The Norwegian Tide Gauge Network



Similar documents
Norsk Naturskadepool

INSURING FUTURE CLIMATE CHANGE. Oslo 3 4 November Natural Catastrophe Risk Management Policy in Norway

Objective. (From Statskog SF s charter )

The GLOSS Delayed Mode Data Centre and the GLOSS Implementation Plan 2012

Powering Science at High Latitudes

The climatic challenge of designing a prefabricated catalogue house meeting the criteria of the Norwegian passive house standard

INVITATION TO TENDER. Public Coastal Transport Service Bergen Kirkenes For the period 1 January 2005(-6) 31 December 2012

GNSS permanent stations as the part of integrated geodetic system in Estonia

Provide network RTK Services in a few simple steps

Affiliation: * The Norwegian Meteorological institute, Oslo, ** SINTEF ICT> > Applied Mathematics, Trondheim, Norway 8/15/14

UK sea level 26 June 2013

A greener route to the capital

Basic Climatological Station Metadata Current status. Metadata compiled: 30 JAN Synoptic Network, Reference Climate Stations

Trimble R8 Base and Rover Quick Setup Guide. Inland GPS Inc.

SUMMARY. Search for donors for Norwegian patients. NBMDR and the Norwegian blood banks. HLA typing of donors. Search in and donation by NBMDR

Changes in past, present and future sea level, focusing on the Norwegian west coast. J. E. Ø. Nilsen, K. Richter og H. Drange

Environmental Report 2007

Cruise passenger traffic to Norway history and forecasts until 2060

RELEASE NOTES. Trimble. SPS Series Receivers. Introduction. New features and changes

ESTABLISHMENT OF A PERMANENT GPS STATION AT THE DEPARTMENT OF GEODESY AND SURVEYING OF THE BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS

interim report 2nd quarter 2008 BN Boligkreditt AS

Developments in sea level data management and exchange

SURVEY PRO. GPS Quick Start Guide

Statoil s Arctic program, Bear Island nature reserve and the ice edge May 12, 2014

Norconsult AS Trekanten, Vestre Rosten 81, NO-7075 Tiller Memo no.: 1 Tel: Fax:

Kirkenes :16 Side 1 PORT OF KIRKENES THE GATEWAY TO THE BARENTS SEA AND THE NORTHERN SEA ROUTE A PLACE FOR BUSINESS AND PLEASURE

Highway Bergen - Haugesund

PLM PRODUCT INFORMATION

Earth Coordinates & Grid Coordinate Systems

Trimble TerraSync User Guide for Laser GPS Offset

ACK E MHz ELT Frequently Asked Questions

Sail Date 2017: Apr 30

NJDEP GPS Data Collection Standards For GIS Data Development

Gravir Outer, Isle of Lewis Site and Hydrographic survey report

Service Quality Performance Report 2013

TASK. Windows Edition version Edition Tidal Analysis Software Kit

Havforskningsinstituttet

THE NORWEGIAN BONE MARROW DONOR REGISTRY

21. oktober Arctic-Hub. Mineral terminal largest in the Barents region

Safety at Sea a Review of Norwegian Activities

DeepWind'2013, January, Trondheim, Norway. Measurement of wind profile with a buoy mounted lidar. Jan-Petter Mathisen

Revolutionary Inspection Technology by FORCE Technology

LRS - Application Form PRESIDENT OF THE OFFICE OF ELECTRONIC COMMUNICATIONS

Postcode changes in Norway 2015/10/01

Ksat Infrastructure and architecture for Multi-Mission Applications. dr. Kris Nackaerts dr. Martin Krynitz dr. Jan Petter Pedersen

USER S MANUAL. Settop RadioLink. Settop DataConvert. Rev. March

Clever Devices IVN GPS Broadcast over Ethernet Interface Control Document

Bluetooth HC-06 with serial port module Easy guide

Towards a UNITAR office in Bergen, Norway

Part 1 Product introduction 2. Part 2 Features 3. Part 3 Safety notes 4. Part 4 Quick user s guide 5. Part 5 Operation notes 7

Frequency selective monitoring and logging of environmental electromagnetic fields

SCAR WG-GGI NATIONAL REPORT FOR AUSTRALIA. Report of Current Activities of Australia in Geodesy and Geographic Information for the period

The Cadastral System of Norway

Financial framework and development of the public transport sector in six Norwegian cities

ANNUAL REPORT The Draugen field that is operated by Norske Shell started production in 1991 and is operated from Kristiansund.

GNSS Reflectometry at GFZ: ocean altimetry and land surface monitoring

P3.8 INTEGRATING A DOPPLER SODAR WITH NUCLEAR POWER PLANT METEOROLOGICAL DATA. Thomas E. Bellinger

MT3339 PC Tool Operation Manual

MONITORING OF STATION VYHL

PRACTICAL INFORMATION FOR PORT TO PORT PASSENGERS

The delicate water balance of Bryggen

Study in Norway. Admission to universities and university colleges in Norway.

Aquaculture Monitoring Standard

MEDITERRANEAN AND BLACK SEAS HYDROGRAPHIC COMMISSION XVIII CONFERENCE

TROUBLESHOOTING GUIDE

Annual Report The Norwegian Bone Marrow Donor Registry

INTEGRATED METOCEAN MONITORING SYSTEM WEATHERMONITOR SHORT USER S GUIDE Issue Date: MAY 2012

ProductBulletin. Vessel Tracking using HYDROpro. HYDROpro as the Tracking Controller MARINE SURVEYING & CONSTRUCTION

Is a modal shift to Short Sea Shipping within reach for fresh fish? A feasibility study. Oostende, 20 February 2014

The Start of my Arctic Adventure

Release Notes. Asset Control and Contract Management Solution 6.1. March 30, 2005

Online Precise Point Positioning Using the. Natural Resources Canada Canadian Spatial Reference System (CSRS-PPP)

WeatherTRAK Budget Manager and Site Asset Manager

Regulation concerning the prevention of transfer of alien organisms via ballast water and sediments from ships (the Ballast Water Regulation)

Inductive Sensors Single or Dual Loop Detectors Type LD with teach-in

A comparison of radio direction-finding technologies. Paul Denisowski, Applications Engineer Rohde & Schwarz

DIALER SPECIFICATION VERBATIM MODULAR SERIES VSS

Governance theory and adaptation in urban planning processes. Inger-Lise Saglie, UMB og NIBR Mistra-SWECIA seminar 5. June 2009

Statens kartverk Sjø/Norwegian Hydrographic Office

Online GPS processing services: an initial study

Vehicle Tracking System,

Field report. Semester abroad at Østfold University College in Halden, Norway. WS 12/13 Nadine Balter

The Use and Integrity Monitoring of IGS Products at Geoscience Australia (GA)

RELEASE NOTES. Trimble VRS 3 Net GNSS Infrastructure Software. Introduction. New features. Enhancements. Supported operating systems and SQL Server

NSW Air Quality Monitoring Network: Quality Assurance Procedures

NORWEGIAN COASTAL ADMINISTRATION RATES OF FEE 2016

BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA.

OSLO, a new step for the city - port relationship

COMPARISON OF VOLCANO ERUPTIONS IN KAMCHATKA WITH COORDINATES OF ATMOSPHERICS

EN :2005. Wind actions

An Automated Weather Database System

Sea Level Monitoring in Mexico

Motion Activated Camera User Manual

NORWAY High Speed Railway Phase III Initial Option Testing. Atkins: Warwick Lowe

Cisco Aironet Wireless Bridges FAQ

Wages and Working Conditions in Norway

Høyanger Upper Secondary School

WindScanner Research Infrastructure to measure 3D wind with scanning Lidars

GPS Precise Point Positioning as a Method to Evaluate Global TanDEM-X Digital Elevation Model

2.4G Bluetooth Datalink & ipad Ground Station User Guide V1.12

Transcription:

The Norwegian Tide Gauge Network GLOSS Experts 13 th Meeting, October 2013 Tor Tørresen 1 and Svein Ola Thorsen 2 tor.torresen@kartverket.no, svein.ola.thorsen@kartverket.no Introduction The Norwegian Tide Gauge Network is operated by the Norwegian Mapping Authority, Hydrographic Service (NHS). There are 23 digital tide gauges along the Norwegian coast and one gauge in Ny-Ålesund at Svalbard (see Figure 1 and Table 1). 1 Norwegian Mapping Authority Hydrographic Service, P.O. Box 60, 4001 Stavanger, NORWAY 2 Norwegian Mapping Authority Geodetic Institute, 3507 Hønefoss, NORWAY Page 1 of 7

Mausundvær GLOSS station Figure 1 The Norwegian Tide Gauge Network, October 2013. Page 2 of 7

Station Latitude Longitude Continuous GNSS Digital data available from Viker 59º02' N 10º57' E No 1990 Oslo 59º54' N 10º44' E No 1914 Oscarsborg 59º41' N 10º37' E No 1953 Helgeroa 59º00' N 09º52' E No 1965 Tregde 58º00' N 07º34' E Yes, since 2001 1927 Stavanger 58º58' N 05º44' E No 1919 Bergen 60º24' N 05º18' E No 1915 Måløy 61º56' N 05º07' E No 1943 Ålesund 62º28' N 06º09' E No 1961 Kristiansund 63º07' N 07º45' E No 1952 Heimsjø 63º26' N 09º07' E No 1928 Mausundvær 63º52' N 08º40' E Yes, since 2007 1988 Trondheim 63º26' N 10º24' E No 1989 Rørvik 64º52' N 11º15' E No 1969 Bodø 67º17' N 14º23' E No 1949 Kabelvåg 68º13' N 14º30' E No 1988 Narvik 68º26' N 17º25' E No 1931 Harstad 68º48' N 16º33' E No 1952 Andenes 69º19' N 16º09' E Yes, since 2000 1991 Tromsø 69º39' N 18º58' E No 1952 Hammerfest 70º40' N 23º41' E No 1957 Honningsvåg 70º59' N 25º59' E Yes, since 2006 1970 Vardø 70º20' N 31º06' E Yes, since 2005 1947 Ny-Ålesund 78º56' N 11º57' E Yes, since 1993 1976 Table 1: List of stations in the Norwegian Tide Gauge Network. Page 3 of 7

The tide gauge network Until 1985 there were two tide gauge networks in Norway, but between 1986 and 1992 the gauges were modernized and merged into one network operated by the Norwegian Mapping Authority, Hydrographic Service (NHS). The new system used stilling wells and sampled the water level with 15 second intervals. These data were filtered and decimated to 10 minute values and automatically transferred to NHS. A new modernization was completed in 2002. The data loggers were changed to Sutron 8210 and the 10 minute values were obtained by making 3 minute averages of one second samples. In 2007 the sampling and filtering procedures were changed. The sampling frequency is still 1 Hz but now one-minute averages are stored in the data logger, transferred to NHS at regular intervals (every half hour at the moment) and stored in a database. The one-minute values are filtered (Butterworth filter) and decimated to produce ten-minute values. The ten-minute values go through a half automatic quality control. Software developed at NHS is used for manual editing on the data. Ten-minute values are presented on the internet. All the permanent tide gauges are of the stilling well type, except in Hammerfest where a radar gauge (Miros SM-094) is used (since August 2007). The analogue tide gauge at Mausundvær was renewed in 2010, and is now part of the network. The majorities of the gauges are mounted on solid rock and are levelled with about three years intervals. A few gauges are located on slightly unstable ground and are levelled more frequently. The Norwegian Mapping Authority, Geodetic Institute (GI) is responsible for the levelling. Future work The Norwegian Mapping Authority is working on installation of tide gauges on the remote islands Jan-Mayen and Bjørnøya (Bear Island). Rough weather, ice and lack of sheltered areas make it difficult to find a good technical solution. GNSS measurements By October 2013 seven continuous GNSS receivers (CGPS) are installed at six Norwegian tide gauges. In Vardø, Andenes and Tregde the antennas are installed directly at the tide gauge, on the other stations the GNSS receivers are some hundred meters away. In Ny-Ålesund the GNSS receiver is installed near the VLBI-station (Very Long Baseline Interferometry), which is located about 1.5 km from the tide gauge. In May 2009 the GNSS receivers in Ny Ålesund (NYA1, NYAL) was renewed. In September 2010 the GNSS receiver and antenna in Honningsvåg (HONS) was renewed. In May 2012 the receiver in Tregde was renewed. Page 4 of 7

Station Continuous GNSS from GNSS receiver type Serial nr. Firmware version Sampling rate Antenna type Radome Tregde TGDE 2001 Trimble NetR9 5128K 76924 4.60 1 sec. AOAD/ M_T None Andenes ANDE 2000 Trimble NetR5 4649K 03383 3.84 1 sec. Trimble Zephyr TRM5597 1.00 None Ny-Ålesund NYA1 1997 Trimble NetR8 4843K 33429 4.03 1 sec. ASH 701073.3 Snow Ny-Ålesund NYAL 1993 Trimble NetRS 443923 9123 1.1-5 1 sec. AOAD/M_ B Dome Vardø VARD 2005 Trimble NetRS 441223 2898 1.1-5 1 sec. Trimble TRM 29659.00 Dome SCIS Mausundvær FROC 2007 Trimble NetR5 4649K 03429 3.84 1 sec. Trimble Zephyr TRM5597 1.00 None Honningsvåg HONS 2006 Trimble NetR8 4923K 35442 4.03 1 sec. TRM5980 0.00 Dome SCIS Table 2: An overview of status of the continuous GNNS receivers per Oct 2013. The Norwegian Mapping Authority, Geodetic Institute is responsible for the continuous GNSS measurements and analyses of the data. Figure 2: Tide gauges with continuous GNSS receivers at Tregde (to the left) and at Andenes Page 5 of 7

Data availability By the end of 2012 the Norwegian water level database contained about 1536 years with digital water level observations. All data have been through a quality control, and all corrections are flagged and documented. Figure 3 gives an overview of the available digital time series from the permanent tide gauges that are operated today. Year (1910-2013) Ports 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 Andenes Bergen Bodø Hammerfest Harstad Heimsjø Helgeroa Honningsvåg Kabelvåg Kristiansund Mausundvær Måløy Narvik Ny-Ålesund Oscarsborg Oslo Rørvik Stavanger Tregde Tromsø Trondheim Vardø Viker Ålesund Digital water level data Digital water level data and continuous GNSS data Figure 3: An overview of available digital time series from the stations in the network. Page 6 of 7

International data exchange Quality controlled sea level data are routinely made available through the following international programmes: PSMSL : Monthly and annual means GLOSS : Fast delivery data to UHSLC Delayed mode data to BODC Internet The following quality checked sea level data are available for free download on our web site www.sehavniva.no: Water level observations Tidal predictions Residuals Water level prognosis for 5 days (model-data from the Norwegian Meteorological Institute) Monthly and annual means Tidal levels/reference levels Page 7 of 7