Physics and Engineering of the EPR



Similar documents
U.S. EPR Design Overview

The EPR reactor the reference for New Build

DESIGN OF EPR. Bernard DEBONTRIDE France, AREVA FRAMATOME ANP Plants Sector Nuclear Engineering

AREVA, an unparalleled experience in building nuclear reactors

AP1000 Overview Westinghouse Electric Company LLC - All Rights Reserved

The EPR design: the European reference

New nuclear project financing Warsaw, June 26, 2013 p. 1

Drivers and approach for the design of the EPR reactor

BWR Description Jacopo Buongiorno Associate Professor of Nuclear Science and Engineering

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

V K Raina. Reactor Group, BARC

Olkiluoto 3 Basic Facts

Olkiluoto 3 Project June 2010

Boiling Water Reactor Systems

NEW NUCLEAR POWER PLANTS FOR ONTARIO - THE CONTENDERS October

How To Understand And Understand Tvo

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

NUCLEAR POWER PLANT SYSTEMS and OPERATION

US EPR nuclear technology and market outlook

Status report 99 - ATMEA1 (ATMEA1)

AREVA: supply chain network principles and company s vision

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

How To Clean Up A Reactor Water Cleanup

WWER Type Fuel Manufacture in China

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER G: INSTRUMENTATION AND CONTROL

Pressurized Water Reactor Systems

GNS Activities - Solutions for Russian Spent Fuel -

Workshop GESEL - UFRJ: O presente e o futuro da energia nuclear no Brasil

PROPOSALS FOR UNIVERSITY REACTORS OF A NEW GENERATION

CFD Topics at the US Nuclear Regulatory Commission. Christopher Boyd, Ghani Zigh Office of Nuclear Regulatory Research June 2008

SCDAP/RELAP5-3D : A State-of-the-Art Tool for Severe Accident Analyses

Retrieval of Damaged Components form Experimental Fast Reactor Joyo Reactor Vessel

Public SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

KERNREACTOREN EEN OVERZICHT VAN GENERATIE III+ KERNREACTOREN

ADDITIONAL INFORMATION ON MODERN VVER GEN III TECHNOLOGY. Mikhail Maltsev Head of Department JSC Atomenergoproekt

Introduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels

Fukushima & Three Mile Island Reactor Accidents: Recovery, Cleanup, Lessons, & Future

Nuclear power plant systems, structures and components and their safety classification. 1 General 3. 2 Safety classes 3. 3 Classification criteria 3

4. Reactor AP1000 Design Control Document CHAPTER 4 REACTOR. 4.1 Summary Description

Babcock & Wilcox Pressurized Water Reactors

Dynamic Behavior of BWR

AREVA Advanced nuclear power plants

Nuclear Design Practices and the Case of Loviisa 3

Fukushima Fukushima Daiichi accident. Nuclear fission. Distribution of energy. Fission product distribution. Nuclear fuel

10 Nuclear Power Reactors Figure 10.1

( 1 ) Overview of Safety Measures ( 2 ) Overview of Measures for Attaining Greater Safety and Reliability

3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment

How To Design An Ap 600 Plant

HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT. New Reactor Build. EDF/AREVA EPR Step 2 PSA Assessment

CEP Discussion: AREVA s SONGS-Specific Used Fuel Solution

Generation IV Fast Reactors. Dr Richard Stainsby AMEC

CHAPTER 6 TABLE OF CONTENTS 6 ENGINEERED SAFETY FEATURES... 1

C. starting positive displacement pumps with the discharge valve closed.

Development Study of Nuclear Power Plants for the 21st Century

Belgian Stress tests specifications Applicable to all nuclear plants, excluding power reactors 22 June 2011

DESIGN FEATURES OF BREST REACTORS AND EXPERIMENTAL WORK TO ADVANCE THE CONCEPT OF BREST REACTORS

DEMONSTRATION ACCELERATOR DRIVEN COMPLEX FOR EFFECTIVE INCINERATION OF 99 Tc AND 129 I

Belgian Stress tests specifications Applicable to power reactors 17 May 2011

Technical Challenges for Conversion of U.S. High-Performance Research Reactors (USHPRR)

A short history of reactors

Lead-Cooled Fast Reactor BREST Project Status and Prospects

A Nuclear New Deal. Jacques Besnainou. President, AREVA Inc. AREVA

May 23, 2011 Tokyo Electric Power Company

July 30, 2012 Nuclear Emergency Response Headquarters Government-TEPCO Med-and-long Term Response Council

Achim Beisiegel Fouad El-Rharbaoui Michael Wich. AREVA GmbH, Technical Center, Karlstein, Seligenstädter Strasse 100, Germany

Fuel Cycle R&D to Safeguard Advanced Ceramic Fuel Skills Strategic Options

Test Section for Experimental Simulation of Loss of Coolant Accident in an Instrumented Fuel Assembly Irradiated in the IEA-R1 Reactor

Preliminary validation of the APROS 3-D core model of the new Loviisa NPP training simulator

AREVA. Solutions for Nuclear & Renewable Power Generation

Source Term Determination Methods of the Slovenian Nuclear Safety Administration Emergency Response Team

Teollisuuden Voima Oyj - General Presentation January Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj

NUCLEARINSTALLATIONSAFETYTRAININGSUPPORTGROUP DISCLAIMER

the westinghouse pressurized water reactor nuclear power plant

CFD simulation of fibre material transport in a PWR core under loss of coolant conditions

Numerical Investigation of Natural Circulation During a Small Break LOCA Scenarios in a PWR-System Using the TRACE v5.0 Code

A PROCESS-INHERENT, ULTIMATE-SAFETY (PIUS), BOILING-WATER REACTOR

INSPECTION OF STATE OF SPENT FUEL ELEMENTS STORED IN RA REACTOR SPENT FUEL STORAGE POOL

Flow distribution and turbulent heat transfer in a hexagonal rod bundle experiment

THREE MILE ISLAND ACCIDENT

Government Degree on the Safety of Nuclear Power Plants 717/2013

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)

IV. Occurrence and Progress of Accidents in Fukushima Nuclear Power Stations and Other Facilities

Join the UK Nuclear Renaissance. Procurement & Quality Process

HOW DOES A NUCLEAR POWER PLANT WORK?

7.1 General Events resulting in pressure increase 5

The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar

Radiological objectives and severe accident mitigation strategy for the generation II PWRs in France in the framework of PLE

Safety of New Nuclear Power Plants

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

Solutions for Nuclear & Renewable Power Generation

Analysis of the dynamics of supervision, control and protection systems in pressurized water reactors of evolutive generation

Structural Integrity and NDE Reliability II

Russian Nuclear Power Program (past, present, and future) Dr. Igor Pioro Senior Scientist CRL AECL

February 19, Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company

The Safety of Borssele Nuclear Power Station

Research and Development Program of HTGR Fuel in Japan

Boiling Water Reactor Power Plant

SAFETY STANDARDS. of the. Nuclear Safety Standards Commission (KTA) KTA Residual Heat Removal Systems of Light Water Reactors.

Transcription:

Physics and Engineering of the EPR Keith Ardron UK Licensing Manager, UK Presentation to IOP Nuclear Industry Group Birchwood Park, Warrington UK, November 10 2010

EPRs in UK EPR is Generation 3+ PWR design - evolutionary development of the most recent French and German PWRs (N4 and Konvoi designs) EDF and AREVA have jointly applied for UK Generic Design Assessment (GDA) of an EPR based on the design of the Flamanville 3 EPR being constructed in France EDF plans to construct 4 EPR units in the UK- total output 4x1650MW(e). First unit targeted for operation in 2018. First UK EPR will be twin unit plant at Hinkley Point in Somerset Other UK utilities also considering adopting EPRs IOP 10 th November 2010 Slide 2

Milestones in EPR Development 1987: Framatome and Siemens begin development of advanced PWR for deployment in Europe post 2000. Aim is an evolutionary development of the most modern PWRs then operating. 1993: EPR conceptual design submitted to French and German Safety Authorities. 2000: French Safety Authority issues Technical Guidelines defining safety requirements of EPR. 2005: Construction of first EPR begins in Finland (Olkiluoto 3). 2007: Construction of EPR begins in France (Flamanville 3) 2007: Construction begins of 2 EPR units in China (Taishan). EDF/Areva apply for GDA for the EPR in the UK. 2008: French government announce decision to build second EPR (Penly 3) IOP 10 th November 2010 Slide 3

EPR Design Features Design combines optimum safety & environmental features of N4 and Konvoi PWR designs Improved independence and segregation between redundant trains of protection systems, Improved balance between the prevention and mitigation of accidents Increased conservatism in the design of physical barriers to radioactivity release High neutronic and thermal efficiency Double-wall containment based on French N4: achieves very low leakage in accident conditions (including severe accidents) Global aircraft shell protects reactor building and other safety buildings against aircraft impact, explosion etc IOP 10 th November 2010 Slide 4

Comparison between EPR and N4/Konvoi EPR KONVOI N4 PLANTS Overall Net electrical output 1 660 MW 1 365 MW 1 475 MW Reactor thermal power 4 500 MW 3 850 MW 4 250 MW Efficiency 36% 35.40% 34.50% Plant design life 60 years 40 years 40 years Core Design Number of fuel assemblies 241 193 205 Type 17 x 17 18 x 18 17 x 17 Active length 420 cm 390 cm 427 cm Linear heat rate 166.7 W/cm 166.6 W/cm 179 W/cm Enrichment (max) 5 % U 235 4 % U 235 4 % U 235 Batch discharge burn up 55 to 65 MWd/kg 50 MWd/kg 50 MWd/kg Number and kind of control rods 89 "black rods 61 "black rods 65 "black rods 8 "grey rods In core instrumentation Top mounted Top mounted Bottom mounted Reactor Pressure Vessel Fluence (design target) 60 years 1.2 E19 nvt. 40 years 1.10 E19 nvt 40 years 3.6 E19 nvt IOP 10 th November 2010 Slide 5

Comparison between EPR and N4/Konvoi EPR KONVOI N4 PLANTS Spent fuel volume Normal flow rate 4 separate and independent trains Pumps driven by motors (emergency power supplied) and by 2 SBO diesels 1 486 m 3 2 trains (two pumps per train) +1 backup train (1 pump) Main train cooling pumps : 222 kg/s, Backup train: 153 kg/s COMPONENT COOLING WATER SYSTEM (CCWS) 4 trains (1 pump per train, 1 heat exchanger per train) Emergency feed water system FUEL POOL COOLING SYSTEM 4 separate and independent trains Pumps driven by diesel (directly) and motor (not emergency power supplied) 1 330 m 3 3 trains (one pump per train) Pump delivery: 170 kg/s 4 trains (2 pumps and 1 heat exchanger per train, 2 trains with emergency pump) 4 pumps connected via headers (2 by 2) 2 electrical motor driven pumps, + 2 turbine driven pumps 1 150 m 3 2 trains (one pump per train) Cooling pumps : 105.6 kg/s 2 trains (2 pumps 100% per train, 2 heat exchangers per train) IOP 10 th November 2010 Slide 6

EPR Plant Layout 40 EPR units could supply 100% of UK electricity demand IOP 10 th November 2010 Slide 7

Fuel Assemblies Characteristics Data Fuel Assemblies Fuel rod array 17 x 17 Lattice pitch 12.6 mm Number of fuel rods per assembly 265 Number of guide thimbles per assembly 24 Materials Mixing spacer grids - Structure M5 Guide thimbles Nozzles M5 Stainless steel Hold-down springs Inconel 718 Fuel Rods Outside diameter Active length Cladding thickness Cladding material 9.50 mm 4200 mm 0.57 mm M5 Co-Mixed Burnable Poison (Typical) Material Gd 2 O 3 Gadolinium enrichment (wt%) 2 10 IOP 10 th November 2010 Slide 8

Safety and Environmental Performance IOP 10 th November 2010 Slide 9

EPR TM Core Characteristics EPR TM Large core of EPR TM is an evolution of earlier AREVA core designs A B C D E F G H J K L M N P R S T 900 MWe, 157 fuel assemblies 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 1300 MWe, 193 fuel assemblies 1450 MWe, 205 fuel assemblies EPR TM, 241 fuel assemblies EPR TM main operating parameters Thermal power : 4590 MW Electrical power : ~1600 MWe Number of loops : 4 Number of fuel assemblies : 241 Fuel assembly array : 17x17 Active fuel height in cm : 420 IOP 10 th November 2010 Slide 10

Design reference fuel : UO2 Maximum fuel enrichment 5% w/o U235 Fuel Cycle (1/2) Average discharge burnup consistent with U235 enrichment (55 to 65 GWd/mtU) Cycle lengths from 1 to 2 years MOX (UO2-PuO2) fuel loading capability (MOX not planned in UK currently) Large core promotes flexible and economic fuel management Reduced radial leakage due to reduced Surface/Volume ratio Heavy stainless steel reflector between the core and the core barrel (up to 30 cm thickness) improves neutron economy and further reduces neutron fluence to pressure vessel IOP 10 th November 2010 Slide 11

Fuel Cycle (2/2) Reduced linear heat generation rate despite higher output Despite increased core power of 4590MWth (4250MWth for N4), linear heat generation rate is reduced from 179 to 170 W/cm. Increased admissible radial peaking factor (F H) allows loading schemes with highly irradiated fuel assemblies on the outer ring of the core. Contributes to a better protection of the vessel (60-year lifespan target) and increased burn-up. Fewer assemblies needed to produce the same energy - a saving of about 3% in terms of number of assemblies for same energy output IOP 10 th November 2010 Slide 12

HEAVY REFLECTOR IOP 10 th November 2010 Slide 13

IN-CORE INSTRUMENTATION VIA UPPER HEAD ONLY In-core instrumentation based on German design and experience Aeroball Reference instrumentation for power distribution measurement Self Powered Neutron Detectors (SPND) Fixed incore instrumentation for online core monitoring (surveillance and protection) Calibration based on Aeroball measurements IOP 10 th November 2010 Slide 14

AEROBALL SYSTEM Aeroball system utilises stacks of vanadium alloy steel balls injected into core via 12 in-core lances each containing 3-4 guide tubes Simple reliable system for flux mapping Flux maps can be generated in 10-15 minute periods Accurate 3-D flux maps can be generated at >30% power IOP 10 th November 2010 Slide 15

REACTOR PRESSURE VESSEL Use of super-large forgings reduces number of welds Nozzles are the set-on type requiring a less substantial weld bead. No bottom head instrument penetrations to reduce risk from LOCAs due to penetration failure IOP 10 th November 2010 Slide 16

EPR Reactor Pressure Vessel One Piece Nozzle Shell Forging IOP 10 th November 2010 Slide 17

RCS LAYOUT/GEOMETRY IMPROVED INHERENT SAFETY RPV, PZR, and SGs have increased volume-to-core power ratio reducing the magnitude of operational transients (e.g. peak overpressure in ATWT, MSIV closure) Core uncovery in SBLOCA avoided by: Increased volume of coolant between RPV nozzles and the top of the active core increased. Reactor coolant pump inlet leg located above level of core top to avoiding core uncovery in loop seal clearance phase of SBLOCA Improved mitigation of accidents during shutdown conditions, particularly in mid-loop operation (e.g. extended time for operator action with loss of RHR). IOP 10 th November 2010 Slide 18

Configuration of Safeguard Systems All main safeguard systems and their associated electrical power supply and I&C systems are arranged in a four-train configuration: SIS/RHRS EFWS CCWS ESWS The four-train arrangement corresponds to the four-loop configuration of the RCS. Advantages: Simplified design concept - each system train associated with different RCS loop. Flexible redundancy during plant shutdown conditions when capacity requirements for heat removal and other functions are reduced Ability to perform preventive maintenance of one complete safety train during power operation. Safety trains located in geographically separated reinforced concrete buildings Avoids common cause failure due to hazards fire, aircraft impact etc IOP 10 th November 2010 Slide 19

ORGANIZATION OF SAFEGUARD BUILDINGS ENSURES STRICT PHYSICAL SEPARATION OF SAFETY TRAINS IOP 10 th November 2010 Slide 20

Reactor Building (Primary Containment) Structure Reactor Building consists of a cylindrical outer reinforced concrete Shield Building, and inner pre-stressed concrete Containment Building with a 6 mm thick internal steel liner, Annular space between the Containment and Shield buildings maintained at sub-atmospheric pressure to collect and filter leakages from inner Containment Building. Low leakage to environment in design basis and severe accidents (core melt) Shield Building protects the Containment Building from aircraft impact, explosion pressure wave. IOP 10 th November 2010 Slide 21

SHIELD BUILDING AND CONTAINMENT BUILDING INTERIOR STRUCTURES AND EQUIPMENT IOP 10 th November 2010 Slide 22

AIRCRAFT IMPACT PROTECTIVE SHELL IOP 10 th November 2010 Slide 23

Design against severe accidents EPR design goal requires specific design provisions for severe accidents (core melt accidents). Philosophy of Practical Elimination of risk. Dedicated features included in design to address severe accident challenges: Dedicated valves for rapid depressurization of the RCS at high temperatures conditions to avoid high pressure core melt ejection (avoidance of Direct Containment Heating phenomena), Autocatalytic Hydrogen Recombiners to minimize the risk of hydrogen detonation, Containment designed to promote atmospheric mixing with the ability to withstand the loads produced by hydrogen deflagration, Provision of dedicated compartment to spread and cool molten core debris for long-term corium stabilization (core catcher), Provisions of CHRS with 2 trains allowing one train to be serviced or repaired if long term deployment necessary, Electrical and I&C systems dedicated and qualified to support severe accident mitigation features, IOP 10 th November 2010 Slide 24

IRWST AND CORE MELT SPEADING AREA IOP 10 th November 2010 Slide 25

CORE MELT SPREADING COMPARTMENT UNDER CONSTRUCTION AT OLKILUOTO 3 IOP 10 th November 2010 Slide 26

Flamanville 3 UK EPR Prototype July 2010 IOP 10 th November 2010 Slide 27

GDA Status Step 2 of GDA began August 2007. Concluded May 2008. 4 designs submitted. AECL and ESBWR designs later withdrawn, leaving only EPR and AP-1000 in the process GDA Step 3 began in June 2008. A Safety, Security and Environmental Report for the EPR was submitted for this step Step 4 GDA began in November 2009 - due to close June 2011. Residual issues remain to be closed out by NII. Not expected that GDA Certification of design will be achieved until mid-2012 (60 months since start of Step 2) EDF target to have first UK EPR at Hinkley Point unit operational in 2018 IOP 10 th November 2010 Slide 28

Questions?