Should you require any further information, please contact the Route Plan 2011 mailbox at routeplans@networkrail.co.uk.



Similar documents
4. STATIONS & DEPOTS

London - Manchester & Liverpool via Stoke-on-Trent or Crewe Mondays to Saturdays

Delivering a better railway for the North West and West Midlands: our plans for

Virgin Trains Factsheet March 2009

Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited

Midlands Connect. Economic Impacts Study

Train times. northernrailway.co.uk. Manchester to Stoke-on-Trent via Macclesfield. 15 May 10 December Manchester Piccadilly.

Train times. northernrail.org. Manchester to Stoke-on-Trent via Macclesfield. 13 December May Manchester Piccadilly.

THE STRATEGIC CASE FOR HS2

Demand for Long Distance Travel

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008

Liverpool City Region Long Term Rail Strategy. Converting Strength to Lasting Long Term Economic Growth. Summer (01/08/2014 Issue)

Estimation of electrical losses in Network Rail Electrification Systems

Britain Calling - List of Participating hotels Brand Hotel Name City Mercure Aberdeen Ardoe House Hotel and Spa Aberdeen ibis Aberdeen Centre

Route Strategies. Our high-level approach to informing future investment on roads

SKY BET CHAMPSIONSHIP PLAY-OFF SATURDAY 28 TH MAY 2016

Dunstable & Leighton Buzzard Tickets & Fares Guide

TIME TABLES & DISTANCE TABLES

3. Output framework. Key messages in this chapter

A new rail route to Oxford - Chiltern Railways plans

WATLING STREET BUSINESS PARK A5, CANNOCK, STAFFORDSHIRE, WS11 9XG

IMPERIAL WEST TRANSLATION HUB

Passenger Rail Service Satisfaction Quarter 2 Statistical Release. 18 December Responsible Statistician: Dr Fazilat Dar

Scaling in transportation networks

PR13 Initial Industry Plan Supporting Document

Passenger & Freight Rail Performance: Quality and Methodology Report

Network Rail Monitor. Quarters 3-4 of Year 1 of CP5 12 October 2014 to 31 March June 2015

M-commerce and 4G mobile broadband services

Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division

H2: BIRMINGHAM INTERCHANGE STATION

TfL and Network Rail s consultation on Crossrail 2 Response from London First

Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator

Cold. Storage. facilities FOR SALE. Approx. 100,000 sq ft with mezzanines of 81,392 sq ft over three units on a 6.15 acre site.

Transport Network Inventory

Modernising the Great Western

National Passenger Survey Autumn 2012 Main Report

Wilmington to Newark Commuter Rail Improvement Project

The ScotRail Alliance a new approach to our customers and our railway. Phil Verster, Managing Director, ScotRail Alliance

At Widnes 3MG...prestige facilties at the North West s premier location

Network Rail October 2007 Strategic Business Plan. Supporting Document. Demand Forecasting in the SBP

Examples of Eligible Projects. Project Category Description Examples

ROSTHERNE TO MANCHESTER PICCADILLY

Railway Business Strategy and R&D in Europe

Strategic Business Case

Getting around London

Network Rail Sussex Rail Utilisation Study (RUS)

Major and Minor Schemes

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange

Connect Transform Locate

GETTING TO GOLDSMITHS, UNIVERSITY OF LONDON

The electric multiple unit services and the Wairarapa services are currently provided under contract to Greater Wellington Regional Council.

Your guide to fares and tickets within Zones 1-6

Spatially Enabling an Asset Management Database

National Rail Guide to Tickets

Cross. Channel Express Service. Tel /7003. Ulsterbus Express Service to Scotland & England

Season Ticket User Guide

Asset Management Policy March 2014

The Joint Venture Partnership

CROSSRAIL MOVING LONDON FORWARD. Simon Bennett

Climate Change Adaptation for London s Transport System

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

London and the West Midlands- North West and Scotland Mondays to Fridays

Cathkin Relief Road Planning Statement

Bus Timetables for Academic Year 2015/16 From Knowsley and Liverpool

Qatar Railway Company

Yell.com Rates. April Published by Yell.com Marketing Yell Limited, Queens Walk, Oxford Road Reading, Berkshire RG1 7PT

The new home for your business MAXTED ROAD I HEMEL HEMPSTEAD I HP2 7DX

RMT strike action : FAQs Correct as at 17 June 2016

Thameslink new Class 700 trains

The UK Rail Industry: A Showcase of Excellence

Project Development & Delivery Supporting Document

1. What are the major economic and social challenges facing London and its commuter hinterland over the next two to three decades?

Land disposal consultation report V 1.1 CONSULTATION REPORT. relating to

Hamworthy Heating s new Fleet range of condensing boilers, promises to change the way the industry views commercial boiler solutions.

Transcription:

Route N: West Coast Route Plans are generally published on an annual basis including the most up-to-date position at that point in time. In 2011 we will be publishing information on a route basis as part of our Initial Industry Plan in the Autumn covering CP5 and beyond. In the meantime we have retained the 2010 Route Plans, updated where appropriate with current information including our plans to the end of CP4. This document, therefore, should be read in conjunction with the equivalent 2010 Route Plan. Should you require any further information, please contact the Route Plan 2011 mailbox at routeplans@networkrail.co.uk. Summary of alterations Reference Data Location in Route Change Plan Page 3 ap Page 3 Labels updated to match Appendix B. Figure 8 Current Services Forecast end of year PPM Train Operating Companies Page 17 Arriva Trains Wales 94.1% CrossCountry 88.3% East Midlands Trains 92.0% First Scotrail 90.1% London Midland 89.8% London Overground 94.9% Northern Rail 90.7% Southern 89.6% TransPennine Express 90.9% Virgin Trains 86.1% The above is based on 2010/2011 Period 11 data. Page 7 Wrexham Shropshire and Marylebone Railway ceased trading in December 2010. Current services Freight Operating Companies Page 9 Fastline Freight has ceased trading. Appendix A: Updated ap Appendix B: Updated list of CP4 enhancements Appendix C: Constraints and issues on the route Network Rail 2010 Route Plans Update Route N

2 Appendix A: Updated ap Key to diagrams

Route N: West Coast Main Line GLASGOW CENTRAL MOTHERWELL Route Q P CARSTAIRS 06 Route P Lockerbie Route Q Longtown Mossband Jn Gretna Jn Carlisle Kingmoor Yard AB AA Q R CARLISLE O Route G Penrith Harrison's Sidings Hardendale Oxenholme Lake District 05 CARNFORTH Carnforth Jn Hest Bank Jn Morecambe South Jn LANCASTER AI AB Y P Fylde Jn Farington Curve Jn PRESTON O Preston Docks Farington Jn Euxton Jn Leyland LIVERPOOL LIME STREET AK LIVERPOOL SOUTH PARKWAY Allerton West Jn N WIGAN WALLGATE Springs Branch Jn Euxton Balshaw Lane WIGAN NORTH WESTERN Wigan Station Jn Route04H Bamfurlong Jn 07 Golborne Jn Ashton-in-Makerfield Garston Freightliner Terminal EARLESTOWN Speke Dallam Royal Mail Winwick Jn Halewood Fiddlers Ferry Power Station AG Ditton East Jn Arpley Jn AHC O'Connors Z O Runcorn Halton Jn WARRINGTON BANK QUAY CHESTER Chester East Jn L Crewe North Jn Route L 13 AJ J I 03 Route L Basford Hall Yard H Norton Bridge Jns F Poynton Adlington Prestbury Macclesfield 09 Alsager Congleton Kidsgrove Longport STOKE-ON-TRENT 08 China Clay Terminal Wedgwood Barlaston Stone Norton Bridge Bramhall Sydney Bridge Jn Crewe South Jn K CREWE T Route I Stone Jn STAFFORD G Colwich Jn Rugeley Trent Valley WOLVERHAMPTON 02 LICHFIELD TRENT VALLEY TAMWORTH Polesworth Atherstone BIRMINGHAM NEW STREET BIRMINGHAM INTERNATIONAL AF BEDFORD Route I 12 AF Waste Recycling Group Forders Sidings C Route I DAVENTRY INTERNATIONAL RAIL FREIGHT TERMINAL BEDFORD ST JOHNS Route I NUNEATON D Kempston Hardwick Stewartby COVENTRY Millbrook Trent Valley Jn Long Buckby Lidlington RUGBY NORTHAMPTON Ridgmont B Q Aspley Guise Bridge Hanslope Jn Woburn Sands Street I Wolverton Branch Bow Brickhill Wolverton Works Fenny Stratford MILTON KEYNES CENTRAL Flyover Jn E Bletchley StoneTerminal Denbigh Hall South Jn AC J L BLETCHLEY AA 01 Berkhamsted Hemel Hempstead Apsley Kings Langley Watford Jns Primary Secondary London & SE Commuter Rural Freight only The line shading indicates strategic route sections which are numbered on the map 10 ST ALBANS ABBEY B Park Street U How Wood Bricket Wood Garston Watford North WATFORD JUNCTION Leighton Buzzard Cheddington Tring S AF AA Key STOCKPORT CHEADLE HULME Hartford Winsford M MANCHESTER PICCADILLY AB AK Acton Grange Jn Weaver Jn AO V AP Arpley Yard Acton Bridge Route O AA K AF AH AS Watford StoneTerminal Bushey Watford High Street Carpenders Park Harrow & Wealdstone A Hatch End Headstone Lane 11 Kenton South Kenton Stonebridge Park North Wembley Harlesden AQ Wembley Central Wembley Yard Willesden Euroterminal Route E Route B Route E WILLESDEN JUNCTION Route E Kensal Green Queens Park (London) Kilburn High Road South Hampstead A Route E Camden Jn M LONDON EUSTON

Appendix B: Infrastructure investment in CP4 Figure 19 Infrastructure Investment in CP4 Carlisle station Complete Complete 2011/13 B Northampton Station Redevelopment Redevelopment of the station area including extending the car park. Feasibility study to assess options to develop and enhance the station area. Increase the car parking facilities. Third party 3 2011 Edge Hill Depot : Independent Power Supply Complete Complete 2011/ 12 D E&P Renewal Transformer/Rectifier set renewal Points heating OLE structure remedial works Auxiliary catenary renewal OLE contact wire renewal E&P Renewal Network Rail Various 2011/12 E West Coast car park expansion Programme Project nearing completion. 13 sites completed 2 nearing completion. Increased car park capacity Third party /Network Rail 5-8 2011/12 Telecoms Renewal : CIS Project Complete Complete 2011/12 G Telecoms Renewal : PA/VA Renewal of various public address systems. Telecoms Renewal Network Rail Various 2011/13 H Telecoms Renewal : SISS Renewal of various Station Information and Surveillance Systems (SISS). Telecoms Renewal Third Party Various 2011/12 I Wolverton station New station building Provision of a new ticket office and waiting area 2011/13 J Buildings Renewal : Bletchley Depot Renewal of carriage siding walkways and water services at Bletchley TMD Third party 4 Depot Renewal Network Rail 4 2011/12 K Watford Interchange Project on hold Increased passenger access Third party 3 2011/12 L Bletchley station Station enhancement scheme Improved station environment Third party 3 3

4 Figure 19 Infrastructure Investment in CP4 2011/12 M Camden Carriage Sidings - Euston Project closed 2011/12 N Structures Renewal : embankment works 2011/12 O Structures Renewal : Major bridgeworks P Telecoms Retail Renewal : Various locations 2011/12 Q Signalling Re-control : Northampton Various earthwork, drainage and rock cutting examinations and works. 2011/12 R S&C Track Renewal programme Switches and Crossings works planned at: numerous junctions on the route Earthworks Network Rail Various Various bridgeworks Structures Renewal Network Rail Various Project complete complete Signalling re-control in the Northampton area Signalling Re-control Network Rail 5-8 Track Renewal Network Rail 5-8 2011/12 S Tring Gateway Improvements to Tring station facilities and environment Improved station facilities Third party 3 2011/13 T Stoke-On-Trent station area Re-generation of the area (Stoke Links) Re-generation Third party 1 2012/13 U St Albans Abbey Line Introduction of a tram service to increase capacity on the line Increased capacity DfT 2 2011/12 V Longsight Depot Project closed Project closed 2011/12 W S&C Track Renewal programme Project closed closed 2010/12 X E&P Renewal Overhead line renewal to auxiliary catenary and existing contact wires E&P Renewal Network Rail Various 2012/13 Y Preston station De-cluttering of platforms 1 and 2 Improved appearance of station Network Rail Discretionary Fund 3

Figure 19 Infrastructure Investment in CP4 2012/13 Z Runcorn Construction of a new rail waste container handling facility at Western Point Freight opportunity Third Party 5-8 2012/13 AA Access For All programme Various station improvements Improved station facilities Access For All Various 2012/13 AB Signalling Renewal : Warrington, Preston, Carlisle Life extension signalling works at Warrington, Preston and Carlisle Signalling Renewal Network Rail 6 2011/13 AC Bletchley remodelling Re-signalling and remodelling of the Bletchley area Increased capacity and capability enhancements in the station area Network Rail 5-8 2011/12 Car park expansion scheme at various London Midland stations along the route Complete Complete 2011/13 Telecoms Transmissions Renewal : Various locations Closed Closed 2011/13 AF National Stations Improvement Programme (NSIP) NSIP works planned at various stations along the route. Improved station facilities and environment Network Rail Various 2013/14 AG Ditton Freight Terminal Expansion of existing intermodal freight terminal at Ditton Three new 775m long sidings 2013/15 AH Signalling Renewal : Watford Resignalling and improvements to the Watford area Increased capacity Third party 4 Signalling Renewal Network Rail 2 2013/14 AI 2013/14 AJ Better Rail Stations Review New interchange footbridge between all platforms at Preston. Better Rail Stations Aspirational Better Rail Stations Review Major upgrade at Crewe. Better Rail Stations Aspirational 5

6 Figure 19 Infrastructure Investment in CP4 2013/14 AK Better Rail Stations Review Extend ticket hall & general upgrade throughout station at: Warrington Bank Quay, Wigan North Western. 2012/13 AL S&C Track Renewal programme Switches and Crossings works planned at: numerous key junctions on the route. 2010/14 AM Plain Line Track Renewal Campaign Renewals including: Watford Junction to Euston DC lines 2011/12 Bedford to Bletchley 2012/13 High Output Track Renewals on the Euston to Birmingham route 2010/14 AN Telecoms Concentrator Renewal : Various locations Better Rail Stations Aspirational Track Renewal Network Rail Various Track Renewals Network Rail Various Renewal of various telephone concentrators. Telecoms Renewal Network Rail Various On-going AO Chester Gateway scheme General station improvements Buildings Third Party 1 2014/CP5 AP New rail chord at Warrington Arpley Provision of a new rail chord to connect the Arpley branch lines to the Ditton Goods lines in Warrington Provision of a new by-pass road scheme Third Party 2 Dec 2011 AQ Wembley Central platform Extensions Slow line platform extensions to allow 8-car services to call at Wembley during special events at the stadium. Increased capacity Network Rail Discretionary Fund 5-8 2011/12 Peterborough to Nuneaton Complete Complete 2011/14 Stafford area improvements works Development work to allow the scheme to be implemented during CP5 Improvements to the Stafford station and Norton Bridge areas of the West Coast. Increased line speeds to provide greater capacity in the Stafford area. Network Rail 3 2011/12 Wembley Depot New wheel lathe Installation of a new wheel lathe Third party 1 2012/13 Willesden Carriage sidings Re-signalling of the Willesden Carriage sidings area Improvements to the Willesden area Network Rail 2 2011/14 West Coast Main Line Power Supply Upgrade New auto-transformer system installed on the busier parts of the route between Wembley and Carstairs Renewals and improvements to the power supply to strengthen the system so as to allow for future increases in passenger and freight services Network Rail 5-8

Candidate NRDF schemes in CP4 Figure 20 Candidate NRDF schemes in CP4 2013/15 AS Watford Area Re-signalling Enhancements to the Watford Junction station area Increased Functionality Network Rail Discretionary Fund 3 2013/15 Q Signalling Re-control : Northampton Enhancements in the Northampton Riverside Sidings area Increased Functionality Network Rail Discretionary Fund 5-8 GRIP stages: 1 Output definition, 2 Pre-feasibility, 3 Option selection, 4 Single option selection, 5 Detailed design, 6 Construction, test and commission, 7 Scheme hand back, 8 Project close out 7

8 Appendix C Constraints and issues on the route Capacity and operational constraints A Harrow and Wealdstone Queens Park: Volume of traffic on DC lines with London Underground and London Overground shared working together with traction power supply limitations. B St Albans Abbey branch: single line with no signalling only allows one train at a time on the section, limiting service frequency to 45 minutes C Bletchley Bedford: short single line sections at each end of the route D Nuneaton freight trains (coming from Leicester) crossing at Nuneaton going towards the north or going on to the Coventry branch E Trent Valley line Seven mile section of three track railway between Brinklow and Attleborough F Shugborough Tunnel Two track section through the 710 metre tunnel G Stafford station area North and South junctions at capacity H Norton Bridge flat crossings & fixed diamond limit capacity and performance I Alsager to Crewe short single line section restricts arrangements for train diversions for effective contingency arrangements during engineering works and periods of disruption. J Crewe station: large number of crossing moves north and south of Crewe station and existing signalling infrastructure limits both passenger and freight capacity. K Crewe independent lines: constraints on freight growth. L Crewe Chester lack of regulating points between Crewe and Chester for services onwards towards Holyhead. M Winsford to Hartford 5 miles of two track railway N Wigan Euxton: a mix of speed and crossing movements in this section severely limits capacity through Wigan and Euxton Junction O Preston Carlisle: limited passing loops which are also restrictive in length limited freight capacity P Preston Carstairs: mixed high speed & freight traffic on two-track lines and low performance trains over steep gradients such as Shap and Beattock summits severely limits capacity. Use of diesel traction instead of electric traction restricts speed. Q Carlisle station: area capacity limited by restrictive layout R Carlisle Gretna Junction high usage of available capacity by coal traffic S General line of route Restrictive overhead line sectioning and auto switching and critical sections of line where off route issues can affect the power supply to electric trains. Key locations are (i) North London line and WCML power supplies (ii) Manchester Longsight area (iii) Birmingham Proof House Junction area.