Model E / E3 DN100 (4"), DN150 (6"), DN200 (8") Wet Alarm Valve with E2 Euro Stainless Steel Trim



Similar documents
Diameter 3" 4" 6" 8" Flange type PN 16 PN 16 PN 16 PN 16. Orange-red ( RAL 2002) Height (cm) 27,70 26,30 28,

Wet alarm valves. Wet alarm valves. FM trim

3", 4", 6" & 8" Model H Series Alarm Check Valve Installation and Maintenance Guide

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

M A N U A L

TYPE E Main Valve Sizes 3 /8 through 12

PBX Series Quick Fit Connector Bimetallic Steam Traps

BACKPACK SPRAYERS. MODEL NOS: KSP16 & KSP20 Part Nos: & OPERATING & MAINTENANCE INSTRUCTIONS GC04/12

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW

Float and Thermostatic Traps Series H, C and X

TECHNICAL DATA. Dry 122a. November 12, 2013

Trunnion-Design Ball Valves

Installation, Maintenance, & Repair Series 4000B/LF4000B

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

In-Line Filters and Coalescers with Automatic Drains

INSTALLATION, OPERATION & MAINTENANCE MANUAL

SunMaxx Solar Filling Station Operating Instructions

Mustang Series PRESSURE REDUCING CONTROL VALVE WITH PRESSURE SUSTAINING FEATURE. M115-2 (Globe) M (Angle) Schematic. Standard Components

RAPID RESPONSE Model RSV-1 Residential Shut-Off Valve, 1 Inch and 2 Inch (DN25 and DN50) for Dual-Purpose Residential Water Supply General Description

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

Product Manual. CVS Type 67AFR Filter Regulator. Introduction. Installation. Description

MODEL T200-F18 MODEL T125-F18 Finish Nailers

FT43, FT44, FT46 and FT47 Ball Float Steam Traps

VdS en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS en : (01)

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

Toroidal Conductivity Sensor

REPAIR AND MAINTENANCE MANUAL

Features. Model EX Low Pressure Dry Pipe Valve System 2 (DN50), 2½ (DN65), 3 (DN80), 76 mm, 4 (DN100 ), 6 (DN150), 165 mm & 8 (DN200)

Installation, Operating and Maintenance Instructions for AEON Metal Seated Gate Valve (MSGV) Water

Diaphragm Control Valves FLUXOTROL Series I and Series 25 Installation and Maintenance Instructions

INSTALLATION & OPERATING INSTRUCTIONS

PRESSURE REDUCING CONTROL VALVE

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

Service Manual Rol-Lift

Operating Instructions Drill rig DRU160

Model RV-1 Pressure Relief Valve 2 to 8 Inch (DN50 to DN200), 250 psi (17,2 bar) Pilot-Operated, Globe and Angle Body Styles General Description

PLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering

White Industries Rear Hub Instructions

REPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL)

Round Housing with Side Ports

Tech. Services: (800) Fax: (800) Order Entry: (800) Fax: (800) Internet Address:

HYDRAULIC LIFT TABLE CART 2200-LB.

Installation Instructions

series Materials Body: 1/2, 3/4 and 1 : dezincification resistant alloy brass EN CW617N

Installation Instructions S

OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

Type and Type Pneumatic Control Valves. Type (left) and Type (right) Mounting and Operating Instructions EB 8026 EN

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)

This instruction is valid for all ACD pump models shown on page 2

BERMAD Fire Protection

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

IF IT FLOWS THE BOWIE PUMP CAN PUMP IT

SureSite Magnetic Liquid Level Indicator

BERMAD Fire Protection

Wet System. Technical Manual for Operation, Maintenance, and Troubleshooting

Hydraulic Air Riveter. Operation Manual RC197 RC198. Recommend for mass production line industrial area. Page 1

V47 Series Temperature Actuated Modulating Water Valves

1 TON FOLDING CRANE CFC1000

MAINTENANCE MANUAL INDEX DOUBLE CHECK ASSEMBLIES MODELS 850 & 850U 1/2" - 2"

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

Potter Electric Sprinkler Monitoring Training Manual

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

SE-100-1, SE-200-1, SE-500-1, and SE AIR CHAMP PRODUCTS. User Manual SE BRAKE MODELS: (i) MTY (81)

Voltmaster Trash Pumps Model TSP2, TSP3 and TSP4

Submersion/Insertion Toroidal Sensor

THERMOSTATIC MIXING VALVE TRIM K-T9493, K-T9494

Operating and installation instructions

Fig B36 Stainless Steel 'T' Type or Basket Type Strainers

ROUGHNECK II Pumpless Drain

Drive shaft, servicing

Fisher 249 Caged Displacer Sensors

BOWIE PUMPS OPERATION - MAINTENANCE

CYLINDER LEAKAGE CHECK (Compression)

Section 6 Brake Drum Failure Analysis. Brake Drum Wear Conditions. What is Normal Wear? What is Deep or Excessive Wear? WARNING. Deep, Uniform Wear

15GAL STEEL OIL DRAIN WITH 110V PUMP

SELECTION, APPLICATION & MAINTENANCE

Rexroth Hydraulic Pump A10VO Series User Manual

TECHNICAL SERVICE MANUAL

For exploded diagram and part number information, refer to the Spare Parts Catalog available on our website at

SELECTION, APPLICATION AND MAINTENANCE

INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 16303

CHROME FRONT BRAKE MASTER CYLINDER KIT

Tri-Homo Style Operation and Maintenance Instructions

Fuel Injection Pump, Rotary ( )

Fire Hydrant Troubleshooting

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

EWE Ball Valve-Type Tapping Valve. EWE Ball-Type Tapping Valve. EWE GBM Tapping Valves. for water and gas

Trash Pumps Models: 56200, , 56201, , 56300, , 56301,

Baumann 24000SB Barstock Control Valve

10 TON HYDRAULIC PRESS

Transcription:

Information on Set-up, operation, service and maintenance Model E / E3 DN100 (4"), DN150 (6"), DN200 (8") Wet Alarm Valve with E2 Euro Stainless Steel Trim Model E/E3 with Stainless Steel Euro Trim Approval No. G4060049 DN 100 Approval No. G4060050 DN 150 Approval No. G4060051 DN 200 Conforms to EN 12259-2 (CE)

Safety Information The applicable rules and regulations on accident prevention at the place of use of the equipment must be complied with. The wet alarm valve sets are built using state of the art technology and in accordance with recognized safety legislation. These systems should only be used: a. for the intended purpose, b. in a technically safe and fault-free condition. Any faults which could affect safety must be rectified immediately. The wet alarm valve stations are intended solely for use to supply of water within a fire extinguishing system. The use of this equipment for any other purpose, or for a purpose which extends beyond the intended use, shall be deemed misuse. The intended purpose also includes: Compliance with all information in Bulletin 409 Provision of inspection and maintenance work. In addition to Bulletin 409, the generally applicable and national regulations on accident prevention and environmental protection must be provided complied with only qualified and trained personnel may work on the system. The recommended adjustment, maintenance and inspection works must be carried out on the due date. Protect all upstream and downstream system parts and operating media from unintentional operation. During all maintenance, inspection and repair work, ensure that the system is voltage-free and protect the mains switch from an unintentional restart. Provide a warning sign to prevent a restart. Check that any loosened screw connections are securely tightened. After completion of maintenance work, check that all safety equipment functions correctly. Never modify, alter or extend the valve sets without the manufacturer's approval. This also applies to welding of bearing parts. Any components which are not in perfect condition must be replaced immediately. Use original spare parts and consumables only. If parts supplied by a third party are installed, we cannot guarantee that these parts have been designed and manufactured to the required performance and safety standards. Use of non original parts will void all warranties. Handle and dispose of all substances and materials used correctly, in particular: a. when working on lubrication systems and equipment, b. when cleaning using solvents. Scope of Supply The wet alarm valve set trim is supplied in three assemblies. 1. Bypass line 2. Alarm line 3. Test/drain valve

Assembly Fit the connection pieces into the corresponding connections in the valve (WAF27/WAF24). Now seal the test/drain valve with the conical 2" thread into the valve. Then (where applicable), fit the 2" bracket for the drain line.. Then (where applicable), fit the 2" bracket for the drain line. Then secure the alarm line using union nuts WAF30. If the optional retard chamber P/N 6303400530 is used, it must now be fitted to the alarm control valve with the restrictive orifice. Connect the alarm pressure switch to the retard chamber with the ¾" outlet for the alarm line to the mechanical alarm gong. If the retard chamber is not used, install the alarm pressure switch with the ¾" outlet for the alarm line to the mechanical alarm gong directly onto the alarm control valve. Ensure that the alarm pipe to the mechanical alarm is properly secured. Affix the sign for the alarm control valve either onto the retard chamber or the alarm control valve. Finally, connect the bypass line to the valve using the two union nuts WAF24. We recommend that clamping ring unions are screwed in using a drop of oil. The water supply pressure gauge is below, the sprinkler pipe pressure gauge is above. Now install the optional supervision of the alarm control valve. The diagram shows an alternative set-up with two alarm pressure switches. Warning: The assembly threads are jammed and compressed. The following values must be specified according to VdS 2100-01: Point 4.1.2 of the upper limit of the triggering threshold: DN 200 51 l/min, DN 150 53 l/min and DN 100 34 l/min Point 4.1.4 of the upper limit of the delay threshold: DN 200, DN 150, DN 100 all 30 seconds Optional retard chamber with restrictive orifice Part no. 6303400530 Enclosed loose Retrofit kit for 2 pressure switches Part no. 6999996232

Trim Description The basic trim components for the Reliable Alarm Valves Model E/E3 are designed for rapid, simple and compact attachment and serve as connection points for the alarms and other devices. They are also used for operational testing of the alarm devices without putting the system into operation. Three basic trim sets are available for models E / E3: Constant pressure - retard unit not required. Variable pressure retard unit required. Supervisory equipment according to VdS requirements (where required) must be ordered separately. Operating instructions are not included in the scope of delivery. Automatic venting via the drip valve is possible. Figure 3 Model E3 Version Groove / Groove Pos. Designation 1 Wet alarm valve 2 Water supply 3 Main drain valve 4 Alarm test valve 5 Alarm shutoff valve 6 Automatic drain valve 7 Alarm pressure switch 8 Retard unit Variable supply pressure The normal position of the alarm valve is shown in Figure 2. A water flow in the pipe system, resulting from one or several activated sprinklers, causes the valve clapper to open and water from the supply line to enter the sprinkler system for discharge over the source of the fire. The movement of the clapper (item 4) across the pin (item 8) opens the seat (item 3) and allows water to flow through the seat into the alarm channel. A continuous water flow fills the retard chamber and activates the alarm pressure switch and - if fitted - the mechanical alarm gong. A small amount of water is expelled simultaneously from the bleed valve. If the water stops flowing from the alarm valve, the clapper closes (item 4) and no further water flows to the retard chamber. The retard chamber and alarm line are drained via the bleed valve. Practically all sprinkler pipe systems contain trapped air. If water hammer or a pressure spike occurs in the supply line, the rise in pressure compresses the trapped air and causes the alarm valve clapper intermittently to lift, which can cause false alarms. Reliable's alarm valve prevents a false alarm in these circumstances using two features: a. The bypass line equipped with the check valve diverts sudden increases in pressure from the supply line away from the alarm valve clapper. This creates over-pressure in the system, which pushes the clapper into the seat. In the event that a sudden high pressure increase raises the clapper away from its contact surface and allows water to flow into the alarm line, the retard chamber will become active. b. The inlet restrictive orifice in the retard chamber and the ball drip valve permits the drain-off of intermittent water before the chamber fills and an electrical and mechanical alarm is triggered. Constant supply pressure In systems in which the water pressure remains constant, the operation of the Alarm Valve Model E/E3 corresponds exactly to the description above, with one exception:

Description: The retard chamber is not necessary and water which passes through the seat in the contact surface of the alarm valve flows straight to the electrical and mechanical alarm devices, activating these devices. Bypass line Valve in open position Drainage Alarm line Bypass line Figure 2 Pos. Designation Part number Amount DN 100 DN 150 DN 200 DN 100 DN 150 DN 200 1a Body groove/groove 6102045519 6102065519 6102085519 1 1 1 1b Body flange/groove 6102040531 6102060531 6102080531 1 1 1 1c Body flange/flange 6102040500 6102060500 6102080500 1 1 1 2 Valve cover 92116304 92116306 92116308 1 1 1 3 Seat 96016124 96016126 96016128 1 1 1 4 Clapper with bearing parts 71020424 71020626 71020828 1 1 4 5 Clapper gasket with supporting 93416104 93416106 93416108 1 1 disc 6 Drain plugs ( except metric 95206104 95206104 95206104 1 1 valves) 7 Supporting discs bolt/ nut 94906124 95606126 95606126 1 4 1 8 Pivot pin 95006124 95006126 95006128 1 1 9 Seat O-ring 95436124 95436126 95436128 1 1 10 Seat O-ring 95446124 95446126 95446128 1 1 11 Valve cover gasket 93706124 93706126 93106128 1 1 12 Valve cover bolts 91106124 91106126 91106126 6 6 6 13 Clapper spring 96406124 96406124 96406124 1 1 1 14 Screw plug 98604402 89044002 86044002 1 1 1 15 Retard chamber with restrictive orifice 6303400530 6303400530 6303400530

Test To test the operational readiness of the entire system, open the test valve, which should trigger an electrical and mechanical alarm. Opening the test valve corresponds to the opening of a sprinkler. Drain valve Test valve Figure 1 Testing with this valve gives the advantage that the valve clapper can also be tested. If the mechanical alarm does not operate, please check and clean the filter in alarm line upstream of the alarm gong. To check that the supply line allows the unobstructed supply of water, close the alarm control valve and slowly open the drain valve (Fig. 1). Once the test is complete, close the drain valve and open the alarm control valve. The alarm control valve must be supervised and secured according to the respective regulations. Warning: Always inform the corresponding authorities/persons when working on the sprinkler system. Maintenance Reliable alarm valves and associated trim must undergo periodic inspection/testing. VdS CEA requires minimum periodic inspection, testing and maintenance. Alarm valves must undergo functional testing, cleaning, inspection and if necessary, replacement of parts once a year as a minimum. Malfunctions are indicated by one or more of the following symptoms: 1. The mechanical alarm gong is not working: (see Test). 2. Continuous water flow in the drain line: a. Open the drain valve (Fig. 1) to remove all loose particles from the valve seat. Close the drain valve and check whether the water flow has stopped. b. Close the main control valve and check whether water is coming from below or above the valve clapper. Note: The lower pressure gauge (water supply) must display "0" when the main control valve is closed and the pressure across the ventilation valve has been reduced at the pressure gauge valve. a. If the water is coming from below the valve clapper, it will stop now. b. If the water is coming from above the clapper, it will continue to flow. Note: To avoid downtimes, the following parts should be to hand before dismantling the valve: 1. Seat installation tool: DN 100 Part No. 6881240000 DN 150 Part No. 6881260000 2. Clapper gasket set (item 5) 3. Cover gasket (item 11) 4. O-rings (items 9+10) 3. Remove valve clapper: In both cases (a or b), the system must be drained by closing the main control valve and opening the drain valve. Remove the valve cover (item 2), the sealing plug on the clapper stem (item 14), the pivot pin (item 8) and remove the entire clapper. Warning: Press the spring (item 13) down when removing the pivot pin. 4. Careful inspection for damage: a. Damage to the clapper gasket inspect the surface for embedded foreign bodies. Replace the gasket if damage is found (make sure that all parts are cleaned thoroughly prior to reassembly). b. Damage to the seat surface clean the seat thoroughly. Inspect the seat for other damage in the seat or for stones or other foreign bodies in the seat groove. If the seat

or other valve parts are damaged, please contact Reliable. 5. Replacing the seat O-ring: a. Using the seat installation tool, carefully unscrew the seat (do not damage the seat surface). b. Remove the O-rings (items 9+10) and clean the O-ring groove and the sealing surface thoroughly. Check for damage or foreign bodies. c. Install the O-rings in the seat groove using a little lubricating grease. Never overtighten, twist or damage the O-rings in any other way. d. After checking the correct seat of the O- rings, carefully reassemble the seat using the seat installation tool. 6. Assembly of the alarm valve: a. Fully insert the clapper Guide the pivot pin (item 8) into the clapper bore (item 4) Press and hold the spring (item 13) and locate in the position between clapper and body and fully insert the pivot pin Insert the screw plug. b. Lift the clapper and check for ease of movement and correct seating. c. Install the valve cover (item 2) and check that the gasket (item 11) is seated correctly. Tighten the bolts evenly. d. Close the drain valve. Slowly open the main control valve. Ensure that the alarm control valve and main control valve are secured in the open position. False alarms Generally water hammers in the water supply are the reason for false alarms and may occur if the system loses its effective over-pressure. The corresponding pressure displays shown on the water supply pressure gauge and the sprinkler pipe pressure gauge provide the visual warning that the over-pressure conditions are no longer in place. One or more of the following conditions can lead to a loss in pressure unsealed system drain valves, leaks at the seat (item 3) Fig. 2 of the alarm valve, leaks between the clapper (item 4) and the sealing surface (item 5) or leaks at the check valve in the bypass line. Troubleshooting measures: 1. Inspect all system drain valves for leaktightness. 2. To locate and rectify a leak at the valve seat, proceed as described earlier. 3. To rectify a leak between the clapper and the sealing surface, proceed as described earlier. 4. To locate and rectify a leak at the check valve, proceed as described earlier: a. Close the main control valve and depressurize the area between the clapper and the main control valve via the drain valve at the pressure gauge ball valve. If water continues to be expelled, the check valve must be cleaned and repaired, or replaced. b. If the check valve in the bypass line is leaking, the entire system must be drained via the drain valve. c. Following repair work, close the drain valve (Fig. 1) and slowly open the main control valve and monitor the system accordingly. 5. If it is not possible to fully drain the retard chamber and alarm line, false alarms may occur. Where this is the case, check for blockages in the restrictive orifice below the retard chamber and the bleed valve. Intermittent alarms Intermittent alarms are the result of airlocks in the sprinkler pipe system. To rectify the problem, slowly fill the system with water while ventilating the system via all system openings. If the system is put under pressure, venting at all high points including the sprinklers will be necessary. If spare parts are required, use original Reliable parts only. When ordering spare parts, please state part number, part name, size, model and serial number.

FL /FL FL/Gro ove Groove /groove Bulletin 409 German NAV UK Rev. 00 05.04.2013 Model E / E3 with Euro Trim Installation Dimensions in mm Valve A B C D G H J K L 100 165 155 385 207 110 146 120 190 280 150 185 185 410 220 143 178 120 190 280 200 220 195 430 255 170 205 120 190 280 100 165 155 385 207 110 146 120 190 280 150 185 185 410 220 143 178 120 190 280 200 220 195 430 255 170 205 120 190 280 100 165 155 385 207 89 146 120 190 280 150 185 185 410 220 108 178 120 190 280 200 220 195 430 255 135 205 120 190 280 Flange dimensions Valve Flange Bolt circle Hole Bolts Bolts Pressure level Nominal width DN Outer Ø D in mm Ø k in mm Ø d in mm Amount n x Ø d 100 220 180 18 8 8 x M16 PN 10/16 150 285 240 22 8 8 x M20 PN 10/16 200 340 295 22 12 12 x M20 PN 16 Valve Nominal width DN Outside diameter mm Groove dimensions Groove diameter mm Groove width mm 100 114.0 110.1 9.5 150 (Europe) 168.0 164.0 9.5 150 (UK) 165.0 160.8 9.5 200 219.0 214.0 11