BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN SUMMARY

Similar documents
The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Queensland Parks and Wildlife Service PEST MANAGEMENT PLAN

Preparing a Green Wedge Management Plan

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Aiding the Hydro-scheme development process. Web-links to useful information sources

Advice note. Linking River and Floodplain Management

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY.

Tree Condition Survey for Proposed Taplow Footbridge at Ray Mill Island and Taplow Riverside, Mill Lane Taplow, Buckinghamshire

3.0 Planning Policies

MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM

The Green Belt A Guide for Householders

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

Glossop Design & Place Making Strategy

Stowmarket Area Action Plan (AAP) Examination

BIDFORD PARISH NEIGHBOURHOOD PLAN NEIGHBOURHOOD DEVELOPMENT PLAN. Consultation Document on Draft Policies 25th May th July 2015

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

Wildlife Habitat Conservation and Management Program


Lincolnshire Walks. Marston & Hougham

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

The NSS - Rural Development and Rural Settlement

Cathkin Relief Road Planning Statement

National Planning Policy for Waste

Didcot Further Expansion

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)

Marchand Provincial Park. Draft Management Plan

Living & Working Managing Natural Resources and Waste

Earls Court Farm Worcester

28.0 Development Permit Area #2 (Neighbourhood District)

Peninsular Florida Landscape Conservation Cooperative. Charter. Background

Protected Areas on Private Land: Shaping the Future of the Park System in Australia

CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS

No Land Use and Building Act (132/1999, amendment 222/2003 included) Chapter 1. General provisions. Section 1 General objective of the Act

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

05 AREA/SITE SPECIFIC GUIDELINES

Rev Issue Status Prepared / Date Approved/Date. - Draft 1 LOA / JSE /

Corridor Goals and Objectives

Lincolnshire Walks. Round Horncastle

Creating the environment for business

PLANNING SERVICES UNIT

BASILDON BOROUGH COUNCIL

September Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI

Introduction. Two storey & first floor rear extensions. two storey rear 1

Newsletter Jumbo Glacier Alpine Resort Proposal

Dorset Green SANGs Report

THE SECRETARY OF THE INTERIOR WASHINGTON

Reference: 05/00928/FUL Officer: Mr David Jeanes

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November Prepared by Capita Lovejoy on behalf of William Davis Limited

4 Adoption of Asset Management Policy and Strategy

SOUTH DEVON AONB PARTNERSHIP DRAFT MEMORANDUM OF AGREEMENT

Handsworth Library, Soho Road, Handsworth, Birmingham, B21 9DP

Wildlife Habitat Conservation and Management Plan

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Camp. plan template. elements. This section that need to. identify the. vegetation. of flying-fox. also

Carmarthenshire LDP Site Assessment Proforma

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

TABLE OF CONTENTS. INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal...2 Vision...

Planning application process improvements

Taylor Wimpey UK Ltd. December 2007

Strategy. Strategy for Lorry Parking Provision in England

Manthorpe Grantham Conservation Area

Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria

Charging for Pre-application Advice

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Koser Field. 7th St SE 2.25

Public Land Management and Interdependent Collection of Programs

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Michigan Wetlands. Department of Environmental Quality

Management Plan Template For Conservation Easements Held by CPW

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Development Management Report

an Inspector appointed by the Secretary of State for Environment, Food and Rural Affairs

Northern Territory Fisheries Resource Sharing Framework

Green Infrastructure Case Study Template

Restoration. a brief look at

The Mersey Gateway Project

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

How To Write A New Bill On Flood Management In Scotland

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL

Guidelines for State Agency Management of Volunteer Activity

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

November General Notes. Tree Protection. Tree Protection and New Development Guidance Note

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

2 NEW BUILD PLOTS, ST DAVIDS, PERTHSHIRE, PH7 3PJ Madderty School 0.5m Crieff 5m Perth 11m

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Transcription:

BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN SUMMARY Introduction 1. This Strategic Management Plan has been prepared to review and update the proposals of the s Management Strategy and Plan (BLMSP) (1992). The Strategic Management Plan has been prepared by Land Use Consultants, overseen by a s Steering Group comprising Hampshire County Council, New Forest District Council, English Nature, the Environment Agency, Wessex Water, Bournemouth & West Hampshire Water Company, and the Hampshire Wildlife Trust. 2. The purpose of the review was to build upon the success of the original BMLSP taking into account changes that have occurred in terms of land use and activities at the lakes, and also changes in legislation, policy and guidance since 1992. The area covered by this Strategic Management Plan has also been extended from the original BLMSP, so that it now includes all of the lakes and adjoining land within the s study area. Factors Influencing the Strategic Management Plan 3. A number of changes have taken place since the BLMSP was published, most notably: ending of much of the mineral extraction activity in the study area, (with the exception of the north of the study area), although processing of minerals continues in a number of locations, and several sites in the study area are still being restored. designation of a large proportion of the study area as a Special Protection Area and Ramsar site, which means that it is of national and international importance for its nature conservation interest, and in particular for over-wintering waterfowl. This has brought with it various statutory duties and responsibilities to protect and conserve the ecological interest in order to achieve nature conservation objectives. inclusion of the s study area in the proposed New Forest National Park. 4. The Strategic Management Plan has drawn on both detailed research relating to the study area, such as monitoring of waterfowl populations, and consultation with those with an interest in the study area. The Value of s 5. The s study area is a valuable resource, catering for a wide range of uses and interests: It has been an important source of minerals over many years, providing essential supplies for the construction industry. It represents an important ecological asset, as part of the wider Avon Valley, but also through the creation of large areas of open standing water. It is a strategic resource for water storage and supply. It is a regionally important location for water-sports, including sailing, water-skiing, and canoeing. It provides an important local resource for recreational fishing. It also caters for a range of other recreational pursuits, including shooting, walking and bird watching. It is an agricultural resource, providing back-up grazing for the New Forest.

It is an educational resource, linked to all the above uses. 6. The proposals in the Strategic Management Plan take into account the history and evolution of the study area, the various interests involved, and the statutory duties that need to be discharged by public authorities. 7. The Strategic Management Plan looks at the lakes as a whole, and defines an overall Strategic Aim and Key Principles to help to manage the multiple uses and potentially conflicting interests at the lakes. The Strategic Aim of the Plan is: To ensure that existing and future uses at s, including water storage and supply, sport and recreation, nature conservation, mineral working and restoration, and residential amenity, are mutually accommodated as far as is practicable, within the framework set by legislation. The Key Principles are: i Opportunities to achieve multiple objectives (e.g. water storage and supply; nature conservation; sport and recreation; access) should be pursued rather than single objectives (i.e. win-win solutions). ii Ensure safe and reliable water supply from specific lakes, within previously agreed drawdown limits, until further research has been undertaken to establish an appropriate management regime for water supply that is consistent with nature conservation and recreation objectives. iii Protect and enhance the nature conservation interest of the s study area as a whole, and in particular those areas designated for their nature conservation value and protected by legislation. iv Where there is a clear and obvious conflict between legal and policy obligations for nature conservation and other uses, nature conservation should take precedence, except where there is a proven over-riding public need for water supply. v Preserve and enhance the landscape, recognising that the lakes have their own unique character within the wider context of the Avon Valley, and carry out management to improve the landscape and nature conservation value of the lakes and land areas in between the lakes. vi Ensure that the restoration of mineral workings is co-ordinated and managed, and carried out to a high standard in keeping with nature conservation, amenity and landscape objectives. vii Maintain and manage current well-established sport and recreational uses at the lakes, and seek enhancement in such uses, within constraints set by nature conservation objectives. viii Improve footpath access for local residents and visitors. ix Improve educational interpretation at the lakes, including the nature conservation and historic interest of the area. x Implement the Strategic Management Plan through engagement with landowners, users of the lakes, local residents, and other interest groups, under the continued auspices of the s Consultative Committee, with the aim of extending its remit to cover those lakes currently outside the ownership of the water companies. These provide the framework for the Strategic Management Plan, allowing sufficient flexibility to accommodate changes over time.

Key Proposals (see Figure 1) 8. The key proposals included in the Strategic Management Plan are as follows: 9. Mineral workings Continued restoration and aftercare of mineral workings in line with planning consents, conditions and obligations. 10. Water storage and supply (see Figure 2) Continued use of certain lakes within the study area for water storage and supply, with management of the resource to be determined by detailed hydrological studies. The lakes where water supply is the primary purpose are: Pound Ibsley Water Ivy Other lakes with potential for water storage and supply are: Rockford North Somerley 11. Nature conservation (see Figure 3) Manage the sites designated for the nature conservation value in line with statutory requirements and nature conservation objectives, restoring to favourable condition those lakes designated for their nature conservation interest that are not achieving their conservation objectives. s currently in favourable nature conservation condition are: Ibsley Water (eastern part) Ivy s not in favourable condition are: (East) Mockbeggar Rockford (eastern part) Snails Dockens Water Restore sites currently not designated for their nature conservation interest to achieve nature conservation objectives: Ibsley Quarry Ibsley Water (western part) (west) North Somerley Rockford (western part)

Conserve and enhance the nature conservation interest of parts of the study area that have developed nature conservation interest but are not designated, in order to improve the ecological value of s as a whole. These are: Goblins Kingfisher Land surrounding the Wessex Water Treatment Plant Lin Brook. Pursue opportunities to enhance the nature conservation value of other areas not currently contributing to nature conservation interest Pound Hucklesbrook Hurst Ponds Morey's s (excluding Goblin's lake) Poulner (Northfield Wash Pit Hardstanding at Drove Public open space north of Wash Pit Undertake further survey and monitoring work to inform conservation management of the lakes. 12. Sport and recreation (see Figure 4) Continuation of sailing at, and water-skiing at, subject to appropriate arrangements being in place to ensure that nature conservation objectives are not compromised. Consideration of controlled water-based, non-powered recreational use (e.g. sailing/ canoeing) at Rockford provided there is no adverse impact on the nature conservation interest of the lake or Dockens Water. Maintain active water sports at Hucklesbrook s. Continuation of fishing at: Hucklesbrook Hurst Ponds Kingfisher Meadow, King's and Vincent s Poulner Wash Pit. For lakes that are part of the Special Protection Area or contribute to it, studies are to be undertaken to investigate and monitor the effects of fishing, e.g. at: Kingfisher (east) Fishing will only be allowed to continue at Rockford and Snail's if it can take place without affecting nature conservation interests.

Continue low-key recreation (e.g. non-powered water sports) at Hurst Ponds End shooting at Mockbeggar s and Ibsley Water as this is in conflict with the nature conservation designations. Also seek controls on shooting on the lakes outside the Special Protection Area e.g. North Somerley. 13. Access and parking (see Figure 5) The Strategy seeks to develop a network of linked footpaths to connect specific sites of interest and provide for walking facilities off roads. Footpaths and bridleways already proposed in mineral restoration plans are: a bridleway west of the A338 (which this Strategy recommends should become a definitive right of way with provision for cyclists if feasible) a footpath connecting Mockbeggar Lane with the Avon Valley Path. In addition, the strategy proposes the following routes: a north-south footpath potentially connecting Mockbeggar Lane and Drove. Two indicative routes are shown. There is also the potential to create a link with the former Ibsley Control Tower. a north-south footpath to the east and south of to link with the Study Centre and the bird hide between and Ivy Water. a north-south footpath to the west of Rockford connecting Mockbeggar with Ivy Lane and the Avon valley Path. east of Rockford, to take the Avon Valley Path off Highwood Lane. In addition, a footpath to the south and east of, which would create a circular route around the lake, has been proposed for some time. This should only be introduced if it can be shown that it will result in no additional disturbance to wildlife or adjoining properties. All these proposed paths would be permissive initially, with a view to becoming definitive rights of way in the long term. While it is not the intention to encourage access by car, it is recognised that some provision should be made, particularly to assist those with mobility problems. Four locations offer scope for additional parking: the hardstanding north of Rockford, off Drove near to Pound to the south-west of West, to be accessed off Woolmer Lane east of the former control tower, opposite Forelock Farm (if the control tower is brought into use). There is also limited potential to expand or formalise the parking arrangements at the Study Centre. 14. Agriculture and grazing Opportunities should be pursued to provide for agricultural use of land in the study area, particularly for back-up grazing for the New Forest. Locations that offer potential for this use are: South of Drove north of Rockford east of east of west of Ibsley Water west of at Ibsley Quarry north and east of Mockbeggar s.

15. Education The Strategic Management Plan aims to increase the educational use of the lakes area. Proposals comprise: additional use of the s Study Centre, which should be promoted to a wider range of interests beyond schools, and could include extending the existing building to create a Visitor Centre; the potential use of the former airfield control tower adjacent to Mockbeggar for educational purposes/ bird watching/ historic interpretation etc. A further study is needed of the feasibility of this proposal. Linked to these proposals, a strategy for interpretation and education in the study area should be drawn up, including links with any similar initiatives for the New Forest and the River Avon, and focusing on the history, nature conservation interest and recreational potential of the area. Implementation of the Strategic Management Plan 16. It is recommended that the s Consultative Committee continues to provide a forum for different interests to consider the future of the study area as a whole, and that stakeholders who currently are not represented on the Committee are invited to join. 17. At the detailed level, it is recommended that the s Strategic Management Plan Steering Group, comprising the partners who guided this project, continues to oversee implementation of the Plan. 18. It is recommended that the chair of the Consultative Committee and Steering Group are reviewed, to reflect the extended boundaries to the study area, and that New Forest District Council are invited to take on this role. This arrangement may need to be reviewed once the New Forest National Park Authority is established. S:\2300\2300.01 s\documents\formal Consultation May 04\Report\Executive Summary - Web Version.doc

River Avon Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD 852368 Drawing Number: revfinal_2300-01_015_fig4-6_management_proposals-summary_28-01-04.mxd North Somerley SH Processing Plant Meadow Goblins Moreys s Vincent's King's Pound W ªS Dockens Water Ibsley Water Hurst Ponds Ibsley Quarry (Future North Mockbeggar ) Water Treatment Plant Study Centre Ivy Snails West Kingfisher Rockford Mockbeggar s Lin Brook ªI Wash Pit Ibsley Control Tower and associated land Hardstanding, Drove East Poulner (Northfield) Inset: Hucklesbrook s { î Hucklesbrook s 0 190 380 570 m BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Figure 1: Overview of Management Proposals Key Water storage and supply Rivers/streams Confirmed use for water storage Potential use for water storage subject to appropriate permissions Nature conservation Designated sites to be managed in line with statutory requirements and nature conservation objectives Sites not designated where nature conservation interest should be conserved and/or enhanced Sites not designated to be restored to achieve nature conservation objectives Public open space (New Forest District Local Plan, Adopted 1999) Existing Proposed Sporting uses Fishing, subject to assessment and controls to accord with nature conservation objectives Other locations for fishing W î S H Shooting subject to assessment and controls to accord with nature conservation objectives Existing access Footpath (Public Right of Way) Route of Avon Valley path Existing birdwatching facilities Existing educational facilities ªS Possible additional access Permissive footpath (indicative potential routes subject to further assessment) Potential route for cycleway Possible location for additional/ improved car parking (subject to futher assessment) Ibsley control tower - potential for use as interpretation ªI and viewing location (subject to feasibility study) Study area Non-motorised watersports (e.g. sailing, canoeing) subject to assessment and controls to accord with nature conservation objectives Other locations for non-motorised water sports Waterskiing subject to assessment and controls to accord with nature conservation objectives Other motorised water sports associated with New Forest Water Park Bridleway (Public Right of Way) Permissive footpath Proposed footpath in current mineral restoration plans Proposed bridleway Bird hide/shelter Study Centre Possible location for additional bird hide/shelter LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: 020 7383 5784 Fax: 020 7383 4798 May 2004 Luc@london.landuse.co.uk

Inset: Hucklesbrook s BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Ibsley Quarry (Future North Mockbeggar ) Figure 2: Management Proposals - Water Storage and Supply Mockbeggar Lane Hucklesbrook s Key Study area Mockbeggar s Rivers/streams North Somerley Ibsley Water Confirmed use for water storage Potential use for water storage subject to appropriate permissions Drove River Avon Pound Rockford Highwood Lane Meadow Vincent's Moreys s Goblins King's Dockens Water Ivy Ivy Lane Snails West Snails Lane Lin Brook East Public open space Poulner (Northfield) Hurst Ponds Wash Pit Kingfisher Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD 852368 A388 RINGWOOD { 0 200 400 600 m May 2004 LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: 020 7383 5784 Fax: 020 7383 4798 Luc@london.landuse.co.uk Drawing Number: revfinal_2300-01_007_fig4-1_proposal_waterstorage_and_supply_28-01-04.mxd

Ibsley Quarry (Future North Mockbeggar ) Inset: Hucklesbrook s Hucklesbrook s BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Figure 3: Management Proposals - Nature Conservation Key Study area Mockbeggar s Designated sites to be managed in line with statutory requirements and nature conservation objectives North Somerley Ibsley Water Ibsley Control Tower and associated land Sites not designated where nature conservation interest should be conserved and/or enhanced Sites not designated to be restored to achieve nature conservation objectives Hardstanding, Drove Pound Water Treatment Plant Rockford Processing Plant Study Centre Meadow Moreys s Goblins Ivy Vincent's King's Snails West East Public open space Poulner (Northfield) Wash Pit Hurst Ponds Kingfisher Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD 852368 { 0 200 400 600 m May 2004 LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: 020 7383 5784 Fax: 020 7383 4798 Luc@london.landuse.co.uk Drawing Number: revfinal_2300-01_013_fig4.2_management_proposals-nature_conservation_28-01-04.mxd

Inset: Hucklesbrook s î BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Figure 4: Management Proposals - Sporting Uses Key Study area Fishing, subject to assessment and controls to accord with nature conservation objectives Other locations for fishing SH Non-motorised watersports (e.g. sailing, canoeing) subject to assessment and controls to accord with nature conservation objectives Other locations for non-motorised water sports W î Waterskiing subject to assessment and controls to accord with nature conservation objectives Other motorised water sports associated with New Forest Water Park W SH Shooting subject to assessment and controls to accord with nature conservation objectives Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD 852368 { 0 200 400 600 m May 2004 LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: 020 7383 5784 Fax: 020 7383 4798 Luc@london.landuse.co.uk Drawing Number:revfinal_2300-01_014_fig4.3_management_proposals-sporting_uses_28-01-04.mxd

Inset: Hucklesbrook s BLASHFORD LAKES STRATEGIC MANAGEMENT PLAN Figure 5: Management Proposals - Access ªI Key Study area Existing access Footpath (Public Right of Way) Bridleway (Public Right of Way) Permissive footpath Route of Avon Valley path ªS Existing birdwatching facilities Existing educational facilities ªS Proposed footpath in current mineral restoration plans Proposed bridleway Bird hide/shelter Study Centre Possible additional access Permissive footpath (indicative potential routes subject to further assessment) Potential route for cycleway Possible location for additional/ improved car parking (subject to futher assessment) ªI Ibsley control tower - potential for use as interpretation and viewing location (subject to feasibility study) Possible location for additional bird hide/shelter Reproduced from Ordnance Survey information with the permission of The Controller of Her Majesty's Stationery Office, Crown Copyright, LUC Licence No ALD 852368 Drawing Number: revfinal_2300-01_012_fig4-4_management_proposals-access_28-01-04.mxd { 0 200 400 600 m May 2004 LAND USE CONSULTANTS 43 Chalton Street London NW1 1JD Ph: 020 7383 5784 Fax: 020 7383 4798 Luc@london.landuse.co.uk