The Wickcraft Company. Elevated Boardwalks and Walkways



Similar documents
Introduction to Minimal Excavation Foundations

Safe & Sound Bridge Terminology

Residential Deck Safety, Construction, and Repair

SECTION 1 GENERAL REQUIREMENTS

FINAL FAILURE INVESTIGATION WESTCHESTER NORTH LAGOON BRIDGE. Anchorage, Alaska

Chapter 3 Pre-Installation, Foundations and Piers

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

High Capacity Helical Piles Limited Access Projects

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

3.1 Historical Considerations

Civil Engineering and Architecture (CEA) Detailed Outline

March 19, Ms. Jean McDonald CAP Management th Street, Suite 1010 Denver, Colorado 80202

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS

MOBILE HOME LAW. Revised November 2001

Cellar Tech Containment Well Cellar Systems

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

RESIDENTIAL WOOD DECKS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Installation PowerPoint for Grasscrete Formers

VIII. TRANSPORTATION

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Acceptance Codes APPENDIX - A. Acceptance Criteria

Uncovered Decks & Porches

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Transmission Foundations Case History : Helical piles Hydro One Networks Inc.

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

Pole Building Estimate Number: /2/2010 NORTH SIDE-EAVE SIDE 2 ELEVATION

Scope of EN Clarification Document

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

Roadway Cost Per Centerline Mile Revised June 2014

Virginia Approach Spans

Certification: Building Plans Examiner. Exam ID: B3

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Porous Pavement Alternatives Cost Analysis

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

APPENDIX G. California Coastal Commission & Conservancy Accessibility Standards

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Stormwater/Wetland Pond Construction Inspection Checklist

The unit costs are based on the trend line of the 3 low bids for the average quantity.

Description Quantity Cost Total Cost

Material Substitution Dynamics in PV Mounting Structures

Residential Decks. Planning and Development Services Department

Haynes Recreation Center, Laredo, TX. Data Matrix and Sustainability Benchmarks

General Approach. Structure Components. Is all lumber the same? Lumber Grades. Rafters Girders / Beams Columns. Sketch general structural layout

Designed and Engineered to Perform

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

SECTION COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

SECTION EARTH MOVING

Building Your Interlocking Concrete Pavement to Last a Lifetime

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings.

Vehicle Tracking Pad

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

HIGH TENSION CABLE BARRIER

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

High Strain Dynamic Load Testing of Drilled Shafts

AMERICAN GOTHIC PLAYHOUSE

HANDRAIL STANDARDS HANDRAILS AXESS LADDER SYSTEM KICK FLAT SYSTEM OPEN FLOORING

SECTION STORM DRAINAGE TABLE OF CONTENTS

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

Site Development Information Worksheet for single family residential development

Duraslot Surface Drains

1.7.0 Floodplain Modification Criteria

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

Section 2100-Trenching and Tunneling

1,045 m length of the Deh Cho Bridge

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Town of Beaumont. Lot Grading Guidelines

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

Sample Drawing Package for One and Two Family Dwelling Applications

Timber Decks. Technical Note. March 2007

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

Miller Engineered Solutions Customized Fall Protection Solutions. NEW! Now featuring Rigid Rail Systems

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

FY08 SEWER POINT REPAIRS BID TABULATION

SECTION SUPPORT OF EXCAVATION

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Fabcograte FRP Grating. Tolerances: ±1/16. Tolerances: ±1/16. THICKNESS BAR SPACING PANEL SIZE (FT.) WT (LBS) 1" 1.5" x 1.

SECTION STORM DRAIN SYSTEM

Transcription:

The Wickcraft Company Elevated Boardwalks and Walkways

Wickcraft History Established in 1954 by Dick Wickman Family owned and operated Custom Fabrication with noteable Craftsmanship Started as Dock and Pier Fabrication In 2006, answering the need for new standards in pedestrian walkways, Wickcraft designed the tubular steel frame construction Today Wickcraft offers a wide range of designs and options to address your project requirements

Most common applications Wetlands often the most environmentally sensitive areas for both install and sustainability Impassable areas often the most beautiful applications and therefore the most used

What We Want You to Remember Boardwalks are NOT just for wetlands Boardwalk provide an environmentally sensitive and sustainable alternative to grade level paths A modular, pre-fabricated, galvanized steel design, reduces environmental stress and extends useful life

No Longer Just Wetlands Fastest growing applications for boardwalks. Sensitive areas Trails Sidewalks Rooftops Temporary access

A New Path Alternative Elevated trails should replace grade paths because: Low environmental stress of install Eliminates ground erosion Prevents soil compaction Promotes natural rain water run-off Accommodates native plant growth Encourages small animal movement Just to name a few

When to use Pre-fabricated Steel Environmentally sensitive areas Desire rapid install Require minimal site disruption Right-away access is needed removable Extensions or additions may be added

Pre-Fabricated Frames Custom welded steel frames are galvanized Standard sections are 6 feet long by varying widths: 4, 6, 8, 10 feet wide Each section is connected with a patented Posi-Lock hinge system Each section rests on 4 non-penetrating, adjustable pan-foot legs on shared bearing pads Post-Pile sections are 12 feet long and are designed to rest on posts or Helical Piles using a saddle-cap

Pre-fabricated Decking Standard decks are pre-fabricated to fit frames to ensure a perfect match Common deck material is HDPE (recycle plastic) or Treaded Yellow Southern Pine Custom deck material can be substituted based on design such as, Ipe, Locus Wood, steel grating Pre-fabricated decks are assembled on jigs to ensure uniformity and consistency Deck sections are numbered to match frames

Plan, Design, Build Bringing it to life

Design and Installation Wickcraft can work with full CAD drawings of the site and proposed plan, or from a sketch and measurements of the site. Project owners can engage a contractor of their choice to install the boardwalk. Wickcraft can provide an install manager to ensure a successful installation. Wickcraft can provide install resources with mobilization and travel expenses.

Design Details Project specific, detailed layout drawing is done for each project and serves as an install guide. All options and custom elements are included in drawings such as transitions, railing, curbs, platforms and stairs. Each boardwalk is fabricated per specific design requirements of the project. Engineered stamped drawing can be provided if necessary.

Guarantee Life time guarantee on workmanship 100/50 year guarantee on all galvanized steel for above water and submerged 50 year guarantee on all HDPE (recycled plastic) decking materials 15 year guarantee on all Treated Southern Yellow Pine decking materials

What You Need to Remember Wickcraft boardwalks are NOT just for wetlands Wickcraft provides environmentally sensitive and sustainable alternatives to grade level paths Wickcraft is the only modular, pre-fabricated, galvanized steel boardwalk with history

The Wickcraft Company www.wickcraft.com Amy Vanden Heuvel amy@wickcraft.com 608.282.5332

Design Options The standard boardwalk is design to exceed the bike/pedestrian specifications of 85 LBS/Sqft: Wickcraft is 100 LBS/Sqft The American Association of State Highway and Transportation Officials (AASHTO) H5 boardwalks can be designed to support 10,000 lb trucks and emergency vehicles A pedestrian only (light weight) option is also available for roof-tops and other applications

Frame Design Pre-fabricated designed and fabricated in Madison, WI and shipped to any point in North America. Current installs in 44 states. Modular for the greatest in flexibility and speed of install, reducing the stress on environment Galvanized, tubular structural steel for strong durable design that lasts a lifetime Posi-Loc hinge patented interlocking connector system evens and distributes loads among frames

What is the Purpose Bringing communities together easy tail access and centrally located, destination based systems Providing recreation for visitors trail based activities such as geo-caches and other activities Create educational opportunities with habitat access and signage Providing access for utility vehicle transportation

Cost Comparatives Post-n-timber Pre-cast Concrete Least expensive material $80 - $120 per linear foot Expensive install $50 - $70 per linear foot* 15-25 year life Most expensive materials $180 - $400 pre linear foot Expensive install $20 -$55 per SqFt* * 30-50 year life Pre-fabricated Steel *American Tails ** PeraTrack.com Low material cost $120 - $250 per linear foot Low install cost $18 - $30 per linear foot 50-100 year life

Plan the site Involve park planners, neighborhood groups and land owners on proposed trail location Work with LA s and trail planners to develop trails concepts Engaging surveyors to identify trail coordinates Consulting engineers to develop requirements Checking regulatory bodies for compliance