Joint Strategic Needs Assessment Draft Project Initiation Document



Similar documents
DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY

Appendix 4 - Statutory Officers Protocol

CHILDREN AND ADULTS SERVICE RESEARCH APPROVAL GROUP

Business Continuity Policy. Version 1.0

Patient and public engagement: a practical guide for health and wellbeing boards

Shepway District Council Risk Management Policy

Public Health Intelligence. Natalie Cantillon Principal Public Health Intelligence Analyst Public Health England

Rachael Shimmin, Corporate Director of Adults, Wellbeing and Health. Councillor Morris Nicholls, Portfolio Holder for Adult Services

Strategic Alliance. Business Continuity Policy

SUBJECT: Talent Management Strategy Councillor Sandra Walmsley (Cabinet Member for Resources and Regulation)

HEALTH SYSTEM. Introduction. The. jurisdictions and we. Health Protection. Health Improvement. Health Services. Academic Public

Councillor role descriptions

Research and Innovation Strategy: delivering a flexible workforce receptive to research and innovation

Enterprise Risk Management Policy

Preparing an effective bid

Towards Excellence in Adult Social Care. Statement of purpose. Sector-led improvement

The Learning Zone - Project Management Arrangements

Royal Borough of Kensington and Chelsea. Data Quality Framework. ACE: A Framework for better quality data and performance information

Yes. Yes. Section 1 Summary and Recommendations

Local Healthwatch and NHS Complaints Service. Cabinet member: Cllr John Thomson - Adult Care, Communities and Housing

V1.0 - Eurojuris ISO 9001:2008 Certified

Richmond-upon-Thames Performance Management Framework

Page 329. Integrated Impact Assessment Community Wellbeing Programme

1. Trustees annual report

Risk Management Policy and Process Guide

Birmingham South Central Governing Body Cover Sheet

Business Continuity Management

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers

Job Grade: Band 5. Job Reference Number:

Minutes of a meeting of the Kensington and Chelsea Health and Wellbeing Board held at Kensington Town Hall at 10.00am on Wednesday 9 September 2015

Communications Strategy and Department Work Plan

Disability Employment Services Quality Framework Advice V 2.0

Care service inspection report

Medicines and Healthcare products Regulatory Agency

Communication and Engagement Strategy Final Version 30 th June 2014

INVESTING IN REFORM INVESTING IN STOCKPORT DRAFT BUSINESS CASE

Commissioning Strategy

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

How To: Involve Patients, Service Users & Carers in Clinical Audit

Derbyshire County Council Performance and Improvement Framework. January 2012

Consultation and Engagement Strategy

Comprehensive Spending Review 2007 covering the period

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK

TRUST POLICY FOR EMERGENCY PLANNING

The post holder will be guided by general polices and regulations, but will need to establish the way in which these should be interpreted.

Care service inspection report

How To Manage The Council

TOOL D14 Monitoring and evaluation: a framework

Our Shared Vision for Independent Living in Scotland

Government Communication Professional Competency Framework

CQC s strategy 2016 to Shaping the future: consultation document

Annual Governance Statement

CHESHIRE EAST COUNCIL. Cabinet

Delivering Local Health Care

What our strategy means for the health and adult social care services we regulate

Corporate Risk Management Policy

Dementia. Post Diagnostic Support. HEAT Target

Governing Body Organisational Development Programme 2015/16

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL CABINET THE COUNCIL S 2016/2017 REVENUE BUDGET REPORT OF THE GROUP DIRECTOR CORPORATE & FRONTLINE SERVICES

Slough Children s Services Trust Independent Fostering Agency Statement of Purpose

People Strategy 2013/17

Good Practice Guide: the internal audit role in information assurance

MEMBERS CONSIDER THE RISK STRATEGY AND RECOMMEND APPROVAL TO COUNCIL.

NAVIGATING ETHICAL APPROVAL AND ACCESS IN SOCIAL CARE RESEARCH

Performance Management Framework

CCG: IG06: Records Management Policy and Strategy

JOB PROFILE For a Special Education Needs Coordinator (SENCO)

Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee on Grant Management in Wales Final Report

Inquilab Housing Association. Job Profile

Report. Note for adult safeguarding boards on the Mental Health Crisis Concordat

Core skills. A strategy to support functional and employability skills in the adult social care workforce in England

Governance, Risk and Best Value Committee

Implementing a new 0 to 25 special needs system: LAs and partners

Solihull Clinical Commissioning Group

Business Continuity Management. Policy Statement and Strategy

Information Commissioner's Office

Business Continuity Policy

The Compliance Universe

Risk Management Strategy and Policy. The policy provides the framework for the management and control of risk within the GOC

Job Description and Person Specification. Post Number: HCI.C24 JE Ref: JE028

Introduction. Page 2 of 11

Chesterfield Borough Council. Internal Communications Strategy. April April 2017.

Living with Long Term Conditions. A Policy Framework. Consultation Response Questionnaire

DATA QUALITY POLICY PORTFOLIO RESPONSIBILITY: CORPORATE, CUSTOMER SERVICES AND HUMAN RESOURCES CABINET 10 APRIL 2008

and Entry to Premises by Local

Quality Assessment Framework Core Service Objectives

The Risk Management strategy sets out the framework that the Council has established.

Succession Planning Policy and Procedure

MARCH Strategic Risk Policy Update March 2012 v1.10.doc

THE FUNDAMENTALS OF PROJECT MANAGEMENT

Internal Audit Division

NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy. Version 1.0

CHESHIRE EAST COUNCIL

2006 ANNUAL PERFORMANCE ASSESSMENT OF SERVICES FOR CHILDREN AND YOUNG PEOPLE IN THE EAST RIDING OF YORKSHIRE COUNCIL

Risk Management Strategy

RISK MANAGEMENT POLICY AND STRATEGY. Document Status: Draft. Approved by. Appendix 1. Originator: A Struthers. Updated: A Struthers

Strategic plan. Outline

KNOWLEDGE REVIEW 13 SUMMARY. Outcomes-focused services for older people: A summary

Summary of the role and operation of NHS Research Management Offices in England

Better Skills Better Jobs Better Health. National occupational standards for the practice of public health guide

Transcription:

Draft Project Initiation Document Approved by: < Enter name> Date: < DD: MM: YY> Author: Rebecca Brown, Projects and Information Officer

Project Initiation Document History Revision History Revision Version Summary of Changes Officer date 24/01/08 1 First draft of key sections for Councillor Buxton s digest. RB 07/02/08 2 Draft for SMG, completing all sections and updating RB others. 11/02/08 2.1 Incorporated comments from Ann Ramage and James Hebblethwaite. RB 13/02/08 2.2 Comment from James H and Janine Jolly re consultation. Amended risks section. RB 19/02/08 3 Amendments following SMG RB 20/02/08 3.1 Comments from Paul Morse on communications plan RB 25/02/08 4 Comments from Tony Redpath RB 28/02/08 4.1 Final comments from Ann Ramage RB Approvals A record of approvals is kept in the Project Deliverables List and Sign off document. Contents Document History Contents 1. Purpose of Document 2. Background 3. Project Definition: Objectives and Scope 4. Method of Approach 5. Milestones and Key Deliverables 6. Interfaces 7. Business Case 8. Project Quality Plan 9. Brief Equalities Impact Assessment 10. Project Controls 11. Communication Plan 12. Project Organisation 13. Constraints 14. Initial Risk Log 15. The Project plan Page 2 of 12 V4.1

1. Purpose of document The purpose of this document is to define how this will be undertaken, what the product(s) will be and broadly set out future tasks needed to support further fuller JSNAs; It will form the basis for the management of the project. The first product of the Joint Strategic Needs Assessment (JSNA) is to be completed by the end of July 2008. 2. Project background The requirement for the JSNA was created by Section 116 of the Local Government and Public Involvement in Health Act 2007 and all upper tier local authorities and Primary Care Trusts (PCTs) are required to undertake one. In the view of the Government, a good strategic needs assessment is based on a joint analysis of current and predicted health and well-being outcomes, an account of what people in the local community want from their services and a view of the future, predicting and anticipating potential new or unmet needs (Commissioning Framework for Health and Well-being, Department of Health 2007). The Government anticipates that the JSNA process will result in stronger partnerships between communities, local government and PCTs and provide a firm foundation for commissioning that not only improves health and social care provisions but also reduces inequalities. This vision of stronger partnership is reinforced in the cross-sector concordat Putting People First; a shared vision and commitment to the transformation of adult social care. 3. Objectives and scope of project Overall goal The JSNA will seek to identify and understand the current and future health and well being needs of the local population over both the short term (3-5 years) and longer term (5-10 years) and inform the Council s Community Strategy and Local Area Agreement. Products 1. A needs analysis assessment to inform the revision of the Community Strategy 2. A document for the public this will focus on signposting to information on how people can best improve their own and others health and how to access services 3. A product for commissioners which is tailored to significant commissioning decisions to be made 4. A database for all data which can be routinely updated and which satisfies the Department of Health s requirements for the core data set for JSNAs as well as forming part of the picture of our community being produced to inform the next Community Strategy. Page 3 of 12 V4.1

Objectives (between now and July 2008) To evaluate whether the Council and PCT has sufficient information about its local community and their short term and long term needs, to ensure they can commission the most appropriate services for them; To identify the health inequalities in the Borough and the services required to address them. To identify how best to store all collected data so it is readily accessible and easily updated; To makes sure local people understand what is being done about health and well being in their area; To set out steps on how to undertake future JSNAs and develop procedures and policy if required. Scope It will include: 1. Writing a requirements document to define the information we want to know about the Borough s population for this JSNA and as ongoing work for JSNAs in the future. 2. A review of all primary data available to profile the population and their needs. 3. An examination of policies, strategies and business plans produced by the Council and PCT to understand existing and planned priorities for services. 4. Assessing the quality of the qualitative and quantitative data collected by each business group in the Council and PCT and identify any improvements that could be made, data that are missing or being collected unnecessarily. 5. Analysing the data collected and working with commissioners to review whether the right services are currently being commissioned. 6. Identifying the health inequalities in the Borough and the services required to address them. 7. Taking into account the needs of all children, but particularly vulnerable groups (looked after children, children with disabilities, children in transition and those with caring responsibilities). 8. Understand the ambitions and aspirations of the population for the short and long term future and considering how the service needs to change. 9. Looking at the effectiveness of links between the Council and the PCT to make recommendations on how they can be enhanced and strengthened. Page 4 of 12 V4.1

10. Identifying a process for consulting the local community on the results of this JSNA and a consultation process for residents to be more involved in future JSNAs by establishing mechanisms of engagement including the groups to involve, the extent of their involvement, the form of consultation and a means to provide continuous feedback. 4. Method of Approach The JSNA process will be underpinned by: Partnership working: JSNA will be led by the Director for Environmental Health and Trading Standards on behalf of the Executive Director of Housing, Health and Adult Social Care, the Executive Director of Families and Children s Services and the Director of Public Health at the PCT, working in collaboration with Directors of Commissioning. Community engagement: actively engaging with communities, patients, service users, carers, and providers including the third and private sectors to develop a full understanding of needs, with a particular focus on the views of vulnerable groups Evidence of effectiveness: identifying relevant best practice, innovation and research to inform how needs will best be met. 5. Milestones and Key Deliverables Milestone/deliverable Further information Date (2008) Recruitment of data analyst Questionnaire Production of a Requirements document Good data analysis will be crucial to the success of this project. 30K has been made available by the Head of Resource Management to recruit one in this financial year. A list of questions will be circulated to all commissioners in the Council and PCT. This will ask them to identify information already available and its format, and information that is needed but not currently collected these questions will form the basis for a discussion. Commissioners will also be asked to flag up key areas where they feel their understanding needs to be strengthened or where particular focus is required. This will enable us to clearly prioritise areas for analysis. This will be a list of questions based on the core datasets defined by the Department of Health and consultation with the all commissioners (see above) March Discussions complete by end of May May Page 5 of 12 V4.1

Review of policies, strategies and business plans. Consultation plan Data gathering An examination of those produced by the Council and PCT to understand existing and planned priorities for services. Production of a plan identifying existing community engagement, how this can be put to best use for this JSNA and what should be done in the future (LINks). Once implemented this will help us understand the ambitions and aspirations of the population for the short and long term future and considering how the service needs to change. Review and verify core datasets, check integrity of data. Cross reference with National Indicators set. Assess the adequacy of existing consultation processes. May/June May March-June Audit report Report on this audit of data above June Data Analysis Product 1 Products 2 and 3 Analysing information collected against the requirements document, seeking reasons for trends and identifying gaps in data and defining what is subsequently required. Needs analysis assessment to inform the revision of the Council s Community Strategy Write written reports for the public and commissioners (scope still to be defined) summarising main findings including recommendations for further work/next steps. May-June End of July Autumn 2008 Product 4 Published database of available sources of information Autumn 2008 Further work Devise procedure for gathering additional data. Post Autumn Provide feedback Issue guidelines to current data holders on data quality including advice on how collection could be improved and whether certain data are no longer necessary. 2009 Separate document Finalise procedure for undertaking future JSNAs. 2009 6. Interfaces The data required for the JSNA will be consistent with that required for other needs assessments, for example, the Children and Young People s Plan which is required by the Childrens Act 2004. To prevent duplication of work, we will find out what other assessments are currently being undertaken by the Council and PCT to make the best use of our resources. Page 6 of 12 V4.1

This process links with a new statutory duty to engage people in design and delivery of services through the establishment of LINks. The outcomes of this project will provide evidence and feed into the revision of the Community Strategy and identify areas for priority action in future Local Area Agreements. 7. Business Case The requirement for the JSNA was created by Section 116 of the Local Government and Public Involvement in Health Act 2007 and all upper tier local authorities and Primary Care Trusts (PCTs) are required to undertake one. Commissioning services and interventions will achieve better health and well being outcomes and reduce inequalities. The JSNA will address outcomes described in both the: National Indicator Set for local authorities and local authority partnerships and; The Vital Signs referred to in The NHS in England: The Operating Framework for 2008/9. 8. Project quality plan The progress, activities and products of this needs assessment shall be monitored by the Project Board and at the Senior Management Group meetings. The JSNA working group will meet fortnightly and assess material gathered and the progress of review activities/ tasks in terms of quality. A log will be kept of every task and every decision made. This will be updated whenever necessary and a version archived so a full record is kept. 9. Brief Equality Impact assessment No Equalities question Yes/No 1. Is there reason to believe that certain groups will be over or under represented as service users/recipients as a result of this project? 2. Is there reason to believe that different groups have different needs, experiences, issues or priorities in relation to this project? 3. Do you have evidence through internal research, monitoring or through external reports, to support your answers to questions 1 and 2? 4. Have you consulted with relevant individuals, groups and organizations as to their experiences, issues or priorities in relation to this project? Yes Yes Yes Yes 5. Is there public concern that the function or policy as outlined in this No Page 7 of 12 V4.1

project could operate in a discriminatory way? 6. Is there reason to believe that this project will better promote equality of opportunity within the Borough? 7. Is there reason to believe that this project will increase the accessibility of the service or function provided? 8. Is there reason to believe this project will increase the Council s reputation as an equal opportunities employer? Yes Yes No We are liaising with Phillip Brocklehurst, Martin Waddington and Libby Blake to consider how various components of this impact assessment can be taken further during the course of the project. 10. Project controls Monitoring of the project will occur at the Project Board, the Senior Management Group (SMG), the Departmental Managers Team (DMT) Meeting, and the JSNA Working Group. The role of the DMT will be to oversee the workings of the review on a fortnightly basis that will include the sanctioning of officer s work and any movement of resources. The Project Board will consider any ongoing issues or strategic areas that are referred from DMT or evident as an emerging trend. The SMG will be notified of key findings and developments. The Project Manager will notify all key managers of any unforeseen risks that may affect the project as they arise. 11. Communication plan Party To be informed by Frequency Sponsors: Cllrs Fiona Buxton Health and Well Being Partnership Board PCT Paul Morse/Ann Ramage Paul Morse/Ann Ramage Melanie Smith/Ann Ramage/Rebecca Brown At key stages through the fortnightly digest meetings and on demand. To approve Project Implementation Document and at other key stages. To approve Project Implementation Document and at other key stages. Page 8 of 12 V4.1

Senior Management Group Ann Ramage/Rebecca Brown To approve Project Implementation Document and at other key stages. Cabinet Melanie Smith/Paul Morse Final Report Management Board Jean Daintith/ Paul Morse At key stages Contributing Officers Ann Ramage/Rebecca Brown Miscellaneous communication 12. Project Organisation Sponsoring/ Lead Member: Councillor Fiona Buxton, Cabinet Member for Housing Services, Environmental Health and Adult Social Care The Project Board will comprise of: - Project Board Chairman Project Board Members Project Manager: Paul Morse Stella Baillie, John Wilkinson, Melanie Smith, PCT Commissioner (to be confirmed), Tony Redpath and Martin Waddington. Ann Ramage Production Team: - Name Business Group/Team Job Title Ann Ramage HHASC Environmental Health Head of Environmental Quality, Public Health and Service Improvement Rebecca Brown HHASC Environmental Projects and Information Health Officer James Hebblethwaite PCT Public Health Analyst Henry Bewley HHASC Policy and Performance Officer Joanne Hay FCS Head of Policy and Performance David Walton HHASC Disability, HIV and Senior Management Page 9 of 12 V4.1

Older People Services Information Officer Nicola Weaver Corporate Services Kensington and Chelsea Partnership Research And Programmes Officer Janine Jolly PCT Head of Community Engagement 13. Constraints Please order your constraints from the highest score of both severity and likelihood to the lowest, i.e. high severity and high likelihood at the top of the table. No Description Severity/ impact - high, medium or low Likelihood - High, medium or low Planned actions Responsible Officer 1 Time available to complete the first stage of this JSNA means the scope of this first JSNA is not as wide as it should be. New consultation exercises with the local community will not be extensive. We will focus on exercises that have already taken place. High High Regular review of key stages and progress with each. Developing communications plan to ensure future JSNAs focus more on community engagement. Paul Morse Janine Jolly and Melanie Marshman. 2 Successful communications with internal and external partners. Medium Medium Regular updates on progress with project. Ann Ramage 14. Initial Risk log Please order your risks from the highest score of both severity and likelihood to the lowest, i.e. high severity and high likelihood at the top of the table. Please group the risks by categories. No Description Severity/ impact - high, Likelihood - High, medium or Planned actions to reduce risk Responsible Officer Page 10 of 12 V4.1

medium or low low 1 Being able to recruit analytical support within the appropriate time period High High Start task immediately. Speak to Melanie Smith to investigate whether existing staff in PCT may be available - contact Agency if not. Contact Andrew Kerslake from Oxford Brookes University to explore possibility of using their resources. Ann Ramage 2 Successful engagement of all sections of Council and PCT to contribute to JSNA High Medium Identify officer from each section of business group (and PCT where possible) to create sense of ownership. Include in staff targets. Ann Ramage 3 Loss of key staff during the project. The project is reliant on a very small number of staff but its initial phase will be completed over a relatively short time period. High Medium Ensure clear and documented project management and extensive inclusion of senior management. Paul Morse 15. The Project Plan The project is defined into four main phases that are: - Stage one (now until mid March 2008) for the production of the requirements document. Stage two (March to April 2008) for prioritising issues and data gathering. Stage three (April to July 2007) for the analysis of the data and the production of the final report to inform the Community Strategy. Stage four (July to Winter 2009) production of products 2, 3 and 4. END. Page 11 of 12 V4.1

Sign-Off Letter This sign-off letter should be completed by the Lead Cabinet Member To: Councillor Fiona Buxton PROJECT INITIATION DOCUMENT The Royal Borough Review of Environmental Health and Trading Standards I have reviewed the above document. I accept the document s contents as correct and sign it off. I accept the document s contents as correct and sign it off, subject to the attached comments. I do not accept the document s content and cannot sign it off. or other comments as appropriate. Councillor Fiona Buxton Date Page 12 of 12 V4.1