VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s.



Similar documents
HS line TSI Conformity Certification and Safety Assessment

CTCS Chinese Train Control System

Railway Institute research and implementation

Applicable standards in CR Rolling stock - Freight wagons TSI (2006/861/EC)

Choose certainty. Add value.

Train Homologation Process

Rail research Successes and challenges

Investment projects on PKP Polish Railway Lines network

3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

The Ministry of Transport, Public Works and Water Management of the Netherlands

High speed train vehicle dynamics. challenges and opportunities

SBB Infrastructure, Measurement and Diagnostic Technology.

Appendix A. About RailSys 3.0. A.1 Introduction

ERTMS for a competitive railway

Guide for the application of the CR LOC&PAS TSI

High Speed Rail in Poland plans & activities

HSR THE TRAIN OF THE FUTURE New technologies and research trends

ZKL Bearings for Railway Rolling Stock

Railway Systems Covering the Life Cycle of any Type of Railway Project

AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.

Fit for the European Rail Market Training Competence - Certification

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

ACTION PLAN

Opening of Tohoku Shinkansen Extension to Shin Aomori and Development of New Faster Carriages Overview of Series E5/E6 Shinichiro Tajima

White Paper European Railway Traffic Management System - ERTMS

Rail Expertise & Testing. Your 2014 Reference Guide IS O 9 1: 2 8

How to Overcome Challenges in Placing in Services of Rolling Stock Vehicles in Europe

Railway Research and Technology in China Today

Maintenance of EMU - a new approach for management and technology

NY State Rail Summit Alstom Transportation Inc.

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Czech Republic

PRICES AND COSTS IN THE RAILWAY SECTOR

TÜV SÜD Rail. New Challenges in Railway Operations

European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R

Guideline. Date:

The Value Proposition for GS1 ID Keys and RFID in Rail

Assessment of freight train derailment risk reduction measures: A1 Existing measures

ERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges

C a b l i n g s o l u t i o n s a t t h e c o r e o f R a i l w a y N e t w o r k s

Bearing designs. Bearing testing. Extract from the Railway technical handbook, volume 1, chapter 4, page 99 to 105

VBB Cross-border railcars Core Output INTER-Regio-Rail Removing barriers to regional rail transport

The application of GSM-R of Chinese railway. Ministry of Railway of the People s Republic of China

Energy efficiency and fuel consumption of fuel cells powered test railway vehicle

Dominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail

INDIA S FIRST TETRA NETWORK by Delhi Metro Railway Corporation(DMRC)

Energy efficiency in drivers training

Intelligent Rolling Stock Monitoring

Bearing calculation. Extract from the Railway technical handbook, volume 1, chapter 5, page 106 to 121

Crosswind Behavior of Rail Vehicles: A Systematic Investigation of the Sensitivity to Vehicle Parameters

ERTMS/ETCS. Functional Requirements Specification FRS

Single Axle Running Gears FEBA - a New Concept of Radial Steering

The risk of derailment and collision, and safety systems to prevent the risk

Signaling Programme. Signaling Programme - Laboratory Test Gitte Oberbossel

Newag s Dragon Locomotives Powered By ABB

Presentation of the Shift2Rail Multi-Annual Action Plan

ATLAS. Proven Technology & Partnership For interoperability

Condition monitoring and condition-based railway Asset Management for High Speed lines

Put safety at the heart of your rail operations

BOMBARDIER INTERFLO*550 for ERTMS Regional

Ordinance on Railway Infrastructure. General provisions. Article 1

Railway Simulation & Timetable Planning

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015

AGV Full speed ahead into the 21st century

Wojciech Rybak Dyrektor Biura Realizacji Inwestycji. INVESTMENT PLANS CONCERNING MODERNISATION OF THE PAN-EUROPEAN TRANSPORT CORRIDOR no VI

Siemens AG Mobility Division Nonnendammallee Berlin Germany

AUTOMATIC TRAIN OPERATION: THE MANDATORY IMPROVEMENT FOR ETCS APPLICATIONS

Coexistence between GSM-R and 3G / 4G-Systems in the 900 MHz Frequency Band - Swedish View.

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013

Virtual sales. assistant. Navigating within ABB to find complete Industrial IT solutions

Power Electronics Technologies for Railway Traction Systems

The future is already here

Rail Line Radio Systems

Application of Systems Engineering to Enhance Safety and Risk Management in Railway Projects. R N Dumolo Mott MacDonald Limited

How a German Technical University interacts with the (Railway) Industry

Research for High Speed. Pierre-Etienne Gautier INEXIA, Scientific Director St Denis la Plaine, France

Accident / Incident Reporting Guidelines for Provincial Railways

Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division

FINAL PRODUCT TO BE DELIVERED TO ISR RAILWAY LINES AKKO CARMIEL, HAIFA BET SHEAN AND HERZELYA KEFAR SABE LINES

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008

siemens.com/mobility/vectron How to transform borders into connections? Vectron. The locomotive that s forging new paths. Creating Corridors

Relevant parameters for a reference test track Deliverable D1.7

PRIMA EFFICIENCY ACROSS BOUNDARIES

Passenger transport. Traction service. Vehicle maintenance

Class 92 Electric Locomotive

Documentation on Noise-Differentiated Track Access Charges Information on Status, Background and implementation

Railway Crossing Information System

Transcription:

VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s. Railway Research Institute, j.s.c. www.cdvuz.cz Test Centre VUZ Velim

Who we are A joint stock profit making company The shares are owned by Czech Railways, j.s.c. VUZ is a company with more than fifty years tradition

VUZ deals with a large scope of activities. It comprises: Authorized activities: - Conformity assessments Accredited activities: - Testing - Certification for products Services provided on Test Centre VUZ Velim Training activities Expert activities

VUZ Authorizations Authorized Body No. AO 258 / Notified Body No. 1714 Authorized Body - issued by Ministry of Transport of the Czech Republic Accredited Testing Laboratory No. 1462 Certification Body for product certification No. 3149 Acknowledgement for rolling stock testing issued by EBA - German Railway National Safety Authority Acknowledgement for rolling stock testing issued by CESIFER Italian railway National Safety Authority

ISO 9001:2008 VUZ is holder of ISO certificate The certificate covers these business fields: Conformity assessment of products with technical requirements of European railway system Testing and certification of parts of railway, rail vehicles, its equipment and materials

Accredited Testing Laboratory VUZ Testing Laboratory performs tests of railway vehicles, their components and railway facilities. Accredited Testing Laboratory offers: tests of running safety and running behaviors, brake tests, traction tests noise tests according to the TSI requirements tests of electrical and power supply systems, pantograph tests electric tests and environment impact tests on communication and signalling facilities and tests of EMC

Test Centre VUZ Velim Test Centre VUZ Velim is located 50 km east of Prague. Accredited Testing Laboratory VUZ performs tests at its own Test Centre VUZ Velim and VUZ also offers to companies possibility to perform tests themselves. Test Centre VUZ Velim includes and offers: Railway test circuits (large and small) Dynamic Testing Laboratory Halls for Test preparation Training Centre Power station supplying all main European tractive power systems

Small and Large Test Circuits Large Railway Test Circuit total length of track 13.276 km admissible weight per axle 25 t admissible top speed 210/230 km/h Small Railway Test Circuit total length of track 3.951 km admissible weight per axle 25 t admissible top speed 90 km/h

The circuits rings also offer possibility to perform special tests noise tests in the special sections of large test circuit, parameters of which meet the requirements of technical specification for interoperability of the Rolling stock subsystem - noise tests of the European signalling and communication equipment ERTMS (ETCS, GSM-R) test centre is covered by GSM-R signal and the section of large test circuit is equipped by ETCS system Level 1 possibility of simulation of supply changes and power supply disturbances EMC measuring in the special section of large test ring

Dynamic Test Laboratory Dynamic Testing Laboratory is focused on realization of: static and quasistatic tests and measurements dynamic fatigue and strength tests of vehicles and their components bearings test bench

Training Centre for Interoperability Training Centre for Interoperability is located in the building of Dynamic test Bench and offers: TSI assessment training courses Railway sector testing activities training courses Training courses according to requirements of customers Renting of TC offices according to customers needs

Test Preparation Halls Basic parameters of the Test preparation halls: HPZ I two tracks with length 57,5 m each for axle load of 25 t service pit 35 m long, pressure air, power supply and offices HPZ II two tracks with length 144 m each for axle load of 25 t service pit 138 m long, crane, pressure air, power supply and offices

ETCS and GSM-R at Test Centre VUZ Velim Large Test Circuit is equipped with ETCS Level 1 Control panel is located in dispatcher's room Pilot Project ETCS Level 2 will cover also Large Test Circuit Large Test Circuit is covered by GSM-R signal Radioblock centre RBC

VUZ - part of development and production process Testing of new and modernized railway vehicles including high speed vehicles Design and homologation tests according to customer needs and railway authorities requirements Testing of rail vehicle components (bogie frames, wheels, axles, buffers ) Testing of railway infrastructure including its parts (sleepers, parts of points, fastening ) Assessment process of all railway subsystems and components including interoperability

Investment activities in Test centre Velim All investment activities were performed or are planned with support of Czech state or European Union. already done Reconstruction of large test circuit infrastructure - track Reconstruction of power supply station, new catenary on large circuit New and reconstructed test preparation halls Establishment of Training centre for Interoperability

Investment activities in Test centre Velim in building or preparation phase New signaling and telecommunication system in Test Centre including preparation of large test circuit as ERTMS/ETCS test track New service equipment for customers in Test Centre Velim (halls extension and set up of other test facilities)

VUZ participation on railway research projects European projects: WIDEM EUROPAC RAILENERGY RAILCOM D-RAIL EUREMCO

Examples of vehicles tested in Test Centre VUZ Velim

Contact Headquarter: Novodvorská 1698 CZ-142 01 Prague 4 - Braník Czech Republic VUZ Test Centre Velim CZ-281 02 Cerhenice Czech Republic

Thank you for your attention www.cdvuz.cz