Offshore Transmission Cost Assessment Workshop

Similar documents

Offshore Transmission: Guidance for Cost Assessment Guidance Document

Offshore Electricity Transmission: Consultation on tender exercises under the enduring regime (178/11)

Viking Link Interconnector

NEW CABLE? - Understanding the cost to connect renewable generation in Orkney

UK content analysis of Robin Rigg Offshore Wind Farm operations and maintenance

This section outlines the Solvency II requirements for a syndicate s own risk and solvency assessment (ORSA).

This letter accompanies Ofgem's attached section 11A formal licence modification notice and also details:

Data Communications Company (DCC) price control guidance: process and procedures

OFFSHORE WIND PROCUREMENT

Invitation to Quote for General Fund Assets Revaluation for Resource Accounting 2015/ /20.

Instructions for use:

STATEMENT OF CHARGING METHODOLOGY FOR USE OF ELECTRICITY NORTH WEST LIMITED S ELECTRICITY DISTRIBUTION NETWORK

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Name Telephone Mike Wilks

Information Commissioner's Office

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

EMR Capacity Market Implementation Coordination Workshop

Disclaimer: All costs contained within this report are indicative and based on latest market information. 16 th March 2015

Rent to Buy 2015 to 2017

TenneT. Stakeholder engagement and Consultation Process OWFs. Day 1 ONL Michiel Müller / Rob van der Hage

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

UK renewable energy an update

London Array Off-Shore Wind Farm

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:

Opening the CfD support scheme to non-uk renewables projects

Thames Tideway Tunnel Cost of capital

Electricity Network Innovation Competition Screening Submission Pro-forma

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)

Grid connection of near shore wind farms

An energy of the future coming from the sea

How To Prepare A Configuration Change Change Request For The Tfnsw Cmaac

Duncan Burt Head of Commercial Operation National Grid. The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE

Cost of and financial support for offshore wind

connected excellence in all we do Turnaround Management

Business Planning & Budgetary Control 2012/13

Improving Cable Repairs. Sean Kelly April 2015

HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER


Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government

Profile. Offshore Wind Projects. Sustainable EPC and Marine Contractors

Validation of Revenue Funded Projects:

Offshore Work Packages

National Grid Electricity Transmission RIIO-T1: Initial Proposals consultation response Supplementary information Strategic Spares

Highlands and Islands Broadband Pathfinder Project - Background

Improving the ACT Building Regulatory System

UNSOLICITED PROPOSALS

AER reference: 52454; D14/54321 ACCC_09/14_865

PATROL ADJUDICATION JOINT COMMITTEE EXECUTIVE SUB COMMITTEE REPORT FOR RESOLUTION. Budget Monitoring of Revenue Expenditure

Offshore Windfarm Egmond aan Zee 4 years of Operation

Report on the EMR Delivery Body s performance of its functions in relation to the Capacity Market

Technical Journal. Paper 142

Supply Chain Plan Final Guidance

The Ontario Energy Board's ( Board ) Decision and Order in the OPA's 2011 revenue requirement submission (EB ) directed the OPA:

DONG Energy AS Wind Energy Market Analysis

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Electricity Market Reform (EMR) Panel of Technical Experts for the Enduring Regime:

THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT

APRIL 2015 ARE YOU READY FOR THE SENIOR MANAGERS AND CERTIFICATION REGIME?

Farm Rent Determinations Minimising Uncertainty

OFFICE OF GAS AND ELECTRICITY MARKETS TRANSITIONAL TENDER REGIME FOR OFFSHORE TRANSMISSION ASSETS DRAFT DATA ROOM POPULATION GUIDELINES

Track and Track Drainage Renewals Programme

Collaborative development of evaluation capacity and tools for natural resource management

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting

Key Players in Performance Management & Performance Measurement

SP Transmission RIIO-T1 Business Plan

THE ROYAL BRITISH LEGION EXTERNAL GRANTS GUIDELINES FOR APPLICANTS

For inclusion in the shortlist to be invited to tender for the provision of Manned Security Services to S4C. Date of publication: 9 December 2013

Newsletter. Opening letter from Chair, Jeremy Newman

We appreciate your feedback

Tasmanian Transmission Revenue Proposal

The Provision of Consultancy: Debt Data Collection and Presentation

ELECTRICITY GENERATION, DISTRIBUTION AND SUPPLY LICENCE EXEMPTIONS FREQUENTLY ASKED QUESTIONS (FAQS)

Ofgem guidance on the determination of disputes for use of system or connection to energy networks

Forensics Science Service Transition (Operation Slingshot) Update

Overview of the UK Demand Response Market

Summary of performance outputs for: The Performance Management Service. Service Delivery Lead: Performance Management Officer - Hetty Thornton

Is Your GIS Smart Grid Ready?

Appendix 1 Action Plan and Progress Against Current Status of Peer Review and Ofsted Fostering Report Recommendations

SSE Greater Gabbard Offshore Wind Farm Supply Chain Engagement

Implementing a leaner and more efficient organisation to capture management gains

TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE

Solvency II for Beginners

Annex C Data Quality Statement on Statistics Release: Adults with learning disabilities known to Scottish local authorities 2012 (esay)

REVISED ADOPTED REGULATION OF THE DEPARTMENT OF EDUCATION. LCB File No. R Effective September 18, 2008

What next for UK auctions of renewable Contracts for Difference?

By Manitoba Hydro, March 4 th 2013

Annual Staff Appraisal Guidance Notes

Risk Management Procedure

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

Applying for EU Funding Part 1: The Pre Planning Stage

Analyst presentation. Atkins Energy business

To be used in conjunction with the Invitation to Tender for Consultancy template.

Continuous Sales & Operations Planning

Report to Trust Board Executive summary

OFFSHORE WIND ENERGY IS GETTING CHEAPER

Transcription:

Offshore Transmission Cost Assessment Workshop Development proposals Roger Morgan, Senior Manager, Developer Engagement 13 December 2013

Points to note for today s workshop The issues we intend to cover during today are to facilitate debate and promote industry feedback If we are to make changes please note that there may be a need for consequential changes to the regulatory/industry framework - if raised we ll note such changes but don t intend to dwell on these today 2

Progress to date Two workshops (Jan & July 2013) Bi-lateral meetings with developers Consultation document published 4 Dec 2013: - Builds on industry feedback - 3 key themes: offshore benchmarking, engagement with developers and incentives 3

Purpose of today s workshop Discuss consultation issues in detail - Ofgem to provide an overview of our consultation document - E.ON to provide a developer s perspective Provide clarity on consultation themes - inform your responses to our consultation document - closing date 11 February 2014 4

Today s Agenda 10.10-11.00: Overview of consultation issues / E.ON presentation 11.00 11.15: Break 11.15 12.15: Roundtable discussions 12.15 12.30: Feedback session 12.30 12.45: Ofgem/developer information exchange 12.45 13.00: Summary of day, next steps 5

Summary of consultation issues Fiona Alexander Manager, Developer Engagement

What is Benchmarking? Process to compare one party s costs to others / to compare costs across industry. To establish what can be expected by an average or best performer in a comparator group. To help judge whether costs are efficient or a party is an outlier. 7

Benchmarking in offshore cost assessments Given the limited amount of comparable data benchmarking has not been used to establish economic and efficient costs. We have used benchmarking to: - identify project cost outliers - cap IDC rates - cap development costs 8

Potential options for developing benchmarking What is the most relevant data set for benchmarking purposes? - Our initial view: Developer final costs corrected for errors or Ofgem s FTV? - We have used DFTV in consultation for illustrative purposes Potential use of benchmarking to help establish the economic and efficient cost for future offshore transmission projects: - Total cost benchmarking OR component level 9

DFTV unit cost m/mw Total project cost benchmarking 0.9 0.8 0.7 Project DFTV ( m/mw) 0.6 0.5 0.4 DFTV ( m/mw) Average 0.3 0.2 0.1 0.0 10

Component cost benchmarking Component average cost as a percentage of total cost 35 30 25 20 15 10 5 0 11

Component Land cable supply and installation Land cable supply and installation Onshore substation Offshore substation Submarine cable supply Submarine cable installation Development costs IDC Current analysis for main components Cost drive unit ( m/driver unit) Co-efficient km 1.214 0.744 km 0.555 MW 0.014 0.636 MW 0.013 0.824 km 0.489 0.941 km 0.352 0.578 Direct costs 0.155 0.888 Total spend Less than or equal to 8.5% Goodness of fit (R 2 ) n/a (too few points) n/a (market based data) Comments For cable length less than 10km For cable length more than 10km Excludes civils costs Excludes platform costs 132kV cables only Currently under review 12

% difference to DFTV estimate Percentage difference to DFTV using component based model 10.0 Percentage difference to DFTV using component based model 5.0 0.0-5.0-10.0-15.0-20.0 13

Ofgem engagement - key project stages Connection offer High level design and consent Procurement Financial investment decision Construction 14

Engagement options Option 1: retain current process with minor clarifications Option 2: collect data and review accuracy/ completeness at each project stage Option 3: Collect data and assess costs at each project stage Option 4: Defer cost assessment until after preferred bidder has been appointed 15

Incentive mechanism key considerations Target value with an assessment after the completion of the activity. Where cost deviate from the proposed target, there are a number of options for dealing with the difference: - Excess costs or savings from over/ under spend - Pre agreed symmetrical/ asymmetrical mechanism allowing for sharing gains and losses - Separate treatment of specific cost elements in response to changes in assumptions TNUoS charge interaction 16

Next steps Benchmarking peer review lead to publication of data in first quarter of 2014 We are happy to stage bi-lateral meetings with developers. Consultation closes 11 February 2014. We may set out proposals in Q2 2014. 17

Guy Phillips Offshore Cost Assessment Consultation Workshop Monday, 16 December 2013

Developers Perspective Previous experience through Robin Rigg East and West, the first to transfer, and London Array, the largest transfer to date. Generally the process works well Version control important Process can take too long between issuing new versions of the cost assessment. Changes in staff both at Ofgem and in the Developer teams can lead to the reason for changes to values in the cost template being lost.

Developers Perspective No apparent benefit to doing the cost assessment process in stages. Everything remains open until final transfer value confirmed. Better to at least indicate those areas that, subject to new issues on the plant, are actually closed out. Where Ofgem does choose to use consultants to justify costs, they need to be allowed sufficient time to do this. Factor in Ofgem approval process to timescales for setting the Initial and Indicative Transfer Values Ability to use appropriate estimates to close things out for the Final Transfer Value would be useful

Initial thoughts on Ofgem consultation Benchmarking Additional information helpful, benchmarking methodology limitations Unique designs Timeframe Different contract strategies Ofgem engagement Improvements to option 1 reflect our feedback and experience Efficiency incentives FTV feeds directly in to TNUoS charges Not clear how an incentive mechanism would work and be in the interest of customers

Information Exchange in the Cost Assessment Process Phill Heyden Manager, Developer Engagement

Overview of slides Background and context Data issues Areas of improvement Data requirements / timing Templates Proposed next steps 23

Cost assessment process Initial work commences Ofgem supplies cost template, developer completes and sends submissions, we sense check data and set an initial transfer value Indicative transfer value (ITV) Developer updates cost submissions, we undertake ex-ante analysis, involving benchmarking analysis, a forensic accounting review, technical review - the resulting information is used to set an indicative transfer value (ex-ante) Updates Developers continue to provide periodic updated forecasts as we move towards finalising the cost assessment process Final Transfer value (FTV) The process to set the final transfer value (ex-post) commences once a project reaches 90-95% of project outturn costs this involves a forensic review, benchmarking of each category with a technical assessment on material increases from the ITV 24

Analysis of information We apply two tests to the cost submissions provided by developers: Test one assessing the accuracy and allocation of developers cost submissions Test two assessing if developers costs are economic and efficient 25

Cost assessment data: Data issues - information supplied is not in a standard format - cost allocation methodologies not fully explained - incomplete / inaccurate information Forensic and technical reviews: - information not prepared / available when site visits are carried out - loss of expertise /people moving to other roles 26

Areas of improvement The cost assessment template (CAT) - consistency with NGET TNUoS requirements - version control project management costs - man hour rates, hours applicable to OFTO, description of tasks split IDC cashflow - aligned to asset completion developer data room tracking cost increases / substantiation 27

Data requirements /Timing Key requirements: - summary of all of the costs including lower level cost movements by assets type - reconciliation/explanations for cost movements between different versions Timing of submissions (after the ITV?): - on quarterly basis / after presenting costs to project board? - when there are significant costs increases to an asset (say Xm and/or +X%)? - any other? 28

Template - example 1 Contract Overview London Eye Offshore Windfarm Contracts overview V1.0 Projected Costs Projected Variance Projected Variance September 2014 Costs (B-A) Costs Q3 (C-B) - Initial transfer December 's September - 's value 's (A) 2014-2015 's (C) indicative transfer value 's (B) Supplier (?) Commentary CR2 - Project common costs (Development cost, administration & management) 10.00 11.00 1.0 12.00 1.0 1m increase due to extended project management time for important meetings with Ofgem CR3 - Offshore Substation 20.00 18.00-2.0 22.00 4.0 2m increase due to installation vessel unavailability (VO 2) 2m increase due to construction delays 29

Template - example 2 London Eye Offshore Wind Farm onshore cable costs V1.0 Contract Overview Projected Costs September - 2009 's (A) Projected Costs December - 2009 's (B) Date Variance (B - A) 's Projected Costs Q3 September - 2011 's (C) Date Variance (C - B) 's % Allocation to OFTO Commentary on cost status and variance Land cable A) Engineering hours to landcable 500,000 510,000 10,000 530,000 20,000 100% 20k increase due to HDD being used B) Onshore Cable Supply 2,000,000 2,100,000 100,000 2,300,000 200,000 100% 200k increase due to copper prices increasing 30

Proposed next steps Establish industry working group to consider improvements related to: - templates - TNUoS requirements - project management costs - IDC - use of the data room Workshops to take place in early 2014 - volunteers? 31