Common InfraBIM requirements YIV2015



Similar documents
A Conceptual Methodology and Practical Guidelines for Managing Data and Documents on Hydroelectric Projects

Tekla Structures More than a detailing tool. Precast concrete

RoadBIM Seminar Tallinn

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of ( )

Foreword. Version Parties to the COBIM project

Inframodel 3 (4-5) InfraFINBIM / buildingsmart Infra Seminar 19 November Juha Hyvärinen, Senior Scientist

InfraBIM Tiina Perttula

New Business Models in Construction

Tietomallintamisen läpimurto infra-alalla - tietomallintamisella automaatioon

Professional Engineers Providing Structural Engineering Services In Buildings

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

COBIM. Series 1. General part. Common BIM Requirements v 1.0

Project Management Manual Update Transportation Department City of Edmonton

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Development of the BIM based process for Dredging Works

Getting More Value from your BIM Process with Autodesk Collaboration and Data Management Products

NETLIPSE NETWORK MEETING Seppo Mäkinen Finnish Transport Agency

Series 600: Earthworks

GIS Solutions for FTTx Design. David Nelson, GISP

TechnicalNotes. Terramodel Software for Construction

14TH INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN AUGUST 2003

Engineering Council of South Africa

Built Environment Process Reengineering (PRE)

No Land Use and Building Act (132/1999, amendment 222/2003 included) Chapter 1. General provisions. Section 1 General objective of the Act

Sage 300 ERP What's new. Being connected helps get more done

TENDER DOCUMENT PROCEDURE FOR MAJOR WORKS CONTRACTS USING AS GENERAL CONDITIONS OF CONTRACT

Summary of Stakeholder Report. Action 1, BIOGASSYS, Decision making tools for the establishment and expanding of biogas production and consumption

Civil Engineering and Architecture (CEA) Detailed Outline

USABILITY OF A FILIPINO LANGUAGE TOOLS WEBSITE

WORKSHOP PEDAGOGY. Operating environment of workshops. Information for stakeholders and partners. PRINCIPLES OF COACHING IN WORKSHOPS

Get to know your Autodesk Design and Creation Suites 2014

JOB DESCRIPTION POSITION TITLE:

Instructions for Writing a Thesis for the Master s Degree

Graduate route 3 candidate guidance

Spatially Enabling an Asset Management Database

The Gateway Review Process

Improving Data Quality: Empowering Government Decision Makers with Meaningful Information for Better Decision Flow in Real-Time

Workflow and Process Analysis for CCC

Built Environment Process Reengineering (PRE): Infra FINBIM

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

How To Manage Transportation Asset Management

SOLUTIONS FROM VIANOVA SYSTEMS

COMPANY... 3 SYSTEM...

Retaining Wall Global Stability & AASHTO LRFD Unnecessary, Unreasonable Guideline Changes Result in Huge Wastes of Money at Some Wall Locations

integrated operational management

BRIDGES ARE relatively expensive but often are

use of OpenBIM Hospitals in Denmark Norway and Espoo Hospital in Finland DENMARK - FINLAND - NORGE

COBIM. Series 8. Use of models for visualization. Common BIM Requirements v 1.0

STANDARD OPERATING PROCEDURES QUALITY ASSURANCE AND QUALITY CONTROL 04

Gestão Integrada de Projectos. Arquitectura

Work Type Definition and Submittal Requirements

Transportation Management. Transportation Procurement. Transportation Planning & Execution. Fleet Management. Audit, Payment & Claims

Space Project Management

Documents pertaining to safety control of nuclear facilities. 1 General 3. 2 Submission of documents 3. 3 Document structure and contents 3

Improving supply chain management information systems in public administration using a new theory

Sage 300 ERP 2014 Get more done.

BETTER BY 3D DESIGN AND COORDINATION IN BUILDING SERVICES INDUSTRY

5047P Architectural and Engineering Services for the Cambie Fire Hall and Ambulance Station Project- Addendum #2

Client Consultancy. Description of services December The Danish Council of Practising Architects (PAR)

1Current. Today distribution channels to the public have. situation and problems

CONSTRUCTION MANAGEMENT

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY

INTRUSION PREVENTION AND EXPERT SYSTEMS

Forensic engineering of a bored pile wall

Framework Agreement on the Improvement of Energy Efficiency in Industries

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices

EUROPASS DIPLOMA SUPPLEMENT

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

FutureWorks Nokia technology vision 2020: personalize the network experience. Executive Summary. Nokia Networks

BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi

A COMPARISON OF PRINCE2 AGAINST PMBOK

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

The Verdura Wall check with your local building department

Vertex BD. Leading Software Solution for Cold Formed Steel Construction

Airport safety and security solutions. Tailored intelligent solutions to protect passengers, assets and infrastructure. Answers for infrastructure.

Strategic Plan for Control Period 5, Issue Two

Quality Control and Quality Assurance Guide

Design of Network Educating Information System Based on Use Cases Driven Shenwei Wang 1 & Min Guo 2

Sage 300 ERP 2014 Get more done.

Streamline your design-to-cost processes with Autodesk Navisworks

Quality Assurance/Quality Control Plan. Division of Transportation Solutions

BIM in Finland today. TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair FINLAND

Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)

Intergraph Roadway Information Management Solution. Title Title. Title Title. A White Paper

Project Management Standards: A Review of Certifications/Certificates

Post-Merger Integration at Sachtleben

INTERNATIONAL STANDARD ON AUDITING 530 AUDIT SAMPLING AND OTHER MEANS OF TESTING CONTENTS

CIVIL ENGINEERING ASSOCIATE, 7246

Guidelines for Cost Estimate Template

INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS (ISAE) 3402 ASSURANCE REPORTS ON CONTROLS AT A SERVICE ORGANIZATION

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

Autodesk Solutions for Environmental Engineering. Engineering a better environment

Guidelines for Writing Reports in Engineering Engineering Faculty, Monash University

Introduction to Fractions

Design-Bid-Build versus Design-Build: The client s choice

Role in the project (e.g. Prime Engineering Consultant or Contractor), and summary of professional Duties : Name Professional Duties Contract Awarded?

Transcription:

Common InfraBIM requirements YIV2015 Vol 1.0 MANAGING MODEL BASED PROJECT Quality control Interaction and collaboration Supervision and coordination Infra modeling Coordination of disciplines Gathering of initial data Planning, construction, asset management Jari Niskanen WSP Finland Oy English version 1.0

Document version history Version Date Author Description 1.0 5.5.2015 Jari Niskanen Guideline 1.0 14.9.2015 English version

CONTENT 1 INTRODUCTION... 4 2 Planning a model-based project... 5 2.1 Planning phases in Finnish planning system... 5 2.2 Modeling plan... 6 2.3 Modeling extent and level of accuracy... 6 3 GOALS WITH MODELING AND PURPOSE of USE MODEL... 7 4 PROCESS DESCRIPTION... 7 4.1 Actors... 8 4.2 Cooperation and data exchange between actors... 8 4.3 Schedule... 8 5 Model description document and list of contents... 8 6 Quantity and cost management... 9 7 quality assurance... 10 8 utilization principals of model in different project phases... 10

1 INTRODUCTION This document describes management of projects which use modeling. Use of modeling effects project organization, phasing, schedule, approach and exchange of information. Project responsible shall be able to evaluate how information modeling can be used to maximize the added value and how modeling contributes to achieve overall project objectives.

2 PLANNING A MODEL-BASED PROJECT 2.1 Planning phases in Finnish planning system Workflow in an infra project can be described with following diagram. Time spam of project from its first phases to the end can be long. On the other hand, modeling planning can start at any project phase. Starting point in this document is, that an information modeling plan has to be made regardless of project phase. Contents of modeling plan document vary depending on project phase, but these differences are not dealt with in this context. Data delivered to orderer in infra project Edited from source: Lehtovirta Final product in documentbased, main contract form project Preliminary design report, preliminary drawings General design report, complement drawings, electronic data Road design, complement drawings, electronic data Construction design Drawings Work specification Design data to be implemented at sites Working drawings Investment requirements and preliminary design General plan Early design phases, Road, street or railway design Construction design Construction Final product in model-based, cooperation form project Preliminary design model General design model Construction design model 3D-objects Required data Initial data model Initial data model Initial data model Road, street or railway model Implementation model As built drawings Operation and maintenance Maintenance manual Picture 1. Produced material per project phase. As built model Asset management model Interface to archiving and administration systems

2.2 Modeling plan In initiation stage of project, the project responsible makes model plan, which shows: general goals of modeling and purpose of use; what the project or process needs the model for process description o project actors, roles (responsibilities) and tasks o cooperation and exchange of data o schedule modeling extent and level of detail cost calculation/administration; procedures quality assurance principles of model utilization in relation to project phase o design, construction, implementation o use, administration, maintenance o purchase and contracting techniques Model plan is an appendix document in design contract. Other central documents in engineering procurement as design principals and design program are closely related to it. Most of data shown in modeling plan belongs more naturally in design plan, but it s more suitable to keep these as separate documents, as long as model documents and design documents have different content and contractual position in construction. 2.3 Modeling extent and level of accuracy Requirements for modeling extent and level of accuracy are based on earlier specified goals and purpose of use. When specifying and documenting the modeling accuracy and it s extent, we can lean on specifications in other parts in this requirement and instruction documentation. Requirements concerning the modeling extent and level of accuracy are recommended to be documented in the corresponding form of design program. Factors affecting the extent and level of accuracy are specified and documented with designing principals, design program and modeling plan. In goal situations, obligations and requirements of modeling are outlined through design principals and program. General modeling requirements offers a foundation which may be relied on in documents. Design principals Design program Modeling plan document General modeling requirements Picture 1. Definition of design and modeling task.

3 GOALS WITH MODELING AND PURPOSE OF USE MODEL Project goals set on modeling are documented in modeling plan document. General goals are for example benefits in securing execution of project, increase productivity and efficiency in construction, improve quality in design and construction, more cost effective controllability of project, benefits offered by model in understanding and its contents and form a picture of project etc. Purpose of use for modeling is described in the modeling plan document. These can be for instance: Description: communication with outside interest groups Description: internal communication and transfer of data in a design or construction project Clash detection between disciplines Clash detection between existing structures and designs Ease the determination of construction qualities: link quality requirements for construction parts to model Improve quality of procurement: construction project defined with model reduces risks for tenderer and leads to better tenders Production scheduling and production control: linking model to schedule with project division and cost control with a model containing quantity data (4D and 5D modeling) Life cycle information management: needed data for operation, management and maintenance systems in an easy accessible form; as built model utilized in maintenance manual or it s user interface Visualization helps understanding content solutions in design producing explicit, understandable and higher quality data of design situation. When central features of solutions are portrayed explicit enough in model, visualization supports also design, management, control and decision-making. Visualization can serve apart from project group and users, also outside interest groups like authorities \, Part 10, In model-based procurement, models are part of contract documents. With help of models the intelligibility of designs increases, service providers risk decreases and client gets more profitable and higher quality tenders. With help of a model, efficiency can also be sought in dividing project in different procurement packages. Quality requirements for construction shown in model, improves the client possibilities to state the quality of construction. At the moment it ś not clear how modeling technology will support this goal in the future. If the goal is to use the produced data from design and construction for the needs of management and maintenance, this shall be taken into account in procurement phase of construction. Parties responsible for maintenance should have a possibility reserved to affect the contents of a modeling plan document. 4 PROCESS DESCRIPTION Process description contains actors in project, their role in project organization as well as their tasks and responsibilities regarding producing or using the model. In addition, cooperation between actors and exchange of information as well as schedule of project is described.

4.1 Actors Most central actor in a project is the client. The client is responsible for project financing, decision-making and management and makes also the decisions and procurement concerning modeling. The client is responsible for project preparations and implementation and receives the final design for their own archives and administration systems. The client can use outside technical experts as support for procurement and quality assurance (contract control). The client's user role to the model is typically a viewing user. Technical experts must have access to use full-scale tools (programs) for checking the model. Project manager appointed by service provider is responsible for modeling management. Project manager can delegate tasks regarding modeling management to model coordinator, but can t delegate responsibilities regarding modeling, like compatibility of designs (discipline models). Project manager s user role is viewing user. Model coordinators ensure that different areas are consistent and compatible. Technical designers are responsible of their own modeling discipline and a model coordinator ensures the combined model is updated according to modeling plan document. To confirm compatibilities, responsibilities can be delegated in many different ways: to many actors, principal designer (road, railway, street) or project manager (who is ultimately responsible for everything). Model coordinator should have tools to consolidate and control models. Infra model controller is client's controller and responsible for client s quality assurance tasks. Designers draw their own designs following design principals, design program and model plans of their own discipline. Designer follows quality assurance tasks. The designer uses needed tools to make and modify the model of their own discipline and applicable tools for controlling the combined model. 4.2 Cooperation and data exchange between actors The modeling plan document describes cooperation between actors from modeling point of view. Process shall be interwoven with other project work as smoothly as possible. 4.3 Schedule Schedule of modeling follow the schedule of design, where the modeling tasks are added. When scheduling a model for a project, the attention should be drawn especially to following matters: creation of initial data models and delivery well in advance preparation of visualization model in such a way it supports communication and meetings in the project division of project in a way, that it supports modeling and utilization of model 5 MODEL DESCRIPTION DOCUMENT AND LIST OF CONTENTS Model description document describes central initial data per design area, purpose of model, content, coverage, modeling methods and level of accuracy as well as possible limits and deviations from general requirements. With help of the report other parts can interpret the general construction of model, naming practices and degree of readiness. Model description document is updated always when the model is released for other users.

Material division in model description document shall follow the principle, where design model and initial data model are separated and initial data model only consist of data of existing conditions. Out of initial data and model is prepared a listing; model content list with an equivalent structure as an infra model report. The document shows the purpose of files, possible limitations as well as if needed, mistakes in description in comparison with theoretical geometry model. An inspection of documents can be made with help of the table (mark the particular row in the table) before forward delivery to other parties or being generated in to combined model. Table 1. Example on contents of model description in railway plan. 0 General 3 Railway model 3C Constructions and systems 1 Raw material 3C1 Traffic lanes 1A Terrain model 3C1.1 Railway 1B Ground model 3C1.1.1-1 Railway constructions 1B1 Geotechnical soundings 3C1.1.1-2 Drainage 1C Constructions and systems 3C1.1.4-7 Equipment 1D Map and GIS 3C1.1.9 Service roads 1E Other data 3C1.1.10 Crossing 3C1.1.11 Existing constructions 2 Initial data 3C1.2 Road network 2A Terrain model 3C2 Foundation 2B Ground model 3C2.1 Preloading 2B1 Rock face 3C2.2 Surcharge loading 2B2 Soil type surface. 3C2.3 Replacement of soil Peat, lower surface 2B3 Soil type surface. 3C2.4 Work-time abutment wall Clay, lower surface 2B4 Soil type surface. 3C2.5 Pile slab Loam, lower surface 2C Constructions and systems 3C2.6 Loading berm 2D Map and GIS 3C3 Bridges 2E Other data 3C3.1 New bridges 3C3.2 Existing bridges Model description document is more specifically described in part 2 in this set of instruction. 6 QUANTITY AND COST MANAGEMENT Quantity and cost management is described in part 8 in this instruction document, Quantity and cost estimates. How to link models to cost management is at this stage technically unsolved. Nowadays it s essential to keep cost effects up-to-date in the design phase. Modeling benefits are multiplied, if the model can be linked to other functions as production control and cost management. At time of writing, there aren t any established ways to deal with model-based quantity and cost management or for instance connect project and construction part calculation systems totally into model-based design systems.

7 QUALITY ASSURANCE The client receives and accepts the model (models) produced in the project. The client has to ensure, that resources, knowledge and methods needed for this are sufficient. Quality assurance is mainly based on service provider s inspection of produced models and it s documentation. In addition the client can implement a separate quality assurance procedure. Quality assurance is described in part 8 8 UTILIZATION PRINCIPALS OF MODEL IN DIFFERENT PROJECT PHASES Modeling is used differently in different design phases. In the early phases the central factors are for example to find out the technical implementation, reliable definition of investment and maintenance costs as well as confirm acceptability of design. Central element in modeling is the combined model, which supports the implementation of solutions. The combined model is a virtual portrayal of all discipline models. Virtual model can function as a support to confirm the acceptability of design. Work flow of utilization of virtual model in design phase.

Picture 2. Use of modeling as a controlling tool and support in interaction. Utilizing model in construction phase is portrayed in following work flow. Design is made to varying extent, for instance depending on procurement model. In principle, the designer is however always also involved in the construction phase. Construction phase has produced model-based designs from different disciplines and produced combined-models of them. From this entity is produce data for the needs of construction including machine control and on site measurements., As construction progresses, specified initial data as well as changes to design solutions at work site are delivered to designer, who up-dates the designs and the combined model. An administrator has to be appointed before start of construction phase. Most naturally it is the designer. Model coordinator at site is responsible for producing the model for construction.

Picture 3. Utilizing models in construction phase is portrayed in following work flow. The role of model coordinator and responsibility limitations should be defined before start of construction project. Subject significance depends on project procurement model: in the so called integrated implementation models the significance decreases (picture doesn t take side on procurement model; model-based design may have been made separately before construction phase or it can be made as part of procurement within the frameworks of a traditional contract or an alliance type ). Operation and maintenace Picture 4. Utilization of infra model in operation and maintenance phase.

English version 1.0