MEI Structured Mathematics. Practice Comprehension Task - 2. Do trains run late?



Similar documents
Fixture List 2018 FIFA World Cup Preliminary Competition

Cruise Line Agencies of Alaska. Cruise Ship Calendar for 2016 FOR PORT(S) = KTN AND SHIP(S) = ALL AND VOYAGES = ALL

Cruise Line Agencies of Alaska. Cruise Ship Calendar for 2016 FOR PORT(S) = KTN AND SHIP(S) = ALL AND VOYAGES = ALL

EMPLOYMENT APPLICATION {PLEASE Print Clearly}

Beginner Health Workout

New York Marathon Train Start Date: May 6, 2013

I look forward to doing business with you and hope we get the chance to meet soon

10k. 8-week training program

Monday Tuesday Wednesday Thursday Friday Saturday Sunday. Day 4 20-Minute Aerobics Solution. Day 3 Lower Body Weight Training

English National Concessionary Travel Scheme (Free) Bus Pass General Frequently Asked Questions

Basic Components of an LP:

Cruise Line Agencies of Alaska. Cruise Ship Calendar for 2012 FOR PORT(S) = KTN AND SHIP(S) = ALL AND VOYAGES = ALL

Lesson Lesson 2.2 ~ Adding Integers

Cruise Line Agencies of Alaska. Cruise Ship Calendar for 2013 FOR PORT(S) = KTN AND SHIP(S) = ALL AND VOYAGES = ALL

Simulation of modified timetables for high speed trains Stockholm Göteborg

2017 US Masters Tour Packages. Exclusive Sports Pty Ltd ph:

Service Quality Performance Report 2013

Logistics Management Transportation Decisions. Özgür Kabak, Ph.D.

RMT strike action : FAQs Correct as at 17 June 2016

Supplemental Activity

SET GOALS. Identify jobs that interest you and write the titles on the following page.

School of Biosciences Week One Programme Returning Undergraduate Students.

Train times. northernrail.org. Manchester to Stoke-on-Trent via Macclesfield. 13 December May Manchester Piccadilly.

2015 BANK OF AMERICA CHICAGO MARATHON TRAINING PLAN JUST DO IT.

Analysis of Micromouse Maze Solving Algorithms

Available online at ScienceDirect. Procedia Computer Science 52 (2015 )

Super Simple Ironman 70.3 Triathlon Training Plan By Triathlete.com Published Sep 3, 2010 Updated Mar 25, 2014 at 3:49 PM UTC

Midlands Connect. Economic Impacts Study

Charts, Tables, and Graphs

Travel information Arlanda C Skinnskatteberg

GOODS LIFT BOOKING, LOADING DOCK PROCEDURES & MANAGEMENT SERVICES PARKING

PRACTICAL INFORMATION

London - Manchester & Liverpool via Stoke-on-Trent or Crewe Mondays to Saturdays

{insert employer} Employee Transportation Survey

TRAVELLING TO GERMANY

WORDS THEIR WAY. Thursday- FREE CHOICE: See the attached page with Free Choice options and assist your child in completing this activity.

Strategy Deployment Through Collaborative Planning. Linking the Strategy to Practical Activity

System operation. A consultation on making better use of the railway network. August 2015

Proposal for 48/72 Schedule

SuperSpeed Math. Addition, Subtraction, Multiplication, Division And the Gnarlies!

Functional Skills Mathematics Assessment Level 2

What are the specific demands of ultra running on trails and mountainous terrain?

8th Grade Personal Fitness Plan

DECEMBER 2015 PTAB Public Hearing Schedule

SHELL INDUSTRIAL APTITUDE BATTERY PREPARATION GUIDE

Train times. northernrailway.co.uk. Manchester to Stoke-on-Trent via Macclesfield. 15 May 10 December Manchester Piccadilly.

Online Course Syllabus BA435/FIN435 Fundamentals of Investments. Important Notes:

Unit 13 Handling data. Year 4. Five daily lessons. Autumn term. Unit Objectives. Link Objectives

Basic: Communities, Week 4 Bank & Library

Overtime Pay. 1. Am I entitled to overtime pay? 2. How do I calculate my overtime pay? YOUR LEGAL RIGHTS

Graphs and charts - quiz

1 ENGAGE. 2 TEACH and TALK GO. Round to the Nearest Ten or Hundred

There are four levels for you to choose from, based on your level of trading experience.

Accessibility plan. Mövenpick Hotel 's-hertogenbosch

Why build the Silvertown Tunnel?

EdExcel Decision Mathematics 1

MANAGEMENT ACCOUNTING AND CONTROL

MILL HILL. Summer School. Academic Summer Courses for ages years

FIND THE RIGHT TICKET FOR YOU!

12-week Half Marathon Training Program By Ben Wisbey

Branges - Base, travel and arrival information

TIMETABLE ROUTE. Effective 4/24/16 Broward Central Terminal to Hillsboro Blvd. via Dixie Highway

DAY 2 (EXCEPT OF DEPARTURE OF 15 Th February) 1. Saariselkä - FISHING EXPERIENCE BY SNOWMOBILE. DAY 2 and DAY 3 2. Saariselkä - REINDEER SAFARI

2016 Teen Volunteer Application Form

European Union (EU) rules on drivers hours and working time. Simplified guidance. Driving whilst tired is dangerous!

TRAVELLING TO THE UK EUROPE. via E U R O STA R WHERE TO GO AND HOW TO BOOK YOUR TICKET YOUR JOURNEY CONNECTING IN COLOGNE (KÖLN) OR FRANKFURT A.M.

2016 U.S. Open Ticket FAQs

For public transport information phone Buses 192 X92. Easy access on all buses

Superpay and Pension Automatic Enrolment v1.0

INTRODUCTION TO MATHEMATICAL MODELLING

Information and Schedules Township of Monroe 1 Municipal Plaza Monroe Township, NJ Transportation Office: (732)

Qantas International Network Changes Frequently Asked Questions Trade

MAC2233, Business Calculus Reference # , RM 2216 TR 9:50AM 11:05AM

Bridging Units: Resource Pocket 3

Transport Schemes in Poole

Lesson Share TEACHER S NOTES. Making arrangements by Claire Gibbs. Activity sheet 1. Procedure. Lead-in. Worksheet.

Some Options for Child Custody Parenting Plans (for Children of School Age)

Kaplan Aspect London, Leicester Square

OGC Technical and Planning Committee Meeting March 2010

Train times 15 May 10 December 2016

GUIDEBOOK. Version

Solving Linear Equations - Distance, Rate and Time

Network Planning and Analysis

ANGER MANAGEMENT. A Practical Guide. ADRIAN FAUPEL ELIZABETH HERRICK and PETER SHARP

Sample Schedule FOUR-TEAM LEAGUE

HENLEY ROYAL REGATTA 2016

Maths Assessment Year 4: Fractions

1 How to request a tee time

Thameslink new Class 700 trains

CONNECTING PROGRAM FOR EUROPE QUESTIONS AND ANSWERS

Structure of the Academic Year

INFORMATION FOR FAMILIES WITH Children/Young people with ADHD/ADD.

Transcription:

MEI Structured Mathematics Practice Comprehension Task - 2 Do trains run late? There is a popular myth that trains always run late. Actually this is far from the case. All train companies want their trains to be on time. A single late running train may well cause delays to other trains, for example those running just behind it. This creates customer dissatisfaction and can result in compensation having to be paid. Companies are required to submit weekly reports on the punctuality and reliability of their trains; an extract from such a report, for one particular line, is given below in Table. The numbers in the column headed run are the numbers of trains that ran each day. The figures in the six right hand columns give the numbers and percentages of trains arriving at their final destination by certain times; thus on Sunday 22/06/97, 22 trains arrived within 0 minutes of the scheduled time and this was 73.3% of the 30 trains that ran that day. 5 0 Day Date Run Early Right time 5 0 30 60 Sunday 22/06/97 30 4 3.3% 6 20.0% 7 56.7% 22 73.3% 28 93.3% 30 00% Monday 23/06/97 4 22 53.7% 24 58.5% 30 73.2% 35 85.4% 4 00% 4 00% Tuesday 24/06/97 42 2 50.0% 23 54.8% 30 7.4% 34 8.0% 40 95.2% 42 00% Wednesday 25/06/97 42 25 59.5% 27 64.3% 38 90.5% 40 95.2% 42 00% 42 00% Thursday 26/06/97 42 7 40.5% 20 47.6% 26 6.9% 37 88.% 42 00% 42 00% Friday 27/06/97 42 23 54.8% 27 64.3% 34 8.0% 38 90.5% 4 97.6% 42 00% Saturday 28/06/97 3 4 45.2% 4 45.2% 20 64.5% 23 74.2% 29 93.5% 3 00% Table. Performance Statistics for the trains on one line for the week ending 28/06/97 These reports are summarised in the performance tables published on main line stations. There are various reasons for delays to trains, many of them relating to passenger safety. Under the wrong conditions, for example wet leaves on the rails, the friction between steel wheels and steel rails may fall to a very low value, causing a train to have a much longer stopping distance than usual and so necessitating slower running speeds. There is always routine maintenance in progress and trains are usually required to slow down over the section where work is being one. 5 Clearly it would be quite unrealistic to construct a simple timetable on the basis that no delay will occur. That would ensure that all trains run late. In practice train companies work with two timetables: 20 The Working Timetable for a train assumes that it travels at the maximum permitted speed over every section of the track (subject to predicted delays like time lost by slowing down for station stops and subsequently picking up speed). The working timetable is not published. MEI 2005 Do trains run late? Page

The Passenger Timetable allows for a realistic level of delay by scheduling the train to take some minutes longer than the working timetable. If those delays do not occur the train appears to be early. Most passengers would prefer to be told that their journey will take rather longer and then to arrive on time, or even early, than to be made promises that are seldom kept. The Passenger Timetables for the trains on a route are assembled in the published timetable which you can get at any station. 25 30 The difference in times between the Passenger and Working Timetables is called the Engineering Allowance. Thus the allowed time for a journey may be modelled by the equation T = T 0 + E, 35 where T 0 is the shortest possible journey time and E is the Engineering Allowance. At first sight it would seem that all a train company needs to do is to increase the Engineering Allowance and a higher proportion of trains will be on time or early. It is not, however, quite as simple as that. Most trains stop at intermediate stations and a train cannot leave one of those early; otherwise intending passengers would complain about being left behind. Increasing the time between intermediate stations amounts to slowing the train down and thereby providing a less good service. You can get some idea of how the Engineering Allowance is applied in practice by looking inside a published timetable. The figures in Table 2 refer to two scheduled trains (at the time of writing this article), the 0935 from London Paddington to Plymouth and the 0735 going the other way, both operated by Great Western Trains. The trains stop at the same intermediate stations and both are scheduled to take 3 hours 35 minutes. However, the times allowed between any pair of stations are by no means the same. The largest differences are between the times allowed for the final stage of each journey and the corresponding first stage of the journey in the opposite direction. Thus Reading to London Paddington is scheduled to take 33 minutes compared to only 26 minutes from London Paddington to Reading. A similar difference occurs between Totnes and Plymouth. Clearly the practice is to apply much of the Engineering Allowance on the final stage of a journey. 40 45 50 55 To Plymouth To London London Paddington 0935 0* Reading 00 037 Totnes 238 0802 Plymouth 30* 0735 Table 2. Timetables for two Great Western trains between London Paddington and Plymouth. Notes: (i) Times given are departure times except those marked with *. (ii) There are intermediate stations at which both trains stop, but they are not relevant to this article. MEI 2005 Do trains run late? Page 2

Is it possible then to deduce the working timetable for the Plymouth to London Paddington line just by looking at the timetables for these two trains, one in each direction, and taking the lesser time between each pair of stations? On the basis of what we have said so far this would appear to be the case. However, when you look at the times of other trains on the route it becomes clear that there are other considerations to be taken into account. Table 3 gives the times of all Great Western trains stopping at both Newbury and Reading on one day. 60 65 Newbury - Reading 9 8 20 9 9 22 Reading - Newbury 6 5 6 5 7 6 6 7 Table 3. Train times between Reading and Newbury. Clearly it is possible for a train to run between Reading and Newbury in 5 minutes, but most of them are expected to take a few minutes more than this. Such variability is not predicted by the simple model we have developed so far. The reason for this variability is that two other allowances are also made. The Pathing Allowance, P, is time added on to allow for known movements of other trains. It may be necessary to slow a train down because of a slower moving scheduled train in front (for example a freight train); there may be a delay while joining another line or there may be a delay waiting for a platform to become available at a major junction station. The Route Allowance, R, is the extra time, usually quite small, allowed for a particular train to change track. This may, for example, be needed because a station uses only one of its platforms late at night. 70 75 Thus the model for the allowed time, T, is now refined to become T = T 0 + E + P + R. Looking at the published timetable allows you to make an estimate for T 0, the shortest possible journey time between any pair of stations. You can be certain that a train can cover the distance in the shortest journey time in the timetable. However, since you cannot be sure that, even in that case, the values of all the allowances E, P and R are zero, this may in fact not be the shortest possible time. It does, however, give you an upper bound for T 0. You can then go on to obtain an upper bound estimate for the shortest possible total journey time by adding together your upper bounds for the values of T 0 between pairs of stations on the way. 80 85 The trains used to illustrate this article stop at all the major stations on the line. Many trains have fewer stops and so take less time to reach their destination MEI 2005 Do trains run late? Page 3

Questions. This question refers to the data in Table. (i) One of the performance targets is that 90% of trains should arrive at their destination no more than 0 minutes after the scheduled time. State the days of this week on which this target was met. [] (ii) What percentage of the trains arrived early? [2] (iii) What percentage of trains which arrived late arrived more than 30 minutes late? [2] 2 (i) In line 52 it is stated that the times of the trains given in Table 2 between Reading and London are 26 minutes and 33 minutes. Justify this assertion. [] (ii) Give the times that the trains could arrive at their destinations if the Engineering Allowance between Reading and London and Totnes and Plymouth were removed. [3] (iii) The timetable below refers to two trains run over a different route by a different company. Determine whether this company also applies an Engineering Allowance on the final stage of the journey. [3] To Sheffield To London London 0925 546* Luton 0946 522 Chesterfield 25 340 Sheffield 42* 327 (Note: As before, times marked with a * are arrival times and the trains stop at other stations en route.) 3 Reading is a major junction on the line, but Newbury is not. What does Table 3 tell you about any possible Pathing Allowance added at Reading? [] 4 One Sunday recently on a journey north to Nottingham from London it was announced that the train would stand in Bedford Station for an extra 0 minutes. After the period of time the train moved on, changing tracks onto the slow line. At this particular point in the route the single slow line is separate from the fast lines. Give a possible explanation for this delay that would not have occurred had it not been for engineering works on the fast tracks. [] 5 The table below is of the route north to Nottingham. Built into the timetable is an Engineering Allowance and a Pathing Allowance. Deduce the value of T 0, the shortest possible time between Nottingham and London. [4] Nottingham 0852 London 0830 Beeston 0858 Luton 0853 Leicester 0935 Leicester 0956 Luton 036 Beeston 09 London 04 Nottingham 028 MEI 2005 Do trains run late? Page 4

Answers. (i) Wednesday and Friday (ii) Trains arriving early = 26 Number of trains run = 270 Percentage arriving early = 26/270 = 46.7% (iii) No. arriving early or right time = 4 No. arriving late = 270-4 = 29 No. arriving more than 30 minutes late = 7 Percentage of those arriving late arriving more than 30- mins late = 7/29 = 5.4% 2 (i) From London dep 0935, arrive00 giving time of 26 mins From Reading dep 037, arrive 0 giving 33 mins (ii) Dep. Reading 037 with journey time of 26 mins gives arrival time of 03 2 2 Both Times between Totnes and Plymouth are 32 and 27 mins So Dep Totnes at 238 with journey time of 27 mins gives arrival time of 305 (iii) Yes. Times for Chesterfield - Sheffield are 3 and 7 mins Times for London - Luton are 2 and 24 mins 3 Times should all be the same. If not then since Reading is the major junction you would expect times for the Newbury - Reading journey to be longer. This is shown by the data in the table. 4 Engineering works meant that the fast lines could not be used. But since there was only one slow line this was possibly used by a southbound train. So this line was not available for 0 mins. Thus a 0 mins pathing allowance was added. 5 Nottingham - Beeston 6 Beeston - Leicester 23 Leicester - Luton 6 Luton - London 23 Gives shortest time = 3 mins (i.e. Train to London dep 0852, arrive 045 Train to Nottingham dep. 0830, arrive 023) 3 3 4 MEI 2005 Do trains run late? Page 5