B-E-F Apr 16 & Fase 3+4 possible in 16-17 50KN/sqm DIN 18202 tabel 3, Zeile 4 12,20m 1 per 1000 sqm

AVAILABILITY AVAILABLE PER UNIT LFA Warehouse Warehouse E - in option - 15.000 sqm Warehouse F - in option - 15.000 sqm Warehouse C - available - 15.000 sqm Warehouse D - available - 25.000 sqm Warehouse G - available - 15.000 sqm TOTAL SIZE 140.000 sqm Warehouse H - available - 25.000 sqm Mezzanine Offices Warehouse A + B - LEASED -

PROPERTY SPECIFICATIONS WAREHOUSE a Free height of 12,2 m a Span suitable for small and wide aisles a A minimum of 1 loading dock per 1.000 m² a Each loading dock has an automated, electric gate (3m x 3m), dockleveller (6 ton dynamic, 9 ton static), shelter and bumper bars a 1 automated, electric gate on ground floor level (4m x 4,2m) a Floor load of 5.000 kg/m² a Maximum point load pallet racking: 80kN/foot a Flatness floor conform DIN18202 Tabel 3, Zeile 4 (5mm/2m) a Insulated concrete plinth with a height of 2,5m a Certified ESFR sprinkler installation a Fire hose and fire hydrants conform the rules and code a Fire alarm and evacuation system conform the rules and code a Heating by way of gas-fired air heaters with ecofans a Lighting: high frequency TL5 lights equipped with ballasts, 250 Lux at 1,5m MEZZANINE a Mezzanine with a depth of 24 m on the front façade level 6 m a Floor load of 1000 kg/m² a Window for natural light OFFICES a Offices on ground floor and mezzanine level with an open floor plan a High-end VRF-system for cooling and heating a Lighting: high frequency TL5 lights, 500 Lux at worktable level a Pantry with integrated fridge, stainless steel sink and dishwasher a High-end finishing SITE a A 2m high fence around the perimeters of the site with automised entrance gates a Parking for employees a Exterior lights: circulation roads 20 Lux, loading docks 50 Lux

VE-COMMERCE LOGISTIC CAMPUS

LOGISTIC DEVELOPMENT OPPORTUNITY

Ralph Caspanni Business Development Director ralph.caspanni@groepheylen.nl mob. +31 6 31 974 336 De gehele projectinformatie mag niet worden beschouwd als een aanbieding. De vermelde informatie is van algemene aard en niet meer dan een uitnodiging om in onderhandeling te treden. Alle informatie is met zorg samengesteld, is geheel vrijblijvend en is uitsluitend bestemd voor de geadresseerde, tenzij uitdrukkelijk anders vermeld. De informatie is (mede) gebaseerd op door derden verstrekte gegevens. Aansprakelijkheid veroorzaakt door onjuistheid en/of onnauwkeurigheid van door derden verstrekte gegevens aan Groep Heylen wordt niet aanvaard.