1 All interested parties Direct Dial: Date: 17 November 2015 Dear Colleague EPC Contract Principles for OFTO Build Tenders This letter provides guidance on the principles we consider should inform an Engineering, Procurement and Construction (EPC) style contract offered by an offshore generator developer (generator) as part of an OFTO build tender, to ensure the tender results in economic and efficient outcomes. This guidance is intended to support generators in preparing any EPC style contract under the OFTO build: Generator EPC tender option. The guidance is not intended to be prescriptive as we recognise that there may be a variety of ways in which contracts can be designed, based on the particular circumstances of a project and the generator s approach. We expect generators to take this guidance into account when developing an EPC contract to use as part of an OFTO build: Generator EPC tender. Before commencing a tender we would review an EPC contract proposed by a generator against the principles set out in this guidance to ensure the appropriate balance of risks is achieved and the EPC contract is bankable. Context In December 2014 we published OFTO build: Providing additional flexibility through an extended framework 1 (the December 2014 update). This introduced an extended OFTO build framework to provide flexibility to respond to both the current and future requirements of generators. We introduced a range of indicative tender options for OFTO build in relation to the roles of the generator and OFTO. This range of tender options allows generators and OFTOs to have greater or lesser degrees of control over procurement and construction management of offshore transmission assets, depending on the OFTO build option chosen by the generator. In order to implement the OFTO build options across the framework, we updated the Tender Regulations and the new 2015 Tender Regulations came into force on 3 August All the indicative OFTO build options introduced in the December 2014 update can 1 OFTO Build: Providing additional flexibility through an extended framework (December 2014) 2 The Electricity (Competitive Tenders for Offshore Transmission Licences) Regulations 2015 were made on 11 July 2015 and came into force on 3 August
2 now be implemented, subject to a developer complying with the appropriate project qualification requirements and tender entry conditions. To date, generators have been most interested in the OFTO build: Generator EPC option. In this option, we proposed that a generator (or affiliated entity) carries out all supply chain procurement and manages construction of the transmission assets by entering into an EPC style contract 3 with the OFTO as asset owner. Through our engagement with stakeholders, a number of parties have highlighted the similarities between the OFTO Build: Generator EPC option and the tender model used to appoint an Infrastructure Provider to deliver the Thames Tideway project 4. We consider that while there are a number of important differences between the models, the comparison with Thames Tideway is relevant and useful for stakeholders to better understand the OFTO build: Generator EPC model. Overview of the OFTO build: Generator EPC tender option As set out in our December 2014 update, under the OFTO build: Generator EPC option, an EPC contract for construction of the transmission assets would be offered by the generator to all bidders as part of the tender. Bidders would be expected to enter into this EPC contract, rather than procure a construction contract on the open market. The EPC contract would therefore be an important part of the tender specification, and the value of the EPC contract would form a large part of the OFTO s costs. As such we consider that, in addition to determining the value of the EPC contract offered by the generator, we have a role to review the EPC contract to ensure that it has an economic and efficient value, achieves the right balance of risk and would be considered bankable by OFTOs. This will be important to ensure that an OFTO build: Generator EPC tender attracts a sufficient number of bidders to be competitive and leads to economic and efficient costs for the construction, operation and maintenance of the transmission assets. Bidders would have opportunities, arranged by Ofgem during the enhanced prequalification (EPQ) stage and before the submission of bids at the invitation to tender (ITT) stage of the tender, to comment on the draft EPC contract. Generators may choose to respond to these comments by updating the EPC contract and making it available to all bidders during the ITT stage. Although we would not require generators to make changes in response to bidder feedback, generators should consider the likely impact of not making changes on the tender revenue stream (TRS) that would be bid. The EPC contract should be in near final form when bidders make their ITT submissions, with no changes expected during the preferred bidder stage. The OFTO s TRS would be finalised during the tender process and fixed at licence grant. This revenue would only change after licence grant if we agree that an event for which there is designated protection under the OFTO licence has occurred. EPC contract principles In our December 2014 update we set out some high level principles that we would expect an EPC contract offered by a generator to follow. These are: the EPC contract should provide a robust set of terms, which will facilitate the delivery of a low cost of capital financing solution by the OFTO; 3 In this guidance we use the term EPC to refer to a construction contract put forward by the generator as part of the OFTO build tender. Whilst we recognise that the generator may choose to provide a traditional EPC contract, we do not intend to require that all the elements of such a contract are provided. 4 Further details on Thames Tideway can be found at the Ofwat website: 2 of 12
3 the terms and conditions for the EPC contract should, as a starting point, look to align with traditional EPC contracts within the broader infrastructure sector against which long-term project finance debt has been raised; risks should be borne by the party best able to manage them and should be clearly allocated in the EPC contract between the generator EPC contractor (EPC contractor) and OFTO. As such there should be a clear relationship between the level of control and influence the OFTO is provided over construction by the EPC contract and the extent of the OFTO s construction liabilities (ie the extent to which any of the EPC contractor s liabilities are capped within the EPC contract should be proportionate to the amount of influence the OFTO has during construction). This would enable efficient pricing by bidders of any contingency or reserve financing they would require; construction activity should be undertaken economically and efficiently, to deliver value for consumers, in line with industry codes and standards; and criteria and arrangements for handover of any transmission works or assets from the EPC contractor to the OFTO should be clearly set out within contractual agreements between the parties and enable the OFTO to manage its liabilities and obligations under its licence. In general we therefore expect that the EPC contract would cover most of the risk of cost overruns and delays during construction, except potentially for events which would typically be classed as force majeure, or for certain low probability but high impact events which cannot be economically and efficiently priced into the EPC contract or by bidders. Ultimately, however, the generator would still be exposed to these risks through transmission charges even where they are not borne by the generator in its role as EPC contractor. We continue to consider that these high level principles are appropriate, but have since developed these principles in further detail in the annex to this document to provide additional guidance to generators and potential bidders. This process was informed by a workshop we ran in June to gather input from interested stakeholders. The annex to this document highlights specific features of the EPC contract we consider important and outlines our current expectations. Next steps The EPC principles outlined in this letter reflect our current thinking. We do not currently plan to publish any further guidance on the EPC principles and expect generators to be able to take forward the development of an EPC contract if they are considering the OFTO build: Generator EPC tender option. We are happy to work, on a project by project basis, with generators who wish to discuss any such EPC contract with us, or who are considering any other OFTO build option. We continue to welcome further engagement with generators and potential bidders around OFTO build. If you have any questions, relating to this letter please direct them to Elizabeth Cooper, [email protected] in the first instance. Yours sincerely, Steve Beel Associate Partner, Electricity Transmission 3 of 12
4 Annex: Further detail on EPC Contract Principles for OFTO Build Tenders This annex highlights some specific features of an EPC contract we consider important and outlines our expectations in these areas. It is not prescriptive about the EPC contract terms that must be included as we consider that these are most appropriately developed by the generator based on the particular circumstances of a project and the generator s contracting approach. Where we are specific, this is intended to illustrate our principles, rather than specify a detailed model that any contract must follow. This annex is not an exhaustive list of contractual terms and there are a number of terms not discussed in this guidance that we would expect an EPC contract would cover. Responsibilities and information sharing Risks, roles & responsibilities Reporting & access to information We expect the roles and responsibilities during construction to be clear for the EPC contractor, its subcontractors, the OFTO and the OFTO s lenders (as appropriate). The risks borne by the EPC contractor and the OFTO should be clear. In general we expect that the OFTO s role, and therefore exposure to risk, would be limited during construction as the EPC contractor would likely choose to be responsible for construction management, including project management and management of subcontractors. We expect the OFTO to have access to information specified in the EPC contract and receive regular updates from the EPC contractor. Clarity on roles and responsibilities will enable bidders to identify what the OFTO would need to do during construction as well as which risks it must bear. This will allow bidders to competitively price their bid submissions and develop appropriate strategies for managing construction, operations and maintenance. We expect the EPC contractor to try to minimise its exposure to risk by passing this down to subcontractors to manage where these risks are best managed by the subcontractors. We expect this would be reflected in the terms agreed between the EPC contractor and its subcontractors. The OFTO is legally responsible for regulatory reporting and must have access to sufficient information to be able to fulfil this obligation. The OFTO will also be required to report to its lenders to ensure that progress is on track. Compliance with consent conditions & health and safety executive (HSE) requirements We expect that for some critical elements of the construction process the OFTO may be given greater oversight and access to information. We expect the EPC contractor should be responsible (on behalf of the OFTO) for ensuring compliance with relevant consent conditions during construction, particular installation or construction consents and HSE requirements. The OFTO may also want to have some oversight of a few critical activities, such as cable installation as these may particularly affect the operation and maintenance of the assets. Although the OFTO will have legal accountability for these items, these would be effectively delegated to the EPC contractor as the party best able to manage compliance.
5 Design, Specification and Completion date Design & specification The technical specification, transmission asset design and related services should be clearly specified and at a level of detail sufficient to enable bidders to submit robust and competitive bids. The technical information should be able to demonstrate that regulatory compliance can be achieved, as well as specify the acceptance criteria to verify completion and handover of the assets. The OFTO will be legally responsible for the construction, operation, maintenance and decommissioning of the transmission assets from the point of licence grant. As an OFTO build: Generator EPC tender removes the ability for bidders to specify and procure contracts themselves, the EPC contract must provide bidders with enough information (or protection) to know they will be able to meet their obligations under their licence and the industry codes and standards. The design of the transmission assets will also be used by bidders during the tender to determine their approach to operations and maintenance. Bidders need to have enough information to be able to determine the most economic and efficient approach. The design specification is also important to ensure that the OFTO and EPC contractor can agree on the completion of milestones and construction, for example against EPC contract specifications, and to manage any variations during construction. Construction programme & completion date We expect the EPC contract to specify a completion date when operational control of the transmission assets will be handed from the EPC contractor to the OFTO. This date should align with the date when an OFTO starts to receive its revenue stream likely to be when its assets are available for use and accepted by the system operator (SO). For the avoidance of doubt, the EPC contract will not cover preliminary works 5. The developer would transfer preliminary works to the OFTO at licence grant by separate, but related agreement. The point at which the OFTO is expected to take full operational control of the assets will impact, for example, the arrangements that an OFTO would put in place around operations and maintenance. We expect that this date would align with the date from which the OFTO s revenue stream commences, as this is when the OFTO will become responsible for availability of the assets under its licence. This date would be reflective of electrical milestones under the 5 Preliminary works are the necessary works obtained by a generator in relation to the development of the proposed transmission assets before the grant of an offshore transmission licence to a successful bidder following an OFTO build tender. Preliminary works are formally defined in regulation 3(1) of the 2015 Tender Regulations. 5 of 12
6 We also consider that the completion date, and any other dates in the construction programme, should align where relevant with dates set out in the generator s connection agreement (BCA) and OFTO s construction agreement (TOCA) 6. OFTO s construction agreement with the SO; therefore it is important that the EPC contract and relevant agreements under the codes are aligned, as the codes place obligations on the OFTO, generator, SO and potentially other network owners to perform specified activities. We recognise that for staged projects (ie where transmission assets are built out in separate stages and at different times), the completion dates may also be staged, as could revenue allowances. 6 The Transmission Owner Construction Agreement (TOCA) is the agreement between the transmission owner and National Grid Electricity Transmission, the SO. The TOCA specifies the terms of the connection to the onshore grid, such as the design, construction and operation of the assets, specifications of interface sites and commissioning processes and will apply to the OFTO throughout the licence period. This agreement is backed off against the generators Bilateral Connection Agreement (BCA), which is between the generator and the SO. 6 of 12
7 Price & Payment Structure Fixed price The EPC contract should have a fixed price. We consider that this price will include the following components: Costs associated with the delivery of subcontracts A fee for managing the EPC contract and constructing the transmission assets, including (if necessary) an amount to manage construction risk. The OFTO s TRS (and therefore, the allowed cost of the construction works the OFTO will be able to recover) will be fixed as far as possible at financial close and licence grant. We expect that a fixed price EPC contract would therefore be the most efficient contracting approach. This is particularly important under OFTO build: Generator EPC where we expect the generator (as EPC contractor) will be managing day to day construction and interactions with subcontractors and the OFTO would have limited influence over construction (and therefore cost) management. Payment structure Security package We would only expect the fixed price to be subject to change under limited and clearly defined circumstances (see Variations ). We are open to generators proposing appropriate risk sharing mechanisms between the EPC contractor and the OFTO where these reflect the ability to influence construction. This may, for example, provide some upside and downside risk for equity investors. We expect a payment structure would be agreed between the EPC contractor and OFTO. We anticipate the EPC contractor would propose a payment structure based on either milestone payments or payments at regular intervals. We expect the EPC contract to be supported by a comprehensive security package, provided by the EPC contractor, to manage construction risk. Any amount included within the EPC contractor s fee to manage construction risk should relate to the risks which are held by the EPC contractor in coordinating the construction process and which cannot be passed down to subcontractors. A clear payment structure, based on clearly defined milestones where relevant, will maximise bankability for the OFTO and provide clarity to all parties on payment obligations. The security package will be the key tool which the EPC contractor will use to manage construction risk. The list of measures included and the scope of the protection given to the OFTO should reflect the ability of the OFTO to manage risk within the construction period (ie the less involved the OFTO is in managing risk, the more protection it will need from that risk). A robust security package should allow OFTOs to obtain a lower cost of finance and speed up the tender process. 7 of 12
8 Variations (including to construction specification, programme or fixed price) Variations general We expect the EPC contract to clearly set out the full specification of works, and given that the TRS is fixed through a tender, we do not expect variations to the EPC contract that would expose the OFTO to unmitigated cost increases. However, we consider there may be certain limited circumstances where the EPC contractor requires a variation to proceed with construction. While we do not envisage that the OFTO would need to propose variations, we consider that there should also be a mechanism for this in the EPC contract. A variation to the EPC contract, including the proposed completion date, fixed price or the design and specification of the assets, would impact the OFTO and/or the EPC contractor. The OFTO will only be able to seek an adjustment to its TRS in limited circumstances set out in its licence. We therefore expect that the variations in the EPC contract will be similarly limited as the OFTO would only accept a variation which adjusts the price if either the OFTO can adjust its TRS under its licence or if the OFTO agrees to fund the price adjustment itself (eg if the OFTO has been able to price the risk during the tender process). Therefore it is important that if a variation is required, both parties must agree to it before it can proceed. Variations leading to a price adjustment We therefore expect either party to be able to propose variations to the EPC contract in certain limited circumstances. We expect these could only be implemented by mutual agreement. We also expect a robust process for agreeing the scope of any variation. As noted above we do not expect variations to the EPC contract, however we consider there may be circumstances were a variation is required. For a variation that leads to a price adjustment, we expect the EPC contract should include a mechanism to enable the parties to agree the level of the price adjustment. We expect any agreed price adjustment to be paid for by the OFTO. We consider that to be acceptable to a generator and bankable to OFTOs the EPC contract should be clear on the circumstances under which the OFTO is expected to compensate the EPC contractor, over and above the fixed price of the EPC contract. We expect these circumstances would be limited as the EPC contractor would bear all risks that it can reasonably manage during construction. We expect the OFTO will only be able to seek an adjustment to its TRS in limited circumstances set out in its licence. We therefore expect that the OFTO will only accept price adjustments if either it can adjust its TRS under the licence or it agrees to fund the price adjustment itself (eg if the OFTO has been able to price the risk during the tender process). 8 of 12
9 Variations leading to a change of completion date or to the construction programme Variations not impacting on price or completion date We expect that, as with any variation, there should be a mechanism in the EPC contract for both parties to propose variations to the scheduled completion date or construction programme, and a robust process for agreeing these. As we expect the completion date and construction programme to align with the BCA and TOCA, we consider that the mechanism in the EPC contract for variations to the construction programme or scheduled completion date should align with any relevant mechanisms in these agreements. We expect that even where a variation does not impact on the EPC contract price or completion date, there should be a mechanism in the EPC contract to ensure both parties agree before it can be implemented. Both parties may be affected by any change, therefore we expect that any proposed change to the completion date, could only be implemented by mutual agreement of both parties. Delay to the completion date will affect when the OFTO s revenue stream starts, as well as when the transmission assets are available for use by the generator. In practice we do not envisage that the OFTO would wish to propose variations to the construction programme, given its limited role in construction management. We would expect that for any variation to the construction programme proposed by the EPC contractor, the OFTO would be held harmless. As other parties, including the SO or another network owner, might also be affected by a change to construction programme or completion, we think it is important that the mechanism to change these dates in the EPC contract accommodates mechanisms in the relevant industry codes (BCA or TOCA.) Variations, for example to the design and specification of the assets being constructed by the EPC contractor, may impact the arrangements that an OFTO has for operations, maintenance or decommissioning of these assets. This in turn may lead to a change in what the OFTO has to do after construction or to how much it will cost the OFTO to fulfil its obligations under its licence and the industry codes. 9 of 12
10 Liabilities Delay liquidated damages 7 Performance liquidated damages Global cap on EPC contractors liability We consider that the OFTO may expect the EPC contractor to be liable for liquidated damages (or other suitable compensation payment), payable to the OFTO, for delays to the completion date. These should be scaled to cover the OFTO s debt liabilities and possibly some equity liability, for a defined period of time. We consider that the OFTO may expect the EPC contractor to be liable for performance liquidated damages if the OFTO experiences reduced/lost revenue as a result of underperformance of the assets. We consider that it would be appropriate to scale any performance liquidated damages to reflect the loss of annual revenue the OFTO may incur, to a maximum of 10% of an OFTO s annual revenue. The EPC contractor should be able to cap its total liability for performance liquidated damages, in terms of time and costs. We expect that there might be a global cap on the EPC contractor s liabilities. We anticipate that in order to be considered bankable to OFTOs the level of this cap would probably need to represent a significant proportion of the value of the EPC contract. Our initial view is that it may be appropriate for this to be 100% of the EPC contract value. The OFTO s revenue will start on completion, when its assets are available for use. Construction delays which exceed the scheduled completion date will delay the start of the OFTO s revenue and have cost implications for the OFTO as its lenders will expect to receive repayments. The OFTO may also have other costs, such as payments to O&M staff. However, the duration of the revenue term will remain 20 years, despite a delayed start, so loss of revenue would not be a factor when scaling delay liquidated damages. OFTOs will be subject to an availability incentive once their revenue stream starts. If the assets do not perform as expected they will be financially penalised. There is a cap of 10% of annual revenue as a result of unavailability. Performance liquidated damages may be required to help manage the risk to the OFTO that the assets do not perform as required. The size of liabilities should relate to the value of works, costs to the OFTO to complete or fix them, or potential damages for loss of income, etc. We consider the presence and level of liability caps in a proposed EPC contract is fundamental to the ability of bidders to attract competitive financing. If the global cap is significantly less than 100% of the contract value it may be unattractive to bidders. However, we recognise that there is a balance between the EPC contractor s liability and the affordability of the EPC contract (ie a global cap significantly in excess of 100% of contract value could significantly increase the price of the EPC contract). 7 We would not expect a generator to opt for liquidated damages in its BCA under the OFTO build: Generator EPC option, given its role in construction 10 of 12
11 Completion & Handover Asset handover and completion (including completion date & completion testing) We expect that both asset handover and commencement of an OFTO s revenue stream should occur as early as possible. To enable this, we expect the EPC contract should be clear about the handover process, including how this may align with compliance testing under industry codes. We consider this may best be achieved by specifying a clear point of handover. We also expect that the EPC contract will allow for certain non-material works to be completed after handover, where this facilitates an earlier handover point. The completion criteria should be clearly specified and, at a minimum, reflect any relevant criteria from industry codes (eg the OFTO s TOCA). We expect that the EPC contractor s approach to commissioning and testing should allow the OFTO (and/or an independent expert) to observe the process as necessary. For staged projects, we expect that there may need to be more than one handover point. This would enable work packages to be handed over to the OFTO when they are complete and when the OFTO needs to provide transmission services for the generator. We consider handover an important area of the contract and we therefore expect generators to focus on this when developing an EPC contract. In doing so generators should draw on experience of asset transfer under generator build tenders. The completion of non-material works should not present a barrier to handing operational control to the OFTO. The OFTO is likely to want to have full oversight of activities in the testing and commissioning of the transmission assets. If the OFTO has identified this we would expect the EPC contract to facilitate it, including through the use of an independent expert as necessary. We consider that the transmission system work packages for staged projects, and therefore handover arrangements for these, would normally reflect the construction programme for the windfarm. 11 of 12
12 Step in & termination OFTO (& lender) step in rights We consider that the OFTO may wish to have the ability to step in and take control of construction under specified circumstances. We consider this may include: construction being delayed beyond a trigger date (which we expect may be longer than typically seen in large scale construction projects) the EPC contractor being insolvent We consider that the breadth of events that may trigger OFTO step in would be related to the level of risk the OFTO takes during construction an OFTO is likely to require greater step in rights where it bears more construction risk (eg where the OFTO is more exposed to cost overruns and delays). The EPC contractor (as generator) has an incentive to complete the transmission assets to be able to export power form the windfarm. This may mean that longer construction delays would be allowed under the EPC contract before step in can be triggered than would be seen in an industry standard EPC. Termination rights in case of EPC contractor does not perform We consider that the OFTO (and its lenders) may wish to have the ability to terminate the EPC contract under specified circumstances. We consider this may include: EPC contractor non-performance beyond a long-stop date (which we expect may be longer than typically seen in large scale construction projects) Material breach of EPC contract by the EPC contractor We expect that any process for terminating the EPC contract should be clearly specified. We expect the OFTO s lenders would also have the right to step in if the OFTO was in financial distress. This would be reflected in a separate agreement, rather than the EPC contract itself. We recognise that the likelihood of events occurring that could trigger these termination rights is remote, given the relationship between the EPC contractor and the generator. However, termination rights would provide appropriate protections for the OFTO and enable it to secure financing and maintain commercial arrangements with the EPC contractor. As with step in rights, the breadth of events to trigger termination should reflect the allocation of risk. Similarly, the long-stop date may be reflective of the incentives on the EPC contractor to complete construction. 12 of 12
Offshore Electricity Transmission: Consultation on tender exercises under the enduring regime (178/11)
Giedre Kaminskaite-Salters Offshore Enduring Ofgem 9 Millbank London SW1P 3GE Inveralmond House 200 Dunkeld Road Perth PH1 3AQ 17 February 2012 [email protected] 01738 516854 Dear Giedre Offshore Electricity
Offshore Transmission: Guidance for Cost Assessment Guidance Document
Promoting choice and value for all gas and electricity customers Offshore Transmission: Guidance for Cost Assessment Guidance Document Reference: 183/12 Contact Roger Morgan, Senior Manager Publication
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
DTI Consultation on Proposals for a Special Administrator Regime for Energy Network Companies Ofgem s Response
DTI Consultation on Proposals for a Special Administrator Regime for Energy Network Companies Ofgem s Response June 2003 Introduction Ofgem welcomes the DTI consultation on proposals for a special administrator
Department of Health PFU & PPP Forum. Benchmarking and market testing in NHS PFI projects. Code of Best Practice
Department of Health PFU & PPP Forum Benchmarking and market testing in NHS PFI projects Code of Best Practice This Code of Best Practice provides guidance and advice on good practice to NHS Trusts, Project
Report on the EMR Delivery Body s performance of its functions in relation to the Capacity Market
Report on the EMR Delivery Body s performance of its functions in relation to Report Publication date: 19 June 2015 Team: EMR Team Contact: Sujitra Krishnanandan; Matthew Pearson Tel: 020 3263 9832; 020
UK renewable energy an update
UK renewable energy an update 30 October 2014 Robert Hull, Managing Director Renewable energy key challenges 1 2 3 Costs to Climate change: Risks to security consumers: decarbonising of supply: short affordability
Data Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: [email protected] Overview: The Data and Communications Company (DCC) is required
BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service
RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which
NPD Model Explanatory Note
NPD Model Explanatory Note December 2011 FOREWORD In recent years a number of public authorities in Scotland have procured privately financed infrastructure projects using the non-profit distributing or
Guidance on the template contract for social impact bonds and payment by results
Guidance on the template contract for social impact bonds and payment by results Introduction These guidance notes have been prepared to assist users of the Cabinet Office template contract. The guidance
CONTRACT MANAGEMENT FRAMEWORK
CONTRACT MANAGEMENT FRAMEWORK August 2010 Page 1 of 20 Table of contents 1 Introduction to the CMF... 3 1.1 Purpose and scope of the CMF... 3 1.2 Importance of contract management... 4 1.3 Managing contracts...
Appendix 5D Ernst & Young Accounting Treatment
Appendix 5D Accounting Treatment (Ernst & Young) Appendix 5D Ernst & Young Accounting Treatment Introduction An off balance sheet treatment from the position of the Authorities is a fundamental requirement
Nominated Subcontractors on International Projects: Approaches to Risk Allocation
Nominated Subcontractors on International Projects: Approaches to Risk Allocation September 5, 2005 (he following outline was used in a presentation to the Overseas Construction Association of Japan, Inc.
March 2016 K.17 Financing Feasibility Report - Final
March 2016 K.17 Financing Feasibility Report - Final Commercial -Project Management IMPORTANT NOTICE The information provided further to UK CCS Commercialisation Programme (the Competition) set out herein
private finance initiative
private finance initiative Lessons Learned We recently held a series of PFI Roundtable Discussions in collaboration with Trowers & Hamlins LLP. Finance managers from throughout the UK were invited to share
Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer
Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland
LSB Procurement Framework
LSB Procurement Framework Introduction Procurement covers the typical purchase of services, supplies and works required to enable project delivery and to manage the infrastructure. The Services Board (LSB)
The refinancing of the Fazakerley PFI prison contract
Report by the Comptroller and Auditor General The Prison Service The refinancing of the Fazakerley PFI prison contract Ordered by the House of Commons to be printed 26 June 2000 LONDON: The Stationery
NOTICE ON OUTSOURCING
CONSULTATION PAPER P018-2014 SEPTEMBER 2014 NOTICE ON OUTSOURCING PREFACE 1 MAS first issued the Guidelines on Outsourcing in 2004 1 ( Guidelines ) to promote sound risk management practices for the outsourcing
OFFICE OF GAS AND ELECTRICITY MARKETS TRANSITIONAL TENDER REGIME FOR OFFSHORE TRANSMISSION ASSETS DRAFT DATA ROOM POPULATION GUIDELINES
OFFICE OF GAS AND ELECTRICITY MARKETS TRANSITIONAL TENDER REGIME FOR OFFSHORE TRANSMISSION ASSETS DRAFT DATA ROOM POPULATION GUIDELINES Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE
Annex A Feed-in Tariff with Contracts for Difference: Operational Framework
Annex A Feed-in Tariff with Contracts for Difference: Operational Framework November 2012 Contents Executive Summary... 5 Document Overview... 9 1. Introduction... 10 The Energy Bill: The Legal Framework
Schedule 11. The Transfer of Undertakings (Protection of Employment) Regulations 2006
Schedule 11 The Transfer of Undertakings (Protection of Employment) Regulations 2006 1 Definitions 1.1 In this Schedule 11 the following definitions apply: Contractor Personnel means any employee, worker,
Feasibility. A guide to feasibility planning for junior mining companies
Financial institutions Energy Infrastructure, mining and commodities Transport Technology and innovation Life sciences and healthcare Feasibility A guide to feasibility planning for junior mining companies
Litigation schemes and proof of debt schemes: Managing conflicts of interest
REGULATORY GUIDE 248 Litigation schemes and proof of debt schemes: Managing conflicts of interest April 2013 About this guide This guide sets out our approach on how a person who provides a financial service
Agreements, bonds and guarantees
Agreements, bonds and guarantees SPV Formation The Special Project Vehicle (SPV) may take a variety of forms, including a corporation, limited liability company, general partnership, limited partnership,
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under
UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT NOTICE. Services
1/6 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:273114-2011:text:en:html UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT
Consideration of a revised approach and timetable for the education quality assurance contract procurement.
14 Council 23 July 2014 Quality Assurance Contract Procurement Classification Public Purpose For decision Issue Consideration of a revised approach and timetable for the education quality assurance contract
School Construction Projects
The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect
Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006
TUPE Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006... 1 Service Provision Changes... 1 Employer Liability Information... 2 Liability for Failure to Inform and Consult
ENHANCEMENT CONTRACTS - AVAILABILITY OF INSURANCE TO NETWORK RAIL
ENHANCEMENT CONTRACTS - AVAILABILITY OF INSURANCE TO NETWORK RAIL Background As part of the consultation process relating to the revision of the template agreements a few stakeholders have suggested that
Section A: Compensation on Termination for Board Default and Voluntary Termination
PART 23 OF THE SCHEDULE: COMFENSATION ON TERMINATION Section A: Compensation on Termination for Board Default and Voluntary Termination If Project Co terminates this Agreement pursuant to Clause 45 (Board
GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities
GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities Office of Government Procurement Building Control (Amendment) Regulations 2014 Procurement
Shtokman Development AG
Shtokman Development AG Integrated Development of the Shtokman Gas- Condensate Field. Phase 1 SDAG Standard EPC Contract. Main Principles. EPC Contracts What is an EPC contract? - Contract for Engineering,
Part E: Contract management
Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project
Info sheet : Considering labour standards in the procurement process
Info sheet : Considering labour standards in the procurement process In line with the EU procurement rules and the Government s value for money principle, contracting authorities can take steps to consider
EPC CONTRACTS IN THE POWER SECTOR
Asia Pacific Projects Update EPC CONTRACTS IN THE POWER SECTOR INTRODUCTION Engineering, procurement and construction (EPC) contracts are the most common form of contract used to undertake construction
Badger BC. Investments Ltd. Business Plan 2014 2017. A wholly owned subsidiary of Broxbourne Borough Council
Badger BC Investments Ltd Business Plan 2014 2017 A wholly owned subsidiary of Broxbourne Borough Council Contents Summary 3 Governance and management structure 4 Rights, obligations and decision making
Apprenticeship standards funding rules 2016 to 2017
Document reference: D Apprenticeship standards funding rules 2016 to 2017 Version 1 This document sets out the funding rules which apply to apprenticeship standards These rules apply for all organisations
RISK MANAGEMENT FRAMEWORK. 2 RESPONSIBLE PERSON: Sarah Price, Chief Officer
RISK MANAGEMENT FRAMEWORK 1 SUMMARY The Risk Management Framework consists of the following: Risk Management policy Risk Management strategy Risk Management accountability Risk Management framework structure.
DBSA RENEWABLE ENERGY FINANCING
DBSA RENEWABLE ENERGY FINANCING Development Bank of Southern Africa Presented by Madalo Minofu Project Preparation Specialist: DBSA Project Preparation Funds Division 2 June 2014 1 DBSA s Product Offering
Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement
Asset Protection Agreement Templates - Customer Explanatory Notes Explanatory Notes on Asset Protection Agreement Clause Heading Background The Asset Protection Agreement is intended for use where the
GUIDANCE NOTE OUTSOURCING OF FUNCTIONS BY ENTITIES LICENSED UNDER THE PROTECTION OF INVESTORS (BAILIWICK OF GUERNSEY) LAW, 1987
GUIDANCE NOTE OUTSOURCING OF FUNCTIONS BY ENTITIES LICENSED UNDER THE PROTECTION OF INVESTORS (BAILIWICK OF GUERNSEY) LAW, 1987 CONTENTS Page 1. Introduction 3-4 2. The Commission s Policy 5 3. Outsourcing
REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013. Department for Culture, Media & Sport. The rural broadband programme
REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013 Department for Culture, Media & Sport The rural broadband programme 4 Key facts The rural broadband programme Key facts
Procurement guidance Managing and monitoring suppliers performance
Procurement guidance Managing and monitoring suppliers performance Procurement guidance: Managing and monitoring suppliers performance Page 2 of 16 Table of contents Table of contents... 2 Purpose of the
Duncan Burt Head of Commercial Operation National Grid. The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE
National Grid House Warwick Technology Park Gallows Hill, Warwick CV34 6DA The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE 16 June 2015 Duncan Burt Head of Commercial Operation National
1. Evolution of infrastructure procurement in NSW. 2. Market consultation and outcomes. 3. Response and implementation. 4. Project Deed Evolution
Reducing Bid Costs for Outcome-Based Procurements in NSW Infrastructure and Structured Finance Unit: Partnering to Create Partnerships December 2015 1. Evolution of infrastructure procurement in NSW 2.
A GOOD PRACTICE GUIDE FOR EMPLOYERS
MITIGATING SECURITY RISK IN THE NATIONAL INFRASTRUCTURE SUPPLY CHAIN A GOOD PRACTICE GUIDE FOR EMPLOYERS April 2015 Disclaimer: Reference to any specific commercial product, process or service by trade
Part One: Introduction to Partnerships Victoria contract management... 1
June 2003 The diverse nature of Partnerships Victoria projects requires a diverse range of contract management strategies to manage a wide variety of risks that differ in likelihood and severity from one
Risk Management. Risk Identification
Management This part provides guidance on the treatment of risks on a PPP project, and; Identifies the major risks common to many PPP projects across all sectors; Allocates the identified risks between
Request for feedback on the revised Code of Governance for NHS Foundation Trusts
Request for feedback on the revised Code of Governance for NHS Foundation Trusts Introduction 8 November 2013 One of Monitor s key objectives is to make sure that public providers are well led. To this
RISK MANAGEMENT POLICY
RISK MANAGEMENT POLICY 1. Preamble: Rail Vikas Nigam Ltd (RVNL) is a Public Sector Undertaking specializing in development and execution of railway projects. In the course of its operations, it is prone
Training Management Guidelines
Training Management Guidelines February 2009 Training Management Guidelines - February 2009 These guidelines provide a strategic approach to training and skills development in the construction industry
Financial Services Guidance Note Outsourcing
Financial Services Guidance Note Issued: April 2005 Revised: August 2007 Table of Contents 1. Introduction... 3 1.1 Background... 3 1.2 Definitions... 3 2. Guiding Principles... 5 3. Key Risks of... 14
SMS0045 Construction Health and Safety Policy and Procedures
SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April
INTRODUCTION. The Merlin Principles. The Elements of each Principle
0 INTRODUCTION The development of the Merlin Standard has been progressed as a joint exercise between the Department for Work and Pensions (DWP) and its providers operating in the Welfare to Work (W2W)
DIRECTORATE OF ESTATES & FACILITIES
DIRECTORATE OF ESTATES & FACILITIES PROCEDURE AND INFORMATION MANUAL EPM PM4 Client Representative (University Project Manager) for Capital Projects Scope of Services Document Originated: April 2006 By:
Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement
Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement Action Note 14/15 27 August 2015 Issue 1. Raising skills levels within the UK workforce is key to delivering sustainable
Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit
Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL XXXXX PPP Unit Chief Executive Officer Job Description: The CEO is tasked with the establishment of a PPP Unit for the Government
Risk Management in the Development of a Penta-P Project
Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don
The South African Council for the Project and Construction Management Professions (SACPCMP)
The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Professional Construction Mentors in terms of Section 18(1) (c) of the Act, 2000 (Act
Network Rail Infrastructure Projects Joint Relationship Management Plan
Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf
NZQA registered unit standard 25872 version 2 Page 1 of 5. Develop and implement a project plan to deliver on an Infrastructure works contract
Page 1 of 5 Title Develop and implement a project plan to deliver on an Infrastructure works contract Level 5 Credits 15 Purpose People credited with this unit standard are able to: explain relationship
Risk Disclosure. Introduction. through Stofs.com falls under the CySEC licence.
Risk Disclosure Introduction AFX Capital and SuperTradingOnline (STO) are trading names of AFX Capital Markets Ltd. and AFX Markets Ltd. AFX Capital Markets Ltd. is authorised and regulated by the Cyprus
Specific Responsibilities Associated Performance Measures 1. Excellence in Commercial Management 2. Excellence in Contract Performance
OUR VISION is to be recognised as the leader in infrastructure service provision POSITION DESCRIPTION Commercial Manager National Maintenance Date reviewed: April 2012 EMPLOYEE NAME: Job Purpose: To achieve
LEAD PROVIDER FRAMEWORK CALL OFF TERMS AND CONDITIONS
LEAD PROVIDER FRAMEWORK CALL OFF TERMS AND CONDITIONS 1 LEAD PROVIDER FRAMEWORK - CALL OFF TERMS AND CONDITIONS - SUMMARY Where an Order Form is issued by the Authority that refers to the Framework Agreement,
Thames Water Utilities Limited. Settlement deed
Thames Water Utilities Limited Settlement deed DATED [ ] THAMES WATER UTILITIES LIMITED the Undertaker [ ] the Owner DEED relating to the mitigation of the effects of settlement arising from the construction
PRIME CONSULTANT SERVICES
GUIDELINES FOR Professional Engineers providing PRIME CONSULTANT SERVICES 1.0 INTRODUCTION 1.1 PURPOSE OF GUIDELINES The "Guidelines for Professional Engineers providing Prime Consultant Services" have
Steel procurement in major projects: Guidance on the application of social issues. Purpose
Steel procurement in major projects: Guidance on the application of social issues Purpose 1. This is a practical guide on how to incorporate social issues in major projects with a significant steel component.
Risk management systems of responsible entities: Further proposals
CONSULTATION PAPER 263 Risk management systems of responsible entities: Further proposals July 2016 About this paper This paper sets out our proposals to provide guidance to responsible entities on our
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations December 2011 Contents Contents... i Introduction... 1 Executive Summary... 1 Background...
CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.????
CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.???? 1 1. PRE-AMBLE All transactions undertaken by the Cape Winelands District Municipality involves a contract whether explicitly
Auditor General Procurement Processes Review - Bid Bonds/Performance Bonds
STAFF REPORT June 22, 2005 To: From: Subject: Administration Committee Deputy City Manager and Chief Financial Officer Auditor General Procurement Processes Review - Bid Bonds/Performance Bonds Purpose:
Guide to Reviewing Contract Documentation
Guide to Reviewing Contract Documentation Introduction In order to help members address the issues associated with the review of contracts The Royal Institute of British Architects (RIBA), in association
How to get value for money from service providers on major projects
How to get value for money from service providers on major projects Session Focus Contracting as a relationship Identifying win/win arrangements Procurement & Planning on major projects Understanding the
Appendix A. Call-off Terms and Conditions for the Provision of Services
Appendix A Call-off Terms and Conditions for the Provision of Services Where an Order Form is issued by the Authority that refers to the Framework Agreement, the Contract is made between the Authority
Procurement Strategy and Contract Selection
GUIDELINE Capital Works Management Framework Procurement Strategy and Contract Selection The suite of Capital Works Management Framework documents is available online www.hpw.qld.gov.au: The Capital Works
Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000
Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE
North American Development Bank. Model Prequalification Document: Prequalification of Contractors
North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried
Delegations will find attached the draft Council conclusions on a Capital Markets Union, as prepared by the Economic and Financial Committee.
Council of the European Union Brussels, 16 June 2015 (OR. en) 9852/15 EF 110 ECOFIN 473 SURE 14 UEM 223 NOTE From: To: Subject: General Secretariat of the Council Permanenet Representatives Committee (Part
Contract for services PSC Contractor (Ltd Company) Terms & Conditions
Contract for services PSC Contractor (Ltd Company) Terms & Conditions T: 0330 555 5000 www.nursdoc.com Contract for Services This Agreement is made between: Nursdoc Limited (Registered No. 08354601) whose
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and
Please send your responses via email, to: [email protected]. Respondent details. Mark Redhead. Head of Policy
REFORM OF THE PRIVATE FINANCE INITIATIVE RESPONSE Please send your responses via email, to: [email protected] The deadline for responses is Friday 10 February 2012. Respondent details Your
CONSULTATION PAPER CP 41 CORPORATE GOVERNANCE REQUIREMENTS FOR CREDIT INSTITUTIONS AND INSURANCE UNDERTAKINGS
CONSULTATION PAPER CP 41 CORPORATE GOVERNANCE REQUIREMENTS FOR CREDIT INSTITUTIONS AND INSURANCE UNDERTAKINGS 2 PROPOSAL 1.1 It is now widely recognised that one of the causes of the international financial
ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES
ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES CAPITAL GRANTS PROGRAM / BUILDING GRANTS ASSISTANCE SCHEME Background Non government schools accepting the
14 December 2006 GUIDELINES ON OUTSOURCING
14 December 2006 GUIDELINES ON OUTSOURCING CEBS presents its Guidelines on Outsourcing. The proposed guidelines are based on current practices and also take into account international, such as the Joint
Establishment of the Entrepreneurs Infrastructure Programme
Fall 08 Establishment of the Entrepreneurs Infrastructure Programme Discussion Paper www.industry.gov.au 1. Introduction 1.1 Purpose In line with the Government s vision to enable growth and productivity
Outsourcing Risk Guidance Note for Banks
Outsourcing Risk Guidance Note for Banks Part 1: Definitions Guideline 1 For the purposes of these guidelines, the following is meant by: a) outsourcing: an authorised entity s use of a third party (the