TIE ROD END DESIGN TUTORIAL



Similar documents
MUSTANG II IFS COMPLETE PARTS PACKAGE

Two most common lock nut groups: 1-Prevailing Torque Type Lock Nuts:

6,100 7,000 lb. Spring Axles

SUBJECT: Special Offset Ball Joint - Allows Adjustment To Caster And Camber Angles

16 April F Dodge Adjustable Track bar with Relocation Bracket 1

Telescoping Post Indicator Wall Post KENNEDY VALVE ISO 9000 ISO 14001

Machine devices, jig devices

2,500 3,700 lb. Spring Axles

The Ford Model A Water Pump

Machine Screws, Dowel Pins and Hardware

KIRÁLY TRADING KFT H-1151 Budapest Mogyoród útja tel: Clamps Clamping devices

Working Drawing and Assemblies. Chapter 10

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27A

MEASURING WHEEL ALIGNMENT

Screw Thread Design. Rev

INDICATOR POST STYLE 2945 A TELESCOPING BARREL ASSEMBLY UL AND FM APPROVED

OWNER S/OPERATOR S - PARTS MANUAL CEMENT MIXER MODEL MX-80

Drive shaft, servicing

SUSPENSION 2-1 SUSPENSION TABLE OF CONTENTS

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

4,000 6,000 lb. Spring Axles

2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13)

PERFORMER ALUMINUM CYLINDER HEADS FE Ford V8s #6005, #6006, #6007, & #6008 INSTALLATION INSTRUCTIONS

H1 Axial Piston Pump, Size 078, Single Technical Information Dimensions

Rating when used as a weight carrying hitch without spring bars:

CLASS III TRUCK PARTS Baker

TECHNICAL INFORMATION

Volkswagen B3 Passat Manual Transmission 02A 34 Manual Transmission - Controls, Assembly (Page GR-34) 02A 5-speed. Gearshift cable/lever installing

Slide the new steering column shaft through the steering column from the driver compartment.

Verify caster, camber and toe-in are correct before proceeding.

HAND PALLET TRUCK Lift-Rite

413 NOVA SYSTEM PAN AMERICAN TOOL CORPORATION 5990 NW PHONE (954) TOLL FREE FAX

STEERING SYSTEM - POWER

ASSEMBLY INSTRUCTIONS ACCORDING TO SAE J1453 FOR FLARED TUBES. 5. Clean properly with appropriate products the part of the tube to be flared.

6 inch A-Arm Lift Kit WARNING: / installation instructions. will fit CLUB CAR DS. included:

DANA 30 MANUAL HUB CONVERSION KIT

ASSEMBLY DIAGRAM AND ASSEMBLY REFERENCE ULTIMA OLD SCHOOL 2 EVO & TC BELT DRIVE UNITS

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

B.TECH. (AEROSPACE ENGINEERING) PROGRAMME (BTAE) Term-End Examination December, 2011 BAS-010 : MACHINE DESIGN

M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS

DTU Animal Cart Programme

POWERS Controls No. 4 Pneumatic Damper Actuator

Thank You For Choosing. INSTALLATION INSTRUCTIONS Portal Gear Hubs Polaris RZR XP 900 Crew. (Right) (Left)

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page

Number Wheeler P/N Description Set Rex P/N Notes Base 1 J Support, Right 1 J Support, Left 1 J Nut (M8)

Step-by-step instructions:

WHAT MAKES A GOOD BRAKE DRUM

7600 SAND STREET, FORT WORTH, TX

MONDOATHENS BASKETBALL SET (Reference PK110)

Lecture slides on rolling By: Dr H N Dhakal Lecturer in Mechanical and Marine Engineering, School of Engineering, University of Plymouth

Innovative Products For Unique Applications. A Tradition of Excellence. Creative Engineering for Fluid Systems. Earthquake Proof Valves

SELF-STEERING AXLE TABLE OF CONTENTS

1993 SUSPENSION Volkswagen Front. EuroVan

TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR

ARVINMERITOR UNITIZED FRONT WHEEL HUB INSPECTION AND MAINTENANCE

TUTORIAL. REbUILdING. front CALIpER O-RING CONVERSION CORVETTE Part #: HT-1

Thank You For Choosing. INSTALLATION INSTRUCTIONS Portal Gear Hubs Polaris RZR 800. (installation performed on 60 Model) (Right) (Left)

PARTS LIST RTR READY-TO-ROLL

DiscPlus DX195 and DX225 Air Disc Brakes

STAR Linear Bushings and Shafts Supplement RE / Linear Motion and Assembly Technologies

HYDRAULIC LIFT TABLE CART 2200-LB.

Technical Data. 7. Bearing Fits. 7.1 Interference. 7.2 Calculation of interference F B LLLLLLLLL( A-54

How To Launch A Rocket From A Formica

Front brakes (FN- 3), servicing

Installation manual. 3 suspension system Ford F150. Part # Part # Important customer information: Ford F150

INSTALLATION INSTRUCTIONS COMPETITION SERIES COILOVER SUSPENSION SYSTEM 03+ Scion xb

AXLE SHAFTS - FRONT Pontiac Bonneville MODEL IDENTIFICATION DESCRIPTION & OPERATION TROUBLE SHOOTING REMOVAL & INSTALLATION

Recall R136 Front Lower Ball Joints Check Torque or Replace

Installing Ball joints on a Ford Superduty Pickup truck REV

Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling

The Pressure Velocity (PV) Relationship for Lead Screws

Ford F-250 / /2 Coil Kit. Ford F-250, F Part#:

Q&A Session for Advanced Ball Screws 102: Troubleshooting for Design Engineers

UC-SERIES TIMKEN BALL BEARING HOUSED UNITS

H EAD TUBE BASICS. Figure 1 - Head tube, front fork and hardware

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 46 Brakes - Mechanical Components (Page GR-46)

Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING

TRAILER AXLE SPINDLE HARDWARE FRUEHAUF "PRO-PAR" AXLE AND MERITOR EARLY MODEL TP AXLE

Roller Chain Coupling

Die casting Figure M2.3.1

Tires and Wheels. Tires and Wheels. Common Tire Terms. Determing Wheel Offset. Determing Bolt Pattern. Dual Wheel/Rim Spacing

Section 6 Brake Drum Failure Analysis. Brake Drum Wear Conditions. What is Normal Wear? What is Deep or Excessive Wear? WARNING. Deep, Uniform Wear

Conceptual Design of Buildings (Course unit code 1C2)

Journal bearings/sliding bearings

NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE

Think precision, Think HSS REAMING

Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the A325 structural bolt. Rev.

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

KF Needle & Gauge Valves

Belt Tensioning Methods for Small Package Conveyors What s the best solution?

FLANGED END BALL VALVE

Parts#MB Reverse Gear MAMBA (Monoblock for Cable operated) For 5 speed Trans., '87 to '06 Big Twin models (except '06 Dyna)

LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions

WATER SERVICE 2

F250 6 RADIUS ARM KIT

Section M POWER LIFTS

AXLE SHAFTS - FRONT Toyota Celica DESCRIPTION REMOVAL, DISASSEMBLY, REASSEMBLY & INSTALLATION DRIVE AXLES Toyota FWD Axle Shafts

Transcription:

TIE ROD END DESIGN TUTORIAL THE FOLLOWING IS A SIMPLIFIED STEP-BY-STEP GUIDE INTENDED TO ILLUSTRATE THE DECISIONS AND COMPROMISES INVOLVED IN DESIGNING A TIE ROD END. THE PROCESS FOR DESIGNING ANY BALL JOINT IS VERY SIMILAR

DESIGNING A ROD END FOR THE 20XX HYPTHETICAL LIGHT TRUCK FROM THE CUSTOMER WE LEARN: 1) PT 12 RELATIVE TO KNUCKLE 26.4MM 2) LOADS 7000 MAX, 4000 WORKING 3) PACKAGE NO ISSUES, 30MM FROM BRAKE ROTOR DUST SHIELD 4) ARTICULATION TRAVEL +/- 18 DEGREES 5) MATING PARTS DETAIL CAST IRON 27MM THICK, STUD UP, CASTLE NUT/COTTERPIN 6) APPLICATION COMMERCIAL LIGHT TRUCK, R&P W/ M16X 1.5 ROD 7) GREASABLE / NON-GREASABLE GREASABLE

BALL STUD DESIGN INPUTS BALL CENTER CAST IRON 7000 LB. MAX 4000 LB WORKING BOSS SURFACE TO BALL CENTER 26.4MM 27.0 MM THICK

BALL STUD SHANK SIZING 7000 LB MAX LOAD 4000 LB WORKING LOAD 26.4MM CANTILEVER BEAM SHEAR-MOMENT CALCULATION 25% F.S. EFFECTIVE MATL ULT = 242KSI EFFECTIVE MATL YEILD = 129KSI => SHANK DIA = 19.6MM 19.6MM SHANK DIA BALL CENTER

TAPER SPECIFICATION STEEL BOSS 1:8 TAPER 1.25:1 THICK/DIA CAST IRON, ALUMINUM 1:6 TAPER 1.3-1.5 THICK/DIA PULL UP STEEL =>.4-.7MM CAST IRON =>.4-.7MM ALUMINUM =>1.0MM THREADS BELOW SURFACE WITH P.U. 0.55MM PULLUP 3 THREADS SHOWING WHEN NUT TIGHT COTTER PIN LOCATION DETERMINED BY CASTLE NUT 1:6 TAPER FOR CAST IRON BOSS HOOP STRESS

CONE WASHER VS. TAPERED BALL STUD CONE ADVANTAGES EASY SERVICE REMOVAL SEAL SURFACE CONTROLLED CHANGE GAGE LENGTH EASILY GT ADJUSTABLE TAPER ADVANTAGES LOCKING TAPER CARBONITRIDE H.T. LOWER COST LESS SENSITIVE TO NUT TORQUE

BALL SIZING LARGER DIA IMPROVES PULL OUT STRENGTH REDUCES BEARING/LUBE PRESSURE NO ARTICULATION UNDERCUT SMALLER DIA MORE ROOM FOR SEAL BETTER PACKAGE LESS EXPENSIVE 30MM BALL DIA 26.3MM BALL DIA 35MM BALL DIA

NOW IT GETS COMPLICATED BETWEEN THE TOP OF THE BALL AND THE KNUCKLE WE NEED TO PACKAGE: BEARING FORGING SEAL AND, IT HAS TO ARTICULATE

STEEL BEARING PACKAGE FOR A 26MM BALL STANDARD HARDENED STEEL BEARING FOR 26MM BALL EXCELLENT WEAR CHARACTERISTICS EXCELLENT PULL OUT STRENGTH HIGHER ROTATING TORQUES HARDENED STEEL BEARING

UPPER FORGING PACKAGE FOR A 26MM BALL WITH STEEL BEARING FORGING CONSIDERATIONS: 5.0MM MIN TOP THICKNESS HOLLOWMILL FOR SEAL RETAINER ARTICULATION WINDOW TOP THICKNESS 15MM SEAL PACKAGE ARTICULATION WINDOW HOLLOWMILL DIAMETER

DON T FORGET ARTICULATION SPECIFIED 18 DEGREE ARTICULATION ANGLE DRIVES: SEAL DESIGN REQUIREMENTS FORGING WINDOW 2 DEGREES OVERTRAVEL NEED TO OPEN ARTICULATION WINDOW SEAL MIN HEIGHT SEAL MAX HEIGHT

WHAT HAPPENS IF WE GO TO A 30MM BALL DIAMETER?

UPPER FORGING PACKAGE FOR 30MM BALL VS. 26MM BALL 15MM SEAL PACKAGE HOLLOWMILL DIAMETER

ARTICULATION STUDY 30MM VS 26MM BALL 2 DEGREES OVERTRAVEL NEED TO OPEN ARTICULATION WINDOW SEAL MIN HEIGHT SEAL MAX HEIGHT

TO AVOID PINCHING THE SEAL, WE LL USE A 26MM BALL (BESIDES, IT S CHEAPER)

READDRESS ARTICULATION WITH 26MM BALL 2 ISSUES SHANK-FORGING CRASH OPEN WINDOW SHANK-BEARING LINE-TO-LINE @ 2 DEGREE OVERTRAVEL LOW RISK COULD UNDERCUT STUD - ADDED $$$ LINE-TO- LINE; FEELING LUCKY? INTERFERENCE; OPEN WINDOW & EVALUATE PULL OUT

PULL OUT STRENGTH ANALYSIS STUD ARTICULATED 20 DEGREES DEFINES WINDOW SURFACE A-B FORGING OVERLAP =.199 SQ. IN PULL OUT FORCE = SIN(18DEG)*1.25*7000 LB =2704LB. RESISTING CROSS SECTION=.199 SQ. IN. PULL OUT STRESS = 2704 LB/.199 SQ IN = 13587 PSI MATERIAL YIELD >30000 PSI NO PROBLEM ARTICULATION WINDOW FORGING OVERLAP AT SURFACE A

ACCOMPLISHMENTS BALL STUD DESIGN - COMPLETE SEAL REQUIREMENTS - COMPLETE BEARING ARRANGEMENT - 50% HOUSING - 25% LUBRICATION - 0%

BEARINGS AND LUBRICATION WE CHOSE A HARDENED STEEL UPPER BEARING BECAUSE OF ROBUSTNESS. THE APPLICATION (COMMERCIAL FLEET) PLACES A HIGH PRIORITY ON DURABILITY AND IS WILLING TO SACRIFICE SOME ROTATING TORQUE WE NOW NEED TO CHOSE A LOWER BEARING

LOWER BEARING - STEEL OR PLASTIC? STEEL / POWDERED METAL BETTER WEAR LESS COMPLIANCE NYLON NOISE ISOLATION LESS EXPENSIVE MORE COMPLIANCE LESS MASS LOWER FRICTION

SOCKET PACKAGE BALL STUD STEEL UPPER BEARING MACHINED HOUSING END MOTION GAP SEALINGCAP GREASE FITTING NYLON LOWER BEARING CONICAL PRELOAD SPRING

GREASE SELECTION LUBRICANT IS AN ESSENTIAL ELEMENT OF JOINT DESIGN GREASABLE VS. NON-GREASABLE TRIBOLOGY STUDIES COSTS

FINISHING THE MACHINED FORGING DESIGN INTERNAL/ EXTERNAL THREADS STEM LENGTH STEM ANGLE MATING FASTENERS COBRA SECTION INPUT REQUIREMENTS LOADS 7000 MAX, 4000 WORKING STEM ANGLE 90 DEGREES @ CURB PACKAGE REQUIREMENTS STRAIGHT, 150MM LONG APPEARANCE PROTECTION 240 HR SALT SPRAY MATING PARTS DETAIL ROD / SLEEVE THREAD SIZE & LENGTH M16X1.5

LENGTH ADJUSTMENT FOR RACK AND PINION JAM NUT INNER END ROTATES 1.5MM/REV TOE SET

DETAILING THE MACHINED STEM ANGLE & LENGTH ARE GIVEN COBRA THICKNESS & LENGTH DEFINED BY A, B AND C TOOL RADIUS D=2.5*THD SIZE +TOE ADJUST E FOR PILOT HOLE + THREAD RUN OUT F= WASHER FACE OF MATING JAM NUT FORGING

FORGING DESIGN - ADDING WHAT WE WILL MACHINE AWAY FORGING TOLERANCES +/-.75MM DRAFT ANGLES 7-9 DEGREES DIE SHIFT.75MM ANGULAR +/- 2 DEGREES E-COAT BEFORE MACHINING

QUOTATION CHECKLIST FORGING DRAWING COMPLETE RFQ ISSUED BALL STUD DRAWING COMPLETE RFQ ISSUED SEAL DRAWING COMPLETE RFQ ISSUED BEARINGS DRAWING COMPLETE RFQ ISSUED MACHINING / ASSEMBLY TIME STUDIES COMPLETE PACKAGING 2000 PIECE BULK - NEED PROTECTIVE COVER

PACKAGING PROTECTIVE COVER MUST NOT FALL OFF IN TRANSIT MUST COME OFF EASILY AT ASSY PLANT COST OF EXPENDABLE SHIPPING CONTAINER PROTECTIVE COVER

CONGRATULATE YOURSELF DESIGN IS DONE PART IS QUOTED READY TO START PROTOTYPES