Product Concept for Tarsier Software Solutions Cable Trunking Electrical Power Bar Hanger



Similar documents
Structural Holding System

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

PEARL Instruction Manual

LK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X.

INSTALLATION MANUAL. Contents JAPANESE ENGLISH GERMAN FRENCH ITALIAN SPANISH. To the installing technician: CEILING BRACKET

Hive Top Ventilation Shims

INSTRUCTIONS: LocknCharge Laptop Carts

Policy on Water Heater Installations Policy No. UPC Effective: September 1, 1995 Revised: February 10, 1996

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

1500 Follow Spot Yoke

Check for deteriorated, shifting or missing tie-down pads. Replace if needed.

Fitting Instructions Garador, Westland & Catnic Garage Door Spring Box Roller Wheels & Wall Bracket & Link Arm

EZ-Steer Assisted Steering System

Pole Lathe and Shave Horse Design

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

DE Frame with C Series Sidelight

Saferand easierinstallation

Operating Instructions Drill rig DRU160

SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair

Roll-Up Door Maintenance Guide

SUPERCHIPPER CASTING MAINTENANCE

Belt Tensioning Methods for Small Package Conveyors What s the best solution?

3/4 PIPE CLAMP WITH STAND

Trillium 40 Axis Spring Tensioner Wire Replacement Instructions

INSTALLATION INSTRUCTIONS

Auto-belay Cable Replacement Process

Guide for Modified Assembly: Lightning McQueen. By: Collin Patterson, University of Delaware. Materials and Tools:

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Item #: BTOL Assembly Instructions

PREASSEMBLED ELEMENTS FOR LIFTING AND SLIDING DOORS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Fish Grader User Manual

INSTALLATION INSTRUCTIONS

POLEMOUNT FIELD FIX ASSEMBLY INSTRUCTIONS

AZEK Rail Install Guide

Solstice/Sky Water Pump Replacement

SPRITE and BIGFOOT DESKTOP CNC MACHINE KIT ASSEMBLY INSTRUCTIONS

Installation Instructions

Router Table Plans.

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

2100 AD Mirror Elevator Ball Nut Replacement Procedure

MGB Chrome Bumper Conversion

Router. A. Identify the major parts of the router. B. Complete a written test on safety and operating procedures of the router with 100% accuracy.

C5 Sound Deadening & Insulation Kit Interior Removal & Installation Instructions

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Honda CX500 & GL500 Forum

USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102

Thanks for choosing Toroidal. This file is developed to assist you in assembling and aligning Toroidal Dish.

DO NOT OPERATE LANCELOT OR SQUIRE WITHOUT FIRST ADJUSTING THE SAFETY GUARD. ( See Below)

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

ECM-D70T / ECM-D70T1.5

Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version

UNIVERSAL MOUNTING SET (UMS) FOR ARTOLINK FSO EQUIPMENT

C-Plus Softgrip Screwdrivers

Build Your Own Solar Car Teach build learn renewable Energy! Page 1 of 1

Seismic Installation for Attic Storage System

RZ Guardrail System Installation Manual

Installation Manuals Version n. 01 of 14/06/2013

Triac Printed Circuit Board Replacement

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT

Odyssey of the Mind Technology Fair. Simple Electronics

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

2&3 SECTION LOFT LADDER

OWNER S MANUAL Table Tennis Table Patent Pending

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual

Expanding a 40-Type Cabinet

PRO PANELS the artist s choice in display designed by artists, for artists. voice: fax:

Organizing and Managing Equipment Rooms

EASY START SYSTEM. Toni Clark practical scale GmbH EASY START SYSTEM 1

CABLE INSTALLATION SYSTEMS

Depending on which elastic support you have you can secure the V2 power unit to the following seat bracket tubes: EXTERNAL DIAMETER 27.

INSTALLATION MANUAL INSIDE PASSENGER COMPARTMENT. HFC 134a FOR EUROPEAN SPEC. / GENERAL SPEC. AIR CONDITIONING ENGLISH

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

Steel Door Frame Installation in Steel Stud Construction

HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL.

P System Cubicles. Certified for more safety

BOBBIN WINDER - TYPES & FUNCTION

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

FIX TURE CARRI ERS. 140(a) MPB-2011-USA

42U/45U 28" Wide Rack Installation & Service Guide

Manual for GlobePharma Mini-Press II Rotary Tablet Press

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

Close Coupled & Back To Wall WC Saintaryware. Fitting Instructions

Sport Ice Elektro 124

REAR SHOCK ABSORBER WITH COIL SPRING

Guidelines for Earthquake Bracing of Residential Water Heaters

ELECTRIC BICYCLE USER MANUAL

Machine needle shut-off nozzle type HP

NONSUCH SPARS Recommended Owner s Maintenance Schedule

Re-board Accessories

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

with installation dynafact boost GAUGE this manual is for use with systems

Testing Accessories. Test PaddleS. Insulated Socket Wrench Jumper Strips Test Lead Kit. Test Paddle Attachment Clips Plugs Binding Posts

Puddle Flange. FRANK Puddle Flange

39HQ Airovision Air Handling Units

Wall installation for Samsung Galaxy

INSTALLATION INSTRUCTIONS AIRCOMMAND IBIS ROOFTOP AIRCONDITIONER

Linkeo 19" freestanding cabinets

IMPORTANT INFORMATION - PLEASE READ. Table of Contents. Introduction. General Information

Transcription:

Product Concept for Tarsier Software Solutions Cable Trunking Electrical Power Bar Hanger Proprietary Notice This work contains information and ideas proprietary to Tarsier Software Solutions. This unpublished work is protected by the laws of Singapore and other countries. The work was created in 2007. If publication occurs, the following note shall apply: 2007, Tarsier Software Solutions. All rights reserved. Tarsier Software Solutions e-mail: tarsiersoft@tarsiersoft.com www.tarsiersoft.com

Contents Executive Summary......1 Introduction......1 Product Overview......1 Product Description......2 Introduction......2 Design Feasibility Testing......3 Prototype Design......3 Prototype Performance Results... 4 Production Unit Design......6 Engineering Design......6 Installation Method......7 Company History... 9

Executive Summary Introduction Tarsier Software Solutions develops product concepts and licenses them to larger companies. These companies are able to utilise their domain knowledge, sales, marketing and distribution infrastructure to successfully commercialise our ideas for both companies mutual financial benefit. Product Overview Cable trunking is an elegant means to hide power cables in an office. However there is no space to place or to access an electrical distribution power bar within it, which means that the power bar must be placed on the floor. This reduces the aesthetics, forces the user to climb under the desk in order to switch sockets on and off and results in the power bar being kicked or knocked in general use or when the floor is cleaned. Our power bar hangers are designed to hang a power bar from the cable trunking. Hanging the power bar from under the cable trunking; 1. provides easy access to the sockets, 2. keeps the power bar safely off the floor, 3. improves the aesthetics. The electrical distribution power bar is hung from the cable trunking using two plastic hangers that are clamped in place under the cable trunking. Screws, screwed into the hangers secure the electrical distribution power bar to the hanger, as if it was being fixed to a wall. The following photograph shows a desk with a power bar hanging from an IKEA Signum cable trunking using a prototype of our Electrical Power Bar Hangers. Page 1

Product Description Introduction Our Power Bar Hangers are designed based on the IKEA Signum cable trunking and enable an electrical distribution power bar to be hung from the cable trunking, but it could be used on any frame based trunking. Hanging the power bar from the cable trunking; provides easier access to the sockets than when they are on the floor. Placing the power bar on the floor forces a person to climb under the desk in order to switch the socket on and off or to remove the plug. Leaving the connected appliance on is wasteful of energy and increases the risk of fire. With the 60 cm wide EFFEKTIV desk it is possible to reach under the desk and operate the socket switches while seated, while the 80 cm wide EFFEKTIV desk does require a person to crouch down, but because the socket is elevated, it is closer and easier to reach than if it was on the floor. keeps the power bar safely off the floor. On the floor the power bar can be kicked or knocked in general use or when the floor is cleaned. improves the aesthetics as there are no cables dropping down from the desk to a electrical distribution power bar on the floor. The electrical distribution power bar is hung from the cable trunking using two plastic hangers that are clamped in place under the cable trunking. Self tapping screws, screwed into the hangers secure the electrical distribution power bar to the hanger, as if it was being fixed to a wall. The following photograph shows an electrical distribution power bar hanging from an IKEA Signum cable trunking using a prototype of our Power Bar Hangers. Page 2

Design Feasibility Testing Prototype Design Tarsier Software Solutions is primarily a software development company so we do not have the facilities to create a complete prototype of the Power Bar Hangers. However, we developed a basic prototype from components with the required functionality and appropriate dimensions. The power bar was hung from the cable trunking using two plastic hangers that are clamped in place under the cable trunking. The prototype Power Bar Hanger (above) was made from the following readily available components, A plastic door hanger with one side cut off to make a right angle. A bolt and wing nut to form a clamp which grips the Signum cable trunking base, (see following picture). The upper jaw was made from a piece of the plastic cut from the door hanger. The self-tapping screw forms the hook the electrical power distribution bar hangs from. Page 3

Prototype Performance Results The prototype revealed the following issues which needed to be addressed in the production design. 1. The hanger rigidity With the prototype hanger the power bar was found to hang off the vertical, as can be seen in the photograph above. This was a combination of the plastic door hanger not forming a perfect right-angle and not having sufficient rigidity. Adding a fillet will strengthen the right-angle. This will also ensure the hanger does not bend when plugs are inserted or removed from the electrical power distribution bar. Additionally a higher placement of the power bar fixing screw and / or extending the length of the hanger will also stop the power bar hanging off the vertical. In the prototype the hanger was 70mm long, with power bar fixing screw was placed 60mm from the top. Trails indicate that the power bar fixing screw can be raised to 50mm from the top of the hanger and still provide sufficient space for plugs with an integral transformer. Electrical power distribution bars were found to be typically 60 mm high. Page 4

2. Improvements to the design of the clamp for ease of installation. When the hangers were fixed to a cable trunking that was already installed under a desk it was found that the prototype s use of a bolt and wing nut to form the jaws to clamp around the cable tray installation was tricky as the bolt head spins when the wing nut is tightened or when trying to put the wing nut on the head of the bolt. The prototypes were installed by lying underneath the desk with one hand inserted in the narrow gap between the trunking and the underside of the desk, to hold the bolt head. The hanger was then slid onto the bolt followed by the wing nut which had to be threaded onto the bolt with a single hand while hanger was held clear. This was very tricky and the wing nut would often fall off onto the face of the installer. Safety goggles had to be worn to prevent eye injuries. The design drawings for the production version detail the design of the jaws so that the hanger can be easily and safely attached to installed cable trunking. 3. Safety Guard for the exposed thread of the power bar fixing screw. The original design for the hanger was to have studs that were integral to the hanger. For the prototype this wasn t possible as Tarsier Software Solutions does not have access to an injection moulding machine to manufacture the hanger with an integral stud. A self tapping screw was used instead. The above photograph of the prototype hanger shows the use of screws to make the studs resulted in the tip of the screw and most of the shank being dangerously exposed. This wasn't expected to be a problem, as the power bar hook was expected to be a stud moulded from the hanger. However testing revealed that different power bars have different sized screw head sockets (diameter and depth). Consequently a single sized stud would not guarantee that the Power Bar Hangers would be universal. Therefore using screws as a means to hang the power bar off the hangers ensures the hangers can be used with any power bar. The hanger design therefore needs to include a means to shield the screw shank and tip. 4. 2mm thick plastic is suitable The 2mm thick plastic (presumably ABS) door hanger that was used to make the prototype was suitable for both the construction of the upper jaw (which supports the weight of the power bar) and to provide enough grip for the power bar fixing (self tapping) screw, from which the power bar hangs off the hanger, to hold the power bar securely. Page 5

Production Unit Design Engineering Design The follow drawings show the design for the production version of our Electrical Power Distribution Bar hanger. Hanger Screw shield Upper Jaw Page 6

Installation Method 1. Insert the upper jaw into the hanger and secure loosely with the wing / butterfly nut so that the upper jaw is free to move vertically. 2. From below the Signum cable trunking, insert the upper jaw between the wire frame of the trunking. Page 7

3. Rotate the hanger so that it faces out allowing the power bar to be attached. This also rotates the upper jaw over the bars forming the trunking. Tighten the wing / butterfly nut so that the hanger is secure. Page 8

Licensing If you are interested in licensing this Product Concept, please e-mail us at tarsiersoft@tarsiersoft.com referring to our Electrical Power Bar Hanger product concept, reference PC07-001, for our standard Licensing Agreement. Page 9