Layout Planning of Waste-to-Energy Plants



Similar documents
48 No Change to Content of Form Permitted

of 11,000 households Steam temperature, boiler 400 C Steam pressure, boiler Incineration temperature 1,100 C

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

1 DESCRIPTION OF THE APPLIANCE

PLANT LOCATION AND LAYOUT

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

PRE-QUALIFICATION ANNOUNCEMENT

INTEC Engineering GmbH Heating Solutions for the Marine Industry

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

I BAU HAMBURG Dry Product Handling

6 CONSIDERATION OF ALTERNATIVES

Waste to Energy in Düsseldorf. for a clean city.

Efficiency on a large scale CFB Steam Boilers

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

Free Examples of plant layout drawing

RECOVERING RESOURCES FOR ALL. Integra South East Energy Recovery Facility

TABLE OF CONTENT

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

Hackney Biomass Boiler Information Request Form

NAWTEC CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Planning Information. Passenger and Freight Elevators.

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

Heating with wood chips and pellets

Facility Support Services

System Assessment Capabilities for Fossil Fuel Power Stations

Temporary Batch Plants

TOWER BETON - VERTICAL BATCHING AND MIXING PLANTS CONCRETE BATCHING PLANTS

High-performance steam boiler and hot water boiler plants for industry

Element D Services Plumbing

Building Code Clarifications - 7. Fire Resistance

COWENS RISK SOLUTIONS WATER DAMAGE PREVENTION

Steam System Best Practices Condensate System Piping

Fortum bygger Sveriges största biokraftvärmeverk i Stockholms stad. Daniel Nilsson Värme & Kraftkonferensen, Stockholm 12 november 2014

RECOVERING RESOURCES FOR ALL. Integra North Energy Recovery Facility

Evaluation of mobile storage systems for heat transport. G. Storch, A. Hauer, A. Krönauer ZAE Bayern, Walther-Meißner-Str. 6, Garching, Germany

I. STEAM GENERATION, BOILER TYPES

Top Technology for Industry, Agriculture, Business and Communities

Taiwan s land area is about 36,000 square kilometers. 2/3 of the lands are mountains and slope lands with cultivated land rate only 22%.

ASME QRO Certification Program

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

University of Iowa Power Plant

Boiling Water Reactor Systems

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation

Half the cost Half the carbon

White Rose Carbon Capture and Storage (CCS) Project

Current as of 11/10/08 1 of 1

Winnipeg Fire Department Fire Prevention Branch

Energy Efficient Operations and Maintenance Strategies for Boilers

Business Plan: Wood chip gasifier (Deliverable 5.2)

Strong partners offer perfect solutions. Automatic filtration and maintenance of engine lubricating oil in diesel locomotives

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY

Transformer Deluge Systems

Energy Efficiency in Steam Systems

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Quanzhou city Licheng Huangshi Machinery Co., Ltd VANCOUVER ENVIRONMENTAL MACHINERY INVESTMENT LTD TEL:

CIBSE Guide M: Maintenance engineering and management Statutory compliance legislation and guidance

Ethanol Vehicle and Infrastructure Codes and Standards Citations

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

I. Introduction. 10 minutes

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

CITY OF LOS ANGELES PERSONNEL DEPARTMENT CAREER OPPORTUNITIES FOR MECHANICAL HELPER

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN

Power Island. Industrial Power Plants. / energy

April 30, 2013 E M. Environmental Management. safety performance cleanup closure

How To Power A Power Plant With Waste Heat

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

Fuel Treatment and Conditioning Systems

HOW DOES A NUCLEAR POWER PLANT WORK?

Public SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT

Scope of EN Clarification Document

4 Alternatives and Design Evolution

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

Gas Meter Clearances and Service Installation Requirements

After close to 50 years working with an unloading

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

Good Practice Form

Pellet Process - Uses and Exposures

The Different Types of Air Conditioning Equipment for IT Environments

Safe & Sound Bridge Terminology

Forgotten savings: Heat recovery from surface blowdown

Installation and Service Instructions. Neutralization System Part no Grünbeck part no

DAYBREAK ATTACHED RESIDENCE DISCLOSURE STATEMENTS Acknowledgement of Receipt Form

Laddomat Charging unit

Gas Meter Clearances and Service Installation Requirements

HEAT RECOVERY OPTIONS FOR DRYERS AND OXIDIZERS

Overview of Heat Recovery Boiler Systems and Operating Costs Factors Effecting Blowdown Blowdown Heat Recovery The Energy Tank

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

COKE PRODUCTION FOR BLAST FURNACE IRONMAKING

Transcription:

Layout Planning of Waste-to-Energy Plants Layout Planning of Waste-to-Energy Plants Falko Weber The layout planning of waste incineration and solid recovered fuel power plants is subject to certain local and project-specific boundary conditions alongside the technical ones. The results of this planning have significant influence on the functionality and operation of the plant, as well as on other criteria. Layout planning or concrete general layout planning can be seen as comprehensive planning for a complete waste incineration plant and must exploit degrees of freedom in planning, while allowing the proper key aspects to be worked out with allowance for existing prerequisites, boundary conditions and client-side wishes and specifications. What do we mean by optimal layout planning? An optimum has been reached when a maximum amount of functionality and efficiency for operation of the plant has been achieved according to the possibilities and specifications of the project and of the customer. Between boundary conditions and objectives an atmosphere of tension arises that has to be mastered in the planning process of the project. Alongside the technical aspects it is project discipline that plays a key role here, i.e., how early on can final fundamental decisions be made in the general planning so that implementation of the objectives is possible in supply and delivery as well as in construction, and according to deadlines in further project realization. In the details of a technical system, e.g., the location of a valve, one can generally find remedies with manageable efforts. The influence of the more or less good general layout of a waste incineration plant is far reaching in contrast. The subsequent modifications of the complete waste delivery logistics system, the O&M areas, and access as well as disassembly concepts or the distances from buildings and escape routes can only be achieved with sometimes considerable effort. It is important at the start of a new construction project to place the necessary importance on the project organization of the general layout planning. The general layout represents the brackets of the room and structure planning for structural engineering, installation engineering and the EI&C technology. A number of aspects of general layout planning shall be touched upon in the following remarks and explanations. Along with the content-related and technical contexts, the step-by-step approach of a new construction project will be explained. Further explanations are based on a waste incineration plant using grate firing. Important superordinate aspects: Specifications and consideration of special requirements should be regarded early on in the project. 151

Falko Weber Selection of the best technical solutions and the functional layout are decisive criteria for operation of the plant. The plant has to be brought into line with site and environmental requirements. Individual aspects to be regarded in detail are: available construction and assembly area, requirements from the approval notification for the plant e.g., maximum construction height, waste fuel logistics by road, rail, private delivery, etc., fire safety requirements, escape routes/stair towers, local special building requirements groundwater, foundations, terrain profile, etc., architectural requirements, requirements for the assembly procedure, consideration or integration of older systems at the site, number of firing lines, local weather conditions with regard to open or closed design of plant components, type of facades, materials, heating. Figure 1 shows influences and requirements of general layout planning. Technical Requirements Waste Logistics Architecture (Customer, Public) Plant Layout and Arrangement Location Space, Foundation O&M Requirements Permit Conditions Figure 1: Influences and requirements What documents and information are important in the initial considerations of the general arrangement plan? Overall layout plan with construction limits and property boundaries, ground elevation data, main connecting roads, access roads to the plant, 152

Layout Planning of Waste-to-Energy Plants data on the planned delivery of waste rail, road, container, etc., water and waste water connections, cooling water on hand, grid connection location, technical data, noise requirements expert s report, location of residential areas, district heating or process steam connections, architectural concept or local guidelines from existing buildings. Example of a general arrangement plan Visitor and Admin Building HV Switchgear Building Generator Transformer Emergency Generator Stair Tower Water Treatment Building Tipping Hall Waste Bunker Boiler House Stack Firefighting Pump Room Firefighting Water Tank Stair Tower Turbine Building Air-Cooled Condenser Fuel Oil Tank, Pump and Unloading Area Cooling Water Cooler ID-FAn Structure Figure 2: Example of an overall layout plan for a waste-to-energy plant, with a firing unit and with delivery of the waste by truck General arrangement necessary buildings and plant components Depending upon: the planned plant technology, the number of firing lines and the flue gas cleaning line and its hook-up, delivery logistics of the waste, the slag and filter dust storage and treatment concept on-site or externally, the cooling concept water or air cooling of the turbine exhaust steam, 153

Falko Weber the necessary interim storage of additional fuels, treated water on the basis of local interfaces and supply situations, specific customer requirements, sound technology requirements, architectural guidelines, the electrical engineering concept. Concrete plant areas and buildings can be determined, specific to each project. In the following the most important plant areas and buildings are listed, which are required, as a rule, for a new construction project of a waste incineration plant: HV Switchgear Building Main Switchgear Building Service Transformer Generator Transformer Emergency Generator Tipping Hall Waste Bunker Baler and Bale Storage Fuel Oil Tank, Pump and Unloading Area Bottom Ash Storage Firefighting Pump Room Water Treatment Building Firefighting Water Tank Demin Water Tank Tanks for Water Treatment Chemicals Urea Water Tank Other Chemicals Storage Boiler House Stair Tower Stack Flue Gas Heat Exchanger Turbine Building Air-Cooled Condenser Cooling Water Cooler Workshop and Stores ID-Fan Structure Visitor and Admin Building Gate House Vehicle Traffic Areas Weigh Bridges Visitor/Staff Parking Areas Perimeter Fences and Gates Landscaping and Rainwater Retention Dimensioning the main components and storage volumes Along with determining technical details, which are crucial in a waste incineration plant, the volumes for interim storage of fuels, residual materials, wastes and operating 154

Layout Planning of Waste-to-Energy Plants materials must be determined. This dimensioning of storage has, in turn, influence upon certain plant components and their layout: Points to be especially observed key point waste bunker: waste bunker capacity, ground water level location of the waste bunker bed, tipping height, waste quality grain size, stackability, density on delivery and during storage, waste delivery logistics, waste transfer point in waste bunker, number and design of waste cranes, operational mode, frequency and times of waste delivery, slag storage capacity raw slag or storage volume for treated slag, number of firing lines. Structure of a waste bunker The building structure of the waste bunker is derived from the planning-side boundary conditions and the already-described aspects: delivery points for the waste, adjacent buildings, such as switchgear building, stair tower, slag loading point, slag hopper level for waste feeding, crane level for the waste crane(s), planned bunker extension, if necessary, planned bulky waste cutters, if necessary, planned waste baling press system, if necessary, wear-resistant or wear-protected bunker interior walls and surfaces. The structure of the waste bunker is derived from already-mentioned criteria and requirements as well as from static dimensioning. The static dimensioning of the waste bunker is important insofar as there are limitations caused through the intermediate supports in the bunker walls (pilaster strips) in waste delivery as well as crane operation of the waste. Special wear and impact protection is required here. The interior walls of the bunker are also to be protected against impact from the waste cranes and against wear. 155

Falko Weber Adjacent boiler house Bottom Ash Storage Waste bunker area b Waste bunker area a Switchgear building Bottom ash loading zone Tipping hall Figure 3: Ground plan of waste bunker +36,05-7,00 Figure 4: Tipping hall Waste bunker area a Waste bunker area b Waste bunker, longitudinal section (example) Bottom ash loading zone 156

Layout Planning of Waste-to-Energy Plants Layout of the boiler house and the flue gas cleaning unit The boiler house with the firing system and the boiler unit is connected directly to the waste bunker. The flue gas cleaning unit is arranged after the boiler house. The following aspects are to be considered superordinately in the layout planning (boiler and flue gas cleaning unit): number of firing lines, number and hook-up flue gas flow of the flue gas cleaning units, type of flue gas cleaning cleaning method, cleaning stages, enclosure of the boiler house, enclosure of the flue gas cleaning unit or open construction, shared building steel construction, enclosure for boiler and flue gas cleaning unit planned? determine locations of main columns, location and height of waste feed hopper, escape routes, stair towers in boiler and flue gas cleaning unit, transition to other buildings, maximum allowable boiler roof height, construction design of the boiler horizontal or vertical design, boiler house access for trucks, disassembly concept for the boiler heating surfaces, heating, smoke and heat extraction, adjacent buildings, fire protection. Additional points especially for the flue gas cleaning unit: building for the storage of dosing materials and chemicals planned, layout of the compressed air generating system, location and minimum height of the smokestack, location of the emissions measuring points. 157

Falko Weber Figure 5: Boiler house, longitudinal section (example with horizontal pass) +45,50 +70,000 +0,000 Adjacent boiler house UEP UVC Stack Figure 6: Flue gas cleaning unit with ash silo and stack, longitudinal section (example) with 12t Boiler Hall Cran 2 Under Load 33,9 kn/m 2 (SLW 60) Figure 7: Example of crane setup for overhaul of boiler heating surfaces, longitudinal section 158

Layout Planning of Waste-to-Energy Plants Turbine house and steam turbine generator set What is important to observe in the layout planning of the water-steam cycle and especially the components in the turbine house: turbine concept, selection of the condensing system/cooling of exhaust steam, layout of the steam turbine generator set, layout of auxiliary components. It has to first be determined how and what kind of energy conversion is provided for and thereby which turbine concept: pure power generation, i.e. pure steam condensation, back-pressure turbine for district heating or process steam supply, steam condensation with partial steam extraction for proportional district heating or process steam supply. Turbine +7,50m +2,90m +0,00m Figure 8: Section of a turbine building with turbine deck (example) 159

Falko Weber For the selection of the condensing system the following are to be considered: air condenser, water condenser cooling water via cooling circuit and wet cooling tower, water condenser open cooling circuit, cooling water from river or sea. Layout possibilities of the steam turbine generator set: ground-level placement i.e. without turbine deck, placement with turbine deck, placement of exhaust steam upward, downward, horizontal. A short live steam line from the boiler to the turbine generator set is to be strived for so that little energy is lost as a result of pressure loss. In addition, topics such as operating and maintenance inspection surfaces are to be planned, pipe ways determined, a turbine house access road planned and, if necessary, a crane installation provided. Infrastructure fuel logistics, roads, access roads, surface areas The infrastructure of a waste incineration plant is of enormous importance as much with regard to external accessibility and interfaces as it is within the plant itself. The daily traffic takes place here, and operating/observation/monitoring and maintenance measures are carried out. Added to this, the infrastructure of the waste incineration plant is to be taken into consideration in a meaningful way for its construction. Synergetic effects come about when the construction site access roads and the circumference of the construction site can be used as fire department bypass roads from the very beginning, and these roads can also be used in the final state. The main criteria for the infrastructure of a waste incineration plant: access from public roads, gatekeeper, scale, fire department bypass around the plant, waste bunker delivery area, access roads, parking spaces for tank installations and silos, general parking spaces, interim storage of waste for control purposes, waste delivery logistics, 160

Layout Planning of Waste-to-Energy Plants interim storage of waste outside the waste bunker planned (?), waste baling press planned (?), administrative building, storage building, workshop, visitors presentation and reception rooms, location of the permanent work stations, escape routes, location of stair towers, surfaces for maintenance depositing surfaces, assembly/disassembly routes, crane locations, fire protection equipment, hydrants, room for possible plant expansion. Figure 9: 3D model of a planned waste-to-energy plant Summary Waste incineration plants require special attention in the layout planning of the overall plant. The sites available or planned for such plants often have demanding boundary conditions for construction of the plant and for the final state of the structure. Unilateral compromises that benefit other key points only become apparent in later operation, but these are then day-to-day and long-lasting. Later modifications and optimizations are only possible within limits, with increased effort and at the burden of other problems and costs. The task of general layout planning lies in being able to determine the main requirements for the site at an early stage and to specifically implement these. The consideration of other criteria, such as architecture or one-time increased investment costs that favor the efficiency of the plant, can lead to a special situation. 161