CONSORTIUM KZU HOLDING GROUP



Similar documents
Piping Systems for Nuclear Power Industry. Prague, October 2011

TUV HELLAS IS: COMPANY PROFILE PRESENTATION OF ACTIVITIES

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

Gas Detection for Refining. HA University

AMTE is also active in the international market. Services have been provided for power plant projects in Chile, Cyprus, Libya, Poland, Syria.

Find job and training opportunities at SteadyGrowth.ca

REFINERIES, CHEMICAL and PETROCHEMICAL INDUSTRIES, TANK FARMS

BONATTI: COMPANY OVERVIEW

STORAGE TANK SELECTION AND SIZING (ENGINEERING DESIGN GUIDELINE)

CITY OF LOS ANGELES PERSONNEL DEPARTMENT CAREER OPPORTUNITIES FOR MECHANICAL HELPER

Whiting Equipment Canada Inc. Whiting Overhead Cranes

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

20,000 Barrel Per Day Crude Oil Refinery

About Smith Tank. Gonzales, LA. 26-Acre facility with rail spur capabilities. 10,000-sq-ft appurtenance fabrication shop

ABOUT US PAUL SPENCE CHIEF EXECUTIVE OFFICER

CRG CONSERVE RESOURCES GROUP ECO ENVIRONMENTAL ENGINEERING TECHNOLOGIES. NEW State of the Art. Advanced OIL REFINERY TECHNOLOGY & PROCESSES

Non-Destructive Testing

A World Class Manufacturer of Induction Bends

I BAU HAMBURG Dry Product Handling

LPG Vessels Custom Quality in Every Detail

World Solution Provider

Main areas of services are:

10% or 500,000 gallons/year of Crude Glycerine. Shutdown: 2009 B100 BioDiesel or Crude Glycerine Soybean Oil or Animal Tallow, Methanol

Refining of Crude Oil - Process

TABLE OF CONTENT

Copyright 2012 Mayekawa Mfg. Co.,Ltd. All Rights Reserved.

********** An short and simple explanation of how oil is converted into gasoline and then brought to you, the consumer.

Help Shape the Future of Energy as an Engineer at Chevron

Olkiluoto 3 Project June 2010

We have the experience

Company Profile. Sterling Industries PLC Sterling House Brunel Road Aylesbury Buckinghamshire HP19 8SS United Kingdom

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

Turnaround and Maintenance Services

Ethanol Vehicle and Infrastructure Codes and Standards Citations

Welding Codes and How They're Used (DOD) (ANSI). (AWS), (ASME) (API). not American Welding Society AWS D1.1 AWS D1.2 AWS D1.3 AWS D1.4 AWS D1.

Facility Support Services

Civil Engineering Sector Labour-Management Health and Safety Committee

REFERENCE LIST / 6. DEVA HOLDİNG A.Ş. ( 2 months ) / TP Workshop. Modification of Pilot reactor and complete piping

What we do Doing Engineering services as General Construction (G.C). Civil Works and other related industries. E, EP, P, EPC, EPCC, EPCF Contractor.

CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach

COMPANY NAME: STREET ADDRESS: CITY: STATE: ZIP: COUNTRY: Have you previously been a supplier member? Yes No If yes, most recent year:

INTEC Engineering GmbH Heating Solutions for the Marine Industry

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

CTI-Investors Forum 2007 CDM/ JI Project Porfolio

AAF Manufacturing Services. Leading the way in engineering excellence

Bulgarian gas market through the eyes of the largest private national investor in the gas sector - Overgas Inc.

References ONSHORE. Weir LGE Process. Excellent Engineering Solutions ONSHORE REFERENCES

Jobson THE RIGHT CONTACT

Course available 24/7 for up to six months from the date of purchase or until completion

Upgrading of Heavy Oils with FLEXICOKING. ExxonMobil Research & Engineering Company Tim Hilbert

HISTORY a locksmith workshop was founded by Galus Bros factory was nationalized


Certificate of Registration

API Flanged Safety Relief Valves Series 526 CATALOG

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE

REFERENCE LIST / 6. Manufacturing stainless steel ducts and supports for tissue machine

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

products 22 º C Ventilation Air Conditioning Refrigeration Energy & Cost Saving Products Inside PROVIDED BY HEINEN & HOPMAN

Prepared and Submitted by

WISI - ABB Water Industrial Sector Initiative Introducing ABB Water for Process Industry. ABB Group July 29, 2009 Slide 1

Cooking at the Speed of light!

Refinery Equipment of Texas. Mini - Refinery Feasibility Overview

DOCUMENTATION FOR QUALIFICATION SYSTEM

PLANT LOCATION AND LAYOUT

C P W R. Research & Training

SERVING THE NATIONS LEADING COMPANIES

TO THE MINISTERIAL COUNCIL OF THE ENERGY COMMUNITY represented by the Presidency and the Vice-Presidency of the Energy Community REASONED REQUEST

SBS INDUSTRIES 24hrs. Worldwide support number

South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification

Overview of pipelines in Europe advantages and disadvantages

OUR CONVERSATION TODAY

Petrochemical Refinery Maintenance. Complete Maintenance Solutions

Concrete Steel Reinforcement and Accessories Sector: Construction Project Value: JD3M Location: Zarqa and Aqaba

WHOLESALE/RETAIL PETROLEUM SIC CODES TO NAICS CODES For more detail information go to:

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION

Part 0 - Classification and Surveys Classification and Surveys I

List of Frequently Utilized Storage Tank Standards and Practices

Officine Costruzioni Ravenna Srl is a young, dynamic, professional company operating in the plant engineering, design and construction field, by

Self Assessment Exercise

ANSI Accredited Standards Developer ANS Percent of ANS American Concrete Institute 0 American Fence Association 0 American Orthotic and Prosthetic

Construction Services. Furnishing Energy Solutions

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

Spill Prevention Control and Countermeasure (SPCC) Regulations Fact Sheet

Presented by: Rhonda Irby Business Development Ghazanfar Group. Ghazanfar Group. Afghanistan s Leading Energy Company

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

If your campus has. Oil Pollution Prevention Rules (con.) Oil Pollution Prevention Rules (con.)

Questionnaire Pure Media Systems

FLEXICOKING technology for upgrading heavy oil and utilization of by-products

Annex of the Certificate (Page 1/4) Scope of Accreditation

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

INDUSTRIAS G.E S.A. E n g ineering Solut i o n s

Advanced Construction Methods for New Nuclear Power Plants

Economic and Social Council

GE Oil & Gas. Air Cooled Heat Exchangers. Robust and reliable for all loads and applications

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

COMBI. 7 SW COMBINED. SEWER. CLEANING. TRUCK ENGLISH INNOVATIONS FOR POWERFUL PERFORMANCES

NOISE CONTROL REVIEW FOR 4 db NOISE REDUCTION SCENARIO FOR WAGERUP 3 EXPANSION PROJECT FOR ALCOA OF AUSTRALIA

IVISIONS STEAM PLANT DIVISIONS TOTAL TURNKEY SOLUTIONS. INDUSTRIAL BOILER & MECHANICAL

Stora Enso Fors Ltd Sweden

TECHNICAL SERVICE GROUP

Transcription:

CONSORTIUM YOUR RELIABLE PARTNER IN CONSULTING ENGINEERING MANUFACTURE AND ERECTION OF STEEL STRUCTURES SUPERVISION TRADING

Company History The company was established in 1992 in Prague, Czech Republic, as a holding structure where major owner is Dr. Eng. Marin Beloev.

Consortium company profile The activity of our company is in the following main fields: Large scale cylindrical storage tanks for all types of services; Industrial pipelines and facilities for chemical and metallurgical plants; Tank farms for storage; Pipeline compressor stations, Pressure vessels, Heavy steel structures, Ducts and facilities for power stations, nuclear power stations; Boilers and heat exchangers, Facilities for production and handling of cement and lime; Civil and industrial construction activities with steel structures, Project management as well as quality control of erection and welding activities NDT and evaluation of the status of welded structures, vessels, pipelines with the Acoustic Emission Method (АЕ)

GEOGRAPHY OF OUR BUSINESS: The Consortium have completed projects in: Germany Czech Republic Greece Syria Lebanon Sudan Bulgaria France Belgium Qatar Jordan Algeria Iraq

company profile Leading Members of the Consortium have the following activities: KZU GROUP ENGINEERING LTD. Consulting, design, welding engineering, NDE. SILOTEH BUL LTD. construction and equipment of projects for processing of agriculture products, grain silos and live stock. TERA BM LTD civil building of apartment and office houses, installation works in industrial projects. TANK OIL LTD. Equipment of petrol and gas terminal. KZU GROUP PROJECT LTD. Design of storage tanks and steel structures.

References 1 2 3 No Description of the Project Investor / Client Three underground storage tanks 6500 m3 each for gasoline. Tank farm, consisting of 3 storage tanks 40 000 m 3 each and 1 tank 80 000 m 3 with double bottom and cup all with floating roofs with pump station. MERO IKL, Vohburg, Germany1995 One tank of 40 000 m3 with double bottom. 4 Two tanks for molasses of 35 000 m3 each and two tanks of 3 000 m3 each. 5 Two tanks with double bottom of 25 000 m3 each. Ceska Rafinerska Litvinov, Czech Republic. MERO IKL/NOELL Hamburg, Germany SUGAR RAFINERY PFEIFER & LANGEN, Appeldorn, Germany/NOELL Hamburg SUGAR RAFINERY JULICH, Germany OILTANKING/NOELL in Gera, Germany. Year of completion 1992 1995 1995 1996 1996

References No Description of the Project Investor / Client 6 Storage tanks with fixed roof, cup and double bottom for: - 3 pcs. volume 5 000 m3 -for fuel oil - 3 pcs. volume 2 000 m3 - for fuel oil - 2 pcs. volume 1 000 m3 - for fuel oil - 1 pcs. volume 1 600 m3 - for fuel oil - 1 pcs. volume 500 m3 - for fuel oil - 8 pcs. volume 360 m3 - for petrol ČESKA RAFINERSKA AS Czech Republic Year of completion 1995-1999 7 Storage tank of volume 3 000 m3 with fixed roof, cup and double bottom for waste waters. 8 Storage tanks with fixed roof, cup and double bottom: with pipelines and pump stations; 4 Pcs. х 10 000 m3 for petrol products. 9 Storage tanks with volume 10 000 m3, with fixed roof, cup and double bottom - 11 pcs. for - for petrol products with pipelines and pump stations CHEMOPETROL AS - Litvinov, Czech Republic CEPRO AS- Tremoshna near Pilsen, Czech Republic CEPRO AS - Cerekvice nad Bystrici, Czech Republic 1996 1997 1999-2000

References No Description of the Project Investor / Client 10 Warehouse for BMW Wackersdorf, Germany 11 12 13 14 Cement silos in 4x500 t. capacity Bosnia and Herzegovina Forum roof of the Munich airport center West. Pipe trusses 25 m. long. See picture enclosed 1 x 5000 m3 for BTX fraction in Litvinov, Czech Republic - Kerosene storage tank 12000 m3, at Munich airport 15 Filling station 16 Storage tank farm 10x33 000 m3 for Banias Refinery Company Stahlbau Wolf Rosenhaim, Germany Year of completion 1997 Plena, Bulgaria 1998 Forum roof of the Munich airport center West Chemopetrol SA Litvinov JPM Ingenieurtechik, Germany Chemopetrol SA Litvinov BUTEC SAL, Lebanon 1998 2001 2001 2002 2003-2004

References No Description of the Project Investor / Client 17 18. 19. 20. Pumping stations for transitions pipelines MELUT BASIN OIL DEVELOPMENT PROJEC design, fabrication of 7 x 52166 m3. Design of storage tanks for Field Production Facility & Central Processing Facility. Prefabrication of steel structures for 2 storage tanks for crude oil with single capacity of 50000 m3 Design fabrication and erection of steel roof structure for warehouse 21. Production of boiler 22. 23. Production of absorber D=1850 mm H=10000 mm and ammonia tank Production of steel masts for Motor Vessel Year of completion Ukraine 1997-2002 PETRODAR/RPJV 2004-2005 LUKOIL BULGARIA 2005 Intercom Group 2005-2006 Promishlena Energetika AD 2005 Agropolychim 2006 Bulyard 2006

References No Description of the Project Investor / Client 24 25 26 28 QATAR GAS ONSHORE PROJECT 3&4 PROCUREMENT OF MATERIALS AND FABRICATION OF 25 STORAGE TANKS DEVEN Jsco CFB Boiler Plant Procurement of materials and fabrication of silos DEVEN Jsco CFB Boiler Plant Procurement of materials and fabrication of boiler supporting structure DEVEN Jsco CFB Boiler Plant Procurement of materials and fabrication of ducts 29 Site Erection of 6 storage tanks BUTEC/QATAR LIQUIFIED GAS COMPANY Year of completion 2007 Foster Wheeler 2007 Foster Wheeler 2007 Foster Wheeler 2007 Nord Ester France 2007 30 Site erection of 13 storage tanks Lesieur, France 2007 31 Site pre-assembly of 7 steel silos Alpro 2007

References No 32 33 34 35 36 37 38. Description of the Project Design, fabrication and erection of 8x2000 m3 + 8x1000 m3 storage tanks for lubricants Design, fabrication and erection of 2x20000 m3 for crude oil with floating roofs, 2x8500 m3 for JET A1 with fixed roof, 1x1200 m3 for water and 1x50 m3 Design and fabrication of 6x58 000 m3 single deck floating roof tanks and 2x66 000 m3 Double deck floating roof tanks Design, procurement of materials and fabrication of 1x35 000 m3 double deck floating roof tank Design of 8x58 000 m3 single deck floating roof tanks Design of 3x10000 m3 with dome roof and 3x14000 m3 with cone roof Design of 19 storage tanks with capacity from 500 m3 to 10 000 m3 for Samawa oil facility. Investor / Client Year of completion Prista Oil 2007-2008 Jordan Petroleum Refinery Company 2008 SCOP, Iraq 2008-2009 BUTEC- SONATRACH 2008-2009 SCOP, Iraq 2009 NOC/SCOP, Iraq 2009 SCOP, Iraq 2009-2010

References No Description of the Project Investor / Client Year of completion 39 Site erection of 6x58000 m3 storage tanks fro Crude oil at Zubair 2, Iraq SCOP 2012 40 Fabrication of 4x5000 m3 and 1x1000 m3 storage tanks for KAFZA free zone oil terminal, Iraq SKA/DIG 2012 41 Site erection and testing of 4x5000 m3 and 1x1000 m3 storage tanks for KAFZA free zone oil terminal, Iraq SKA/DIG 2012 42 Design, procurement of materials, fabrication and testing of Steam Knock Out Drum. Neochim PLC, Bulgaria 2012 43 Fabrication of storage tank 6000 m3 for sulphuric acid. Agropolychim/ Micromet, Bulgaria 2012 44 45 Shot blasting and coating with primer of 25000 m2 steel structures for Varna airport Process vessels for water treatment plant in South Iraq ZKM Varna 2012 Mena Group 2012

References No Description of the Project Investor / Client Year of completion 46 Engineering, procurement, construction of 3 storage tanks 41 m. diameter self supporting umbrella roof ExxonMobil Iraq/FLUOR/DIG In progress 47 Shop fabrication of roof structures for 21 storage tanks for Zubair Oil Field Development Project SPG Steiner GmbH 2013 48 Shop fabrication of roof compression rings and clean out doors for 21 storage tanks for Zubair Oil Field Development Project SPG Steiner GmbH 2013

Clients Gratitude

CERTIFICATES: The production and the personnel are certified according to EN ISO 9001, EN ISO 3834 for steel structures and pressure vessels. Directive 97/23/EC, ANNEX I, Par. 3.1.5, EN 764-5, Par. 6.2.2, AD2000 HP0, Par. 4 Welding engineers are certified by International Institute of Welding.

Certificates

Certificates

Computer Aided Design

Engineering and Research Scientific publications.

KZU has a factory for steel structures in Varna, Zapadna Promishlena Zona Consortium Fabrication facilities CNC cutting system Automatic shot blasting line 3000 mm wide

Main production bay

Erection and Construction Activities 1x80000 m3 & 3x40000 m3 Double Bottom and Double Shell Storage tank farm Vohburg Germany 1994-1996

Erection and Construction Activities 1x 40,000 m3 Molasses Storage Tank Apeldoorn Germany Preparation of the roof for lifting with water

Erection and Construction Activities 11x10000 m3 Fixed Roof Storage Tank Farm - Cepro Turnkey Proj. Cerekvice - Czech Republic 1999 2000

Erection and Construction Activities 10 х 33.000 m3 Floating Roof Crude Oil Storage Tanks Turnkey Proj. Syria 2004-2005

Erection and Construction Activities 3 x 52 000 m3 Palouge FPF in Sudan 2006

Erection and Construction Activities 4 x 52 000 m3 Al-Jabalyn CPF Sudan 2006

Erection and Construction Activities 8 х 2.000 m3 & 8 х 1.000 m3 Prista Oil Storage Tanks Varna, Bulgaria 2008

Erection and Construction Activities 2 х 20.000 Floating Roof Storage Tanks Aqaba Jordan 2009

Erection and Construction Activities Current Project in Motion Site erection of storage tanks for diesel fuel in KAFZA free zone, Iraq

Erection and Construction Activities Cement silos in Bosnia & Herzegovina capacity 2000 t. Ducts for DEVEN JSC as contractor of Foster Wheeler

Erection and Construction Activities Erection of Spherical Tanks Bourgas Bulgaria

Erection and Construction Activities Construction of forum roof of Munich airport Center West. Construction of specialized silos for DEVEN JSC as contractor of Foster Wheeler

Erection and Construction Activities Ventilation Duct at NPP Kozlodui Complex Bulgaria

Contact info Business address: 1700, Sofia 12, Prof. Hristo Vakarelski str. Bulgaria Contact person: George Beloev Commercial Manager Tel: +359 2 962 39 48 Fax: + 359 2 862 48 54 E-mail: office@kzu-group.com WEB: www.kzu-group.com