1 Coleg Gwent Internal Audit Report () 6 June 2012 Overall Opinion

2 The Learning Zone - Project Management Arrangements CONTENTS Section Page Executive Summary 1 Action Plan 4 Findings and Recommendations 5 Debrief meeting 16 May 2012 Auditors David Taylor, Director; Draft report issued 23 May 2012 Responses received 6 June 2012 Helen Cargill, Associate Director; Nigel Ireland, Client Manager; Tulin Cottle, Senior Auditor Final report issued 6 June 2012 Client sponsor Lynda Astell, Vice Principal (Finance, Estates and Information) Distribution Lynda Astell, Vice Principal (Finance, Estates and Information) Pat Godfrey, Clerk to the Corporation This review has been performed using RSM Tenon s bespoke internal audit methodology, i-ris. The matters raised in this report are only those which came to our attention during our internal audit work and are not necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required. Whilst every care has been taken to ensure that the information provided in this report is as accurate as possible, based on the information provided and documentation reviewed, no complete guarantee or warranty can be given with regard to the advice and information contained herein. Our work does not provide absolute assurance that material errors, loss or fraud do not exist. This report is prepared solely for the use of Board and senior management of Coleg Gwent. Details may be made available to specified external agencies, including external auditors, but otherwise the report should not be quoted or referred to in whole or in part without prior consent. No responsibility to any third party is accepted as the report has not been prepared, and is not intended for any other purpose RSM Tenon Limited RSM Tenon Limited is a member of RSM Tenon Group RSM Tenon Limited is an independent member firm of RSM International an affiliation of independent accounting and consulting firms. RSM International is the name given to a network of independent accounting and consulting firms each of which practices in its own right. RSM International does not exist in any jurisdiction as a separate legal entity. RSM Tenon Limited (No ) is registered in England and Wales. Registered Office 66 Chiltern Street, London W1U 4GB. England

3 1 The Learning Zone - Project Management Arrangements 1 EXECUTIVE SUMMARY 1.1 INTRODUCTION An audit of The Learning Zone (TLZ) Project Management Arrangements was undertaken as part of the approved internal audit periodic plan for 2011/12. The audit was undertaken to review the arrangements in place to manage the following risks: Failure to effectively manage the Learning Zone transition adversely impacts on the College s reputation. Failure to recover Learning Zone transition costs adversely impacts financial health. In March 2011, following a statutory consultation process, the Minister for Education and Skills made a decision to approve Blaenau Gwent County Borough Council s proposal to close all school 6th Forms, and to relocate all Post-16 learning to the new Learning Zone on the former steelworks site in Ebbw Vale. The new sixth form and further education campus will be opened in September 2012, managed and governed by Coleg Gwent, for students aged 16 and up across Blaenau Gwent. It will replace sixth form provision at Brynmawr, Ebbw Vale and Tredegar Comprehensive Schools and will relocate the further education provision currently delivered from the College s Ebbw Vale campus. The total budget for the project is 33.5M including 27M to cover the construction and the remainder was attributed to the legal and other associated costs. This budget is managed by the Blaenau Gwent County Borough Council. A Shadow Partnership Board was established and held its first meeting in October The Shadow Partnership Board includes representatives from partner organisations. This Shadow Partnership Board will become a Partnership Board after the move to The Learning Zone (TLZ) is completed. The lead partner for the project is the Blaenau Gwent County Borough Council. An Internal Project Group was also established a year ago and is charged with the smooth transition of the move to the new building. Minutes of this internal group are submitted to the Shadow Partnership Board and to the College s Resources Committee. The College s Corporation Board receives the minutes of the Shadow Partnership Board and the Resources Committee. Various working groups were internally formed in readiness for the move to TLZ. These include Ebbw Vale Learning Zone Property Working Group; Furniture, Equipment & Relocation Learning Zone Group (FERLZ); IT Sub-Groups; and Furniture & Equipment Sub-Groups. These groups report to the College s internal Project Group.xtensive marketing activity for the new provision is undertaken by the College. There is regular communication from the Campus Management Team of the Ebbw Vale campus to all staff, advising them of progress. Overall, the College has estimated that the Transition and Furniture & Equipment costs will amount to 1.2M and 2.15M respectively. The Welsh Government has verbally committed to assisting with these costs and we understand that formal confirmation was received shortly after the audit was completed. The budgets are overseen by the Vice Principal (Finance, Estates & Information Systems) with the Furniture & Equipment costs being managed operationally by the Director of Estates. Risks relating to TLZ have been identified by the College and recorded on the College s Corporate Risk Register. There is also a separate project risk register held by the Lead Partner.

4 2 The Learning Zone - Project Management Arrangements 1.2 CONCLUSION Taking account of the issues identified, the Board can take substantial assurance that the controls upon which the organisation relies to manage this area are suitably designed, consistently applied and effective The above conclusions feeding into the overall assurance level are based on the evidence obtained during the review. The key findings from this review are as follows: Effectiveness The College is anticipating that the project will be completed in accordance with the predetermined budget and timescale. and application of and compliance with control framework The Ebbw Vale Learning Zone (EVLZ) Project Group was established to ensure that the project is managed appropriately. It includes senior management of the College. The College has established a number of working groups to manage the transition to TLZ and at least one member of staff who sits on the Project Group is included within these groups. Progress on the work of the groups is reported to the Project Group via these staff members. There is on-going communication, both internal and external stakeholders, from the College. Briefings are provided to internal and external stakeholders such as existing and potential students, parents, head teachers, councillors, school governors, the College s staff members etc. A website has been developed to promote TLZ. A link is included on the home page of the College s main internet site. An internal group was established within the College to manage the contingency arrangements and these are reported to the Project Group at each meeting. 1.3 SCOPE OF THE REVIEW To evaluate the adequacy of risk management and control within the system and the extent to which controls have been applied, with a view to providing an opinion. When planning the audit, the following limitations were agreed: Limitations to the scope of the audit: We will not comment on the progress made to date or the financial viability of the project, only on the monitoring of proposed targets. Our work does not provide an absolute assurance that material errors, loss or fraud do not exist. The approach taken for this audit was a Risk-Based Audit.

5 3 The Learning Zone - Project Management Arrangements 1.4 RECOMMENDATIONS SUMMARY The following tables highlight the number and categories of recommendations made. The Action Plan at Section 2 details the specific recommendations made as well as agreed management actions to implement them. Recommendations made during this audit: No recommendations were raised as part of this audit. 1.5 ADDITIONAL FEEDBACK We have included some comparative data to benchmark the number of recommendations made, as shown in the table below. In the past year, we have undertaken a number of audits of a similar nature in the sector. Level of Assurance Percentage of Reviews Results of this Audit Green 42.86% X Amber Green 28.57% Amber Red 28.57% Red 0.00% Recommendations Average number in similar audits Number in this audit Recommendations made

6 4 2 ACTION PLAN The priority of the recommendations made is as follows: Priority Description High Medium Low Suggestion Recommendations are prioritised to reflect our assessment of risk associated with the control weaknesses. These are not formal recommendations that impact our overall opinion, but used to highlight a suggestion or idea that management may want to consider. Ref Recommendation Categorisation Accepted (Y/N) Management Comment Implementation Date Manager Responsible No recommendations have been raised as a result of this audit.

7 5 3 FINDINGS AND RECOMMENDATIONS Area 1: That the project management arrangements are in place in readiness for the move to the new Ebbw Vale Campus. 1.1 The Ebbw Vale Learning Zone (EVLZ) Project Group was established to ensure that the project is managed appropriately. A Terms of Reference document is in place for the Group which documents the purpose of the Group as: To coordinate the reporting of all activities relating to the Learning Zone within the College; and From the meeting notes and the Terms of Reference of the Group it is noted that membership includes relevant senior management reflecting the importance of the project to the College. A review of the meeting notes for the period from May 2011 to April 2012 confirmed that the Group has met on a monthly basis. Fieldwork confirmed that notes of the Project Group meetings are submitted to the Shadow Partnership Board (see paragraph 4), the College s Corporation Board and the Resources Committee. To agree and plan any actions or activities required to successfully deliver the outcomes of the Learning Zone project. Membership of the Group is: Deputy Principal (External

8 6 Affairs) - Chair; Principal; Vice Principal (Human Resources & Organisation Development); Vice Principal (Finance, Estates & Information Services); Vice Principal (Curriculum & Quality); Campus Directors (Crosskeys & Ebbw Vale); Deputy Director (Ebbw Vale) Director of Estates & Facilities; Director of Marketing, Communications & Planning; Head of Estates Development & Facilities; HR Consultant;

9 7 Consultant; and Head of Information Technology. The Group meets monthly or more frequently if required. Notes of the Project Board meetings are submitted to the Resources Committee and the Corporation Board. 1.2 The College has established a number of working groups to manage the transition to TLZ. These are: EVLZ Property Working Group; Furniture, Equipment & Relocation Learning Zone Group (FERLZ); IT Sub-Groups; and Furniture & Equipment Sub-Groups. These groups are of an informal nature with no formal terms of The Vice Principal (Finance, Estates & Information Services) confirmed that a number of groups and working groups have been set up to define the roles and responsibilities for the arrangements in place for the move to the new campus in September At least one member of staff who sits on the Project Group is included within each of these groups. Progress on the work of the groups is reported to the EVLZ Project Group via these staff members. This was verified through a review of the EVLZ Project Group meeting minutes. A Furniture, Equipment and Migration Action Schedule has been prepared and is monitored by the FERLZ Group.

10 8 reference. No notes of the meetings of the above groups are taken with the exception of FERLZ. 1.3 The tasks within the internal Working Groups are assigned to appropriate members of staff. The Reporting and Meeting Structure has been documented to illustrate membership of each Group and the reporting lines to the EVLZ Project Group, Corporation Board and ultimately the Shadow Partnership Board. Through reviewing the meeting notes of the internal groups, the following were noted: The Director of Estates provides a Status Report to the Project Group detailing progress on the new site. The Director of Marketing & Communications & Planning is responsible for ensuring the marketing & communications activities are undertaken as detailed within the Marketing, Communications Plan, approved by the Shadow Partnership Board. The Procurement Manager has been allocated the task of purchasing the furniture and fittings for the new Ebbw Vale Learning Zone. 1.4 The Learning Zone Shadow Partnership Board was established in October 2011 and includes representatives from all partners. The College representation The Shadow Partnership Board held its first meeting in October The College is represented at the highest level confirming the commitment of the College to the project. A review of the meeting minutes of the Shadow Partnership Board confirmed that it receives

11 9 includes a member of the Corporation Board, the Principal, and the Deputy Principal. The purpose of the Shadow Board as detailed within the Terms of Reference is to champion lifelong learning in the community in order to meet the needs and aspirations of learners in Blaenau Gwent. The Board has Executive; Monitorial and Advisory responsibilities. Operational responsibilities rest with the Campus Director reporting to the Deputy Director of the College. It meets on a quarterly basis and receives meeting notes of the College s internal EVLZ Project Group. Minutes of the Shadow Partnership Board meetings are submitted to the College s Corporation Board. The membership and responsibilities of the Shadow Board are due to be reviewed at the end of its first year. The Shadow Partnership Board will become Partnership Board various reports from each of the partners; this includes the Ebbw Vale Campus Director report. The report captures information on all activities undertaken by the campus; for example, information on the recruitment process, marketing and communication activities etc. We confirmed that minutes of the Shadow Partnership Board meetings are submitted to the College s Corporation Board.

12 10 after the opening of Learning Zone. 1.5 The EVLZ Project Group members sit on the various Partnership Group meetings (external) and report to the EVLZ Project Group on project issues and updates. This Partnership Group meetings include: Building Workshops; We reviewed the minutes of the most recent three meetings (February, March and April 2012) of the EVLZ Project Group. We confirmed that the reports include a written programme status report and update highlighting key issues (for example the impact of the subcontractor administration on the completion of the project and the contingency arrangements that were required to mitigate this, including a phased occupation). Feedback was also provided to the Group from the transition working groups; Site Progress Meetings; Risk Workshops; Human Resources Marketing and Communication Legal Documentation Group; Ebbw Vale Learning Zone Liaison Group; and Blaenau Gwent Cluster Group. A Status Report is prepared by the Director of Estates in liaison with the external consultants for the project. Curriculum/Schools Transport Actions arising from the meeting are clearly delegated and signposted in the minutes and matters arising forms part of each agenda. There is appropriate scrutiny of the work of each of the transition working groups and the programme itself by the College s Project Group.

13 11 The Status report incorporates updates and information from the internal working groups as well as the updates from the partnership groups listed above. 1.6 A Blaenau Gwent Learning Zone Marketing & Communications Group (BGLZMCG) was set up in October The Group was set up with representatives from key partners. A Marketing & Communications Plan was developed by the Group and approved by the Shadow Partnership Board in October Progress on the Plan activities is formally reported to the Shadow Partnership Board. The College s Head of Marketing, Communications & Planning is responsible for the activities assigned to the College within the Marketing & Communications Plan. The BGLZMCG is responsible for the marketing and communications activities set out in the Marketing and Communications Plan endorsed by the Shadow Partnership Board. A review of the Plan showed that actions, timescale and cost of actions for the marketing and communication activities have been clearly identified. Activities are assigned to each individual partner along with the frequency of the actions required. The Head of Marketing, Communications & Planning is responsible for the activities assigned to the College within the Marketing & Communications Plan. These include open events. Progress on activities and outputs is formally reported to the Shadow Partnership Board.

14 Communication to internal and external stakeholders is made on an on-going basis by the College. The Campus Director (Crosskeys and Ebbw Vale) confirmed that extensive communication of TLZ is provided to both internal and external stakeholders. The following activities have been / are being undertaken by the College: Significant number of presentations are being delivered to Ebbw Vale campus staff members; Various posters summarising the progress on new buildings are placed in the existing Ebbw Vale campus buildings; Extensive briefings through School Learner Forums and Campus Learner Forums. These include student representatives from schools, the Principal, Campus Director, Head of School, Head of Learners and School Liaison Officers; Presentation to the Blaenau Gwent Council members, various corporation groups, schools governors, school head teachers; At least three visits have been made to each of student who is transferring to TLZ from the existing Ebbw Vale campus; Attending parents evenings; Attended various information evenings;

15 13 Held an event at Careers Wales to promote TLZ and related courses; and Attended neighbouring events to promote TLZ. 1.8 A web page was developed to promote TLZ. It is included within the home page of the College s main internet site. The Marketing Department has produced a prospectus of courses are to be run at TLZ. A hard copy of the prospectus was sent to all stakeholders via post. An electronic copy of the prospectus is available on the internet. 1.9 An internal group was established within the College to manage the contingency arrangements around the move to TLZ. Contingency arrangements are There is regular communication with both internal and external stakeholders. A review of the webpage confirmed that it included information on courses offered for the September 2012 intake and news on TLZ. Through reviewing the Project Group meeting minutes, we confirmed that issues are identified on an on-going basis. An informal group was established a month ago to manage and report on issues.

16 14 reported to the Project Group at each meeting Costs for moving to TLZ are managed by the Vice Principal (Finance, Estates & Information Services) and the Director of Finance. Costs are made up of: Exceptional Transition costs this is made up of the following four areas: Costs of commitment to maintain broad 'A/AS'/Vocational Programme budgeted as 463,748; Costs of commitment to allow A2 for one year- budgeted as 399,346; Costs of early recruitment of The Group reported to the Project Group on 30 April 2012 that planning is on-going around the issues. We reviewed the Capital Investment Statement 2011/12 and confirmed the Furniture & Equipment budget of 2.15M and the total spend to date against this budget of 130K. A budget tracker spreadsheet is kept by the Estates Team to ensure that the expenditure is within the budget. A bid to Welsh Government has been made for exceptional funding to support the additional costs to the College of transition to TLZ. The Vice Principal (Finance, Estates & Information Services) confirmed that: Verbal confirmation was received from Welsh Government to indicate that funding for 50% of costs of early recruitment of staff and 100% of the remainder of the requested fund will be made. However; the Welsh Government also indicated that no promise could be made that funding could be confirmed beyond 2013/14. If this is the case then the College would look to reduce the provision of the A/AS/Vocational Programmes to accommodate this. The staff recruitment process is taking place

17 15 staff to ensure smooth transition budgeted as 326,211; and Costs of Community Engagement Plan budgeted as 39,000. The above costs are spread over four years and total to 1,228,305. Furniture & Equipment costs - budgeted at 2.15M of which 900K is funded by Department for Education and Skills (DfES). There has been no spend to date against the exceptional costs budget. later than originally planned therefore 50% of the funding from Welsh Government will cover the necessary costs. Therefore this will not have adverse impact on the College s budget. A list of the new members of staff from the Human Resources department will be obtained and reviewed by the Director of Finance to establish how the actual costs compare to the budgeted costs. No funding would be received in relation to the 2011/12 academic year. This has been budgeted as 68,253 and has already been absorbed by the College. We understand that the College has subsequently received formal confirmation of transitional funding from the Welsh Government.

Coleg Gwent. Business Continuity Plan Test - Post Implementation Review (PIR) Internal Audit Report (12.09/10)

Coleg Gwent. Business Continuity Plan Test - Post Implementation Review (PIR) Internal Audit Report (12.09/10) Internal Audit Report 1 June 2010 Business Continuity Plan Test Post Implementation Review (PIR) CONTENTS Section Page Executive Summary 1 Action Plan 4 Findings and Recommendations 5 Debrief meeting 28

More information

Essex Fire Authority. Fleet Management. Internal Audit Report (4.12/13) 28 February 2013 FINAL. Overall Opinion

Essex Fire Authority. Fleet Management. Internal Audit Report (4.12/13) 28 February 2013 FINAL. Overall Opinion Essex Fire Authority Fleet Management Internal Audit Report (4.12/13) 28 February 2013 FINAL Overall Opinion Essex Fire Authority Fleet Management 4.12/13 CONTENTS Section Page Executive Summary 1 Action

More information

ESSEX FIRE AUTHORITY. Internal Audit Progress Report. Audit Sub-Committee Meeting: April 2012

ESSEX FIRE AUTHORITY. Internal Audit Progress Report. Audit Sub-Committee Meeting: April 2012 ESSEX FIRE AUTHORITY Internal Audit Progress Report Audit Sub-Committee Meeting: April Essex Fire Authority CONTENTS Section Page 1 Introduction 1 2 Final reports 1 3 Key Findings from Internal Audit Work

More information

Cheshire Fire Authority

Cheshire Fire Authority Cheshire Fire Authority Internal Plan 2013/2014 Presented at the Cheshire Fire Authority meeting of: 17 April 2013 Lisa Randall Head of Internal 1 INTRODUCTION This document sets out the approach we have

More information

Essex Fire Authority

Essex Fire Authority Internal Audit Report (2.13/.14) FINAL with the Civil Contingencies Act 1 October 2013 Contents Section Page Executive Summary 1 Action Plan 5 Findings and Recommendations 6 Debrief meeting 15 August 2013

More information

Coleg Gwent. Wireless Audit. Internal Audit Report (2.10/11) 23 May 2011. Overall Opinion: Amber Green

Coleg Gwent. Wireless Audit. Internal Audit Report (2.10/11) 23 May 2011. Overall Opinion: Amber Green Coleg Gwent Wireless Audit Internal Audit Report (2.10/11) 23 May 2011 Overall Opinion: Amber Green Coleg Gwent CONTENTS Section Page Executive Summary 1 Action Plan 5 Findings and Recommendations 10 Debrief

More information

SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012

SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012 SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012 INTERNAL AUDIT PLAN Report of the: Director of Finance Contact: John Turnbull or Gillian McTaggart Urgent Decision?(yes/no) No If yes, reason urgent decision required:

More information

Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary

Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary Avon and Somerset Constabulary Traffic Accidents Internal Audit Report (10.12/13) 12 February 2013 Overall Opinion: Amber/Green CONTENTS Section Page Executive Summary 1 Action Plan 5 Findings and Recommendations

More information

Internal Audit Strategic and Annual Plans 2015/16

Internal Audit Strategic and Annual Plans 2015/16 Internal Audit Strategic and Annual Plans 2015/16 Financial Scrutiny and Audit Committee 10 February 2015 Agenda Item No 8 Summary: This report provides an overview of the stages followed prior to the

More information

INTERNAL AUDIT 2008/09 INFORMATION TECHNOLOGY (BUSINESS CONTINUITY)

INTERNAL AUDIT 2008/09 INFORMATION TECHNOLOGY (BUSINESS CONTINUITY) 2008/09 SUMMARY Location Subject Business Sponsor Staff engaged Coleg Gwent Information Technology (Business Continuity) Lynda Roberts Sue Harris Head of Internal Audit Gaynor Rains Manager David Bratt

More information

Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010

Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010 Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010 This report has been prepared on the basis of the limitations set out on page 16. Contents Page

More information

Financial Planning Assessment Vale of Glamorgan County Borough Council. Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014

Financial Planning Assessment Vale of Glamorgan County Borough Council. Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014 Financial Planning Assessment Vale of Glamorgan County Borough Council Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014 Status of report This document has been prepared for the internal

More information

Coleg Gwent Internal Audit Report 2012/13 Assets and Inventory. Assurance Rating:

Coleg Gwent Internal Audit Report 2012/13 Assets and Inventory. Assurance Rating: Coleg Gwent Internal Audit Report 2012/13 Assets and Inventory Assurance Rating: Distribution List: Draft Report: Principal Vice Principal, (Finance, Estates and Information Services) Clerk to the Corporation

More information

APPENDIX C. Internal Audit Report South Holland District Council Project Management

APPENDIX C. Internal Audit Report South Holland District Council Project Management APPENDIX C Internal Audit Report South Holland District Council Project Management Date: 20th December 2012 Contents Introduction and Scope 1 Executive Summary Assurance Opinion Key Messages 2 3 Management

More information

Coleg Gwent Internal Audit Report 2012/13 Payroll and HR. Assurance Rating: Payroll

Coleg Gwent Internal Audit Report 2012/13 Payroll and HR. Assurance Rating: Payroll Coleg Gwent Internal Audit Report 2012/13 Payroll and HR Assurance Rating: Payroll HR Distribution List: Final Report Audit Committee Principal Vice Principal, (Finance, Estates and Information Services)

More information

The report rated this area Substantial Assurance and made 2 housekeeping recommendations.

The report rated this area Substantial Assurance and made 2 housekeeping recommendations. Audit Committee 21 June 2012 Internal audit report Risk Management review Executive summary and recommendations Introduction Mazars have undertaken a review of Risk Management, in accordance with the internal

More information

Office of the Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary

Office of the Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary Office of the Police and Crime Commissioner for Avon and Somerset and Avon and Somerset Constabulary Internal Audit Report () FINAL Risk Management: Follow Up of Previous Internal Audit Recommendations

More information

Internal Audit at the University of Cambridge.

Internal Audit at the University of Cambridge. Internal Audit at the University of Cambridge. Contents Introduction to Deloitte 1 Our team 2 What is Internal Audit? 4 Our approach to Internal Audit 5 Authority and reporting lines 7 Planning 8 Ad Hoc

More information

Internal Audit Division

Internal Audit Division Internal Audit Division at the Financial Conduct Authority Information Pack April 2013 Contents of Information Pack A. Introduction B. Internal Audit Terms of Reference C. Organisation D. Skills and Competencies

More information

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1

More information

DIRECTORATE OF AUDIT, RISK FF AND ASSURANCE. Appendix 2a FOLLOW UP REVIEW OF CORPORATE BUSINESS CONTINUITY

DIRECTORATE OF AUDIT, RISK FF AND ASSURANCE. Appendix 2a FOLLOW UP REVIEW OF CORPORATE BUSINESS CONTINUITY DIRECTORATE OF AUDIT, RISK FF AND ASSURANCE Internal (Foundry Audit Forms Service San/ Font size to 20/ the RBG: 160, GLA 160, 170) Appendix 2a FOLLOW UP REVIEW OF CORPORATE BUSINESS CONTINUITY DISTRIBUTION

More information

Dacorum Borough Council Final Internal Audit Report. IT Business Continuity and Disaster Recovery

Dacorum Borough Council Final Internal Audit Report. IT Business Continuity and Disaster Recovery Dacorum Borough Council Final Internal Audit Report IT Business Continuity and Disaster Recovery Distribution list: Chris Gordon Group Manager Performance, Policy and Projects John Worts ICT Team Leader

More information

Base for Work: Usk and Magor in Monmouthshire, with flexibility according to needs of the service.

Base for Work: Usk and Magor in Monmouthshire, with flexibility according to needs of the service. ROL PROFIL Post: PROGRAMM MANAGR; Monmouthshire s 21C Schools Programme 5 year fixed term contract Post ID: CYP 003 Salary: Chief Officer range: 75,900 Responsible to: Chief Officer Children and Young

More information

Business Continuity Policy. Version 1.0

Business Continuity Policy. Version 1.0 Business Continuity Policy Version.0 January 206 Contents Contents Version control Foreword Policy. Scope.2 Aim and objectives.3 Methods and standards.4 Responsibilities.5 Governance.6 Training and exercises

More information

Coleg Gwent Internal Audit Report 2014/15 Staff Performance Management. Assurance Rating:

Coleg Gwent Internal Audit Report 2014/15 Staff Performance Management. Assurance Rating: Coleg Gwent Internal Audit Report 2014/15 Staff Performance Management Assurance Rating: Distribution List: Final Report Audit Committee Principal Vice Principal, (Resources and Financial Planning)/Director

More information

Dacorum Borough Council Final Internal Audit Report

Dacorum Borough Council Final Internal Audit Report Dacorum Borough Council Final Internal Audit Report ICT Change Management Distribution list: Chris Gordon Group Manager Neil Telkman - Information, Security and Standards Officer Gary Osler ICT Service

More information

RISK MANAGEMENT STRATEGY

RISK MANAGEMENT STRATEGY RISK MANAGEMENT STRATEGY 1 Introduction The purpose of this document is to outline a which facilitates the effective recognition and management of risks facing the University. The Combined Code on Corporate

More information

CENTRAL LINCOLNSHIRE LOCAL PLAN HIGHLIGHT REPORT

CENTRAL LINCOLNSHIRE LOCAL PLAN HIGHLIGHT REPORT Public Sector Auditing.. Private Sector Thinking CENTRAL LINCOLNSHIRE LOCAL PLAN HIGHLIGHT REPORT Date: 7 th November 2014 Author: Rachel Abbott Principal Auditor Introduction & Scope The National Planning

More information

Annual Governance Statement

Annual Governance Statement Annual Governance Statement 2014/15 1 Fareham Borough Council Civic Offices, Civic Way, Fareham PO16 7AZ Scope of Responsibility Fareham Borough Council is responsible for ensuring that its business is

More information

Housing Association Regulatory Assessment

Housing Association Regulatory Assessment Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing

More information

Oxford City Council Managing Capital Projects

Oxford City Council Managing Capital Projects www.pwc.co.uk Internal Audit Report 2014/2015 August 2015 Oxford City Council Managing Capital Projects Table of Contents 1. Executive Summary... 3 2. Background and scope... 5 3. Detailed findings...

More information

Assessing benchmarks of good practice in school career guidance

Assessing benchmarks of good practice in school career guidance www.pwc.co.uk Assessing benchmarks of good practice in school career guidance Gatsby Charitable Foundation Gatsby Charitable Foundation April 2014 Final report Contents Executive summary 1 1 Introduction

More information

Information Commissioner's Office

Information Commissioner's Office Information Commissioner's Office IT Procurement Review Ian Falconer Partner T: 0161 953 6480 E: ian.falconer@uk.gt.com Last updated 18 June 2012 Will Simpson Senior Manager T: 0161 953 6486 E: will.g.simpson@uk.gt.com

More information

Trust Board Report. Review of the effectiveness of the IM&T Committee

Trust Board Report. Review of the effectiveness of the IM&T Committee 1. Introduction Trust Board Report Review of the effectiveness of the The meets every eight weeks, with a specific responsibility for governance, strategic direction, approval and direction of developments

More information

CONFIRMED BLACKPOOL AND THE FYLDE COLLEGE AUDIT COMMITTEE

CONFIRMED BLACKPOOL AND THE FYLDE COLLEGE AUDIT COMMITTEE BLACKPOOL AND THE FYLDE COLLEGE AUDIT COMMITTEE Minutes of the meeting held at 5.00 pm on Wednesday 20 th March 2013 Main Committee Room, Bispham Campus Present: Together with: A. Cavill (Chair) A. Gilmore

More information

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20

More information

Aberdeen City Council. Performance Management Process. External Audit Report o: 2008/19

Aberdeen City Council. Performance Management Process. External Audit Report o: 2008/19 Aberdeen City Council Performance Management Process External Audit Report o: 2008/19 Draft Issued: 11 February 2009 Final Issued: 6 April 2009 Contents Pages Pages Management Summary Introduction 1 Background

More information

Risk Management Strategy

Risk Management Strategy Risk Management Strategy 2010 RISK MANAGEMENT STRATEGY 1 INTRODUCTION 1.1 What is Risk Management? 1.1.1 Risk can be defined as uncertainty of outcome (whether positive opportunity or negative threat).

More information

Internal Audit Report Project Management

Internal Audit Report Project Management Audit Committee, 20 Internal Audit Report Project Management Executive summary and recommendations Introduction As part of the Internal Audit Plan for 2013-14 Mazars have undertaken a review of arrangements

More information

Code of Corporate Governance

Code of Corporate Governance www.surreycc.gov.uk Making Surrey a better place Code of Corporate Governance October 2013 1 This page is intentionally blank 2 CONTENTS PAGE Commitment to good governance 4 Good governance principles

More information

Cambridgeshire and Peterborough Fire Authority. Internal Audit Progress Report Overview & Scrutiny Committee meeting 16 October 2014

Cambridgeshire and Peterborough Fire Authority. Internal Audit Progress Report Overview & Scrutiny Committee meeting 16 October 2014 Cambridgeshire and Peterborough Fire Authority Internal Audit Progress Report Overview & Scrutiny Committee meeting 16 October 2014 Cambridgeshire & Peterborough Fire Authority 1 Introduction This report

More information

College Governance Statement of Principles, Scheme of Delegation and Terms of Reference

College Governance Statement of Principles, Scheme of Delegation and Terms of Reference College Governance Statement of Principles, Scheme of Delegation and Terms of Reference 1. Principles: 1.1 Background This document sets out the principles underpinning the College Corporation s work.

More information

Internal Audit Report Disaster Recovery / Business Continuity Planning

Internal Audit Report Disaster Recovery / Business Continuity Planning Audit Committee, 28 November 2013 Internal Audit Report Disaster Recovery / Business Continuity Planning Executive summary and recommendations Introduction As part of the Internal Audit Plan for 2013-14,

More information

Note the Chief Internal Auditor s findings to date and gain assurance from Officers that key issues raised are being addressed.

Note the Chief Internal Auditor s findings to date and gain assurance from Officers that key issues raised are being addressed. Agenda Item No: 9 To: Joint Audit Committee Date: 24 September 2014 By: Chief Internal Auditor Title: Internal Audit Update Report 2014-15 Purpose of Report: The purpose of this report is to give an opinion

More information

Chapter 11 Wales. Revision to Emergency Preparedness

Chapter 11 Wales. Revision to Emergency Preparedness Chapter 11 Wales Revision to Emergency Preparedness Civil Contingencies Act Enhancement Programme October 2011 V3: Last updated 09/12/2010 PAGE 1 Chapter 11 (Wales) of Emergency Preparedness, Revised Version

More information

Corporate Risk Management Policy

Corporate Risk Management Policy Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction

More information

Aberdeen City Council

Aberdeen City Council Aberdeen City Council Internal Audit Report Final Contract management arrangements within Social Care & Wellbeing 2013/2014 for Aberdeen City Council January 2014 Internal Audit KPI Targets Target Dates

More information

Derbyshire County Council Performance and Improvement Framework. January 2012

Derbyshire County Council Performance and Improvement Framework. January 2012 Derbyshire County Council Performance and Improvement Framework January 2012 Contents 1. Introduction 3 2. About the framework 4 3. Planning 7 5. Monitoring Performance 8 6. Challenge and Review 11 7.

More information

The preferred option for the future management of Cyclopark is to procure an external operator.

The preferred option for the future management of Cyclopark is to procure an external operator. By: To: Subject: Classification: Mike Austerberry, Corporate Director of Enterprise and Environment Bryan Sweetland, Cabinet Member for Environment Highways & Waste Formation of a company as an option

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Policy Statement & Strategy July 2009 Basildon District Council Business Continuity Management Policy Statement The Council is committed to ensuring robust and effective

More information

Annual Governance Statement 2013/14

Annual Governance Statement 2013/14 31 Annual Governance Statement 2013/14 1. SCOPE OF RESPONSIBILITY ESPO is responsible for ensuring that its business is conducted in accordance with the law and proper standards, and that public money

More information

TRUST POLICY FOR EMERGENCY PLANNING

TRUST POLICY FOR EMERGENCY PLANNING TRUST POLICY FOR EMERGENCY PLANNING Reference Number: CL-OP/ 2013/027 Version: 1.4 Status: New Draft Author: Ashley Reed Job Title: Head of Security and EPO Version / Amendment History Version Date Author

More information

Ealing, Hammersmith and West London College

Ealing, Hammersmith and West London College FURTHER EDUCATION COMMISSIONER ASSESSMENT SUMMARY Ealing, Hammersmith and West London College JANUARY 2016 Contents Assessment... 3 Background... 3 Assessment Methodology... 3 The Role, Composition and

More information

NHS Dorset Clinical Commissioning Group. Internal Audit Annual Report 2014/15. May 2015

NHS Dorset Clinical Commissioning Group. Internal Audit Annual Report 2014/15. May 2015 Internal Audit Annual Report 2014/15 May 2015 Internal Audit Annual Report INTRODUCTION This is the 2014/15 Annual Report by TIAA on the internal control environment at Dorset Clinical Commissioning Group.

More information

House of Commons Corporate Governance Framework

House of Commons Corporate Governance Framework House of Commons Corporate Governance Framework What is Corporate Governance? 1. Good corporate governance is fundamental to any effective organisation and is the hallmark of any well-managed corporate

More information

Reporting The Project Board shall report to the sponsoring Department political board.

Reporting The Project Board shall report to the sponsoring Department political board. Appendix 13 La Mare de Carteret Schools Project Board Mandate Summary (Project restart version March 2014) Function The Project Board is accountable to the Education Department for all aspects contributing

More information

UPDATE ON THE INTERNAL AUDIT AND INVESTIGATION SHARED SERVICE

UPDATE ON THE INTERNAL AUDIT AND INVESTIGATION SHARED SERVICE Audit Committee 28 January 2015 UPDATE ON THE INTERNAL AUDIT AND INVESTIGATION SHARED SERVICE Report by Head of Internal Audit and Investigations Purpose To provide Audit Committee with an update and review

More information

CEREDIGION COUNTY COUNCIL - LEARNING SERVICES SERVICE LEVEL AGREEMENT GOVERNOR SUPPORT SERVICES 2016-2017

CEREDIGION COUNTY COUNCIL - LEARNING SERVICES SERVICE LEVEL AGREEMENT GOVERNOR SUPPORT SERVICES 2016-2017 CEREDIGION COUNTY COUNCIL - LEARNING SERVICES SERVICE LEVEL AGREEMENT GOVERNOR SUPPORT SERVICES 2016-2017 1. OVERVIEW AND DESCRIPTION OF THE SERVICE School governors have over the years seen a significant

More information

Vale of Glamorgan. Overview Report: Review of HR and Workforce Planning. November 2011

Vale of Glamorgan. Overview Report: Review of HR and Workforce Planning. November 2011 Vale of Glamorgan Overview Report: Review of HR and Workforce Planning November 2011 Content 1 Introduction 1 2. Review Findings 3 3. The Way Forward 17 2012 Grant Thornton UK LLP. All rights reserved.

More information

Audit Committee, 13 March 2013. Internal Audit Report Project Management. Executive summary and recommendations. Introduction

Audit Committee, 13 March 2013. Internal Audit Report Project Management. Executive summary and recommendations. Introduction Audit Committee, 13 March 2013 Internal Audit Report Project Management Executive summary and recommendations Introduction Mazars has undertaken a review of the arrangements for project management in accordance

More information

SOUTH NORTHAMPTONSHIRE COUNCIL. 11/31 ICT Capacity Management FINAL REPORT. June 2011

SOUTH NORTHAMPTONSHIRE COUNCIL. 11/31 ICT Capacity Management FINAL REPORT. June 2011 SOUTH NORTHAMPTONSHIRE COUNCIL 11/31 ICT Capacity Management FINAL REPORT June 2011 This report and the work connected therewith are subject to the Terms and Conditions of the contract dated 18/06/07,

More information

Explanatory Memorandum to the Government of Maintained Schools (Clerk to a Governing Body)(Wales) Regulations 2013

Explanatory Memorandum to the Government of Maintained Schools (Clerk to a Governing Body)(Wales) Regulations 2013 Explanatory Memorandum to the Government of Maintained Schools (Clerk to a Governing Body)(Wales) Regulations 2013 This Explanatory Memorandum has been prepared by the Department for Education and Skills

More information

The University s responsibilities and its arrangements for internal audit Internal audit protocol 2014/15 to 2016/17

The University s responsibilities and its arrangements for internal audit Internal audit protocol 2014/15 to 2016/17 The University s responsibilities and its arrangements for internal audit Internal audit protocol 2014/15 to 2016/17 Summary This paper sets out the University s current obligations and arrangements for

More information

Internal Audit Charter. Version 1 (7 November 2013)

Internal Audit Charter. Version 1 (7 November 2013) Version 1 (7 November 2013) CONTENTS Details Page EXECUTIVE SUMMARY... 2 1. BACKGROUND... 3 10. PSIAS REQUIREMENTS... 3 12. DEFINITION OF THE CHIEF AUDIT EXECUTIVE (CAE)... 4 14. DEFINITION OF THE BOARD...

More information

Technology Review Feedback Vale of Glamorgan Council

Technology Review Feedback Vale of Glamorgan Council Technology Review Feedback Vale of Glamorgan Council Audit year: Annual Improvement Assessment 2011 Issued: October 2011 Document reference: 538A2011 Status of report The person who delivered the work

More information

Bridgend County Borough Council. Corporate Risk Management Policy

Bridgend County Borough Council. Corporate Risk Management Policy Bridgend County Borough Council Corporate Risk Management Policy December 2014 Index Section Page No Introduction 3 Definition of risk 3 Aims and objectives 4 Strategy 4 Accountabilities and roles 5 Risk

More information

City of Cardiff Council Improving Scrutiny Project: Project Brief, January 2015

City of Cardiff Council Improving Scrutiny Project: Project Brief, January 2015 APPENDIX A City of Cardiff Council Improving Scrutiny Project: Project Brief, January 2015 Project Purpose Cardiff is proud of its scrutiny arrangements and the important part scrutiny plays in Council

More information

Commissioning Strategy

Commissioning Strategy Commissioning Strategy This Commissioning Strategy sets out the mechanics of how Orkney Alcohol and Drugs Partnership (ADP) will implement its strategic aims as outlined in the ADP Strategy. Ensuring that

More information

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL MUNICIPAL YEAR 2015/16 REPORT OF THE DIRECTOR OF EDUCATION AND LIFELONG LEARNING

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL MUNICIPAL YEAR 2015/16 REPORT OF THE DIRECTOR OF EDUCATION AND LIFELONG LEARNING RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL MUNICIPAL YEAR 2015/16 CHILDREN & YOUNG PEOPLE SCRUTINY COMMITTEE 16 th NOVEMBER 2015 AGENDA ITEM 4 THE GOVERNOR SUPPORT SERVICE IN RHONDDA CYNON TAF REPORT OF

More information

Rent to Buy 2015 to 2017

Rent to Buy 2015 to 2017 Rent to Buy 2015 to 2017 BIDDING PROSPECTUS September 2014 Rent to Buy Contents Page Number Ministerial Foreword 2 Chapter 1 Overview of the fund 3 Chapter 2 The funding model 4 Chapter 3 Bidding requirements

More information

INTERNAL AUDIT FINAL REPORT. Project Management. June 2013

INTERNAL AUDIT FINAL REPORT. Project Management. June 2013 Broxbourne Borough Council Contract Audit Project Management APPENDIX E INTERNAL AUDIT FINAL REPORT Project Management June 2013 Ref 18.12/13 June 2013 Page 1 Broxbourne Borough Council Contract Audit

More information

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have

More information

Hertsmere Borough Council. Data Quality Strategy. December 2009 1

Hertsmere Borough Council. Data Quality Strategy. December 2009 1 Hertsmere Borough Council Data Quality Strategy December 2009 1 INTRODUCTION Public services need reliable, accurate and timely information with which to manage services, inform users and account for performance.

More information

How To Help A Free School

How To Help A Free School EDUCATION SERVICES FREE SCHOOLS Support in Establishing your Free School 1 INTRODUCING BDO * ONCE YOU HAVE RECEIVED GOVERNMENT APPROVAL TO ESTABLISH A FREE SCHOOL, YOU WILL NOW BE CONSIDERING WHAT HAPPENS

More information

Information Commissioner's Office

Information Commissioner's Office Phil Keown Engagement Lead T: 020 7728 2394 E: philip.r.keown@uk.gt.com Will Simpson Associate Director T: 0161 953 6486 E: will.g.simpson@uk.gt.com Information Commissioner's Office Internal Audit 2015-16:

More information

CAMBRIDGE CITY COUNCIL

CAMBRIDGE CITY COUNCIL Agenda Item CAMBRIDGE CITY COUNCIL REPORT OF: Director of Business Transformation TO: Civic Affairs Committee 25 June 2014 WARDS: All INTERNAL AUDIT: REVIEW OF EFFECTIVENESS 2013 / 2014 1 INTRODUCTION

More information

Meeting 2/07/10. consider and discuss the report s recommendations (as relevant to HE and HEFCW) and initial proposals for addressing these

Meeting 2/07/10. consider and discuss the report s recommendations (as relevant to HE and HEFCW) and initial proposals for addressing these For discussion PricewaterhouseCoopers Report Review of the cost of administering the education system in Wales Disclosable Meeting 2/07/10 Agenda Item 13 Reference No HEFCW/10/62 1 Issue This paper presents

More information

The Risk Management strategy sets out the framework that the Council has established.

The Risk Management strategy sets out the framework that the Council has established. Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management

More information

Collaborative development of evaluation capacity and tools for natural resource management

Collaborative development of evaluation capacity and tools for natural resource management Collaborative development of evaluation capacity and tools for natural resource management Helen Watts (Adaptive Environmental Management, formerly NSW Department of Environment and Climate Change) Sandra

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Ref. No. TP/028 Title: Business Continuity Policy Page 1 of 15 DOCUMENT PROFILE and CONTROL. Purpose of the document: Provides an overview of the London Ambulance Service NHS

More information

Risk Management Strategy 2014-2017

Risk Management Strategy 2014-2017 Appendix 1 London Fire and Emergency Planning Authority London Fire Brigade Risk Management Strategy 2014-2017 Our Risk Management Strategy, together with our underpinning risk management framework and

More information

Appenidx 1a. DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF HOUSING COMPLIANCE AUDIT PROGRAMME

Appenidx 1a. DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF HOUSING COMPLIANCE AUDIT PROGRAMME Appenidx 1a DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF HOUSING COMPLIANCE AUDIT PROGRAMME DISTRIBUTION LIST Audit Team David Esling, Head of Audit and Assurance

More information

Locking Stumps Community Primary School. School Business Manager Job Description

Locking Stumps Community Primary School. School Business Manager Job Description Locking Stumps Community Primary School School Business Manager Job Description JOB DESCRIPTION Job Title: School Business and Development Manager Terms and Conditions Term Time Only Annual leave Holidays

More information

Strategic Alliance. Business Continuity Policy

Strategic Alliance. Business Continuity Policy Version 1.1 April 2016 Contents Contents Version control Foreword Policy Scope Aim and objectives Methods and standards Responsibilities Governance Training and exercises Page i ii 1 2 2 2 Version 1.1

More information

Post-accreditation monitoring report: The Chartered Institute of Personnel and Development. June 2007 QCA/07/3407

Post-accreditation monitoring report: The Chartered Institute of Personnel and Development. June 2007 QCA/07/3407 Post-accreditation monitoring report: The Chartered Institute of Personnel and Development June 2007 QCA/07/3407 Contents Executive summary... 4 Accreditation conditions... 4 Observations... 5 Introduction...

More information

Activate Learning Further Education Corporation

Activate Learning Further Education Corporation Activate Learning Further Education Corporation MINUTES of a meeting of the Audit Committee held on 10 June 2014 at 5.30 pm in room A106 at Oxford City College Campus. Present: In attendance: C Jones (Chairman);

More information

IT REVIEW OF THE DISASTER RECOVERY ARRANGEMENTS

IT REVIEW OF THE DISASTER RECOVERY ARRANGEMENTS NOTTINGHAM CITY HOMES IT REVIEW OF THE DISASTER RECOVERY ARRANGEMENTS Report issued: February 2011 Audit Plan: The matters raised in this report are only those that came to the attention of the auditor

More information

The purpose of Estyn is to inspect quality and standards in education and training in Wales. Estyn is responsible for inspecting:

The purpose of Estyn is to inspect quality and standards in education and training in Wales. Estyn is responsible for inspecting: The purpose of Estyn is to inspect quality and standards in education and training in Wales. Estyn is responsible for inspecting: nursery schools and settings that are maintained by, or receive funding

More information

DATA QUALITY STRATEGY

DATA QUALITY STRATEGY DATA QUALITY STRATEGY If you or anybody you know requires this or any other council information in another language, please contact us and we will do our best to provide this for you. Braille, Audio tape

More information

Governance, Risk and Best Value Committee

Governance, Risk and Best Value Committee Governance, Risk and Best Value Committee 2.00pm, Wednesday 23 September 2015 Internal Audit Report: Integrated Health & Social Care Item number Report number Executive/routine Wards Executive summary

More information

upport uy in ccountable ndependent epresentative impact ower and influence Measuring the impact and success of your youth voice vehicle

upport uy in ccountable ndependent epresentative impact ower and influence Measuring the impact and success of your youth voice vehicle Measuring the impact and success of your youth voice vehicle epresentative ccountable ndependent upport uy in impact ower and influence A guide for staff, councillors and young people involved in youth

More information

Audit and risk assurance committee handbook

Audit and risk assurance committee handbook Audit and risk assurance committee handbook March 2016 Audit and risk assurance committee handbook March 2016 Crown copyright 2016 This publication is licensed under the terms of the Open Government Licence

More information

PROPOSAL TO ESTABLISH A CITY ACADEMY - BRENT

PROPOSAL TO ESTABLISH A CITY ACADEMY - BRENT PROPOSAL TO ESTABLISH A CITY ACADEMY - BRENT Need for new school places It is proposed that Willesden High School be closed and immediately replaced by a City Academy. There are currently less than 600

More information

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA Appendix 1c DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF CORPORATE GOVERNANCE, STRATEGIC PLANNING AND PERFORMANCE FRAMEWORKS INTEGRATING NEW AREAS OF GLA BUSINESS

More information

Approaches to Consultation and Engagement by Welsh Local Authorities during the Budget-Setting Process. Good Practice Examples 2014-15

Approaches to Consultation and Engagement by Welsh Local Authorities during the Budget-Setting Process. Good Practice Examples 2014-15 Approaches to Consultation and Engagement by Welsh Local Authorities during the Budget-Setting Process Good Practice Examples 2014-15 Table of Contents Introduction... 3 Engagement... 4 Case Study 1: Carmarthenshire

More information

A Framework for Governance: A flexible guide to strategic planning

A Framework for Governance: A flexible guide to strategic planning Improving governance for schools A Framework for Governance: A flexible guide to strategic planning January 2015 Improving School Governance 2 Improving governance for schools Why a Framework for Governance

More information

Information Commissioner's Office

Information Commissioner's Office Information Commissioner's Office Internal Audit 2013-14: Follow up Last updated 4 July 2014 Distribution For action Senior Corporate Governance Manager Timetable Fieldwork completed 21 May 2014 Draft

More information

Aberdeen City Council IT Asset Management

Aberdeen City Council IT Asset Management Aberdeen City Council IT Asset Management Internal Audit Report 2014/2015 for Aberdeen City Council January 2015 Terms or reference agreed 4 weeks prior to fieldwork Target Dates per agreed Actual Dates

More information

1.1 This report updates Members on progress with asset management.

1.1 This report updates Members on progress with asset management. Lake District National Park Authority Agenda Item: Authority: 3 October 0 Page: ASSET MANAGEMENT UPDATE OCTOBER 0 SUMMARY. This report updates Members on progress with asset management. Recommendation