Power Generation Division



Similar documents
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Presenter: Bruce Clay Clay Energy Fiji

Analysis One Code Desc. Transaction Amount. Fiscal Period

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Ashley Institute of Training Schedule of VET Tuition Fees 2015

Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX

Grid Operations and Planning

Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand

150 Watts. Solar Panel. one square meter. Watts

B O A R D M E E T I N G N a s h v i l l e, T e n n e s s e e November 6, 2014

Status of Renewable Energy in Liberia

BCOE Payroll Calendar. Monday Tuesday Wednesday Thursday Friday Jun Jul Full Force Calc

POLICY FEEDING RENEWABLE. How the Energy Bill might affect green electricity suppliers and also renewable generators

Jeff Haby, P.E. Director Sewer System Improvements. September 15, Agenda

CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY Small Commercial Service (SCS-1) GSR

Your guide to electricity pricing in Ontario

ADB s Rooftop Solar Project. Aiming Zhou Senior Energy Specialist June th Asia Clean Energy Forum

Sage ERP MAS 90, 200, 200 SQL, and Sage ERP MAS 500. Supported Versions

Electricity Supply. Monthly Energy Output by Fuel Type (MWh)

Solarize Frequently Asked Questions (a)

TEACHING SUSTAINABLE ENERGY SYSTEMS A CASE STUDY

Smart Metering Initiative ADWEA Program

Yield Reduction due to Shading:

THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power

Newfoundland and Labrador Hydro Electricity Rates

Computing & Telecommunications Services Monthly Report March 2015

OPERATIONS SERVICE UPDATE

Supervisor Instructions for Approving Web Time Entry

Second Place: Industrial Facilities or Processes, New

Chameliya Hydroelectric Power Project

US Army Corps of Engineers. Vision Statement. Be the premier stewards of entrusted hydropower resources

Roles: Scrum Master & Project Manager

CAFIS REPORT

Detailed guidance for employers

Hawai i s PV Challenge/Opportunity

ENERGY STAR for Data Centers

Applying ICT and IoT to Multifamily Buildings. U.S. Department of Energy Buildings Interoperability Vision Meeting March 12, 2015 Jeff Hendler, ETS

Accident & Emergency Department Clinical Quality Indicators

Overview on SEA output

P/T 2B: 2 nd Half of Term (8 weeks) Start: 25-AUG-2014 End: 19-OCT-2014 Start: 20-OCT-2014 End: 14-DEC-2014

P/T 2B: 2 nd Half of Term (8 weeks) Start: 26-AUG-2013 End: 20-OCT-2013 Start: 21-OCT-2013 End: 15-DEC-2013

3 rd Party Solar Sales April 2012

P/T 2B: 2 nd Half of Term (8 weeks) Start: 24-AUG-2015 End: 18-OCT-2015 Start: 19-OCT-2015 End: 13-DEC-2015

A Resource for Free-standing Mathematics Units. Data Sheet 1

Coffee prices fall but Brazilian production estimated lower

Sino-Italian Environment & Energy Building S I E E B

ACCESS Nursing Programs Session 1 Center Valley Campus Only 8 Weeks Academic Calendar 8 Weeks

ACCESS Nursing Programs Session 1 Center Valley Campus Only 8 Weeks Academic Calendar 8 Weeks

CSP. Feranova Reflect Technology. klimaneutral natureoffice.com DE gedruckt

Solar, storage and mining: New opportunities for solar power development. By Thomas Hillig (THEnergy) and James Watson (SolarPower Europe)

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC

EMPLOYER S LIABILITY CLAIMS

Climatography of the United States No

Presentation to the Staff Subcommittee on Gas 2010 NARUC Winter Committee Meetings Washington, D.C. February 14, 2010

Climatography of the United States No

Jon Buschke 3059 Austin Ave Simi Valley, CA (805)

You probably feel like this is all too true

Coffee prices fall to 18-month low as supply concerns fade

Elevating Data Center & Mission Critical Energy Efficiency

OMBU ENTERPRISES, LLC. Process Metrics. 3 Forest Ave. Swanzey, NH Phone: Fax: OmbuEnterprises@msn.

NYC Solar Workshop NYSERDA s Programs

Strawberry Industry Overview and Outlook. Feng Wu Research Associate Gulf Coast Research and Education Center University of Florida

Coffee year 2014/15 ends with prices at 20-month low

UNDERSTANDING YOUR UTILITY BILL A GUIDE FOR BUSINESSES IN INDIANA

Office of Electricity Delivery & Energy Reliability ANALYSIS AND REPORTING OF METRICS AND BENEFITS FOR ARRA SMART GRID PROJECTS

Architectural Services Data Summary March 2011

A reliable and experienced supplier

How Can Fleets Control Mounting Fuel Costs? Effective fuel management requires purchase controls and driver behavior modification.

Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre

oct 03 / 2013 nov 12 / oct 05 / oct 07 / oct 21 / oct 24 / nov 07 / 2013 nov 14 / 2013.

Tools for Energy Tracking and Benchmarking. ENERGY STAR Portfolio Manager for Congregations

Academic Calendar Arkansas State University - Jonesboro

Managing Staffing in High Demand Variability Environments

Sea Water Heat Pump Project

The Philippines Leyte-Bohol Interconnection Project

Employers Compliance with the Health Insurance Act Annual Report 2015

Electric Market National Overview

Consumer ID Theft Total Costs

Department of Transitional Assistance Report on Paperless Documentation

Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO

A. 5MWp SPV Plant at Khimsar, Rajasthan. B. 5MWp SPV Plant Installed Technologies. D. 5MWp SPV Plant Challenges. E. 5MWp SPV Plant - Performance

UNDERSTANDING YOUR UTILITY BILL A GUIDE FOR BUSINESSES IN OHIO

Industries Association. ERCOT Successes and Challenges

Ontario Wholesale Electricity Market Price Forecast. Ontario Energy Board

TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO

ENERGY SUPPLY ANALYSIS Pucioasa city, Dambovita County

Atlanta Public Schools. Career Academy

Maryland Board of Public Accountancy CPA Examination Application Process (August 1, 2012)

NHS BLOOD AND TRANSPLANT MARCH 2009 RESPONDING EFFECTIVELY TO BLOOD DONOR FEEDBACK

Transcription:

22 nd February 2005 Power Generation Division 1. The Commonwealth Utilities Corporation, Power Generation Division is currently burning / operating LSADO (Low Sulphur Automotive Diesel Oil), which contains less than ½ % sulphur and therefore has less impact on the environment than high sulphur fuels. CUC Power Plant I Page 1 of 6

2. Our Power Production facility consists of four (4) Power Plants that provide reliable and efficient electricity to the Island of Saipan. Power Plant No. 1 which is the biggest and supplies the majority of the electricity to the island of Saipan comprises total of eight (8) Diesel Engines. The Mitsubishi M.A.N. 18V 40/54A Engines 1 ~ 4 are from 1979-83 and each can produce 7,270 kw. (10,232 metric HP) The other four are Mitsubishi M.A.N. 18V 52/55B Engines 5 ~ 8 are from 1989-91 and each can produce 13,040 kw. (17,729 metric HP) Average specific Fuel oil consumption @ 85 % load is 15 kwh/gal, and consumes fuel about 70,000 gals per day. Power Plant 1 produces approximately 76 % of the island production or a total average of 354,576 MWh per year based on generation figures for 2003 ~2004. POWER PLANT I UNIT Design MW Available MW Remarks D/E NO. 1 7.27 6.0 D/E NO. 2 7.27 6.0 D/E NO. 3 7.27 6.0 D/E NO. 4 7.27 6.0 D/E NO. 5 13.04 10 D/E NO. 6 13.04 10 D/E NO. 7 13.04 10 D/E NO. 8 13.04 10 Total 81.2 64.0 Power Plant I units #5~8 were de-rated to 10.0 Mw due to engine cooling system problem especially during hot sunny weather. Power Plant II is mainly used as a stand-by / back-up plant for use during overhaul of the engines at Power Plant 1 or in case of unforeseen problems with any of the engines. Page 2 of 6

Power Plan II has a total of 6 units and is currently able only to produce a total of 3,200 kw due problems on the other units. Power Plant II produces approximately 1.4 % of the island production or a total average of 7,319 MWh per year based on generation figures for 2003-2004. POWER PLANT II UNIT Design MW Available MW Remarks D/E NO. 1 2.5 0.0 Down due to Defective Rectifier on 01/27/04 D/E NO. 2 2.5 0.0 Waiting for T/C ass'y & gen. bearing sleeve D/E NO. 3 2.5 0.0 Waiting for engine parts D/E NO. 4 2.5 1.5 D/E NO. 5 2.5 1.7 D/E NO. 6 2.5 0.0 Down due to crankshaft problem Total 15.0 3.2 Power Plant III was only used as stand-by / back-up plant and presently not operational. Power Plant IV is owned by CUC but operated by PMIC on a longterm contract. The plant comprises of 9 engines of different manufacturers and is presently able to produce a total of 15,400 kw. POWER PLANT IV UNIT Design MW Available MW Remarks D/E NO. 1 3.50 3.20 D/E NO. 2 2.50 2.10 D/E NO. 3 2.50 2.10 D/E NO. 4 2.50 2.10 D/E NO. 5 2.50 2.10 D/E NO. 6 1.00 0.95 D/E NO. 7 1.00 0.95 D/E NO. 8 1.00 0.95 D/E NO. 9 1.00 0.95 Total 17.5 15.40 Page 3 of 6

Power Plant IV produces approximately 23 % of the island production or a total of 98,977 MWh per year based on generation figures for 2003~2004 Others. Besides the power generated by these Power Plants, a substantial amount of power is being generated by hotels, garment industries and other business establishments not connected to the CUC power grid. All these commercial power plants are also generating their power by using diesel driven engines. Peak load graph show the increase of the load from March and significantly dropping in October as the weather cools down. ANNUAL PEAK LOAD PROFILE MWH 72 70 68 66 64 62 60 58 56 54 2000 2001 2002 2003 2004 2005 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Month 3. Drop in Generation for the month of May in 2004 as indicated is attributed to the overhaul of D/E 2, crankpin #5 repair on D/E 3, load downgrade of D/E 5 from 10 Mw to 6.5 Mw due to Turbocharger problem. Also, as shown on the graph load improved on July & August after engines were put back to service after the repair. 4. During the last few years Power Generation has been working persistently in cutting production cost and achieve the highest possible safety and efficiency. Page 4 of 6

Unmanned 13.8KV substation in Lower Base and Chalan KIYA are remotely controlled and monitored using SCADA system (Advance Control PRISM SCADA UNIX operating system based). Central control unit is at Power Plant I. Installation of SCADA System Also, Diesel Engine no. 6 (13 MW) at Power Plant I was partially equipped with SCADA system to obtain a much-improved control and monitoring of the Engine parameters and it s Auxiliary System. This SCADA system is Windows operating system based, ABB SATTGRAPH 5000. However, due to some software/programming problem, SCADA system for Engine #6 is off-line. 5. Further, the Clean Air Act requirements may require un-proportional high investments on the older and inefficient plants such as Power Plant II, III and IV. Page 5 of 6

6. The Power Production Program (PP I, & II) at this present time employs 69 personnel. These are divided in two groups, 49 local hired employees and 20 foreigners hired from private Manpower Company. Overhaul of 13 MW Engine Power Generation Division introduced the organizational changes, improvements and proper technical trainings in the overall workforce in order to achieve a more professional and suitable Maintenance and Operation program. Our Power Production Program will continue to provide a more efficient and reliable power supply to the community and the island of Saipan. If you should have any questions or topics you would like to have clarified, do feel free to contact us. Almondo C. Santos Manager, Power Generation Division Page 6 of 6

Saipan Utility: Currently Saipan have four Power Plants; Power Plant I is the Main Power Plant that produces approximately 76% of the Island Power and have available generating capacity of 65.0 MW. Power Plant I consist of existing plant, which was build in mid 1970 with four units, rated at 7.2 MW each. Phase I and Phase II, which was build adjoining to existing plant in 1988 completed in 1992 with four additional units with 13.0 MW each. Power Plant # 2 is a backup unit, which was, build in 1986 and produces 3.5 MW of backup power with less that one percent (1%) of the island power. Power Plant III is out of commission, although their generating capacity at one time was 1.8 MW. PP IV is an Independent Power Purchase (IPP), which produces approximately 23% of the island power, or 10.1 MW daily. PP IV total generating capacity is approximately 15.0 MW. Our total combine generating capacity is 79 MW. Our highest peak load for 2005 is 63 MW on February 1, 2005. Our highest peak load was noted at 72.0 MW in July 12, 2002. Our average daily load capacity ranges from 40-50 MW. Approximately 10 MW 15 MW of unconnected load, this unconnected load is from the business sector like hotels, garment factories and golf resorts. It is recommended from a consulting firm to installed additional 15 MW-30 MW generating capacity in the next three to five years and additional 15 MW if require by year 2015. We are so dependent with diesel fuel. We received our fuel delivery every 22-26 days. It has been recommended to use Heavy Fuel Oil due to the rising prize of diesel fuel, although we are required to submit air permitting to EPA for compliance due to environmental issue. Our concern is to connect with other utilities, companies to find alternative power source such as Wind, Solar and Hydropower including advantages and disadvantages especially on an island battered with typhoon and cost effective comparing with our current power. We expect to learn a lot in regards the renewable energy workshop and we are hoping that PPA would also acquire information thru Federal Grants and guide the participants to allocate funds for the alternative power. Presented By Lee Lieto & Patrick Reyes