TRICK SHEET on Project Management ITTO s (Input, Tool & Techniques, Output)



Similar documents
Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Project Integration Management

The 10 Knowledge Areas & ITTOs

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Develop Project Charter. Develop Project Management Plan

Input, Output and Tools of all Processes

ITTO Review (from I/O perspective)

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs

Project Management Process. Prepared by Jay Knape

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)

Time Management. Herb Pollard III

Managing IT Projects. Chapter 2 The PMI Framework

PMP Project Management Professional Study Guide, Third Edition

Certification Preparation Course LATVIKON (R.E.P.)Centre

PROJECT MANAGEMENT PLAN CHECKLIST

Project Risk Management

PROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP

Project Management Institute (PMBOK 2000) PMP Preparation Worksheet

The Plan s Journey From Scope to WBS to Schedule

Making project management indispensable for business results. Project Management 101

The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004)

PMP 2013 Exam Prep. Course Overview


Principles of Project Management

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

Project Management Professional (PMP)

PMP Exam Preparation Answer Key

21. Earned Value deals with: a. EV Scope b. PV Time c. AC Cost 22. Portfolios are organized around business goals. 23. Take stern action against

Project Management Professional (PMP) Boot Camp

A Comparison of PMI s PMBOK Guide Versions 4 & 3

Partnering for Project Success: Project Manager and Business Analyst Collaboration

PMBOK 5 th Edition Crash Course

Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

PROJECT TIME MANAGEMENT. 1 Powered by POeT Solvers Limited

Project Time Management

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

Project Scope Management in PMBOK made easy

Project Management Program. (PMP Exam) 50 Cragwood Rd, Suite 35 South Plainfield, NJ 07080

The Project Planning Process Group

TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT. Hazar Hamad Hussain *

PMP Examination Tasks Puzzle game

- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B

Impact of PMBOK 5 th Edition

Project Cost Management

Certification Exam Objectives: PK0-003

PROJECT TIME MANAGEMENT

PMP/CAPM Prep course. Anwers to all questions with rationale

Interpreting the Management Process in IEEE/EIA with the Help of PMBOK

Chapter 6. (PMBOK Guide)

PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING PMI PMBOK & ESTIMATING

Project Management Standards: A Review of Certifications/Certificates

A COMPARISON OF PRINCE2 AGAINST PMBOK

Introduction to the ITS Project Management Methodology

Project Management for Everyone

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART C CERTIFIED PRACTISING PROJECT MANAGER (CPPM)

Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

IT Project Management Methodology. Project Scope Management Support Guide

CPM -100: Principles of Project Management

PMI Risk Management Professional (PMI-RMP) Exam Content Outline

MAPPING OF PROJECT MANAGEMENT METHODS AND TECHNIQUES TO SOFTWARE ENGINEERING PROCESSES

Project Time Management

PMI Risk Management Professional (PMI-RMP ) - Practice Standard and Certification Overview

Chapter 01. PMP work book answers V Exercise 01: Question Answer Question Answer

The contact workshop is a mix of instructor lead and self paced learning, designed as per the PMBOK Fifth edition of Project Management Institute.

Certificate In Project Management (CIPM)

PMP Handouts Dr Pratul Sharma Project Management Framework

PMP Certification Study Notes 9 - Project Human Resource Management

PHASE 3: PLANNING PHASE

MNLARS Project Audit Checklist

PMI Lexicon of Project Management Terms

Project Managing to Support Change. Cathryn Stam, PMP Tina Salaris, RN, PMP

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

Project Management Certificate (IT Professionals)

Contrasting CMMI and the PMBOK. CMMI Technology Conference & User Group November 2005

Comparing the Differences and Complementary features of PRINCE2 and the PMI PMBOK Guide

The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management.

Minnesota Health Insurance Exchange (MNHIX)

Module 3: The Project Planning Stage

4. Project management triangle The Project Management Triangle (called also Triple Constraint or the Iron Triangle) is a model of the constraints of

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved

Program Title: Advanced Project Management Knowledge, Skills & Software Program ID: # Program Cost: $4,690 Duration: 52.

This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed by the IIBA.

Metadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500

EXAM PREP COURSE. Course Overview. Course Objectives. Course Materials Include: Our PMP Exam Prep (Fifth Edition) training program:

Computing Services Network Project Methodology

Project Management Professional (Certified by PMI)

PHASE 3: PLANNING PHASE

Project Stakeholder Management

Project Time Management

Errata 1 st Printing. Errata 2 nd Printing

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date:

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Assessment of NCTD Program Management Framework for Positive Train Control Program

Errata. 133 Figure 5-15 Corrected the output for 8.3 Control Quality to read verified deliverables

PBL: Project Management. Competency: Project Definition

Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:

A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition

Transcription:

TRICK SHEET on Project Management ITTO s (Input, Tool & Techniques, Output) Compiled by Abdulla Al Mamun, MBA, MCAS, PMP Based on PMBOK 5 th Edition

Integration Management Project Charter Formal authorization of the Initiate Project Statement of Work (SOW) Expert judgment Project Charter project or phase Business case Facilitation techniques Agreement/Contract Enterprice Environment Factor () Organizationl Pricess Assets() Develop Management Document actions to define, prepare, integrate, and coordinate subsidiary plans into the PMP Project Charter Outputs from ning Process Enterprice Environment Factor () Organizationl Pricess Assets() Expert judgment Facilitation techniques Project Management Direct & Manage Project Work Execute the work defined in the Execute Project management plan Expert judgment Deliverables project mgmt plan to achieve Approved changed requests PMIS Work performance information requirements in scope statement. Enterprice Entervironment Factors () Meetings Change requests () Project Management Updates Project Documents Updates Monitor & Project Work Monitor and control the processes to meet the performance objectives. Project management plan Expert judgment Change requests Schedule Forecasts Analytical techniques Work performance Reports Cost Forecasts PMIS Project Management Updates Validated Changes Meetings Project Documents Updates Work performance info Enterprice Entervironment Factors () () Perform Integrated Change Reviewing change requests, approving change requests and controlling changes. Project management plan Expert judgment Approved Change Requests Work performance reports Meetings Change Log Change requests Change Tools Project Management Updates Enterprice Entervironment Factors () Project Document Updates () Close Project or Phase Finalize all activities to formally close the project or phase. Close Project management plan Accepted deliverables () Expert judgment Final Product, Service or Result Transition Updates

Scope Management Is the process of creating a Project Management Expert Judgement Scope Management scope management plan that Project Charter Meetings Requirement Management Scope documents how the project Enterprise Environmental Factor Management scope will be defined, Organizational Process Assests validated, and controlled. Collect Requirements Defining and documenting stakeholders' needs to ensure project objectives are met. Scope Management Interviews Requirement Documents Requirement Management Focus Group Requirement Traceability Matrix (RTM) Stakeholder Management Facilitated workshops Project Charter Group Creativity Techniques Stakeholder Register Group Decision Making Techniques Questionnaires and Surveys Observations Prototypes Benchmarking Context Diagrams Document Analysis Define Scope Developing detailed description of the project and product as a basis for future decisions. Scope Management Expert Judgement Project Scope Statement Project Charter Product analysis Project Documents Updates Requirement Documents Alternative Identification Facilitated Workship Create WBS Validate Scope Subdividing major deliverables into smaller components Formal acceptance of the completed project deliverables. Scope Management Decomposition Scope Baseline Project Scope Statement Expert Judgement Project Documents Updates Requirement Documentation Project Management Inspection Accepted deliverables Requirement Documents Group Decision Making Techniques Change requests Requirement Traceability Matrix Work Performance Information Verified Deliverables Work Performance Data Project Documents updates Scope Monitoring status of the project and product scope and managing changes to scope baseline. Project Management Requirement Documentation Requirement Traceability Matrix Work Performance Data Variance analysis Work Performance Information Change requests Updates:, Docs,

Schedule Schedule Management is Project Management Expert Judgement Schedule Management Management the process of establishing the Project Charter Analytical Techniques policies, procedures, and Enterprise Environmental Factor Meetings documentation for planning, Define Activities Activity list Schedule Management Decomposition Activity list Milestone list Scope baseline Rolling wave planning Activity Attributes Enterprice Entervironmental Foactors Expert judgment Milestone Lists Sequence Activities Identify and document the logical relationships and dependencies Time Management (ITTO) Schedule Management Precedence Diagraming Method (PDM) Project Network Schedule Diagram Activity lists Dependency Determination Project Document Updates Activity Attributes Leads & Lags Milestone List Project Scope Statement Enterprice Entervironmental Foactors () Schedule Management Expert judgment Activity Resource Requirements Estimate Activity Estimating the type and Resources quantities of resources Activity lists Alternative Analysis Resource Breakdown Structure required Activity Attributes Published Estimating Data Project Document Updates Resource calendars Bottom Up Estimating Risk Register Project Management Software Estimate Activity Estimate # of work periods per Activity Cost Estimates Enterprice Entervironmental Foactors () Schedule Management Expert judgment Activity duration estimates Durations activity Activity lists Analogous Estimating Project Document Updates Activity Attributes Parametric Estimating Activity resource requirements 3 Point Estimating Resource calendars Group Decision Making Technique Project Scope Statement Reserve analysis Develop Schedule Analyze sequences, durations, Risk Register Resource Breakdown Structure Enterprice Entervironmental Foactors () Schedule Management Schedule Network Analysis Schedule baseline resources and constraints to Activity lists Critical Path Mehod Project Schedule document project schedule Activity Attributes Critical chain method Schedule Data Project Schedule Network Diagrams Resource Optimization Technique Project Calendars Activity resource requirements Leads and Lags Updates Resource calendars Schedule compression Project Document Updates Project Scope Statement Scheduling Tools Risk Register Resource Breakdown Structure Enterprice Entervironmental Foactors () Schedule ling changes Project Management Performance Reviews Work Perform Information Project Schedule PM Software Schedule Forecasts Work performance data Resource Optimization Technique Change Requests Project Calendars Modeling Techniques Updates:, Docs, Schedule data Leads & Lags Schedule compression Scheduling Tools

Cost Management (ITTO) Cost Is the process that establishes the Project Management Expert Judgement Cost Management Management policies, procedures, and Project Charter Analytical Techniques documentation for planning, Enterprise Environmental Factors Meetings managing, expending, and Organizational process Assets controlling project costs. Estimate Costs Develop an approximation of the costs of the resources to complete project activities Cost Management Expert judgment Activity cost estimates HRM Analogous Estimating Basis of estimates Scope baseline Parametric Estimating Project Documents Updates Project schedule Bottom-up estimating Risk Register 3-point estimating Enterprise Environmental Factors Reserve analysis Cost of quality Vendor Bid Analysis Group Decision Making Tech PM Estimating Software Determine Budget Aggregating estimated costs to establish an authorized cost baseline. Cost Management Cost Aggregation Cost Baseline Scope baseline Reserve analysis Project Funding Requirements Activity Cost Estimates Expert judgment Project Documents Updates Basis of Estimates Historical relationships Project schedule Fund limit reconciliation Resource Calendars Risk Register Agreements Costs Monitoring status of the project to update the project budget and managing changes to the cost baseline Project Management Earned Value Mgt (EMV) Work Performance Project Funding Requirements Forecasting (ETC, VAC etc) Cost Forecasts Work performance Data To Complete Perf Indx (TCPI) Change requests Performance Reviews Project Management Reserve analysis Project Documents Updates PM Software

Quality Management (ITTO) Quality Identifying quality Project management plan Cost-Benefit Analysis Quality Management Requirements and/or Stakeholder Register Cost of quality (COQ) Process Improvement plan standards for the project and Risk register Seven Basic Quality Tools Quality Metrics product and documenting how Requirement Documentation Benchmarking Quality Checklist the project will demonstrate Design of experiments compliance. Statistical sampling Project Docs Updates Flowcharting Additional Quality ning Tool Meetings Perform Quality Assurance Quality Auditing the quality Requirements and the results from quality control measurements to ensure appropriate quality standards and operations definitions are used. Monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes. Execute Quality Management Quality Managementa and Change requests Tools Process Improvement Quality Audits Updates: docs, plan, Quality Metrics Process Analysis Quality Measurement Project Documents Project management plan Cause & Effect diagrams Quality Contraol Measuret Quality metrics charts Validated changes Quality checklists Flowcharting Validated deliverables Work Performance Data Histrogram Change requests Approved change requests Pareto Chart Work performance Info Deliverables Run Charts Updates: docs, plan, Project Documents Scatter Diagram Statistical sampling Inspection Approved Change Request Review

Human Resources Management (ITTO) HRM Identify, document, assign R & R & Organization charts and Human Resource : reporting structure. Project Management Position Description Activity resource requirements Networking Roles & Responsibility Organization theory Project Org Chart Expert Judgement Staffing Mgt Meetings Acquire Project Team Obtaining required project resources. Execute HRM Pre -Assignment Project Staff assignments Negotiation Resource calendars Acquisition Project Mgt Updates Virtual Team Muli-criteria decision analysis Develop Project Team Develop individual or group skills to enhance project performance. Execute HRM Interpersonal skills Team Perfom Assessment Project Staff Assignments Training Updates Resource calendars Team building Activities Ground Rules Co-Location Recognition & Rewards Personal Assessment Tools Manage Project Team Track team performance, providing feedback, resolving issues, managing changes to optimize project performance. Execute HRM Observation & conversation Change Request Project Staff Assignments Project performance appraisal Updates:, Docs,, Team perform assessment Conflict Management Issue Log Interpersonal skills Work Performance Reports

Communication Management (ITTO) Commutations Management Is the process of developing an appropriate approach and plan for project communications based on stakeholder s information needs and requirements Project Management Communication Requirement Analysis Communications Mgt plan Stakeholder register Communication Technology Project Docs Updates Communication Model Communication methods Meetings Manage Communication Is the process of creating, collecting, distributing, storing, retrieving, and the ultimate disposition of project information Execute Communication Management Communication Technology Project Communication Work Performance Reports Communication Model Project Management Updates Communication Mothods Project Document Updates Informmation Management Methods Updates Performance Reporting Communication Is the process of monitoring and controlling communications throughout the entire project life cycle to ensure the information needs of the project stakeholders are met. Project Management Information Management Systems Work Performance Information Project Communications Expert Judgement Change Requests Issue Log Meetings Project Management Updates Work Performance Data Updates

Risk Management (ITTO) Risk Identify Risk Determine approach and plan risk mgmt activities Determine and document characteristics of potential risks Project Management Analytical Techniques Risk management plan Project Charter Expert Judgement Stakeholder register Meetings (Methodology, Roles & Responsibility, Budgetting, Timing, Risk Categories, Probablity and Impact Matrix, Rivised Stakeholder Tolerance, Reporting Formats, Tracking) Risk management plan Documentation Reviews Risk register Cost management plan Information gathering Techniques (List of Identified Risk, List of Potential Responses) Schedule mgmt plan Checklist analysis Quality Management Assumption analysis HRM Diagramming techniques: Scope Baseline (C & E Diagram, System or Process Flow Diagram, Influence Diagram) Activity Cost Estimates Activty Duration Estimates SWOT analysis Stakeholder register Expert judgment Project Documents Procurement Documents, Perform Qualitative Risk Analysis Conduct qualitative analysis of risks and conditions and prioritize their effects Risk management plan Scope Baseline Risk register Risk Probablity and Impact Assesst Probablity & Impact Matrix Risk Data Quality Assessment Risk Categorization Risk Urgency Assessment Expert judgement Project Documents Updates Perform Quantitative Risk Analysis Measure probability and consequences of risks and estimate implications for project objectives Risk management plan Cost management plan Schedule mgmt plan Risk register, Data gathering & representation Technique Quantitative Risk Analysis and Modeling Techniques Expert Judgement Project Documents Updates Risk Response Develop options and actions to enhance opportunities and reduce threats to the project's objectives Risk management plan Risk register Strategies for Negative Risk or Threats Strategies for Position Risk or Opportunities Contingent response strategies Expert Judgement Project Management Updates Project Documents Updates Risk Monitor residual risks, identifying new risks, executing risk response plans and evaluating their effectiveness. Project Management Risk Reassessment Work Performance Info Risk register Risk Audits Change Requests Work Performance Data Varinace & Trend Anlysis Updates:, Docs, Work Performance Reports Technical Perfom Measurement Reserve Analysis Meeting

Procurement Management (ITTO) Procurements Determine what, how and when to procure. Prepare procurement documents to support vendor selection and develop the procurement SOW. Project management plan Make-or-buy analysis Procurement Mgt Requirements Documents Expert judgment Procurement SOW Risk register Market Research Make/buy decisions Activity resource requirements Meetings Procurement Documents Project Schedule Source selection criteria Activity Cost Estimates Change requests Stakeholder Register Procurement Documents Updates Conduct Procurements Select from potential sellers Execute Project management plan Bidders Conference Sellected Sellers Procurement Documents Proposal evaluation technique Agreements Source selection criteria Independent Estimates Resource Calenders Seller proposals Expert judgment Project Updates Project Documents Advertising Project Doc Updates Make / Buy decision Analytical Techniques Procurement SOW Procurement Negotiations Procurement Manage seller relationship, review seller performance and manage contract related changes Project management plan Contract Change Sysm Work Performance Information Procurement Documents Procurement Perfrom Review Change requests Agreement Inspections and Audits Updates: s, Docs, Work Performance reports Performance Reporting Approved change Requests Payment Systems Work Performance Data Claims administration Records mgmt system Close Procurements Select from potential sellers Close Procurement documentation Procurement audits Closed procurements Procurement documentation Procurement Negotiations Updates: Records mgmt system

Stakeholder Management (ITTO) Identify Stakeholders Documenting stakeholders, interest, power and expectations Initiate Project Charter Stakeholder analysis Stakeholder register Procurement Documents Expert judgment Meetings Stakeholder Management Is the process of developing appropriate management strategies to effectively engage stakeholders Project Management Expert judgment Stakeholder Mgt Stakeholder register Meetings Project Docs Updates Analytical Techniques Manage Stakeholders Engagement Stakeholder Engagement Is the process of communicating and working with stakeholders to meet their needs/expectations, address Is the process issues of etc monitoring overall project stakeholder relationships and adjusting strategies and plans for engaging stakeholders. Execute Stakeholder Management Communication methods Issue Log Communication Management Interpersonal skills Change requests Change Log Management Skills Updates: docs; plan; Project Management Information Management Performance reports System Issue Log Expert judgment Change requests Work Performance Data Meetings Updates Project Documents