Development of the BIM based process for Dredging Works

Similar documents
Built Environment Process Reengineering (PRE): Infra FINBIM

RoadBIM Seminar Tallinn

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

Common InfraBIM requirements YIV2015

InfraBIM Tiina Perttula

Inframodel 3 (4-5) InfraFINBIM / buildingsmart Infra Seminar 19 November Juha Hyvärinen, Senior Scientist

New Business Models in Construction

buildingsmart and Infra FINBIM

Built Environment Process Reengineering (PRE)

SOLUTIONS FROM VIANOVA SYSTEMS

BIM based Schedule Control for Precast Concrete Supply Chain

Case stories- Utilisation of dredged sludge Pansio / Aurajoki Turku Execution of dredging works

BIM-based falling prevention planning

WATERWAYS in Finland

УДК 528 Nguyen Thanh Le APPLYING MULTIBEAM ECHO-SOUNDER SYSTEM IN MAKING MULTISCALE SEABED TOPOGRAPHY MAP IN VIETNAM

NEW DIGITAL TERRAIN MODELING (DTM) TOOLS FOR CABLE ROUTE PLANNING by Dr. Jose M. Andres Makai Ocean Engineering Inc.

Autodesk Solutions for Environmental Engineering. Engineering a better environment

Habitat suitability modeling of boreal biodiversity: predicting plant species richness and rarity

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Evaluation of Forest Road Network Planning According to Environmental Criteria

BIM in Finland today. TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair FINLAND

Profile. Marine ingenuity In just two words, we show what we do, how we do it, and what makes us different. Dredging and Marine Contractors

Mapping Solar Energy Potential Through LiDAR Feature Extraction

City modeling and BIM in infrastructure planning

Witty City. A Tekes Smart City Programme /2014. Program manager Virpi Mikkonen. Smart procurement program Program manager Sampsa Nissinen

Chapter Overview. Bathymetry. Measuring Bathymetry. Echo Sounding Record. Measuring Bathymetry. CHAPTER 3 Marine Provinces

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of ( )

DATA MANAGEMENT AND EXPLOITATIONS DURING THE USE OF A FACILITY (DAMEX)

The Design and Application of Water Jet Propulsion Boat Weibo Song, Junhai Jiang3, a, Shuping Zhao, Kaiyan Zhu, Qihua Wang

Case study on asset tracing

Service Road Map for ANDS Core Infrastructure and Applications Programs

BIM-based Site Layout and Safety Planning

CHAPTER 1. Title Plan ENGLAND & WALES UK LAND REGISTRY SERVICES. Also available for Scotland, N Ireland, Ireland, Isle of Man and Channel Islands

Foreword. Version Parties to the COBIM project

BuildingSMART International Infrastructure Room Work Plan 2015 Summary

REFLECTIONS ON THE USE OF BIG DATA FOR STATISTICAL PRODUCTION

Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study

COBIM. Series 3. Architectural design. Common BIM Requirements v 1.0

USABILITY OF A FILIPINO LANGUAGE TOOLS WEBSITE

We know the Arctic. for your success

KEY FACTORS AND BARRIERS OF BUSINESS INTELLIGENCE IMPLEMENTATION

What's New in Heavy Civil Construction Software. Chris Richardson HCC-6898

MASS STABILIZATION of. peat, mud and contaminated sediments. Geoteknikerdag Juni 1st & 2nd 2007 Mikko Leppänen & Jorma Havukainen Ramboll Finland Oy

Acoustic design according to room shape

COBIM. Series 1. General part. Common BIM Requirements v 1.0

A HYBRID GROUND DATA MODEL TO SUPPORT INTERACTION IN MECHANIZED TUNNELING

COMPARISON OF DIFFERENT ACCURACY IN A BUILDING LIFE CYCLE ASSESSMENT: A CASE STUDY ON THE THREE DIFFERENT ACCURACY OF INVENTORY

Cyber Security VTT and the Finnish Approach

How To Understand The Value Of Building Information Modelling

Getting to a Facility Management BIM

Electro mobility and transport in Finland

Procedure for Marine Traffic Simulation with AIS Data

WHITE PAPER SPLUNK SOFTWARE AS A SIEM

Construction automation and productivity - Industry perspective

The optimum offshore survey workflow for high-quality GIS results. by integrating CARIS & EIVA software

A Study on Design of Virtual Desktop Infrastructure (VDI) System Model for Cloud Computing BIM Service

Nokia Siemens Networks Service Operations and Management Solution

Tekla Structures More than a detailing tool. Precast concrete

The challenge of corporate safety and security

Documentation on Noise-Differentiated Track Access Charges Information on Status, Background and implementation

POSITION DESCRIPTION 1 PURPOSE OF POSITION

Dynamic resource management for energy saving in the cloud computing environment

TechnicalNotes. Terramodel Software for Construction

use of OpenBIM Hospitals in Denmark Norway and Espoo Hospital in Finland DENMARK - FINLAND - NORGE

EDITH COWAN UNIVERSITY

CORPORATE BPM ACTIVITIES TOOLS IN THE BULGARIAN ENTERPRISES

3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND

About the Publication

Monitoring Web Browsing Habits of User Using Web Log Analysis and Role-Based Web Accessing Control. Phudinan Singkhamfu, Parinya Suwanasrikham

ARINC 629 Data Bus Standard on Aircrafts

Application Guide. Import Licences for Agricultural Products

Laser Scanning for an Integrated BIM

GPS Machine Control Grading & BIM (Building Information Modeling)

NETWORK MANAGEMENT AND DEVELOPMENT OF NEW BUSINESS OPPORTUNITIES A CASE STUDY IN FINNISH METAL INDUSTRY NETWORK. Tiina Valjakka, Katri Valkokari

CONSTRUCTION MATERIAL TESTING

Innovative capture and modeling of existing building conditions using 3D laser scanning. Entry B Submission

Adverse Physical Conditions & The Experienced Contractor

Description of Simandou Archaeological Potential Model. 13A.1 Overview

Available in Base or Survey Standard or Survey Professional series with different modules add-ons to suit your technical requirement and budget.

Ocean Engineering, Surveying and Mapping Services

Security Executive Summary. Securing LTE Radio Access Networks Effectively

Automatic Detection of PCB Defects

ISSN: (Online) Volume 2, Issue 2, February 2014 International Journal of Advance Research in Computer Science and Management Studies

Transcription:

The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Development of the BIM based process for Dredging Works R. Heikkilä a, T. Leinonen b, H. Paukkeri c and H. Virtanen a a Construction Technology Research Center, University of Oulu, Finland b Terramare Oy, Finland c Meritaito Oy, Finland E-mail: rauno.heikkila@oulu.fi, tapio.leinonen@boskalis.com, heikki.paukkeri@meritaito.fi, henvirtan@gmail.com Abstract - Development of building information modelling for dredging process has been studied. In dredging area different 3-D guidance and control systems have been used already over 15 years. However, the information transfer process from early initial data acquirement phase through design and further to construction phase has suffered from information delivery gaps, undetermined modelling and information delivery methods. In the paper, a new specification for initial data modelling, BIM based design process and BIM based as-built measurement and quality control procedures are to be introduced. Most essential in the process model is to transfer the information, which is binding the parties. This will be done electrically using 3D information models throughout the total operation chain. An important result of the project is also the documentation of the current dredging work process in Finland that has not been done in the past. The new models were tested using Novapoint software as a BIM design tool and two different construction projects (Rauma and Helsinki, Finland) were used for the experiments. Future work will be also described. of civil engineering, means the whole of the parsed digital data of the product, in its whole life-cycle. In the model-based process, the current situation of the planning area is described in the initial model which becomes to the design model by adding the design data into it. The design model is edited to production model which is utilized in dredging monitoring systems. Furthermore, the as-designed model is compared to the as-built model, the measured data of the fairway is saved in the maintenance model, and the final situation of the fairway is described in the residual model. Keywords - BIM, Automation, Dredging 1 Introduction Dredging monitoring systems (DMS) have been widely used for a long time (more than 15 years). As well, survey methods and modelling applications are relatively advanced. The whole dredging project still needs improvement. There have been a lot of problems in split of work and communication. For example the official data transfer has been document-based and the electronic data provided has remained to be only unofficial additional information and thus not transferred and shared with the later work phases. In the fairway and dredging projects ordered by Finnish Transport Agency, the undeveloped data transmission and data utilization are today aimed to be improved by applying and utilizing BIM (Building Information Modelling). BIM or Infra BIM on the area Figure 1. From planning to construction current process: approximately 200 drawings in 5 folders (length about 10 km) and a map for background from the client, in DWG format. Bathymetry data is given to contractor in ASCII format. The aim of the research project called Dredging BIM was to investigate and develop for dredging works a new process utilizing information modelling and automation, and to publish it for the whole branch along the instruction of the client. As the sub-purposes, the following tasks were set: to research the possibilities to develop the source data, to develop the construction planning by defining the construction model, to research the possibilities to develop the gathering of as-built information, utilizing information gathered by dredging

POSTER PAPER monitoring systems, continuous sounding methods and barsweeping, and to develop the methods for digital data transfer utilizing open formats when possible. 2 Methods A new BIM based process model (Fig. 1) has been developed for dredging works and industry. In the process model, special initial information model is created based on 3D underwater surveys and other investigations. The initial information model will be transferred to designer. The design of new waterway will be performed using specialized modelling method, which creates a design model. For production purposes a specified production model will be transferred and utilized in the dredging automation systems used. During the production, specific as-built models based on measured data will be created, and transferred to the utilization in maintenance of the waterways and further in the control of water traffic. As-built and maintenance models are based on real measured data. During the operation and maintenance period continuous 3D control surveys will be performed, these survey results are further saved to the maintenance model. focused on the phases of construction design and construction of the fairway. Finnish InfraBIM guidelines were applied on the modelling of the source data of Rauma fairway. Details from the view of fairways were developed for the specification of these guidelines. The development work of the specification in the as-designed model was based on the InfraBIM guidelines on the as-designed modelling of roads and highways. Also, the dredging contractors were listened in order to gather the information for the development work. The as-designed model contained definitions for the digital data needed for dredging works, including fairway model, bathymetric and subsurface data, boulders and pits for buoy weights. Figure 3. Rauma dredging project was selected as a pilot project for the experiments (The 4th largest port in Finland, deepening the current 7,5 m/10 m fairway to 12 m, costs app. 14 million EUR, estimated benefits app. 33 million EUR (30 years, 5%). Figure 2. New BIM based model for dredging works. One of the purposes of this first study was to develop the specification of the as-designed model for dredging, of which the usability was found out by processing and modelling the data of Rauma fairway. Moreover, the possibilities to utilize and develop the source data of dredging, the open format data transmission with IM (LandXML-based InfraModel) and infrabim guidelines, were studied. The work Figure 4. Production model current process done by contractor. The contractor creates the 3D model:

The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) edge lines, slopes, slope inclinations, buoy pits, triangulation in correct way, triangulation into matrix, crane monitoring system (three matrixes). Figure 5. Operator user interface for 3D dredging work (University of Oulu, Terramare Oy). Figure 7. A scene to the waterway model in the design software (Novapoint). The sweep level (blue surface), the rock cuts (grey) and the soil cuts (light green) of the waterway were modelled. Figure 8. A scene to the as-designed string line model using 3D-Win software. The file was imported using open Inframodel format. Figure 6. Example of measured (echo sounding) 3D as-built model (University of Oulu). 3 Results Concerning the source data of dredging and planning works, needs for the development its coverage, the utilization of the measurements and the modelling of investigations were found. Also the development of dredging monitoring systems is needed for commissioning the model-based process and the IMbased data transmission. Also, the specification of the Inframodel format was still insufficient unambiguous, which turned out as the computer applications processed the Inframodel data differently. The ensemble of the source data of the dredging process and its usability, quality and manageability is estimated to be improved in the future by processing and aggregating the data in the model-based way. Figure 9. A scene to the as-designed model (3D-Win software). In the machine monitoring test the production (asplanned) definition was detected functional. Machine monitoring worked flawlessly as planned. The need for improvement was though detected in the naming of the conveyable files. In the original production definition the production data meant all the data needed for

POSTER PAPER execution. To clarify naming in the future it s suggested that production model only consists of the structural surfaces of the fairway or harbour. The rest of the model-based and other materials should be named as production material. It was detected that when naming the as-built model the same rules should be followed as when naming the as-planned model. In road and railway construction (as well as in building sector) as-built model is at this moment defined as a design model which is corrected with the design mistakes. At the dredging industry this is not accurate and overall asbuilt model is defined as the actualized seafloor model detected by Multibeam or other acoustic surveying. The as built materials should consists of as-built model, detected soil type information, boulder information, the locations of blasted areas, experiential information and other files. The maintenance material is needed when keeping up the fairways and as start-up information for later dredging works in the same area. Maintenance information consists of the seafloor model detected by Multibeam or other acoustic surveying, soil type information, boulder information, the locations of blasted areas and experiential information. Advanced dredging contractors are able to use their existing systems and know-how for utilizing information models proficiently and effectively. The subscribers needs and opportunities in the model-based execution should be developed further for example using a suitable cloud service. At this moment it s not easy to storage the information models needed by the maintenance in the current data registries of the subscriber. When comparing to the traditional design process, BIM based design needs a little bit more modelling work. In addition of the surface models every single pit should be modelled including also feature classified information. In the dredging process used in Finland these types of surface models have been used in design process for the needs of the volume calculations and to create cross-sections as a part of traditional design process. By developing more accurate specifications and guidelines for modelling methods, the quality of design models as well as the accuracy of design work can be improved. The open LandXML standard and the Finnish extension Inframodel (IM) are quite unknown among the dredging industry in Finland and worldwide. To enable and facilitate the change and move to the new BIM-based process, more efforts should be aimed to the information communication between BIM developers and dredging industry. In this work, suggestions were given to improve the source data of dredging projects and the data transmission. By increasing the amount of low-frequent soundings and the soil interpretations made of them, with utilizing the other investigations and already in the early phases of the projects, the source data will be improved. As well, the MBES data is to utilize also for habitat mapping in order to improve the soil cointerpretations. Also, the IM-specification and its usability will be improved by changing the cross section parameters of the fairways and by adding the definition for point objects, such as boulders, with feature data in the definition. 4 Conclusions A new unique Infra BIM based process model has been developed and documented for dredging works and industry. The process model can further be utilized worldwide after some additional tests. Most essential in the process model is to transfer the information, which is binding the parties. This will be done electrically using 3D information models throughout the total operation chain. An important result of the project is also the documentation of the current dredging work process in Finland that has not been done in the past. In addition, detailed modelling specifications as well as the nomenclature and numbering of part models have been developed. Also an extension for the next open inframodel schema has been suggested adding the needed parts and features to the schema from the dredging side. The new Dredging BIM process model has been practically tested, but not yet in the whole scope of the purpose. New experiments will be needed for the feasibility evaluation and additional development of the inframodel extension part as well as in as-built and maintenance models. In that way confidence will be created to ensure that all necessary information is transferred in different project phases. For the wide continuation development and utilization, a common development and piloting plan would be valuable. Open information transfer using the newest Inframodel extension will be a new challenge also for dredging industry. The saving and transferring of measured information needs to be studied more due to the typical extent of measurement data and information content. The transferring of production model to dredging monitoring systems needs software development and programming work from the industry. The final form and production of maintenance information model needs to be focused with more precision. References [1] Athmer, J. & Gijzel, T. 2006. Dredging, Trenching and Rock Placement Works for the Sakhalin-1

The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Project, Russian Far East. Terra et Aqua. 105. S. 3 17. ISSN 0376-6411.AuthorSurname C. and AuthorSurname D. A conference paper. In Proceedings of the conference, pages 12 34, Sydney, Australia, 2014. [2] BuildingSMART. 2011. Open standards for infrastructure. BuildingSMART newsletter no. 5, s. 1. Saatavissa [viitattu 8.8.2012]: http://bwdssv07.bwk.tue.nl/files/newsletters/buildingsmartnewsletter-august-2011.authorsurname F. Title of the web content. On-line: http://abcd.efg.hij, Accessed: dd/mm/yyyy. [3] Costaras, M. P. & Bray, R. N. & Lewis R. P. & Lee M. W. E. 2011. The Importance of Bed Material Characterisation in Planning Dredging Projects. Terra et Aqua. 123. S. 24 30. ISSN 0376-6411. [4] Hyvärinen, J. & Porkka, J. 2010a. InfraModel tiedonsiirron sovellusohje v1.2. Ohjeistus LandXML tiedonsiirtostandardin käyttöön kotimaan infrarakentamisessa. Espoo: VTT. 118 s. + liitt. 19 s. Saatavissa [viitattu 7.8.2012]: http://www.infrabim.fi/inframodel_tiedonsiirron_s ovellusohje_v1%202.pdf. [5] Kajanen, J. & Liukas, J. & Nätynki, R. 2006. InfraModel2 Loppuraportti. 49 s. Infra-model2- projektin loppuraportti, luonnos, v. 0.8. Saatavissa [viitattu 7.8.2012]: http://cic.vtt.fi/projects/inframodel2/material/publi shed/reports/im2_loppuraportti_luonnos0_8.pdf. [6] Sirkiä, E. 2006. Veneväylien suunnitteluohje. Helsinki: Merenkulkulaitos. 28 s. Merenkulkulaitoksen julkaisuja 9/2006. ISSN 1456-7814 ISBN 978-951-49-2120-9. [7] Tang, J & Wang, Q. & Zhong, T. 2009. Automatic monitoring and control of cutter suction dredger. Automation in Construction. Vol. 18:2. S. 194 203. ISSN 09265805 doi: 10.1016/j.autcon.2008.07.006. [8] Tang, J & Wang, Q. & Zhong, T. 2009. Automatic monitoring and control of cutter suction dredger. Automation in Construction. Vol. 18:2. S. 194 203. ISSN 09265805 doi: 10.1016/j.autcon.2008.07.006. [9] Tirkkonen, T. & Yli-Villamo, H. & Mäkelä, H. Väylärakenteiden hallinta tuotemallipohjaisesti. Liikenteen Suunta. Liikenneviraston t&k -lehti 1/2010. S. 28 33. ISSN 1799-2052.