PLANNING COMMISSION COUNTY OF MONTEREY, STATE OF CALIFORNIA

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE

ORDINANCE NO

BOARD OF ADJUSTMENT STAFF REPORT. BOA File No West Avenue- Multifamily Building

ORDINANCE NO AMENDING THE SAN MATEO MUNICIPAL CODE TO ADD CHAPTER 7.46 REGARDING MEDICAL MARIJUANA COLLECTIVES REGULATIONS

Section 801 Driveway Access Onto Public Right-of-Ways

PLANNED DEVELOPMENT PERMIT

Alarms. Chapter 27 ALARMS. Definitions. Police Alarm System. Alarm System Requirements Alarm System Inspections Alarm Agent Permits

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE

Section Emergency Water Shortage Regulations and Staged Water Use Reduction Plan Section Scope and Purpose

The following definitions apply with regard to requirements specified in this document:

CHAPTER 7 BUILDING ARTICLE 7-1 UNIFORM CODES Adoption. Board of Appeals. Annual Review

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

COUNTY AND DISTRICT INITIATIVE & REFERENDUM PETITIONS

Texas Natural Resource Conservation Commission Page 1 Chapter Water Quality Performance Standards For Urban Development

Application Package for License for Sidewalk Dining Adjacent to Eating Establishment

Development Variance Permit Application Package

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

CHAPTER 15 - BUILDING, PLUMBING, ELECTRIAL AND HOUSING CODES

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

Questions and Answers for Local Governments

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

Suffolk County Department of Health Services. Division of Environmental Quality

General Fire Code Requirements Within Commercial Tenant Spaces

(c) Western Sycamore (Platanus racemosa)

ALBEMARLE COUNTY CODE CHAPTER 5 BUILDING REGULATIONS ARTICLE I. ADMINISTRATION

COASTAL DEVELOPMENT PERMIT

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

NEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY

Chapter 8.24

NOW, THEREFORE, BE IT ORDAINED by the Princeton Council as follows:

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Chapter 5. Code Enforcement

ORDINANCE NO. 72 THE TOWNSHIP BOARD OF TRUSTEES FOR THE CHARTER TOWNSHIP OF LANSING HEREBY ORDAINS:

Answers to Commonly Asked Questions

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

THE TOWN OF COLONIAL BEACH, VIRGINIA DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT

April 1, Section 1. Declaration of a Water Shortage Emergency Section 2. Purpose and Authority Section 3. Effect of Ordinance...

City of Valdosta Land Development Regulations. Table of Contents

CHAPTER MECHANICAL CODE HEATING, AIR CONDITIONING, VENTILATING AND REFRIGERATION DIVISION 2 - APPEALS

SECTION 105 PERMITS. Gas:

FILING REQUIREMENTS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS

CITY OF SANTA ROSA DEPARTMENT OF COMMUNITY DEVELOPMENT STAFF REPORT FOR PLANNING COMMISSION SEPTEMBER 13, 2012 APPLICANT FILE NUMBER CUP12-042

OREGON FIRE CODE Interpretations and Technical Advisories

2-1 TITLE 7 CONSTRUCTION REGULATIONS 2-4

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

STAFF REPORT PLANNING COMMISSION REGULAR MEETING OF OCTOBER 20, Debbie Hill, Associate Planner 9386-A1

MOBILE HOME LAW. Revised November 2001

EXHIBIT LRP: :A ORDINANCE NO.

Chapter WIRELESS COMMUNICATION FACILITIES

Chapter 5.58 SECURITY ALARM SYSTEMS

CHAPTER XIX PLUMBING

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

B. Improve the appearance and character of areas surrounding new development.

CITY OF THE VILLAGE OF DOUGLAS ALLEGAN COUNTY, MICHIGAN ORDINANCE NO

ORDINANCE NO

BUSINESS USE PERMIT APPLICATION

Arkansas HVAC/R Law. Act 277, Amended by: Act 112 of 1993; Act 442 of 1995; Act 344, 1997; Act 465 of 1999; Act 1563 of 2001 & Act 1712 of 2003

9. Does the County of San Diego keep home plans on file for existing homes?

ALARM SYSTEMS Ord. No Adoption Date: September 9, 2008 Publication Date: September 17, 2008 Effective Date: October 16, 2008

How To Install An Overhead Sewer

The Board of Zoning Appeals shall have the duty and power to:

CHAPTER 3 MANUFACTURED AND MOBILE HOMES

PERMITS REQUIRED & PERMIT EXEMPTIONS

Page 1 of 51 Exterior Plumbing Quiz Part 1

CITY OF SEAL BEACH APPLICATION FOR BUSINESS LICENSE

ARTICLE IV. DRIVEWAYS

COMP PLAN SUBMITTAL CHECKLIST

ARLINGTON COUNTY CODE. Chapter 18 PLUMBING AND GAS CODES

DEPARTMENT OF CONSUMER AND INDUSTRY SERVICES DIRECTOR'S OFFICE

TITLE 6. Health and Sanitation CHAPTER 1. Health and Sanitation

Development Services Guidelines

Mission Canyon Residential Design Guidelines Workshop. Table Focus: Environmental Issues and Concerns

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?

TREE ORDINANCE. Section

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

Package Treatment Plant Policy and Procedure

Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms

Minor Accommodation Planning Review Application

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

Certification. Septic Tank Contractors

ON-SITE WASTEWATER TREATMENT SYSTEMS ACT

SOLAR ENERGY FACILITIES ZONING AMENDMENTS

CHAPTER 17. Sewers and Sewage

ATTENTION BUILDERS, CONTRACTORS AND DEVELOPERS

dpd Seattle Permits Tip Small Business: Getting Your Use and Building Permit from DPD RESEARCH RESOURCES

TREE CONTRACTORS LICENSE APPLICATION

STAFF REPORT: CONSENT CALENDAR. Vasanth Venugopal. 367 Via Lido Soud, City of Newport Beach (County of Orange)

Chapter 54: Natural Gas

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

OCFRD TENT STANDARD This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.

Transcription:

LYNNE MOUNDAY ZONING ADMINISTRATOR STATE OF CALIFORNIA COUNTY OF MONTEREY RESOLUTION NO. 000630 A.P.# 008-381-009-000 In the matter of the application of Pebble Beach Company (PLN000630) FINDINGS & DECISION for a Coastal Administrative Permit in accordance with Chapter 20.76 (Coastal Administrative Permits) of Title 20, Monterey County Code (Zoning), to allow for the construction of: 17,342 sq. ft. maintenance building including a chemical storage unit; a service island for equipment and vehicles; storage bins; a 1,000 gallon above ground fuel storage tank; approximately 23,000 cubic yards of grading; retaining walls; nine (9) employee parking spaces; and Design Approval, located at 17 Mile Drive, Pebble Beach, between Whitman Lane and Carmel Way, Del Monte Forest area, Coastal Zone, came on regularly for meeting before the Zoning Administrator on January 10, 2002. Said Zoning Administrator, having considered the application and the evidence presented relating thereto, 1. FINDING: The subject Coastal Administrative Permit and Design Approval (PLN000630), as described in condition #1 and as conditioned, conforms with the plans, policies, requirements and standards of the Local Coastal Program (LCP). The LCP for this site consists of the Del Monte Forest Land Use Plan, Coastal Implementation Plan (Part 5), Part 6 of the Coastal Implementation Plan, and the Monterey County Zoning Ordinance (Title 20). The property is located at 17 Mile Drive between Whitman Lane and Carmel Way (Pebble Beach Golf Links) in the Del Monte Forest area of the Coastal Zone. The parcel is zoned OR-D (CZ) or Open Space Recreation, Design Control District. The site is physically suitable for the use proposed. The project is in conformance with the public access and public recreation policies of the Coastal Act and Local Coastal Program, and does not interfere with any form of historic public use or trust rights (see 20.70.050.B.4). No access is required as part of the project as no substantial adverse impact on access, either individually or cumulatively, as described in Section 20.70.050.B.4.c of the Monterey County Coastal Implementation Plan, can be demonstrated. EVIDENCE: Staff review of the application and plans submitted for the Coastal Administrative Permit contained in the project file at the Monterey County Planning and Building Inspection Department. No conflicts were found to exist. No communication was received during the course of review of this project to indicate that there is any inconsistency with the text and policies of these documents. EVIDENCE: Although the project is located in a high archaeological sensitivity area, the applicant has submitted evidence (letter) by Dr. Gary Breschini of Archaeological Consulting, Inc. of Salinas dated November 14, 2000, which indicates that no archaeological resources exist in the immediate project area. A condition has been added to require that work be stopped in the event that any archaeological resources are found during construction. EVIDENCE: The project site is not located within or near to an environmentally sensitive area as shown in the Del Monte Forest resource maps. On a site visit conducted on July 11, 2001 staff verified that

Pebble Beach Company (PLN00630) Page 2 the proposed building site is located on existing planted turf, disturbed ground and an existing concrete parking area. EVIDENCE: The Del Monte Forest Land Use Advisory Committee reviewed and recommended approval (2-0 vote) of the Coastal Administrative Permit and Design Approval on July 5, 2001. EVIDENCE: The project, as proposed and conditioned, will incorporate state-of-the-art runoff control devices to capture and treat runoff from the facility, consistent with LUP policies regarding water quality and discharge into the Carmel Bay. EVIDENCE: The site is located in a highly scenic area, however, the proposed siting of the maintenance facility and associated landscaping provides continued screening and thus the building will not be visible from any public viewing area. Staff site visits on July 11, 2001 and September 14, 2001 verified that the proposed building will not be visible form 17-Mile Drive, Carmel Beach (Scenic Road) or Point Lobos State Park. EVIDENCE: There has been no testimony received, either written or oral, during the course of public hearings to indicate that the site is not suitable for the project. Necessary public facilities are available for the use proposed. The project has been reviewed by the Monterey County Planning and Building Inspection Department, Parks Department, Water Resources Agency, California Department of Forestry Monterey Peninsula, Public Works Department, Environmental Health Division, and the Del Monte Forest Land Use Advisory Committee. There has been no indication from those agencies that the site is not suitable. There are no physical or environmental constraints such as geologic or seismic hazard areas, environmentally sensitive habitats, or similar areas that would indicate the site is not suitable for the use proposed. EVIDENCE: The proposed project is located close to but not directly on an area identified in the Local Coastal Program as a public access area to Carmel Beach and will not encroach upon the existing access trail, consistent with LCP public access policies. 2. FINDING: The proposed project, including all permits and approvals, will not have significant adverse impacts on the environment. A Negative Declaration has been prepared and is on file (File # PLN000630) in the Department of Planning and Building Inspection. Potential environmental effects have been studied, and there is no substantial evidence in the record, as a whole, that supports a fair argument that the project, as designed, may have a significant effect on the environment. The Negative Declaration reflects the independent judgment and analysis of the County based upon the findings and conclusions drawn in the Initial Study and the testimony and information received, and scientific and factual data presented as evidence during the public review process. The Monterey County Planning and Building Inspection Department, located at 2620 1 st Avenue, Marina is the custodian of the documents and the materials that constitute the record of proceedings upon which the adoption of the Negative Declaration is based. EVIDENCE: The application, plans, and support materials submitted by the project applicant to the Monterey County Planning and Building Inspection Department for the proposed development, found in the project file EVIDENCE: County staff prepared an Initial Study for the project in compliance with the California Environmental Quality Act (CEQA) and its Guidelines. The Initial Study provided substantial evidence that the project would not have significant environmental impacts. A Negative Declaration was filed with the County Clerk on December 4, 2001. The following evidence has

Pebble Beach Company (PLN00630) Page 3 been received and considered: All comments on the Initial Study; evidence in the record that includes studies, data and reports supporting the Initial Study; additional documentation requested by staff in support of the Initial Study findings; information presented during public hearings; staff reports that reflect the County s independent judgment and analysis regarding the above referenced studies, data and reports; application materials, and expert testimony. Among the studies, data and reports analyzed as part of the environmental determination are the following: Stephen R. Staub, Forester s Report, 05/15/ 2001. Haro, Kasunich and Associates, Inc. Geotechnical Investigation, 04/13/2001. Haro, Kasunich and Associates, Inc. Grading and drainage plan, 09/19/2001 Haro, Kasunich and Associates, Inc., Letter on soil conditions, 10/10/2001 Letter by Gary S. Breschini, PhD, Archaeological Consulting, 11/14/2000. Pebble Beach Company, Environmental Evaluation Document 11/14/2001 EVIDENCE: No facts, reasonable assumptions predicated on facts, testimony supported by adequate factual foundation, or expert opinion supported by facts, have been submitted that refute the conclusions reached by these studies, data and reports. Nothing in the record alters the environmental determination, as presented by staff, based on investigation and the independent assessment of those studies, data and reports EVIDENCE: Studies, data and reports prepared by staff from various County departments including Planning and Building Inspection, Public Works, Environmental Health and Monterey County Water Resources Agency support the adoption of the Negative Declaration for the project. 3. FINDING: The establishment, maintenance, and operation of the proposed development applied for will not under the circumstances of the particular case, be detrimental to the health, safety, peace, morals, comfort, and general welfare of persons residing or working in the neighborhood or to the general welfare of the County. EVIDENCE: The project as described in the application and accompanying material was reviewed by the Department of Planning and Building Inspection, California Department of Forestry Monterey Peninsula, Public Works and Parks Departments, Environmental Health Division, and Water Resources Agency. The respective departments and Agency have recommended conditions, where appropriate, to ensure that the project will not have an adverse effect on the health, safety, and welfare of persons either residing or working in the neighborhood or the County in general. 4. FINDING: The subject property is in compliance with all rules and regulations pertaining to zoning uses, subdivisions and any other applicable provisions of Title 20, and all zoning violation abatement costs, if any, have been paid. EVIDENCE: Staff review of sections 20.38 and 20.44 of the Monterey County Code (Zoning) that establish regulations for development in Open Space Recreation and Design Approval districts. Staff verification of the Monterey County Planning and Building Inspection Department records indicated that no violations exist on subject property. 5. FINDING: The project is appealable to the Board of Supervisors and the California Coastal Commission.

Pebble Beach Company (PLN00630) Page 4 EVIDENCE: Section 20.86 of the Monterey County Coastal Implementation Plan, Part 1 (Zoning Ordinance). DECISION It is the decision of the Zoning Administrator of the County of Monterey that the Negative Declaration be adopted and said application for a Coastal Administrative Permit be granted as shown on the attached sketch and subject to the following conditions: 1. The subject Coastal Administrative Permit and Design Approval allow for: construction of a 17,342 sq. ft. maintenance building including a chemical storage unit; a service island for equipment and vehicles; storage bins; a 1,000 gallon above ground fuel storage tank; approximately 23,000 cubic yards of grading; retaining walls; nine (9) employee parking spaces; and Design Approval. Neither the uses nor the construction allowed by this permit shall commence unless and until all of the conditions of this permit are met to the satisfaction of the Director of Planning and Building Inspection. Any use or construction not in substantial conformance with the terms and conditions of this permit is a violation of County regulations and may result in modification or revocation of this permit and subsequent legal action. No use or construction other than that specified by this permit is allowed unless additional permits are approved by the appropriate authorities. (Planning and Building Inspection) Prior to the Issuance of Grading and Building Permits: 2. The applicant shall record a notice which states: "A permit (Resolution 000630) was approved by the Zoning Administrator for Assessor's Parcel Number 008-381-009-000 on January 10, 2002. The permit was granted subject to 20 conditions of approval, which run with the land. A copy of the permit is on file with the Monterey County Planning and Building Inspection Department." Proof of recordation of this notice shall be furnished to the Director of Planning and Building Inspection prior to issuance of building permits or commencement of the use. (Planning and Building Inspection) 3. All exterior lighting shall be unobtrusive, harmonious with the local area, and constructed or located so that only the intended area is illuminated and off-site glare is fully controlled. The applicant shall submit 3 copies of an exterior lighting plan which shall indicate the location, type, and wattage of all light fixtures and include catalog sheets for each fixture. The exterior lighting plan shall be subject to approval by the Director of Planning and Building Inspection, prior to the issuance of building permits. (Planning and Building Inspection) 4. No land clearing or grading shall occur on the subject parcel between October 15 and April 15 unless authorized by the Director of Planning and Building Inspection. (Planning and Building Inspection) 5. A geotechnical investigation was prepared by Haro, Kasunich and Associates on April 13, 2001 and updated via letters dated September 19 and October 10, 2001. The recommendations contained in said report and letters are hereby incorporated as conditions of approval and shall be followed and submitted with the plans when a building permit is applied for. (Planning and Building Inspection) 6. A Forester s Report dated May 15, 2001 was prepared by Stephen Staub with recommendations for the handling and replanting of the existing trees at the project site. The applicant shall comply with the

Pebble Beach Company (PLN00630) Page 5 recommendations of the report which are hereby incorporated as conditions of approval. (Planning and Building Inspection Department) 7. Prior to issuance of grading or building permits, a drainage plan shall be prepared by a registered civil engineer or architect addressing on-site and off-site impacts, that includes routing stormwater runoff from the paved parking areas to an oil-grease/water separator to mitigate the impact of impervious surface stormwater runoff. Necessary improvements shall be constructed in accordance with approved plans. (Water Resources Agency) 8. The building(s) shall be fully protected with automatic fire sprinkler system(s). The following notation is required on the plans when a building permit is applied for: "The building shall be fully protected with an automatic fire sprinkler system. Installation, approval and maintenance shall be in compliance with applicable National Fire Protection Association and/or Uniform Building Code Standards, the editions of which shall be determined by the enforcing jurisdiction. Four (4) sets of plans for fire sprinkler systems must be submitted and approved prior to installation. Rough-in inspections must be completed prior to requesting a framing inspection." (Fire District) 9. The building(s) shall be fully protected with automatic fire sprinkler system(s). The following notation is required on the plans when a building permit is applied for : The building(s) shall be fully protected with an approved central station, proprietary station, or remote station automatic fire alarm system as defined by National Fire Protection Association Standard 72-1993 Edition. Plans and specifications for the fire alarm system must be submitted and approved by the enforcing jurisdiction prior to requesting a framing inspection. All fire alarm system inspections and acceptance testing shall be in accordance with Chapter 7 of NFPA 72-1993. (Fire District) Prior to Final Building Inspection/Occupancy: 10. The applicant shall comply with Ordinance No. 3932 of the Monterey County Water Resources Agency pertaining to mandatory water conservation regulations. The regulations for new construction require, but are not limited to: a. All toilets shall be ultra-low flush toilets with a maximum tank size or flush capacity of 1.6 gallons, all shower heads shall have a maximum flow capacity of 2.5 gallons per minute, and all hot water faucets that have more than ten feet of pipe between the faucet and the hot water heater serving such faucet shall be equipped with a hot water recirculating system. b. Landscape plans shall apply xeriscape principles, including such techniques and materials as native or low water use plants and low precipitation sprinkler heads, bubblers, drip irrigation systems and timing devices. (Water Resources Agency & Planning and Building Inspection) 11. The site shall be landscaped. At least three weeks prior to occupancy, three copies of a landscaping plan shall be submitted to the Director of Planning and Building Inspection for approval. A landscape plan review fee is required for this project. Fees shall be paid at the time of landscape plan submittal. The landscaping plan shall

Pebble Beach Company (PLN00630) Page 6 be in sufficient detail to identify the location, specie, and size of the proposed landscaping materials and shall be accompanied by a nursery or contractor's estimate of the cost of installation of the plan. Before occupancy, landscaping shall be either installed or a certificate of deposit or other form of surety made payable to Monterey County for that cost estimate shall be submitted to the Monterey County Planning and Building Inspection Department. (Planning and Building Inspection) 12. Where gates are to be locked, the Reviewing Authority having jurisdiction may require installation of a key box or other acceptable means to immediate access for emergency equipment. (Fire District) 13. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to all premises upon which facilities, buildings, or portions are hereafter constructed or moved into or within the jurisdiction. Since the area is served by public water, it is requested that all fire flow needs be attached to that system. Minimum main size to be 8 diameter pipeline. (Fire District) 14. The hydrant or fire valve shall be 18 inches above grade, 8 feet from flammable vegetation, no closer than 4 feet nor further than 12 feet from a roadway, and in a location where fire apparatus using it will not block the roadway (Jones style hydrant w/2-4 and one 2 ½ outlet. (Fire District) 15. Portable fire extinguishers shall be installed in occupancies and locations as set forth in Section 1002 of the 1998 Uniform Fire Code and as required by the Fire Chief. (Fire District) 16. The applicant shall comply with Articles 52 (Motor Vehicle Dispensing), 79 (Flammable and Combustible Liquids), and 82 (Liquefied Petroleum Gases) and with Section 902.4 (Key Box-Haz mat security box for site Material Data Safety Sheets) of the 1998 Uniform Fire Code, as required by the Fire Chief. (Fire District) Continuous Permit Conditions: 17. All landscaped areas and/or fences shall be continuously maintained by the property owner and all plant material shall be continuously maintained in a litter-free, weed-free, healthy, growing condition. (Planning and Building Inspection) 18. If, during the course of construction, cultural, archaeological, historical or paleontological resources are uncovered at the site (surface or subsurface resources) work shall be halted immediately within 50 meters (165 feet) of the find until it can be evaluated by a qualified professional archaeologist. The Monterey County Planning and Building Inspection Department and a qualified archaeologist (i.e., an archaeologist registered with the Society of Professional Archaeologists) shall be immediately contacted by the responsible individual present on-site. When contacted, the project planner and the archaeologist shall immediately visit the site to determine the extent of the resources and to develop proper mitigation measures required for the discovery. (Planning and Building Inspection) 19. The applicant shall comply with Title 19 of the California Code of Regulations, Subchapter 3 and Health and Safety Code Chapter 6.95 dealing with Hazardous Material Registration and Business Response Plans, as approved by the Director of Environmental Health. (Environmental Health) 20. All vehicles or parts stored for longer than 72 hours that contain gasoline, oils, lubricants, coolants, or any other

Pebble Beach Company (PLN00630) Page 7 hazardous materials/wastes shall be stored in impervious areas with secondary containment features approved by the Division of Environmental Health. The 72 hour limit shall not apply to impounded vehicles. (Environmental Health)

Pebble Beach Company (PLN00630) Page 8 PASSED AND ADOPTED this 10th day of January, 2002. LYNNE MOUNDAY ZONING ADMINISTRATOR COPY OF THIS DECISION WAS MAILED TO THE APPLICANT ON IF ANYONE WISHES TO APPEAL THIS DECISION, AN APPEAL FORM MUST BE COMPLETED AND SUBMITTED TO THE CLERK TO THE BOARD OF SUPERVISORS ALONG WITH THE APPROPRIATE FILING FEE ON OR BEFORE THIS PROJECT IS LOCATED IN THE COASTAL ZONE AND IS APPEALABLE TO THE BOARD OF SUPERVISORS AND THE COASTAL COMMISSION. This decision, if this is the final administrative decision, is subject to judicial review pursuant to California Code of Civil Procedure Sections 1094.5 and 1094.6. Any Petition for Writ of Mandate must be filed with the Court no later than the 90 th day following the date on which this decision becomes final. NOTES 1. You will need a building permit and must comply with the Monterey County Building Ordinance in every respect. Additionally, the Zoning Ordinance provides that no building permit shall be issued, nor any use conducted, otherwise than in accordance with the conditions and terms of the permit granted or until ten days after the mailing of notice of the granting of the permit by the appropriate authority, or after granting of the permit by the Board of Supervisors in the event of appeal. Do not start any construction or occupy any building until you have obtained the necessary permits and use clearances from the Monterey County Planning and Building Inspection Department office in Marina. 2. This permit expires two years after the above date of granting thereof unless construction or use is started within this period.