Business Continuity Policy

Size: px
Start display at page:

Download "Business Continuity Policy"

Transcription

1 Business Continuity Policy Reference Number: 243 Author & Title: Siân Dyson Resilience Manager Responsible Director: Chief Operating Officer Review Date: 29 May 2018 Ratified by: Francesca Thompson Chief Operating Officer Date Ratified: 29 May 2015 Version: 2.0 Related Policies and Guidelines Incident Reporting Policy and Procedure Major Incident Plan Strategic Framework for Risk Management Business Continuity Plan Business Impact Analysis Template Business Impact Analysis Guidance & Example Business Continuity Plan Template Business Continuity Plan Guidance & Example Author: Siân Dyson Resilience Manager Page 1 of 17

2 Index: 1. Policy Summary 3 2. Statutory Requirements 3 3. Definition of Terms Used 4 4. Business Continuity at the RUH Objectives Key Challenges Delivery 7 5. Duties and Responsibilities 8 6. Assurance Framework Monitoring Compliance Review Training References 14 Document Control Information 15 Ratification Assurance Statement 15 Consultation Schedule 16 Equality Impact: (A) Assessment Screening 17 Amendment History Issue Status Date Reason for Change Authorised 1.0 Final February 2015 First draft from merge of draft Operational and Strategic Francesca Thompson Policies 2.0 Final May 2015 Amendments on policy and title changed to Business Continuity Policy Francesca Thompson Author: Siân Dyson Resilience Manager Page 2 of 17

3 1. Policy Summary Business Continuity Management (BCM) can be described as the capability of an organisation to plan for and respond to incidents and business disruptions in order to continue business operations at an acceptable predefined level (BCI, 2011). Effective Business Continuity Planning within the Royal United Hospitals Bath NHS Foundation Trust (RUH) will ensure that the Trust is able to maintain a safe, predetermined level of service to patients in the event of business continuity disruptions. Business Continuity Management (BCM) is an integral aspect of Trust management and must be carried out, not only in response to, but proactively in preparation for, potential business continuity disruptions. This policy describes the principles and processes required to develop and maintain robust business continuity arrangements for the RUH. Business Continuity Management will be driven by senior management who will ensure that risks that pose a threat to normal service delivery are identified and planned for. During a disruption, the short-term focus is the maintenance of critical functions whilst also forward planning to recover and resume business as usual as quickly as possible. 2. Statutory Requirements The Royal United Hospitals NHS Foundation Trust has statutory Business Continuity responsibilities to fulfil. This policy will ensure that the RUH complies with these statutory duties and all staff have a responsibility to comply with the policy and the processes that underpin it, as described within Section 5: Roles and Responsibilities. The Trust s statutory Business Continuity responsibilities are as follows: As a Category 1 responder, the RUH is required by the Civil Contingencies Act (CCA) 2004 to carry out Business Continuity Planning and, more specifically, maintain compliance by ensuring the following is carried out: Civil Contingencies Act 2004 Requirements Section of Act Risk Assessment (Business Impact Analyses) Exercising of Business Continuity Plans Business Continuity Training of key staff Review and maintenance of Business Continuity Plans Publication of Business Continuity Plans Author: Siân Dyson Resilience Manager Page 3 of 17

4 The Health & Social Care Act (2012) states that providers such as the RUH must be properly prepared for dealing with a relevant emergency. The NHS England Core Standards for Emergency Preparedness, Resilience and Response (EPRR) are the minimum standards which NHS organisations and providers of NHS funded care must meet. These Standards stipulate that such organisations must have suitable, proportionate and up to date plans which set out how they will maintain prioritised activities when faced with disruption from identified local risks; such as severe weather, IT failure, infectious disease, fuel shortage or industrial action (NHS England, 2014). NHS England s Everyone counts: Planning for patients 2013/14 and Business Continuity Framework (2013) both consolidate this requirement by articulating that NHS organisations must be able to maintain continuous levels in key services when faced with disruption from identified local risks such as those described above. ISO is an international standard for Business Continuity Management. This standard specifies requirements to plan, establish, implement, operate, monitor, review, maintain and continually improve a documented management system to protect against, reduce the likelihood of, prepare for, respond to and recover from disruptive incidents when they arise (ISO, 2012). The RUH must provide evidence of aligning its business continuity management system to this standard. PAS 2015 is a Publicly Available Specification that provides a resilience framework for NHS organisations and states that each organisation must undertake Business Continuity Management to ensure that it is resilient and that this should be carried out in a structured and well-planned manner (PAS 2010). 3. Definition of Terms Used Business Continuity is the capability of an organisation to continue to deliver products / services at acceptable predefined levels during and following disruptive incidents. Business Continuity Disruptions may be caused by many different factors and may be local, regional or national in nature. Examples of business continuity disruptions include: One or more buildings or areas becoming unusable due to fire, floods, criminal damage. Internal disruption of services due to IT system failures, bleep system failures, staff shortages due to pandemic flu / industrial action. External disruption of services due to utilities failures, communication / transport network failures, fuel shortages, severe weather, Major Incidents. These disruptions may or may not occur in isolation and one may lead to another, for example a transport network failure may result in a shortage of staff. Author: Siân Dyson Resilience Manager Page 4 of 17

5 Business Continuity Management (BCM) describes a management process that identifies potential threats to an organisation and the impacts that those threats might cause to business operations if realised. BCM provides a framework for strengthening organisational resilience through an effective response capability that safeguards the interests of key stakeholders, reputation and value-creating activities. Business Continuity Management Programme is an on-going management and governance process supported by senior management and appropriately resourced. The programme ensures that the necessary steps are taken to identify the impact of potential losses, maintain viable recovery strategies and plans, and ensure continuity of services through training, exercising, maintenance and review (BCI, 2011). Business Impact Analysis is a process of analysing activities within a department and the effect that a business disruption may have upon them. Business Continuity Plan is a document that describes the procedures required to respond to, recover from and restore and resume activities to a pre-defined level of service during and following a business continuity disruption. Critical Activities are activities that must be performed in order to deliver the key services which enable an organisation to meet its most important and time sensitive objectives. Recovery Time Objective (RTO) is the target time set for resumption of delivery of a product, service or activity following an incident or during a period of disruption. Maximum Tolerable Period of Disruption (MTPOD) is the duration of time after which an organisation s viability will be irrevocably threatened if product and / or service delivery cannot be resumed. Author: Siân Dyson Resilience Manager Page 5 of 17

6 4. Business Continuity at the RUH 4.1. Objectives The Trust will have robust Business Continuity procedures in place, which reflect statutory requirements, national policy, latest guidance and local risks and prioritise critical activities. These procedures will include clear responsibilities and be delivered through: The Trust s Business Continuity Management Programme and overarching Business Continuity Policy The Resilience Manager, Business Continuity & Transport Officer and identified Business Continuity Leads across the Trust Completed, reviewed and maintained departmental Business Impact Analyses and Business Continuity Plans. Business Continuity promotion, training and exercising Business Continuity Management is to be integrated and evidenced within Trust business planning processes. Business Continuity risks will be systematically reviewed to ensure that they are identified, protected against, reduced in likelihood where possible, prepared for, responded to and recovered from should they be realised. The Trust s risk management and incident reporting processes will be utilised to report Business Continuity risks and disruptions as appropriate. Business Impact Analyses and robust and accessible Business Continuity Plans will be developed, tested, reviewed and maintained for all appropriate departments. Effective and efficient internal and external communication will be maintained in preparation for, during and following Business Continuity disruptions Key Challenges The key challenges for Business Continuity Management at the Royal United Hospitals Bath NHS Foundation Trust are: Levels of hospital activity and capacity Patient acuity Range of services provided 24/7 provision of services Author: Siân Dyson Resilience Manager Page 6 of 17

7 High number of internal and external stakeholders Requirement for multi-agency planning with external stakeholders Supply chain vulnerability Technological dependencies, both medical equipment and information management Departmental interdependencies Size and vulnerability of sites Unpredictability of threats such as severe weather, IT and utility disruptions Duration of disruption caused by threats such as pandemic flu and severe weather Reputational risk to Trust during and following business continuity disruptions Motivation and engagement of staff with conflicting priorities to carry out Business Continuity planning Providing assurance of compliance with the Business Continuity Strategic Policy Meeting statutory Business Continuity requirements 4.3. Delivery The objectives will be achieved though: A Business Continuity Policy which describes the principles and processes required to develop and maintain robust business continuity arrangements for the Trust; based on national best practice guidance. Adherence to the Business Continuity Policy and underpinning procedures by all staff in order to effectively manage Business Continuity disruptions. Performance against the policy monitored through the EPRR Operational and Strategic Groups and the annual EPRR Core Standards audit. The consideration of Business Continuity Management in Trust-wide business planning, with advice sought from the Resilience Manager as required. The inclusion of Business Continuity Management within departmental training for staff, facilitated by departmental Business Continuity Leads, supported by Divisional Business Continuity Leads, the Resilience Manager and the Business Continuity and Transport Officer as required. Departmental Business Impact Analyses, which are the first stage of the Business Continuity planning process. These will be completed by all departments, prioritising those which carry out critical activities. Departmental Business Continuity Plans, which describe the procedures required by departments to respond to, recover from and restore and resume Author: Siân Dyson Resilience Manager Page 7 of 17

8 activities to a pre-defined level of service during and following a business continuity disruption. These plans must be maintained as live documents and reviewed and tested when changes within the department occur or on an annual basis as a minimum. Departmental and Trust-wide Business Continuity exercises, supported by the Resilience Manager, Business Continuity and Transport Officer and other managers as appropriate. Coordinated and controlled responses to Business Continuity disruptions following the processes documented within the relevant Trust Business Continuity Plans with support from all required departments. Debriefing of Business Continuity disruptions, internally and externally if required. Lessons must be identified and actions allocated using Datix, overseen by the Resilience Manager and monitored by the EPRR Operational and Strategic Groups. 5. Duties and Responsibilities The Business Continuity duties and responsibilities of Trust staff are as follows: Chief Executive The Chief Executive has overall responsibility and accountability for Business Continuity Management under the Civil Contingencies Act (2004). Board of Directors The Board of Directors are responsible for the overall strategic direction of the Trust with regards to Business Continuity. The Board will hold the organisation to account for the delivery of the Business Continuity strategy and seek assurance that Business Continuity procedures in place are robust and reliable. The Board will monitor progress and ensure that the Trust is compliant with statutory Business Continuity duties. Chief Operating Officer (Accountable Emergency Officer) As the Trust s Accountable Emergency Officer, the Chief Operating Officer holds Executive level accountability for Business Continuity and ensuring that the Trust has robust business continuity planning arrangements in place which reflect standards set out in PAS 2015 and ISO The Accountable Emergency Officer shall be supported, where appropriate, by a non-executive director or appropriate other board member, to endorse assurance to the board that the organisation is meeting its obligations with respect to Business Continuity and relevant statutory obligations under the Civil Contingencies Act The Accountable Emergency Officer will ensure that the Trust is appropriately represented at Business Continuity governance meetings, sub-groups or working groups of the Local Health Resilience Partnership (LHRP) or Local Resilience Forum (LRF). Author: Siân Dyson Resilience Manager Page 8 of 17

9 Executive Directors The Executive Directors have responsibility for ratifying directorate level Business Impact Analyses and Business Continuity Plans. Director of Estates and Facilities The Director of Estates and Facilities is responsible for ensuring that the directorate s response procedures to foreseeable disruptions such as utility failures, fires and floods are documented, tested, reviewed, maintained and readily available. These plans must include estimated timeframes that can be shared with Trust departments so that they can plan accordingly. The Estates and Facilities Directorate will need to engage with departments during the creation of Business Impact Analyses and Business Continuity Plans and provide support as required. The Director of Estates and Facilities also has responsibility for ensuring that timely, and effective communication systems are in place to alert the Resilience Manager, Business Continuity Officer and the wider Trust to incidents or forthcoming planned work that may cause Business Continuity disruptions. During a Business Continuity disruption, the Estates response team will need to respond to the incident in a timely manner as required and ensure that they liaise effectively and regularly with the Resilience Manager, Business Continuity Officer and the incident response team (if convened) to keep them informed of developments, issues and timeframes for recovery. Director of Information Management & Technology (IM&T) The Director of IM&T is responsible for ensuring that the department s response procedures to foreseeable disruptions such as network outages are documented, tested, reviewed, maintained and readily available. These plans must include estimated timeframes to be shared with various departments so that they can plan accordingly. The IM&T department will need to engage with departments during the creation of Business Impact Analyses and Business Continuity Plans and provide support as required. The Director of IM&T also has responsibility for ensuring that timely and effective communication systems are in place to alert the Resilience Manager, Business Continuity Officer and the wider Trust to incidents or forthcoming planned work that may cause Business Continuity disruptions. During a Business Continuity disruption, the IM&T response team will need to respond to the incident in a timely manner as required and ensure that they liaise effectively and regularly with the Resilience Manager, Business Continuity Officer and the incident response team (if convened) to keep them informed of developments, issues and timeframes for recovery. Author: Siân Dyson Resilience Manager Page 9 of 17

10 Divisional Managers Divisional Managers have responsibility for ensuring that Business Continuity Plans capable of maintaining minimal acceptable standards of service delivery are in place for each department. Each division will carry out an annual review of Business Continuity Management and ensure that plans are exercised annually as a minimum and updated as appropriate. Divisional Managers will be responsible for the identification and support of Divisional Business Continuity leads and are members of the EPRR Strategic Group. Divisional Business Continuity Leads Divisional Business Continuity Leads will be identified by Divisional Managers and will work closely with the Resilience Manager to ensure that departments complete Business Impact Analyses and develop, test, review and maintain Business Continuity Plans within the timeframes required. They will review completed departmental Business Impact Analyses and Business Continuity Plans with the Resilience Manager. Departmental Business Continuity Leads Departmental Business Continuity Leads will be identified by the Divisional Business Continuity Leads and will be responsible for completing departmental Business Impact Analyses and Business Continuity Plans with support from their department, the Divisional Business Continuity Lead, the Resilience Manager and the Business Continuity & Transport Officer. Resilience Manager On behalf of the Accountable Emergency Officer, the Resilience Manager will ensure that the organisation meets its statutory obligations under the CCA (2004) and complies with all relevant Business Continuity guidance for the NHS, providing assurance to the Board as summarised by NHS England s Core Standards for Emergency Preparedness, Resilience and Response (EPRR). The Resilience Manager will develop and deliver the Trust s Business Continuity Management Programme, improve standards of Business Continuity planning across the organisation and provide leadership on specialist Business Continuity issues. The Resilience Manager will coordinate larger Business Continuity training exercises internally for the Trust and externally with multi-agency partners. The Resilience Manager will develop and contribute to professional relationships with multi-agency partners that facilitate the continual development of Business Continuity arrangements and ensure appropriate representation at LHRP and LRF Business Continuity sub-groups. Business Continuity and Transport Officer The Business Continuity and Transport Officer reports to the Resilience Manager and supports the implementation of business continuity planning across the Trust. The Business Continuity & Transport Officer will assist departmental Business Continuity Leads with the completion of Business Impact Analyses and Business Continuity Plans. Author: Siân Dyson Resilience Manager Page 10 of 17

11 EPRR Strategic Group The EPRR Strategic Group meets quarterly, chaired by the Chief Operating Officer. This group oversees the Business Continuity work carried out by the Resilience Manager and supports the Resilience Manager with the implementation of the Business Continuity Strategic Policy and underpinning procedures across the Trust. EPRR Operational Group The EPRR Operational Group meets quarterly, chaired by the Resilience Manager. This group oversees the Business Continuity work carried out at an operational level and supports the Resilience Manager with assisting with completion and ratification of departmental Business Impact Analyses and Business Continuity Plans. On Call Directors On Call Directors have responsibility for overseeing the strategic response to Business Continuity disruptions out of hours, following the processes documented within the relevant Trust Business Continuity Plans. On Call Managers On Call Managers have responsibility for overseeing the operational response to Business Continuity disruptions out of hours, ensuring that the processes documented within the relevant departmental Business Continuity Plans are followed as required. Matrons / Clinical Service Managers Matrons and Clinical Service Managers are key role models for effective Business Continuity Management and have responsibility for continuing to provide safe levels of care during Business Continuity disruptions. They must work closely with departmental Business Continuity Leads to develop, test, review, maintain and train against departmental Business Continuity Plans. They are also responsible for ensuring that regular audits are carried out, to check Business Continuity equipment such as back up paper systems, torches etc. are functional and accessible. All staff All staff have a responsibility to comply with this policy and the required underpinning processes and to attend or undertake training sessions as appropriate to their role. Author: Siân Dyson Resilience Manager Page 11 of 17

12 6. Assurance Framework The Board of Directors The Board of Directors is responsible for ensuring that the Trust has appropriate Business Continuity processes in place to enable the organisation to deliver its objectives and statutory requirements. Activities to demonstrate that Business Continuity is an integral part of clinical and corporate governance include: The Trust Board receiving and formally approving the Trust Business Continuity Policy and underpinning Business Continuity Management Programme and the Annual EPRR Report. The Annual EPRR Report for the Board of Directors presents a summary of EPRR (including Business Continuity) within the Trust and the improvements made over the preceding 12 months, demonstrated through the management of specific incidents and exercises and through compliance with the EPRR Core Standards. The report also identifies gaps within the Trust s current EPRR provision and includes a Work Plan detailing the mitigating actions to further strengthen the Trust s Business Continuity capabilities moving forward. Presentations from the Resilience Manager to the Board as requested. Additional Business Continuity reports / updates will be produced by the Resilience Manager upon request. Reports of Business Continuity disruptions and their management produced by the Resilience Manager as requested. Trust Management Board The Trust Management Board reviews significant Business Continuity disruptions and their management and actions arising post incident. This is can be achieved on a monthly basis through reports to the Board following incident debriefs. Trust n Clinical Governance Committee The n Clinical Governance Committee is an assurance committee. The role of the Committee is to seek assurance that all non-clinical risks within the Trust are appropriately identified, assessed and managed. The Committee receives an EPRR (including Business Continuity) report annually as a minimum. This report describes the progress the Trust makes in the delivery of the Business Continuity requirements of the EPRR Core Standards and the actions required to ensure continued improvement and development in this area. The Committee highlights any areas of concern by identifying risk areas for inclusion on the Trust-wide Risk Register and brings these to the attention of the Board. The Committee supports compliance with the Business Continuity Policy through local governance structures and processes. Author: Siân Dyson Resilience Manager Page 12 of 17

13 EPRR Strategic Group The EPRR Strategic Group s purpose is to seek assurance that the Trust has a robust framework for EPRR including Business Continuity in place at a strategic level. The Group meets on a quarterly basis. The Group receives policies, updates and other documents for review and dissemination. The Group receives feedback from members progress with the implementation of the Business Continuity Strategic Policy and underpinning processes. EPRR Operational Group The EPRR Operational Group s purpose is to seek assurance that the Trust has a robust framework for EPRR including Business Continuity in place at an operational level. The Group meets on a monthly basis and reports Business Continuity developments and issues to the EPRR Strategic Group regularly. Once completed, departmental Business Continuity Plans will be submitted to the appropriate Divisional Business Continuity Lead and the Resilience Manager for review. The plan will then be submitted to the Trust s EPRR Operational Group for ratification. 7. Monitoring Compliance The Trust s processes for monitoring Business Continuity Management will incorporate proactive, reactive, internal and external monitoring systems, including routine Business Continuity Management reporting and investigation of Business Continuity disruptions and their impacts. The Board of Directors will evaluate the effectiveness of the Trust Business Continuity Management Programme annually through the Annual EPRR Report and audit against the EPRR Core Standards. Business Continuity disruptions must be recorded via Datix by the department affected. Structured and timely debriefs will take place, chaired by the Resilience Manager, with lessons identified, actioned and recorded using the system. Actions must be completed by the allocated individual or team within the timeframe specified. Business Continuity disruptions may be reported externally depending on the scale of the disruption, the severity of the impact and the relevance of the lessons identified to other organisations. Business Continuity compliance may be monitored through other reports and publications as applicable, for example Care Quality Commission reports. Author: Siân Dyson Resilience Manager Page 13 of 17

14 8. Review This policy is subject to a planned review every three years as part of the Trust s Policy Review Process. However, there may be updates required in the interim arising from amendments or release of new statutory requirements or guidance or internal changes within the Trust. These updates will be made as soon as practicable to reflect and inform the Trust s revised policy and practise. 9. Training The Resilience Manager, with the assistance of the Business Continuity and Transport Officer, will provide training and support to appropriate Trust managers on the completion of the Business Impact Analysis and Business Continuity Plan templates. Cascade training will then be used to disseminate training as required. Each division / directorate is responsible for ensuring that staff receive training appropriate to the Business Continuity requirements of specific departments. 10. References The EPRR Core Standards (2014) NHS England pdf NHS England Business Continuity Management Framework (2013) NHS England Everyone Counts: Planning for Patients 2013/14 (2013) NHS England The Health & Social Care Act (2012) ISO (2012) International Organisation for Standardisation 38 Dictionary of Business Continuity Management Terms (2011) The Business Continuity Institute PAS 2015: 2010 Framework for Health Service Resilience (2010) The British Standards Institution (BSI) The Civil Contingencies Act (CCA) Author: Siân Dyson Resilience Manager Page 14 of 17

15 Document Control Information Ratification Assurance Statement Dear Please review the following information to support the ratification of the below named document. Name of document: Name of author: Business Continuity Policy Siân Dyson Job Title: Resilience Manager I, the above named author confirm that: The Policy presented for ratification meets all legislative, best practice and other guidance issued and known to me at the time of development of the Policy; I am not aware of any omissions to the Policy, and I will bring to the attention of the Executive Director any information which may affect the validity of the Policy presented as soon as this becomes known; The Policy meets the requirements as outlined in the document entitled Trust-wide Policy for the Development and Management of Policies (v4.0); The Policy meets the requirements of the NHSLA Risk Management Standards to achieve as a minimum level 2 compliance, where applicable; I have undertaken appropriate and thorough consultation on this Policy and I have documented the names of those individuals who responded as part of the consultation within the document. I have also fed back to responders to the consultation on the changes made to the Policy following consultation; I will send the Policy and signed ratification checklist to the Policy Coordinator for publication at my earliest opportunity following ratification; I will keep this Policy under review and ensure that it is reviewed prior to the review date. Signature of Author: Date: 29 May 2015 Name of Person Ratifying this policy: Francesca Thompson Job Title: Chief Operating Officer Signature: Date: 29 May 2015 To the person approving this policy: Please ensure this page has been completed correctly, then print, sign and post this page only to: The Policy Coordinator, John Apley Building. The whole policy must be sent electronically to: ruh-tr.policies@nhs.net Author: Siân Dyson Resilience Manager Page 15 of 17

16 Consultation Schedule Name and Title of Individual Date Consulted Francesca Thompson, Chief Operating Officer 18/05/15 Howard Jones, Director of Estates and Facilities 18/05/15 Sarah Truelove, Director of Finance & Deputy Chief Executive 18/05/15 Heather Cooper, Head of Performance 18/05/15 Suzanne Wills, Divisional Manager, Surgery 18/05/15 Nicky Ashton, Divisional Manager, Women & Children s 18/05/15 Fiona Bird, Divisional Manager, Medicine 18/05/15 Jo Miller, Head of Nursing, Medicine 18/05/15 Sharon Bonson, Head of Nursing, Surgery 18/05/15 Vicky Tinsley, Head of Nursing & Midwifery, Women & 18/05/15 Children s Ian Troise, Technical Service Manager 18/05/15 Tanya Beale, Chief Information Officer 18/05/15 Brian Gubb, Head of Estates 18/05/15 Alexandra Lucas, Head of Risk and Assurance 18/05/15 Lee Warner-Holt, Matron Clinical Site Services 18/05/15 Simon Jack, Business Continuity & Transport Officer 18/05/15 The following people have submitted responses to the consultation process: Name and Title of Individual Date Responded Francesca Thompson, Chief Operating Officer 18/05/15 Nicky Ashton, Divisional Manager, Women & Children s 21/05/15 Name of Committee/s (if applicable) Date of Committee Author: Siân Dyson Resilience Manager Page 16 of 17

17 Equality Impact: (A) Assessment Screening To be completed when submitted to the appropriate Executive Director for consideration and approval. Person responsible for the assessment: Name: Job Title: Siân Dyson Resilience Manager Does the document / guidance affect one group less or more favourably than another on the basis of: Race Ethnic origins (including gypsies and travellers) Nationality Gender (including gender reassignment) Culture Religion or belief Sexual orientation Age Disability (learning disabilities, physical disability, sensory impairment and mental health problems) Is there any evidence that some groups are affected differently? If you have identified potential discrimination, are there any valid exceptions, legal and/or justifiable? Is the impact of the document/guidance likely to be negative? If so, can the impact be avoided? What alternative is there to achieving the document/guidance without the impact? Can we reduce the impact by taking different action? Yes/ N/A N/A N/A N/A Comments If you answered NO to all the above questions, the assessment is now complete, and no further action is required. If you answered YES to any of the above please complete the Equality Impact: (B) Full Analysis Author: Siân Dyson Resilience Manager Page 17 of 17

NHS Hardwick Clinical Commissioning Group. Business Continuity Policy

NHS Hardwick Clinical Commissioning Group. Business Continuity Policy NHS Hardwick Clinical Commissioning Group Business Continuity Policy Version Date: 26 January 2016 Version Number: 2.0 Status: Approved Next Revision Due: January 2017 Gordon Stevens MBCI Corporate Assurance

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY This document is uncontrolled once printed. Please check on the CCG s Intranet site for the most up to date version BUSINESS CONTINUITY MANAGEMENT POLICY DOCUMENT CONTROL Type of Document Document Title

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy 1 NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops. Commissioning Strategy Finance Publications

More information

BUSINESS CONTINUITY MANAGEMENT FRAMEWORK

BUSINESS CONTINUITY MANAGEMENT FRAMEWORK BUSINESS CONTINUITY MANAGEMENT FRAMEWORK Document Author: Civil Contingencies Service - Authorised by the CCS Joint Management Board - Version 1.0. Issued December 2012 Page 1 FRAMEWORK STATEMENT Business

More information

Business Continuity Management Policy

Business Continuity Management Policy Business Continuity Management Policy Business Continuity Policy Version 1.0 1 Version control Version Date Changes Author 0.1 April 13 1 st draft PH 0.2 June 13 Amendments in line with guidance PH 0.3

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Page 1 of 15 Business Continuity Policy First published: Amendment record Version Date Reviewer Comment 1.0 07/01/2014 Debbie Campbell 2.0 11/07/14 Vicky Ryan Updated to include

More information

South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy

South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy Reference No: CG 01 Version: Version 1 Approval date 18 December 2013 Date ratified: 18 December 2013 Name of Author

More information

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20

More information

BUSINESS CONTINUITY POLICY

BUSINESS CONTINUITY POLICY BUSINESS CONTINUITY POLICY Document Type Corporate Policy Unique Identifier CO-038 Document Purpose To provide a structure through which: i. A comprehensive business continuity management system (BCMS)

More information

Essex Clinical Commissioning Groups. Business Continuity Management System. Scope and Policy

Essex Clinical Commissioning Groups. Business Continuity Management System. Scope and Policy Essex Clinical Commissioning Groups Essex Clinical Commissioning Groups Business Continuity Management System Scope and Policy Policy Author: Daniel Hale - Head of Emergency Planning Version: 1.0 Date

More information

NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00)

NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) Subject and version number of document: Serial Number: Business Continuity Management Policy

More information

1.0 Policy Statement / Intentions (FOIA - Open)

1.0 Policy Statement / Intentions (FOIA - Open) Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies

More information

Business Continuity Policy

Business Continuity Policy Page 1 of 16 Business Continuity Policy Issue Date: Aug 2013 Document Number: 00241 Prepared by: Business Management and Continuity Senior Manager Next Review Date: April 2014 Page 2 of 16 NHS England

More information

NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy. Version 1.0

NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy. Version 1.0 NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy Version 1.0 Document Control Title: Status: Version: 1.0 Issue date: May 2014 Document owner: (Name,

More information

TRUST POLICY FOR EMERGENCY PLANNING

TRUST POLICY FOR EMERGENCY PLANNING TRUST POLICY FOR EMERGENCY PLANNING Reference Number: CL-OP/ 2013/027 Version: 1.4 Status: New Draft Author: Ashley Reed Job Title: Head of Security and EPO Version / Amendment History Version Date Author

More information

BSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012

BSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012 To: From: Subject: Status: Date of Meeting: BSO Board Director of Human Resources & Corporate Services Business Continuity Policy For Approval 28 February 2012 The Board is asked to agree the attached

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Ref. No. TP/028 Title: Business Continuity Policy Page 1 of 15 DOCUMENT PROFILE and CONTROL. Purpose of the document: Provides an overview of the London Ambulance Service NHS

More information

Solihull Clinical Commissioning Group

Solihull Clinical Commissioning Group Solihull Clinical Commissioning Group Business Continuity Policy Version v1 Ratified by SMT Date ratified 24 February 2014 Name of originator / author CSU Corporate Services Review date Annual Target audience

More information

Business Continuity Management (BCM) Policy

Business Continuity Management (BCM) Policy Business Continuity Management (BCM) Policy Reference number: Corporate 042 Title: Business Continuity Management (BCM) Policy Version number: Version 2 Policy Approved by: LLR PCT Cluster Board Date of

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not

More information

RISK MANAGEMENT STRATEGY 2014-17

RISK MANAGEMENT STRATEGY 2014-17 RISK MANAGEMENT STRATEGY 2014-17 DOCUMENT NO: Lead author/initiator(s): Contact email address: Developed by: Approved by: DN128 Head of Quality Performance Julia.sirett@ccs.nhs.uk Quality Performance Team

More information

NHS Commissioning Board Business Continuity Management Framework (service resilience)

NHS Commissioning Board Business Continuity Management Framework (service resilience) NHS Commissioning Board Business Continuity Management Framework (service resilience) 1 P a g e NHS Commissioning Board Business Continuity Management Framework Date 7 January 2013 Audience NHS Commissioning

More information

Risk Management & Business Continuity Manual 2011-2014

Risk Management & Business Continuity Manual 2011-2014 ANNEX C Risk Management & Business Continuity Manual 2011-2014 Produced by the Risk Produced and by the Business Risk and Business Continuity Continuity Team Team February 2011 April 2011 Draft V.10 Page

More information

Pandemic Influenza Plan 2015/2016

Pandemic Influenza Plan 2015/2016 NOT PROTECTIVELY MARKED Pandemic Influenza Plan 2015/2016 Policy number: N/A Version 1.5 Approved by Name of author/originator Owner (director) Executive Management Team Mark Twomey, Deputy Director of

More information

Managing Performance Policy

Managing Performance Policy .1 Managing Performance Policy Reference Number: 123 Author & Title: Gayle Williams, HR Manager Responsible Directorate: Human Resources Review Date: 11 March 2016 Ratified by (committee): Lynn Vaughan

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY Version No: 1 Issue Status: awaiting Trust Board approval Date of Ratification: 11th April 2012 Ratified by: Risk Management Committee Policy Author(s): Stuart Coalwood

More information

WILTSHIRE POLICE FORCE POLICY

WILTSHIRE POLICE FORCE POLICY Template v4 WILTSHIRE POLICE FORCE POLICY BUSINESS CONTINUITY MANAGEMENT SYSTEMS (BCMS) Effective from: July 2013 Version: 2.0 Next Review Date: July 2015 POLICY STATEMENT Wiltshire Police has a statutory

More information

Business Continuity Management Framework 2014 2017

Business Continuity Management Framework 2014 2017 Business Continuity Management Framework 2014 2017 Blackpool Council Business Continuity Framework V3.0 Page 1 of 13 CONTENTS 1.0 Forward 03 2.0 Administration 04 3.0 Policy 05 4.0 Business Continuity

More information

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1

More information

39 GB Guidance for the Development of Business Continuity Plans

39 GB Guidance for the Development of Business Continuity Plans 39 GB Guidance for the Development of Business Continuity Plans Policy number: Version 2.2 Approved by Name of author/originator Owner (director) 39 GB Executive Committee Date of approval August 2014

More information

Title. Learning from Incidents, Complaints and Claims. Description of Document

Title. Learning from Incidents, Complaints and Claims. Description of Document Title Description of Document Scope Author and designation Equality Impact Assessment (EIA) Associated Documents Supporting References Learning from Incidents, Complaints and Claims This policy identifies

More information

How To Manage Risk In Ancient Health Trust

How To Manage Risk In Ancient Health Trust SharePoint Location Non-clinical Policies and Guidelines SharePoint Index Directory 3.0 Corporate Sub Area 3.1 Risk and Health & Safety Documents Key words (for search purposes) Risk, Risk Management,

More information

CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY

CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY Zurich Management Services Limited Registered in England: No 2741053 Registered Office The Zurich Centre, 3000 Parkway Whiteley, Fareham Hampshire, PO15 7JZ CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY

More information

NOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Specialist Operations Contingency Planning Business Continuity Manager 17.09.12

NOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Specialist Operations Contingency Planning Business Continuity Manager 17.09.12 POLICY BUSINESS CONTINUITY Policy owners Policy holder Author Head of Services Specialist Operations Contingency Planning Business Continuity Manager Policy No. 132 Approved by Legal Services 17.09.12

More information

Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015. Business Continuity Policy Statement 2015

Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015. Business Continuity Policy Statement 2015 Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015 Business Continuity Policy Statement 2015 This Policy sets the direction for Business Continuity

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Version 1 approved by SMG December 2013 Business Continuity Policy Version 1 1 of 9 Business Continuity Management Summary description: This document provides the rationale

More information

Business Continuity Policy and Business Continuity Management System

Business Continuity Policy and Business Continuity Management System Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain

More information

BUSINESS CONTINUITY POLICY

BUSINESS CONTINUITY POLICY BUSINESS CONTINUITY POLICY Last Review Date Approving Body n/a Audit Committee Date of Approval 9 th January 2014 Date of Implementation 1 st February 2014 Next Review Date February 2017 Review Responsibility

More information

CAMBRIDGESHIRE COMMUNITY SERVICES NHS TRUST BUSINESS CONTINUITY PLAN VERSION 6.0

CAMBRIDGESHIRE COMMUNITY SERVICES NHS TRUST BUSINESS CONTINUITY PLAN VERSION 6.0 CAMBRIDGESHIRE COMMUNITY SERVICES NHS TRUST BUSINESS CONTINUITY PLAN VERSION 6.0 Page 1 of 34 DOCUMENT PROCESS AND CONTROL Title: Synopsis: Who is it for: Cambridgeshire Community Services NHS Trust Business

More information

Business Continuity Plan

Business Continuity Plan Business Continuity Plan March 2014 Version: 1.0 Ratified by: Quality Group Date ratified: Name of originator/author: Name of responsible committee/ individual: Julie Killingbeck NHS North Lincolnshire

More information

abcdefghijklmnopqrstu

abcdefghijklmnopqrstu abcdefghijklmnopqrstu Business Continuity A Framework for NHS Scotland Strategic Guidance for NHS Organisations in Scotland 1 Contents 1. Introduction 4 1.1 Business Continuity Overview 5 2. Roles and

More information

NHS Lancashire North CCG Business Continuity Management Policy and Plan

NHS Lancashire North CCG Business Continuity Management Policy and Plan Agenda Item 12.0. NHS Lancashire North CCG Business Continuity Management Policy and Plan Version 2 Page 1 of 25 Version Control Version Reason for update 1.0 Draft for consideration by Executive Committee

More information

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy Part Two Part One Not Protectively Marked DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy. The Dorset & Wiltshire Fire and Rescue Authority (DWFRA)

More information

Business Continuity Policy. Version 1.0

Business Continuity Policy. Version 1.0 Business Continuity Policy Version.0 January 206 Contents Contents Version control Foreword Policy. Scope.2 Aim and objectives.3 Methods and standards.4 Responsibilities.5 Governance.6 Training and exercises

More information

Update from the Business Continuity Working Group

Update from the Business Continuity Working Group 23 June 2014 Performance and Resources Board 19 To note Update from the Business Continuity Working Group Issue 1 The Business Continuity Working Group oversees the development, maintenance and improvement

More information

Corporate Risk Management Policy

Corporate Risk Management Policy Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction

More information

Business Continuity and Emergency Planning Policy and Strategy

Business Continuity and Emergency Planning Policy and Strategy Business Continuity and Emergency Planning Policy and Strategy Corporate/Strategic Register No: 12009 Status: Public once ratified Developed in response to: Civil Contingency Act (2004) Staff / Management

More information

CCG: IG06: Records Management Policy and Strategy

CCG: IG06: Records Management Policy and Strategy Corporate CCG: IG06: Records Management Policy and Strategy Version Number Date Issued Review Date V3 08/01/2016 01/01/2018 Prepared By: Consultation Process: Senior Governance Manager, NECS CCG Head of

More information

Business Continuity Policy and Plan

Business Continuity Policy and Plan Business Continuity Policy and Plan Policy Number: 040 Version: 2 Ratified by: V1 Approved by GB 2013 V2 update approved by OLT 26 Sept 2014 Name of originator/author: Robert Kirton Interim CFO 2013 Executive

More information

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy Not Protectively Marked Item 6 Appendix B DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Management Policy The Dorset & Wiltshire Fire and Rescue Authority () is the combined fire and rescue authority for

More information

BUSINESS CONTINUITY POLICY RM03

BUSINESS CONTINUITY POLICY RM03 BUSINESS CONTINUITY POLICY RM03 Applies to: All NHS LA employees, contractors, secondees and consultants, contractors and/or any other parties who will carry out duties on behalf of the NHS LA Version:

More information

Type of change. V02 Review Feb 13. V02.1 Update Jun 14 Section 6 NPSAS Alerts

Type of change. V02 Review Feb 13. V02.1 Update Jun 14 Section 6 NPSAS Alerts Document Title Reference Number Lead Officer Author(s) (name and designation) Ratified By Central Alerting System (CAS) Policy NTW(O)17 Medical Director Tony Gray Head of Safety and Patient Experience

More information

EMERGENCY PREPAREDNESS POLICY

EMERGENCY PREPAREDNESS POLICY EMERGENCY PREPAREDNESS POLICY CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: Policy Emergency Planning PURPOSE This document sets out the strategic framework for the management of emergency preparedness

More information

WEST YORKSHIRE FIRE & RESCUE SERVICE. Business Continuity Management Strategy

WEST YORKSHIRE FIRE & RESCUE SERVICE. Business Continuity Management Strategy WEST YORKSHIRE FIRE & RESCUE SERVICE Business Continuity Management Strategy Date Issued: 12 November 2012 Review Date: 12 November 2015 Version Control Version Number Date Author Comment 0.1 June 2011

More information

Business Continuity Management Policy and Plan

Business Continuity Management Policy and Plan Business Continuity Management Policy and Plan Version No Author Date of Update 0.3 Allan Jude and Charmaine Grundy 05/06/2015 1 P a g e Contents Contents... 2 1. Introduction... 3 2. Purpose... 4 3. Definitions...

More information

Business Continuity (Policy & Procedure)

Business Continuity (Policy & Procedure) Business Continuity (Policy & Procedure) Publication Scheme Y/N Can be published on Force Website Department of Origin Force Operations Policy Holder Ch Supt Head of Force Ops Author Business Continuity

More information

BUSINESS CONTINUITY PLAN

BUSINESS CONTINUITY PLAN MEETING DATE: 10 April 2014 AGENDA ITEM NUMBER: Item 7.6.2 AUTHOR: JOB TITLE: DEPARTMENT: Julie Killingbeck/Catherine Wylie Relationship Manager Commissioning/Director Quality and Assurance NHS North Lincolnshire

More information

Information Governance Strategy 2015/16

Information Governance Strategy 2015/16 Information Governance Strategy 2015/16 Ratified Governing Body (November 2015) Status Final Issued November 2015 Approved By Executive Committee (August 2015) Consultation Equality Impact Assessment Internal

More information

EPRR: Toolkit Facilitator Guide

EPRR: Toolkit Facilitator Guide NHS England Business Continuity Management EPRR: Toolkit Facilitator Guide APPENDIX 1 1 [Intentionally Blank] INTRODUCTION The document has been designed to assist you to deliver the outcomes of the workshop

More information

INFORMATION GOVERNANCE STRATEGY

INFORMATION GOVERNANCE STRATEGY INFORMATION GOVERNANCE STRATEGY Page 1 of 10 Strategy Owner Valerie Penn, Head of Governance Strategy Author Caroline Law, Information Governance Project Manager Directorate Corporate Governance Ratifying

More information

INFORMATION GOVERNANCE POLICY

INFORMATION GOVERNANCE POLICY INFORMATION GOVERNANCE POLICY Primary Intranet Location Information Management & Governance Version Number Next Review Year Next Review Month 7.0 2018 January Current Author Phil Cottis Author s Job Title

More information

Strategic Alliance. Business Continuity Policy

Strategic Alliance. Business Continuity Policy Version 1.1 April 2016 Contents Contents Version control Foreword Policy Scope Aim and objectives Methods and standards Responsibilities Governance Training and exercises Page i ii 1 2 2 2 Version 1.1

More information

JOB DESCRIPTION. Hours: 37.5 hours per week, worked Monday to Friday

JOB DESCRIPTION. Hours: 37.5 hours per week, worked Monday to Friday JOB DESCRIPTION Job Title: Head of Business Continuity & Risk Band: Indicative Band 8b Hours: 37.5 hours per week, worked Monday to Friday Location: Accountable to: Tatchbury Mount, Calmore, Southampton

More information

Business Continuity Management Policy and Plan

Business Continuity Management Policy and Plan Business Continuity Management Policy and Plan 1 Page No: Contents 1.0 Introduction 3 2.0 Purpose 3 3.0 Definitions 4 4.0 Roles, Duties & Responsibilities 4 4.1 Legal And Statutory Duties, Responsibilities

More information

Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016

Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016 Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016 Policy Statement - 2016 This Policy sets the direction for Business Continuity Management at Leicester

More information

BUSINESS CONTINUITY POLICY. UHB 050 Version No: 4 Previous Trust / LHB Ref No: Interim Civil Contingencies and Emergency Planning Manager

BUSINESS CONTINUITY POLICY. UHB 050 Version No: 4 Previous Trust / LHB Ref No: Interim Civil Contingencies and Emergency Planning Manager Reference No: BUSINESS CONTINUITY POLICY UHB 050 Version No: 4 Previous Trust / LHB Ref No: N/A Documents to read alongside this Policy N/A Classification of document: Area for Circulation: Author: Executive

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain its essential business functions during

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Policy Statement & Strategy July 2009 Basildon District Council Business Continuity Management Policy Statement The Council is committed to ensuring robust and effective

More information

Policy for the Analysis and Improvement Following Incidents, Complaints and Claims

Policy for the Analysis and Improvement Following Incidents, Complaints and Claims Policy for the Analysis and Improvement Following Incidents, Complaints and Claims Exec Director lead Author/ lead Feedback on implementation to Deputy Chief Executive Clinical Risk Manager Clinical Risk

More information

NHS North Durham Clinical Commissioning Group. Information Governance Strategy 2015/16

NHS North Durham Clinical Commissioning Group. Information Governance Strategy 2015/16 NHS North Durham Clinical Commissioning Group Information Governance Strategy 2015/16 Document Status Equality Impact Assessment Document Ratified/Approved By Final No impact Risk and Audit Committee/Governing

More information

Version: 3.0. Effective From: 19/06/2014

Version: 3.0. Effective From: 19/06/2014 Policy No: RM66 Version: 3.0 Name of Policy: Business Continuity Planning Policy Effective From: 19/06/2014 Date Ratified 05/06/2014 Ratified Business Service Development Committee Review Date 01/06/2016

More information

Staffordshire County Council. Civil Contingencies Policy

Staffordshire County Council. Civil Contingencies Policy Staffordshire County Council Civil Contingencies Policy Version 1 September 2012 Staffordshire County Council s Civil Contingencies Policy 1.1 Introduction The County Council aims to protect the wellbeing

More information

South Norfolk Council Business Continuity Policy

South Norfolk Council Business Continuity Policy South Norfolk Council Business Continuity Policy 1 Title: Business Continuity Policy Date of Publication: TBC Version: 2 Published by: Emergency Planning Team Review date: April 2014 Document Owner: Document

More information

Business continuity management policy

Business continuity management policy Business continuity management policy Issue sheet Document reference Document location Title Author Issued to Reason issued NHSBSADPN001b S:\BSA\IGM\Mng IG\Developing Policy and Strategy\Develop or Review

More information

PS 170 Business Continuity Management Policy

PS 170 Business Continuity Management Policy PS 170 Business Continuity Management Policy July 2013 Version 2 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy St Mary Magdalene Academy V1.0 / September 2014 Document Control Document Details Document Title Document Type Business Continuity Policy Policy Version 2.0 Effective From 1st

More information

The policy applies to all members of staff employed within the Trust who are involved in any aspect of alert dissemination, action, and /or review.

The policy applies to all members of staff employed within the Trust who are involved in any aspect of alert dissemination, action, and /or review. The Newcastle upon Tyne Hospitals NHS Foundation Trust Central Alert System (CAS) Policy and Procedure Version No.: 4.2 Effective From: 26 th May 2015 Expiry Date: 26 th May 2018 Date Ratified: 11 th May

More information

Essex Clinical Commissioning Groups. Business Continuity Management System. Business Impact Analysis Process

Essex Clinical Commissioning Groups. Business Continuity Management System. Business Impact Analysis Process Essex Clinical Commissioning Groups Essex Clinical Commissioning Groups Business Continuity Management System Business Impact Analysis Process Policy Author: Daniel Hale - Head of Emergency Planning Version:

More information

Safety Alerts Management Policy

Safety Alerts Management Policy Safety Alerts Management Policy Version Number 1.1 Version Date February 2014 Policy Owner Author First approval or date last reviewed Staff/Groups Consulted Director of Nursing and Clinical Governance

More information

NHS Newcastle Gateshead Clinical Commissioning Group. Information Governance Strategy 2015/16

NHS Newcastle Gateshead Clinical Commissioning Group. Information Governance Strategy 2015/16 NHS Newcastle Gateshead Clinical Commissioning Group Information Governance Strategy 2015/16 Document Status Equality Impact Assessment Document Ratified/Approved By Approved No impact NHS Quality, Safety

More information

Business Continuity Policy & Plans

Business Continuity Policy & Plans Agenda Item 8.3a SNCCG Governing Body 11.03.2014 Business Continuity Policy & Plans Ref Number: Version: 1 Status: Pending Approval Author: A Brown Approval body Governing Body Date Approved Date Issued

More information

Technology & Telecommunications Electronic Data Backup Policy

Technology & Telecommunications Electronic Data Backup Policy Technology & Telecommunications Electronic Data Backup Policy Document Status Version: V3.0 Approved DOCUMENT CHANGE HISTOR Initiated by Date Author Head of IS&T 14 March 2012 IS&T Security & Resilience

More information

MANAGEMENT OF POLICIES, PROCEDURES AND OTHER WRITTEN CONTROL DOCUMENTS

MANAGEMENT OF POLICIES, PROCEDURES AND OTHER WRITTEN CONTROL DOCUMENTS MANAGEMENT OF POLICIES, PROCEDURES AND OTHER WRITTEN CONTROL DOCUMENTS Document Reference No: Version No: 6 PtHB / CP 012 Issue Date: April 2015 Review Date: January 2018 Expiry Date: April 2018 Author:

More information

Update from the Business Continuity Working Group

Update from the Business Continuity Working Group 18 June 2015 Performance and Resources Board 14 To note Update from the Business Continuity Working Group Issue 1 The Business Continuity Working Group oversees the development, maintenance and improvement

More information

HEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT

HEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT HEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT February 2012 1 Role of the Health and Social Care Board The role of the Health and Social Care Board (the Board) is broadly contained

More information

Emergency Preparedness, Resilience and Response (EPRR)

Emergency Preparedness, Resilience and Response (EPRR) GB 15/135 Emergency Preparedness, Resilience and Response (EPRR) Introduction The NHS needs to plan for and respond to a wide range of emergencies and business continuity incidents that could affect the

More information

Emergency Management and Business Continuity Policy

Emergency Management and Business Continuity Policy www.surreycc.gov.uk Making Surrey a better place Emergency Management and Business Continuity Policy 4 TH EDITION June 2011 Title Emergency Management and Business Continuity Policy Version 4.0 Policy

More information

Freedom of Information Act Publication Scheme Protective Marking. Publication Scheme Y/N Yes Title. Version 3.0 Summary

Freedom of Information Act Publication Scheme Protective Marking. Publication Scheme Y/N Yes Title. Version 3.0 Summary Freedom of Information Act Publication Scheme Protective Marking Not Protectively Marked Publication Scheme Y/N Yes Title Business Continuity Policy and Equality Impact Assessment Version 3.0 Summary This

More information

The Royal Wolverhampton NHS Trust

The Royal Wolverhampton NHS Trust The Royal Wolverhampton NHS Trust Trust Board Report Meeting Date: 22 April 2013 Title: Emergency Preparedness Annual Report 2012/2013 Executive Summary: Action Requested: Report of: Author: Contact Details:

More information

NHS Durham Dales, Easington and Sedgefield Clinical Commissioning Group. Business Continuity Plan

NHS Durham Dales, Easington and Sedgefield Clinical Commissioning Group. Business Continuity Plan NHS Durham Dales, Easington and Sedgefield Clinical Commissioning Group Business Continuity Plan Page 1 Review To be done annually Author Chief Operating Officer Reviewer Head of Corporate Services Version

More information

Hart First Response. Business Continuity Policy

Hart First Response. Business Continuity Policy Title: Filename: Iss2_24apr14 Pages: 5 Author: Graham Brown Approved by: HFR Executive Committee Issue 1: 06/01/2011 Issue 2: 24/04/14 Review Date: 24/04/17 1. Introduction 1.1. Hart First Response (HFR)

More information

Cumbria Constabulary. Business Continuity Planning

Cumbria Constabulary. Business Continuity Planning Cumbria Constabulary Business Continuity Planning 0 Cumbria Shared Internal Audit Service Images courtesy of Carlisle City Council except: Parks (Chinese Gardens), www.sjstudios.co.uk, Monument (Market

More information

Community and Built Environment Localities and Safer Communities Business Continuity Management Policy Andrew Fyfe

Community and Built Environment Localities and Safer Communities Business Continuity Management Policy Andrew Fyfe Community and Built Environment Localities and Safer Communities Business Continuity Management Policy Andrew Fyfe 4 Aug 14 Draft v4.4 TBC Resilience Team BCM Policy draft v4.4 1 4 Aug 2014 Statement of

More information

Business Continuity Management. Policy Statement and Strategy

Business Continuity Management. Policy Statement and Strategy Business Continuity Management Policy Statement and Strategy November 2011 Title Business Continuity Management Policy & Strategy Date of Publication: Cabinet Council Published by Borough Council of King

More information

Birmingham CrossCity Clinical Commissioning Group. Business Continuity Management Policy

Birmingham CrossCity Clinical Commissioning Group. Business Continuity Management Policy Birmingham CrossCity Clinical Commissioning Group Business Continuity Management Policy Version V1.0 Ratified by Operational Development Group Date ratified 6 th November 2014 Name of originator / author

More information

Business Continuity Management Policy and Framework

Business Continuity Management Policy and Framework Management Policy and Framework Version: Produced by: Date Produced: Approved by: Updated: 7 University Manager with the assistance of the Operational Group 11 th March 2010 Steering Group (14 December

More information

NHS Hartlepool and Stockton-on-Tees Clinical Commissioning Group. Information Governance Strategy 2015/16

NHS Hartlepool and Stockton-on-Tees Clinical Commissioning Group. Information Governance Strategy 2015/16 NHS Hartlepool and Stockton-on-Tees Clinical Commissioning Group Information Governance Strategy 2015/16 Document Status Equality Impact Assessment Final No impact Document Ratified/Approved By Hartlepool

More information

NHS NEWCASTLE GATESHEAD CLINICAL COMMISSIONING GROUP

NHS NEWCASTLE GATESHEAD CLINICAL COMMISSIONING GROUP NHS Newcastle Gateshead Clinical Commissioning Group NHS NEWCASTLE GATESHEAD CLINICAL COMMISSIONING GROUP Business Continuity Plan (including Emergency Planning Response and Resilience, Surge Management

More information

Incident Management Plan

Incident Management Plan Incident Management Plan Document Control Version 1 Name of Document NHS Guildford and Waverley CCG Incident Management Plan Version Date 1st December 2015 Owner Director of Governance and Compliance [Accountable

More information